Loading...
HomeMy WebLinkAboutPower Point of Pond Row Road and Infrastructure Improvements CC Presentation June 8 2015Pond Row and Fowler Street and Infrastructure Improvements Pond Row and Fowler Street and Infrastructure Improvements W. Babcock St. Fowler Avenue To Huffine Pond Row Pond Row extension HAVEN site Park Property Fowler Avenue Intersection at Huffine 100-ft ROW Fowler Avenue Minor Arterial Cross-section Fowler Avenue expansion park frontage - Total $1,455,994.67 Pond Row Intersection at Ravalli Street 60-ft ROW 100-ft ROW Pond Row Local Street Cross-section Pond Row Road and Infrastructure Cost Estimate 1.Mobilization and permitting……………………………..$47,000 2.Paving and infrastructure improvements….……..$398,953 3.Engineering and project management ..…………...$89,191 4.Contingency (10%)…………………………………………...$44,595 Total…..……………………………………..……..……$579,739 Cost influences: •Two stream crossings (large culverts & permitting) •Utilities (water main, storm sewer, street lights) •Higher construction costs in general Pond Row Road and Infrastructure Costs Possible Funding Sources Pond Row Road and Infrastructure 1.TOP Bond premium revenues……………………….$428,000 2.TOP Bond principal unallocated balance……….$915,000 3.Cash-in-lieu of dedicated parkland balance…..$290,000 4.General Fund 5.Other source TBD Note: The anticipated contribution for development of the parcel to the east (HAVEN site) would be roughly 20% of the total cost of Pond Row improvements (approx. $116,000) Recommendation for Funding Pond Row Road and Infrastructure 1.TOP Bond premium revenues…………………….$428,000 2.TOP Bond principal unallocated balance…….$151,739 (TOP fund reimbursed if costs lower than estimated) TOTAL………………………………………………………..$579,739 Possible Next Steps 1.Approve funding for Pond Row via resolution (on next agenda) 2.Complete design of Pond Row 3.Secure payback agreement with HAVEN 4.Obtain timing variance for Fowler 5.Other action as directed by Commission