HomeMy WebLinkAboutC5. Res 4606, CO 10 WTP Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 10. MEETING DATE: June 15, 2015 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager’s signature on the Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 10. BACKGROUND: Attached is a copy of change order number 10 for the above referenced project. This change order includes three items. One is a credit and two are additions. Page two of the change order entitled “Change Order No. 10 Summary” provides a short description of each of the items involved with this change. The remainder of the document contains the detailed backup cost information for each item. Overall this change will decrease the contract price by $98,294.00 and increase the final completion contract time by 330 days. The credit is because there was an item for force account work that was included in the bid award. It was not used and will therefore be deducted from the final contract amount. The time issue is due to some repairs that could not be completed over the winter due to weather. They were also dependent on the City having some other work completed which is still outstanding. The time that is being granted will take the completion out until the end of July to make sure everything is completed. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order decreases the contract amount by $98,294.00 from $27,270,364.00 to $27,172,070.00. Attachments: Change Order No 10, Resolution No 4606 Report compiled on: 6/2/15 74 1 of 2 COMMISSION RESOLUTION NO. 4606 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH APOLLO, INC., KENNEWICK, WASHINGTON. WHEREAS, the City Commission did, on the 25th day of May 2011, authorize award of the bid for the City of Bozeman Hyalite/Sourdough Water Treatment Plant Replacement project, to Apollo, Inc., Kennewick, Washington; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Apollo, Inc., as contained in Change Order No. 10, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 75 Resolution No. 4606, Change Order 10 for WTP Replacement 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 15th day of June, 2015. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 76 77 78 79 80 81 82 83 84