Loading...
HomeMy WebLinkAbout15- Task Order Tetra Tech for 2015 Mitigation System ModificationsTASK ORDER 2015 MITIGATION SYSTEM MODIFICATIONS BOZEMAN LANDFILL March 16, 2015 CLIENT: CONSULTANT: The City of Bozeman Tetra Tech, Inc. P.O. Box 1230 851 Bridger Drive, Ste 6 Bozeman, Montana 59711-1230 Helena MT 59715 Attention: Mr. Rick Hixson Attention: Mr. Kirk A Miller INTRODUCTION Sub -slab depressurization systems (aka mitigation systems) were installed in 28 homes in the Bridger Creek Phase III subdivision during 2013 and 2014. These systems continued to operate and Tetra Tech periodically conducts inspections of the systems to confirm the fans are functioning, vacuum measurements meet objectives and the systems are in good working order. Tetra Tech periodically receives calls from homeowner concerned about noise, the appearance of the discharge piping on the exterior of the house, how their system is functioning and other matters. These homeowner contacts have identified several modifications to existing systems that warrant implementation. In three cases, it is primarily a change to the discharge piping location. For several homes, we have recently observed a decrease in vacuum levels beneath the slab of their home, indicating that depressurization may not be occurring to the desired level across the entire basement during the winter months. Hence, further investigation (i.e., additional vacuum monitoring points) or an expansion of the mitigation system in these homes is proposed. SCOPE OF SERVICES This task order includes the following work activities; • Addition of two new vapor extraction points and three new vapor monitoring points (VMP) in SAI -18. • Modification of both discharge pipes for the two existing mitigation systems in SAI -1 to carry discharge points above highest roof line. This may also require framing and siding to enclose the two new pipes. • Modification of discharge piping for existing mitigation system in SAI -17 to carry discharge point above highest roof line and add framing and siding to enclose the new pipe. • Modification of discharge piping for existing mitigation system in TI -5 to carry discharge point above highest roof line and add framing and siding to enclose new pipe. A larger fan may also be installed. • Check taping connections between plastic sheeting and foundation walls on homes with crawl space mitigation systems. Add new tape as needed to maintain good seal. • Respond to City requests for data, information or to attend meetings related to the project. Task Order For Mitigation System Modifications Bozeman Landfill, Bozeman, Montana March 16, 2015 Page 3 of 3 Response to Requests for information from Homeowners and City We periodically are contacted by homeowners to provide information, answer questions, inspect existing mitigation systems and conduct other tasks related to conditions in their home. In addition, we are also periodically requested to provide City staff with information, data or analysis related to the project. This task covers the anticipated level of response to these requests through August. It is based upon the level of effort we have experienced over the last six months. PERIOD OF PERFORMANCE Tetra Tech's anticipated schedule to complete the mitigation system modifications is January through April 2015, depending upon homeowner access. The vacuum and indoor air sampling activities, including reporting will occur between February and May 2015. The responses to homeowner requests are likely to be ongoing, so a specific timeline cannot be projected. COSTS Estimated costs to complete the foregoing scope of services are $72, 419, as detailed in Table 1. The services will be conducted on a time and materials basis. Please note that our cost estimate uses new billing rates for work conducted after January 2015. SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated January 3, 1994 and Amendment Nos. 1, 2, 3, and 4 of the Professional Services Agreement dated July 31, 1995; January 1, 1996; March 17, 1997; and December 10, 2001, respectively. CLIENT: City of Bozeman By: , Its: CONSULTANT: Tetra Tech By: Its: Senior Project Manager Date: _ 16-15 Date: March 16, 2015 NOTICE OF CONFIDENTIALITY This Task Order (including attachments) contains information confidential to Tetra Tech, Inc., its subsidiaries, and subcontractors. It is intended only for City of Bozeman to consider Tetra Tech providing professional services at the Bozeman Landfill. Any other use is prohibited, without the prior written consent of Tetra Tech, Page 3of3 TABLE 1 - ESTIMATED BUDGET 2015 MITIGATION SYSTEM MODIFICATIONS BOZEMAN LANDFILL BOZEMAN,MONTANA Date Submitted: 3/16/2015 Task 200 Mitigation System Modifications Field Work Units Rate Cost Project Manager/Senior Hydrogeologist, per hour 24 $180.00 $4,320.00 Assistant Project Manager/Hydrogeologist, per hour 8 $100.00 $800.00 Environmental Scientist, per hour 120 $100.00 $12,000.00 Field Technician, per hour 32 $75.00 $2,400.00 Administrative Personnel, per hour 8 $70.00 $560.00 Labor Subtotal $20,080.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile 2,000 $0.56 $1,120.00 Per Diem and Lodging, per person per day 22 $140.00 $3,080.00 Subcontractors Triple R Mitigation 1 $24,000.00 $24,000.00 Vacuum meter, per day 20 $25.00 $500.00 TetraTech Subcontractor Markup (10%) $2,450.00 Direct Costs Subtotal $26,950.00 Task 200 Mitigation System Modifications Total $47,030.00 Task 300 Response to Reguests from Homeowners Project Manager/Senior Hydrogeologist, per hour 32 $180.00 $5,760.00 Assistant Project Manager/Hydrogeologist, per hour 20 $100.00 $2,000.00 Principal Engineer, per hour 16 $275.00 $4,400.00 Environmental Scientist, per hour 8 $100.00 $800.00 Administrative Personnel, per hour 8 $70.00 $560.00 Labor Subtotal $13,520.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile 400.00 $0.56 $224.00 Photocopies, estimate 50 $0.10 $5.00 Direct Costs Subtotal $229.00 Task 300 Response to Requests from Homeowners Total $13,749.00 Task 600 Project Management and Response to City Requests For Information Project Manager/Senior Hydrogeologist, per hour 36 $180.00 $6,480.00 Assistant Project Manager/Hydrogeologist, per hour 20 $100.00 $2,000.00 Environmental Scientist, per hour 8 $100.00 $800.00 Administrative Personnel, per hour 30 $70.00 $2,100.00 Labor Subtotal $11,380.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile Photocopies, estimate 400.00 200 Direct Costs Subtotal Task 600 Project Management and Response to City Requests Total TOTAL OFALL TASKS Tetra Tech $0.60 $240.00 $0.10 $20.00 $260.00 $11,640.00 $72,419.00