Loading...
HomeMy WebLinkAboutTOP Revised Budget - Front St • P. O. Box 7021 • Bozeman, MT 59771 • • 406-587-8404 • Fax 406-582-1136 • www.gvlt.org • info@gvlt.org • TOP Board c/o Carolyn Poissant PO Box 1230 Bozeman, MT 59771 May 7, 2015 Dear Chairman Hawks and TOP Board members: As requested by Ms. Poissant at the April TOP meeting, the City of Bozeman’s Public Works Department reviewed our proposed budget for the Front Street connector pathway. Their estimator added additional costs to the proposed project due to the increasing costs of construction, the standard City design/build costs, and issues that GVLT did not anticipate. However, GVLT has also secured a commitment of funding from the Northeast Urban Renewal Board (NURB) to support this project, which will help reduce the additional amount needed from TOP. This brings GVLT’s total contribution to $33,600 - an increase from 12% of the total project cost to 16%. Thus, the total budget for the project and our request to TOP is modified as follows (see also detailed budget, attached): Total Project Cost TOP Request GVLT contribution Original Budget $156,300 $137,700 (88%) $18,600 (12%) Revised Budget $211,706 $178,106 (84%) $33,600 (16%) Difference +$55,406 +$33,600 +$15,000 I will be in attendance at this week’s TOP meeting and look forward to discussing this project at that time. Yours sincerely, Kelly A. Pohl Associate Director Front Street Pathway Proposed Budget Revised with COB estimate 5/11/2015 Cells in blue show changes Expenses Funding Project Component Item Detail Estimate Source TOP Proposal GVLT** Engineering and Design Engineering and design Design and construction specs*Sanderson Stewart $15,000 $15,000 Survey COB $3,000 $3,000 COB will require survey Bicycle/Pedestrian Bridge Bridge structure 60' x 10' clear-span, prefab from Contech Contech $52,200 $52,200 Crane Service crane to set bridge COB $5,000 $5,000 COB crane estimate much higher than GVLT's Bridge abutments poured concrete $7,500 $7,500 Stream improvements excavation pulling back banks, removing debris M. Johnson, RESPEC $3,000 $3,000 Building permit City of Bozeman Table D, Fee Schedule $600 $600 Stream permits including floodplain, 310, 318, 404 Kingfisher $10,000 $10,000 Paved path Path excavation and paving Asphalt and excavation for 1250 ft x 10 ft at $4/sq. ft for 4" thick; adjusted down for 2.5" thick COB $41,406 $16,406 $25,000 COB recommended increasing cost because asphalt cost increases. Site Finishes Fencing 6 ft. tall chain link, 780 ft. x 14 ft Bridger Fence $11,000 $11,000 Landscaping/ site reclamation planting, reseeding, site finishes M. Johnson, RESPEC $3,000 $3,000 Signage Kiosk Standard kiosk and maps GVLT $2,000 $2,000 Totem structure Standard totems and signage GVLT $600 $600 Management Project management 100 hrs @$60/hr GVLT $6,000 $6,000 taxes/bonds/insurance 2%COB $3,300 $3,300 Costs not expected by GVLT Contingency at 30%COB $48,100 $48,100 COB requests a 30% contingency; GVLT budgeted 15% originally. Total $211,706 $178,106 $33,600 Project Proportion 84%16% *Pre-design work may come from existing contract with Public Works, paid for with Impact Fees. Additional construction design will be necessary. **GVLT sources include in-kind, Recreational Trails Program Grant, Collin's Coalition, NURD, and sponsorships. Notes on Budget Adjustments requested by City of Bozeman (COB)