Loading...
HomeMy WebLinkAboutRFQ Bozeman Engineering.CTA Architects EngineersCity of Bozeman Street, Intersection, Transportation, Lighting, Telecommunications and Stormwater Engineering Services Bozeman, Montana May 15, 2015 PART I SECTIONS A, B, C, AND D ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Request for Qualifications, Street, Intersection, Transportation, Lighting, Telecommunications and Stormwater Engineering Services; Bozeman, Montana 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER April 26, 2015 N/A B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Erik Garberg, PE 5. NAME OF FIRM CTA Architects Engineers 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS 406.556-7100 406.585.3031 erikgarberg@ctagroup.com C. PROPOSED TEAM (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME -V PARTNER SUBCON-TRACTOR a. X CTA Architects Engineers 411 East Main Street Suite 101 Bozeman, MT 59715 Project Management, Quality Control, Quality Assurance, Transportation and Stormwater Engineering, Civil Engineering, Civil Design Engineering, Landscape Architecture, Planning CHECK IF BRANCH OFFICE b. X CTA Architects Engineers 121 South Main Street PO Box 1153 Livingston, MT 59047 Civil Engineering, Flood Plain/Stream Permitting, Surveying/ROW, Public Outreach Planning CHECK IF BRANCH OFFICE c. X CTA Architects Engineers 13 North 23rd Street PO Box 1439 (59103) Billings, MT 59101 Utility Extension Engineering, Environmental Engineering, Telecon/Fiber Engineering CHECK IF BRANCH OFFICE d. X CTA Architects Engineers PO Box 32024 Langley, BC, Canada V1M 2M3 Urban Development, Market Analysis CHECK IF BRANCH OFFICE e. X CTA Architects Engineers 306 W. Railroad Ave. Suite 104 Missoula, MT 59802 Electrical Engineering, Lighting Design CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE g. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) Civil Engineering Pat White, PE Kris Desper, PE Caleb Minnick, PE Ron Isackson, PE Organizational Chart Erik Garberg, PE Project Manager / Transportation & Stormwater Engineer Surveying George Bornemann, PLS CTA Support Services Web Design Graphic Design Fundraising/Grant Writing Marketing Environmental Engineering Tim Mullholland, PE Structural Engineering Mechanical Engineering Architecture Bond Issue Experience Public/Private Ventures Planning Doug Riley Public Outreach Stephanie Ray Urban Development / Market Analysis Kieron Hunt Electrical Engineering / Lighting Alan Bronec, PE, LEED AP Telecon / Fiber Engineering Kris Good, RCDD Northeast Urban Renewal Board Landscape Architecture Deb Rosa, RLA SECTION E RESUMES E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Erik Garberg, PE Project Manager a. TOTAL b. WITH CURRENT FIRM 16 1 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Bozeman, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S. Bachelor of Science / Civil Engineering / 1999 Montana State University Civil Engineer: MT, TX, IA 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) City of Bozeman Planning and Zoning Chairman, Whitefish City Councilor, City of Bozeman Economic Development Council 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Willow Glen and Stillwater Stormwater Improvements; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Designed and installed regional stormwater improvements to resolve issues of increased run-off volumes caused by new developments within existing neighborhoods. Role: Project Manager b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eisinger Motors Site Improvements and Access Permitting; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Provided site design and permitting services for a new facility. The project included a traffic impact study, underground stormwater treatment and detention, and a low pressure sewer system requiring direction boring for installation. Role: Project Manager c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Map Brewery; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Located next to Glen Lake the project required possessed significant environmental complexity, fill, and coordination with City Parks. Role: Project Manager d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Montana State University Innovation Campus; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This project is a technology park located in a technology TIF. This project requires coordination with local utilities including broadband providers, sensitive environmental areas, and other complex access issues. Role: Project Manager e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 5 West Site Design and Access Permitting; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 Pending (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Designed and permitted a 5 Story mutli-use building in Downtown Bozeman. The project required underground stormwater storage and treatment and will use impervious pavers. Additionally, the project required a detailed traffic impact study for several intersections. Role: Project Manager E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Patrick J. White, PE Civil Engineer/Utility Extensions a. TOTAL b. WITH CURRENT FIRM 28 9 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Billings, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science/Construction Engineering Technology/Montana State University/1986 Architecture: 1980 -1982 Montana State University PE: MT, WA Nassco: Pipeline Assessment Condition Program. Cert 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers (ASCE)– MT President, 2009 - Region 8 Governor 2010-2013. ASCE Committee on Technical Advancement, Liaison to; Pipelines, Aerospace, Wind. 2010-2015 ASCE Committee on Sustainability 2012-2015 ASCE Sustainable Pipeline Design Committee, Co-Chair, Manual of Practice, 2013-2015, Co-Author. Underground Construction Magazine – “Trenchless Solutions Used in Airport Sewer, Water Improvements” 1999 Author National Survey “Current Practices on Trench Bedding, Embedment, Backfill and Shoring” 2013 Co-Author Silver MAME Award for Environmental Planning on "The Landing at Star Lake": Design Engineer 1991 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Empire Parking Garage Utility Relocation; Billings, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012-2013 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLEX Check if project performed with current firm Description: Designed the utility relocation and coordinated efforts of ten utility companies, two city departments, three city projects: The Empire Parking Garage design-build project and their team, City sewer line rehabilitation and its consultant and the Northern Hotel rehabilitation project and its contractor. In addition to this Utility Relocation. ($1.2 Mill Place holder) Role: Project Manager/Design Engineer/Utility Coordinator. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pinnacle Bank, Cody, WY PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2009-2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Civil work involved vacating a city alley, dedicating a new alley on a different part of the site and relocating, overhead power, telephone, communications as well as underground natural gas raw water and sewer. Power and natural gas were re-routed around the site and across WYDOT R.O.W. by open cut construction. CTA Civil coordinated the effort with WYDOT, City of Cody, Qwest, Energy West, Bresnan and two separate construction projects for the utility relocations. On site Storm water is designed to be treated and retained on site and where it will infiltrate back into the aquifer. Utility relocation only costs $358,000 Role: Design Engineer/Utility Coordinator. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Highway 93 Water and Wastewater Utility Extension, Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2007-2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Installation of 25,800 lineal feet of water and wastewater utility extension including; 2,500 ft of 6” force main, 2,300 ft of 8” force main, 2,300 ft of 14” force main, 7,500 ft of 18” gravity sewer, 1 wastewater lift station, 3-800 foot river crossings of the Stillwater River by the use of Horizontal Directional Drilling (HDD), 8 trenchless crossings of HWY 93, 11,200 ft of 14” Water transmission line. Constructed in Montana State Highway 93 right of way. A Preliminary Engineering report with Alternative Analysis was prepared first for City, MDT and DEQ approval prior to Design. Permitting agencies included 10; US Army Corps of Engineer, Flathead County Conservation district, MT-DNRC, MT Fish Wildlife and Parks, Federal Fish Wildlife and Parks, Flathead Co. Flood Administrator, City of Kalispell, MT-DOT, MT-DEQ Construction cost was slightly under budget at 3.8 million dollars. Role: Project Manager, Design Engineer and Construction Manager e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Billings Boulevard, Billings, MT 2005 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Responsible for utilities engineering including; 12 to 30-inch diameter storm water system, 31x51-inch RCP Arch suburban ditch piping, sewer improvements and King Avenue water improvements. The project generally replaced an aging roadway 3,500 feet in length with all new water storm and sewer utilities within a 3-lane roadway section including sidewalks and a parallel bike path with improvements to provide safe student drop-off of pick-up facilities for Newman Elementary school. Underground and overhead Utilities including: Power, Phone, Natural gas and Fiber Optic were relocated and paid separately. Civil roadway and municipal utilities cost was $2,037,000 Role: Project engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Kris A. Desper, PE Civil Engineer a. TOTAL b. WITH CURRENT FIRM 23 7 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Bozeman, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science in Civil Engineering Technology/ NAU/ 1992 Bachelor of Science in Earth Science/ Northern Arizona University/ 1984 Professional Engineer: AZ, MT, WA, ID, OR 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers - Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Flathead County South Campus; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Performed site design for a new administration building and parking area including: demolition, grading, service utilities, and ADA accessibility. Performed hydrology analysis to design an on-site detention pond. Due to the tight site constraints, treatment of the collected runoff utilized a Downstream Defender unit by Hydro to meet the City requirements for treatment prior to entering the detention pond. Construction Costs: $6 million. Role: Civil Engineer b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED JBLM Madigan Army Medical Center; Fort Lewis, WA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Performed site design and construction administration (CA) for a temporary medical building including: grading, service utilities, ADA accessibility, performed hydrologic analysis and implemented low impact development (LID) using rain gardens to treat storm water on site while complying with Washington Dept. of Ecology regulations and Energy Independence and Security Act of 2007 (per federal regulations). Construction: $2 million. Role: Civil Engineer c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Glacier Eye Clinic; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design for the site with CA included 400 feet of new frontage road, grading and drainage for the road and parking areas, reconfigured intersection for frontage road connection, new water main extension along the frontage, miscellaneous building services, ADA compliance and permitting. Designed a new stormwater detention pond to address the collected runoff from the new frontage road. Construction costs of $3.4 million. Role: Civil Engineer d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED USACE Port Angeles Border Station; Port Angeles, WA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Performed site design and construction administration for a building renovation and several new outbuildings. To meet the current state stormwater regulations, multiple rain gardens were implemented down gradient from the buildings to provide treatment prior to infiltration. Design included a stormwater report meeting the Department of Ecology 2005 Manual requirements. Construction costs of $7.34 million. Role: Civil Engineer e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Quinn Court; Bellingham, WA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Designed the stormwater collection, treatment and detention system for a small subdivision. LID techniques utilized multiple rain gardens located along the roadway edges to provide treatment prior to entering various detention ponds. Underground detention vaults comprised of recycled glass were constructed under the roadways. Challenges included storm water analysis for a stepped stage storage underground vault and pond system. Role: Civil Engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Caleb Minnick Civil Engineer/ Flood Plain/Stream Permitting a. TOTAL b. WITH CURRENT FIRM 8 4 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Livingston, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science/Civil Engineer/Montana State University/2006 PE: MT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certified Floodplain Manager (ASFPM) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fleshman Creek Restoration; Livingston, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This project included installation of 3600 lineal feet of new sewer main piping, replacement of six public road crossings of Fleshman Creek and the restoration of 6000 lineal feet of Fleshman Creek itself. Caleb’s duties included inspection and testing services for both the creek and sewer installation portions of the project, as well as assisting in preparation of construction administration documentation. Role: Design and Construction Administration b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rock Creek Road North Bridge Replacement; Clyde Park, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: designing a new bridge crossing of Rock Creek near Clyde Park, MT. Design services performed by Caleb included hydrologic and hydraulic modeling of the proposed crossing, construction documentation and specifications, and permitting with all applicable jurisdictions. Additionally, Caleb provided bidding services and construction administration services during the duration of the project. Role: Civil Engineer c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Taco Bell and Teachers Credit Union; Great Falls, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Two adjacent sites concurrently being developed in Great Falls, MT. Design services included major site grading and stormwater management, utility design, and construction document production. Role: Site Design and Development Services d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Park County Fairgrounds Sanitary Sewer Extension; Livingston, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Provided design, bidding and construction administration services for a sanitary sewer main extension to service the Park County Fairgrounds complex. 1200 lineal feet of sewer main was designed to service 6 existing buildings along with providing for future needs of the fairgrounds. Role: Civil Engineer e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carbon County Floodplain Administration; Red Lodge, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing -- (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Floodplain administration services to Carbon County, MT. Services include, permit review, code enforcement, public involvement and technical review of proposed developments within the floodplain. Role: Civil Engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ron Isackson Design Engineer a. TOTAL b. WITH CURRENT FIRM 11 4.5 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Bozeman, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science / Civil Engineering / 2004 Montana Tech Civil Engineer (USA): CO, IL, MT, NV, WY, TX, Civil Engineer (CAN): SK, AB, BC 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers - ASCE 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Montana State Innovation Campus (MSUIC); Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 TBA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design and development of the civil construction plans for a 40 acre economic development for high-tech and research type businesses. The project entailed extension of City water and sewer main, storm water system, transportation network, and pedestrian facilities. Role: Design Engineer b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Park Properties PER; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Development of a Preliminary Engineering Report for a 275 acre piece of land, with the City of Bozeman and Department of Natural Resources being the stakeholders. The report analyzed the feasibility of providing a transportation network system (both pedestrian and vehicular) and utility servicing to and within the property, with the assumption the property would have industrial and commercial land uses. Role: Civil Engineer c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rocky Mountain Arsenal Scenic Byway; Commerce City, CO PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: The project consisted of 3.5 miles of new roads, 5.5 miles of refurbished roadway, drainage improvements, and other improvements to improve safety and to bring roads up to current specifications. Role: Design and preparation of Construction Documents. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Big Hole River Irrigation Diversion; Twin Bridges, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Project involved the design of a system of rock weirs to divert water into a canal. The goal of the project was to improve river user safety. Project also involved the design of headgate structures and water measuring devices. Role: Civil Engineer e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Middle Creek Parklands Subdivision (208 acres); Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Responsible for the design and development of construction plans for the central water and sanitary sewer system, road network, and stormwater management system. Included in the responsibilities, were construction inspection and obtaining all the necessary permits. Role: Design Engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Debra Rosa Landscape Architect/Parks a. TOTAL b. WITH CURRENT FIRM 16.5 15 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Bozeman, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Landscape Architecture / 1997 / Iowa State University Landscape Architect: Montana 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Landscape Architects ASLA Member of Council of Landscape Architects Registration Board CLARB, Community Transportation Enhancement Program (CTEP) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capital Crossing, Regina, Saskatchewan, Canada PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014-2015 2015-2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design and develop Construction Documents for new 73 acre Mixed-Use Residential and Commercial Development. Project includes site amenities, grading, and landscaping of 4.5 acres of passive open space and developed park. Amenities include basketball courts, play structure areas, multi-use playfield, seating, and trails. Provided open space and park development construction documents, cost estimates for $1.4 Million construction of these spaces. Role: Project Manager / Planner / Landscape Architect b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Blackfeet Community College Boarding Dormitory, Browning, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012-2013 2013-2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design and develop Construction Documents for new 7.5 acre 53,000 square-foot LEED K-12 dormitory with multiple entry drop-off & seating, parking, basketball court, multiple play structure areas, multi-use playfield, seating, oversight areas, and perimeter fencing. Provide project discipline coordination and construction documents. Role: Landscape Architect c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lambert School District Sports Complex; Lambert, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012-2013 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design and develop Construction Documents for a new 14 acre sports complex with new concessionaire, pavilion, parking, stadium seating, stadium lighting, football field, track lanes & facilities, stormwater facilities, perimeter & internal fencing, landscaping and irrigation. Provide community, users & owner facilitation, construction documents, construction administration for $3.2 Million project. Role: Project Manager / Planner / Landscape Architect d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Glazebrook Park Expansion; Godfrey, IL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design and develop Construction Documents for new 12+ acre ball-field complex with restroom facilities, parking areas, stormwater facilities, and hierarchy trail network. Provide full project discipline coordination, construction documents and cost estimates for $1 Million project. Role: Landscape Architect e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Silverbrook Estates; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007-2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Develop Construction Documents and Design Guidelines for 385 acre Mixed-Use Residential and Commercial Development. Project includes site amenities, grading, and landscaping with 5-miles of trails through 42+ acres of open space, natural areas, and park system. Trails system includes arterial and connector pedestrian, and pedestrian/bicycle path types. Parks include tennis court, basketball, picnic pavilion, and seating improvements. Park and trail development constructed at $3.3 Million. Role: Project Manager/Planner/Landscape Architect E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Tim Mullholland Senior Environmental Engineer a. TOTAL b. WITH CURRENT FIRM 18 2 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Billings, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Environmental Engineering – Montana Tech, 1997 Masters of Science, Environmental Engineering – Montana Tech, 1999 Professional Engineer: MT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) OSHA 29 CFR 1910.120 HAZWOPER 40 hr technician Level and Supervisor Level Training Montana Storm Water Pollution Prevention Plan (SWPPP) Administrator Level Training (2012) USEPA AHERA Asbestos Inspector Initial Training (2015) A Comparison of Filtered vs. Unfiltered Metal Concentrations in Treatment Wetlands, Mine Water and The Environment – Volume 19, Number 2, December 2000 Floating Islands as an alternative to constructed wetlands for treatment of excess nutrients from agricultural and municipal wastes – results of laboratory-scale tests, Land Contamination and Reclamation, 16 (1), 2008 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Diesel Spill to South Cottonwood Creek; Fallon County, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Response to a 3,100 gallon diesel spill in a creek in Eastern Montana. Oversaw contractors to excavate contaminated soil, reconstruct creek channel, and re-vegetation of disturbed area. Landowner initiated litigation early into the project that resulted in many stakeholders including federal government agencies. Release was closed by all regulatory agencies in less than three years. Work was conducted as the owner of Landyard Engineering Services, LLC. Role: Project Manager/Senior Engineer b (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Petroleum Refinery; Billings, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted a series of pilot studies including vapor enhanced recovery (VER), bio-slurping, and ozone sparge. The pilot study objectives included determining the feasibility of the treatment technologies to address light, neutral, and dense NAPL recovery, remediate dissolved phase petroleum and chlorinated hydrocarbon plumes and residual vadose zone contamination, and vapor intrusion. The investigation included historical document search to determine the likely type and location of buried waste that may be contributing to plumes. Reviewed existing groundwater and soil analytical data to identified data gaps and developed subsurface soil and groundwater investigation work plans to better define dissolved phase, LNAPL, and DNAPL plumes. Role: Project Manager c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alternate Source of Selenium Demonstration; Billings, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted an alternate source demonstration for selenium in groundwater beneath the LTU. The methods included collecting background groundwater, surface water, creek sediment and soil selenium data to statistically determine that the source of selenium was naturally occurring and a function of evapotranspiration and not leaching from the permitted unit. Work was conducted as an employee of ATC Associates of Billings, Montana. Role: Project Manager E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE George Bornemann, PLS, CFedS Surveyor a. TOTAL b. WITH CURRENT FIRM 15 8 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Livingston, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Paul Smiths College of Arts and Science, Forestry and Surveying, 1977 Land Surveyor: ID, MT, ND, SD, WA, WI, WY 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certified Federal Surveyor (CFedS) Registration CFedS Training Programs – “Non-Rectangular Surveys”,”Introduction to the Geographic Coordinate Database” Montana Association of Registered Land Surveyors – South Central Chapter 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Gardiner Gateway Project; Gardiner, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Topographic Survey, Construction Stakeouts, and Right-of-Way acquisition for a 24 million dollar project to upgrade utilities, roadways, pedestrian facilities, and other features at north entrance of Yellowstone National Park. Role: Surveyor b (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geographic Coordinate Database Upgrade; Park County, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Collection of accurate positioning information on hundreds of Public Land Survey System section corners located throughout Park County for the purpose of adjusting and upgrading GCDB and Geographic Information Systems at County and State levels. Role: Surveyor c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED USGS Columbia Environmental Research Center; Columbia, MO PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Provide topographic survey of existing research facility for design of upgrades to ponds and support facilities. Accurate identification and location of underground utilities to aide and guide planning and design. Role: Surveyor d (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Department of Military-Kalispell Armed Forces Reserve Center; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Topographic survey of site for use in design of underground utilities. Detailed, accurate measurements of all above ground improvements as well as sub-surface utilities using existing site plans and appropriate surface geophysical methods. Layout of control survey for use in future construction and quality control. Role: Surveyor e (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jewel Cave National Monument; Badlands National Park, SD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Topographic survey of complete sanitary sewer system, highway segments and numerous culvert crossings for design of upgrades. Collection of all utility data including location of buried electric, data, and gas services. Accurate measurement of all inverts elevations, pipe sizes and pipe types. Role: Surveyor E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Doug Riley Planner a. TOTAL b. WITH CURRENT FIRM 22 1 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Bozeman, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MPA – Western Michigan Univ: BS – Central Michigan Univ N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member – American Planning Association: Member – Montana Association of Planners 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Planner; Stillwater County, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: On-going planning services for Stillwater County, MT. Role: Planner b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Planner; Carbon County, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: On-going planning services for Carbon County, MT Role: Planner c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Senior Planner/Associate Planner; City of Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 - 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Current Planning and development review activities within the Community Development Department including projects within several special overlay and TIF districts. Work also included assistance with updates to the Growth Policy and special studies. Coordinated several applications for City development projects. Role: Planner d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Senior Planner, Mesa County, CO PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 - 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Current planning and development review including subdivisions, conditional use permits and site plan reviews. Assisted the Long Range Planning Division with several community planning efforts including the Clifton and Gateway Community Plans. Role: Planner e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Director of Planning and Research, Charter Township of Chocolay; Marquette, MI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1999 - 2004 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Managed all planning related matters for this suburban/bedroom community which included planning and access management considerations along the US-41/M-28 Corridor. Role: Planner E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Stephanie Ray Public Involvement and Education a. TOTAL b. WITH CURRENT FIRM 15 6 months 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Livingston, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BA Psychology Minor Political Science N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Montana Association of Planners 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Kalispell Urban Renewal Plan; Kalispell, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Description: CTA contracted with the City of Kalispell to complete a large urban renewal land planning exercise promoting consistent land use and development patterns that reflect the City’s growth policies and community’s desire for the future vision of South Kalispell. The effort included extensive public outreach, surveys, project website, community meetings/charrettes, and presentations to City boards and commissions. Role: Planner b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Red Lodge School Reuse Strategy and Action Plan; Red Lodge, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Description: CTA took the lead role in working with stakeholder groups and the public in an effort to gather feedback on the community’s ideas and priorities for repurposing the Old Roosevelt School. CTA’s work included developing a survey component, brochures, and a ‘meeting in a box’ that individuals and stakeholder groups could use for consistent and informative presentations. Role: Planner c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Yelm Program/Project Manager; Yelm, WA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1997 - 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: As a staff member for the City of Yelm for 17 years there were a number of projects that required varying levels of public involvement and outreach that included multiple stakeholders such as granting agencies, state permitting and review agencies, regional boards, counties, cities, Tribal governments, and city council boards and commissions. I represented the City on a number of local and regional committees and was the spokesperson for a number of projects and executive team projects. Role: Planner d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Kieron Hunt Urban Development Market Analyst a. TOTAL b. WITH CURRENT FIRM 15 2 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; British Columbia, Canada 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Arts Degree – Urban Geography Post Baccalaureate Certificate – Urban Studies 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Urban Development Institute International Council of Shopping Centres Township of Langley Economic Development Advisory Committee Economic Development Retail Panelist (Saskatchewan, Alberta & British Columbia) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Park Master Plan & Market Analysis; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted a comprehensive market analysis for retail, office, light industrial and hotel land uses for an approximate 200 acre site jointly owned by the City of Bozeman and DRCC. Intent and result of analysis and master plan created by CTA was to stimulate development interest in the lands. Role: Lead Market Analyst b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED METG Master Plan & Market Analysis; East Helena, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted a market analysis for retail and industrial land uses for remediated lands in the City of East Helena formerly owned by the ASARCO smelter. The objective of the process was to identify potential re-use of the formerly contaminated lands for land uses that would be compatible for economic growth of the local and regional community. Role: Lead Market Analyst c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miller Hill Corridor; Duluth MN PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted a market analysis and development strategy identifying gaps and future land use opportunities along a heavily traveled urban corridor. The process identified strategic parcels for development and/or redevelopment, as a way to educate and inform potential tenant and investor interests. Role: Project Manager and Lead Consultant d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Commercial Industrial Development Study; Saskatoon, Saskatchewan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This study entailed participation and interaction with an established Steering Committee as well as interaction with local First Nations. The resulting document has been a widely used reference document within the City and for external developers, such as Dream Centres (formerly Dundee), Pinnacle Developments and Harvard Developments to name a few. Role: Project Manager and Lead Consultant/Analyst e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED West Valley City Centre; Salt Lake City, UT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 - 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Conducted an Urban Renewal Market Analysis and repositioning strategy to create an urban node in the City of West Valley, which will be served by new light rail transit. Land uses to focused on included retail, office and institutional. Role: Market Analyst E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Alan Bronec, PE, LEED AP Electrical Engineer/Lighting a. TOTAL b. WITH CURRENT FIRM 26 17 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Missoula, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Electrical and Engineering Technology – 1989 Electrical Engineer: ID, MT, OR, CA, AZ, CO, UT, NV, TX, NE, WS, NM, AK, PE 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) National Council of Examiners for Engineering and Surveying (NCEES) LEED Accredited Professional 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Milwaukee Road Trail; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This project included the design and construction of approximately 2200 linear feet of ten feet wide shared-use trail along the abandoned Milwaukee RD rail alignment, adjacent to Story Ditch in Bozeman, Montana with 12 miles of LED trail lighting. Project Cost: $183,486 for Phase 1, $115,660 for Phase 2 and $172,600 for Phase 3. Role: Electrical Engineer/Lighting Designer b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MSU Campus Lighting Study; Bozeman, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: CTA conducted an extensive lighting audit throughout the entire Bozeman Campus. This audit consisted of evaluating the existing exterior lighting levels across the 400 acre campus including the lighting at 62 buildings, 19 parking lots, and all roadways, walkways, and bikeways that interconnect the campus. The audit also consisted of measuring the existing illumination levels, documenting areas with deficient illumination levels, making recommendations to improve energy efficiency, and developing a master plan to correct the deficiencies. Project Cost: $400,000. Role: Electrical Engineer/Lighting c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Big Sky Town Center; Big Sky, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: The Big Sky Town Center is a 165 acre mixed use development site in Big Sky, Montana. CTA developed the lighting master plan design guidelines and prepared construction documents for the street lighting, park lighting, trail lighting, and parking lot lighting throughout the development. Project Cost: $320,000. Role: Electrical Engineer/Lighting Designer d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Missoula Industrial Park Roadway Lighting; Missoula, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: CTA performed a lighting study and prepared preliminary design documents to provide illumination along a 2 mile segment of the Expressway Street in Missoula, MT. CTA also designed and implemented a test site utilizing solar powered LED luminaires. The luminaires selected for this test site are totally self-contained (no utility power required). They are equipped with a photovoltaic solar array, batteries, and control system that automatically reduces the light levels to a 30 percent level late at night and early in the morning when the vehicular and pedestrian activity is low. An on-board occupancy sensor will automatically ramp the illumination level up to 100 percent when a vehicle or pedestrian approaches the luminaire. Project Cost: $40,000. Role: Electrical Engineer/Lighting E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Kris Good, RCDD Communications Engineer a. TOTAL b. WITH CURRENT FIRM 35 4 15. FIRM NAME AND LOCATION (City and State) CTA Architects Engineers; Billings, Montana 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) General Coursework in Business and Communications, Edmonds Community College, Edmonds, Washington RCDD, Registered Communications Distribution Designer, certified by BICSI 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Registered Communications Distribution Designer (RCDD), BICSI 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Border Patrol Port of Entry; Portal, ND PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This project was new construction of a Border Crossing Facility. The low voltage scope included working with DHS, CBP, and GSA for strict adherence to all requirements and standards. Design of campus wide fiber optic and copper backbone in underground pathways and vaults as required for connectivity to all buildings. Role: Low Voltage / Communications Engineer b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED St. Joseph Regional Medical Center; Lewiston, ID PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design of a 48 strand fiber optic backbone cable from the Main Medical Center to new warehouse location 4 miles away. This scope included interfacing and utilizing utility poles owned by CenturyLink, boring into buildings and placement of new poles. Provided storm load, ice load, bending moment calculations, and pole size and classifications. This design was accepted by the local Utilities for placement and use. Role: Low Voltage / Communications Engineer c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Joint Base Lewis McCord; Federal Way, WA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This is an ongoing project to replace and upgrade existing facilities. This included, Access Control, Video Security, Cable Infrastructure, LAN room design, Underground Utilities, and Communications Pathways design. Role: Low Voltage / Communications Engineer d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Medical Education Training Complex; Fort Sam Houston, San Antonio, TX PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: This was a new building housing the Medical Administration, at Fort Sam Houston. This was a design build project that included SIPRNET, NIPRNET, Access Control, CCTV, and additional low voltage systems that had to adhere to the I3A documents. Scope also required new fiber optic and copper feed cables from existing Central Office to new building locations 2 miles away. Role: Low Voltage / Communications Engineer e . (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Yellowstone Club; Big Sky, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2005 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design of a 13,000 plus acre property in a forested privately owned ski resort. Scope included all underground communications systems to provide voice and data services to all Corporate and Residential locations and construction of a new Central Office and Data Center. This included Fiber Optic and copper cabling as well as wireless and Cellular systems. Role: Low Voltage / Communications Engineer SECTION F EXAMPLE PROJECTS F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Livingston Streetscape Master Plan; Livingston, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Vision Livingston Downtown Partnership Karyle Frazier 406.222.7470 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) CTA was contracted in November 2008 to conduct a summary study of the central downtown area of Livingston, Montana. CTA worked over the course of several months developing a plan with representatives of Vision Livingston. The central core area of the downtown streetscape master plan is bounded by 2nd Street and B Street and Park Street and Clark Street. CTA’s role was primarily to listen to the city representatives and members of Vision Livingston as numerous studies and efforts have been made to plan for the study area. The project defined recommendations for street reconditioning, parking definition, street trees and amenities, sidewalk detailing and resurfacing, streetlighting, intersection treatment and how to safely move people through the commercial area. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Livingston and Bozeman, Montana Project Management, Civil Engineering F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Shilo Road Streetscape, Billings, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Billings/Sanderson Stewart Jacob Brotzler 406.869.3339 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) With close coordination between the roadway engineer and the City of Billings, CTA provided streetscape beautification improvements for the North Shiloh Road Corridor. With Budget constraints and the required coordination between several other construction projects in the area, CTA excelled in providing a solution that will be attractive and maintainable for many years. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Billings, MT Project Management, Landscape Architecture, Wayfinding, Irrigation Design F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Milwaukee Road Trail; Bozeman, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Bozeman James Goehrung; Director of Facility Services 406.582.3237 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) This project included the design and construction of approximately 2200 linear feet of ten feet wide shared-use trail along the abandoned Milwaukee RD rail alignment, adjacent to Story Ditch in Bozeman, Montana. Enhancements to the landscaping at the new Bozeman Public Library (one of the termini) were also included, as well as the development of a trailhead at Peets’ Hill. CTA LandWorks took the lead in designing sustainable landscaping, irrigation, and lighting systems (LEED criteria), while CTA Civil Engineers designed the horizontal and vertical alignments to meet applicable standards for both bicycle and ADA criteria. CTA Civil Engineers also designed stormwater management facilities to address runoff. Hyalite Environmental performed necessary environmental engineering for the permitting of two bridges to be constructed as part of the trail system. CTA has provided bidding support services to the City of Bozeman, and was on-site to provide construction administration throughout the construction, which occurred in early 2007. This project was financed by CTEP funds. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Billings, Bozeman, MT Project Management, Architecture, Structural (Bridges) Engineering, Wayfinding, Mechanical Engineering, Electrical (Lighting) Engineering, Landscape Architecture, Site Planning, Civil Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Red Lodge Streetscape; Red Lodge, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Red Lodge Economic Development Corp. Laura Getz 406.446.0115 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) CTA developed a master plan for 6 blocks of downtown Red Lodge, from 8th to 1th St. along Broadway Avenue. Using the historical architecture of downtown Red Lodge as a framework, the design implemented sustainable practices while increasing parking and accessibility. More pedestrian friendly streets were designed to slow vehicular traffic down and encourage people to shop. This will be accomplished through the use of intersection bump outs, wider sidewalks, varied surface treatments, and other streetscape design elements. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Billings, MT Project Management, Landscape Architecture F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED North 7th Improvements; Bozeman, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2010 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Bozeman Dustin Johnson 406.582.2273 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) In conjuction with another consultant CTA reviewed the North 7th Corridor to develop ideas and concepts to create a character for the area. From this work a list of potential projects was generated with a single catalyst project selected for design and construction. CTA helped prepare the construction docunents, performed the lighting study, and helped identify additional funding sourcesces. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Bozeman, MT Landscape Architecture, Lighting, Planning, Irrigation Design F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Silver Park; Missoula, MT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Missoula Dave Shaw, Parks and Trails Design Manager 406.552.6264 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The team of Territorial Landworks, Inc. (TLI), CTA Architects Engineers and Fearless Engineering were selected to provide professional services for this $2.5 million final phase (park) located on what was once the Champion Sawmill site. The project is funded through a combination of MRA and CTEP grants and includes a timber framed central pavilion, a large central green, climbing boulders, nature-based play areas and native plantings with crushed stone trails to create a naturalized park setting. The park also incorporates the parks lighting to elevate energy conservation and security to the facility. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Missoula, MT Project Management, Lighting, Landscape Architecture b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Territorial Landworks, Inc. Missoula, MT Construction F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Missoula Parks Redevelopment; Missoula, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Missoula Donna Gaukler; Director, Missoula Parks and Recreation 406.552.6265 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) CTA planned and designed the redevelopment of four parks in the City of Missoula focused around new playgrounds. Sacajawea, Marilyn, LaFray and Boyd Parks were redeveloped through a $280,000 federal grant. CTA worked through a series of detailed public workshops and charettes for each of the parks and performed volunteer construction of the LaFray project playground shown here. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Various Locations Project Management, Accounting, Electrical Engineering, Site Planning, Landscape Architecture, Mechanical Engineering, Surveying F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Libby Main Street Revitalization; Libby, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Libby Revitalization, Inc. John Norberg 406.293.2731 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Libby main street revitalization master plan will provide several benefits to the town when this project is complete. It will create a pedestrian focused atmosphere. This is accomplished by tree plantings that will provide a canopy over the sidewalk. Planting beds at main intersections and crosswalks create areas that are pleasing to the eye and also denote to drivers that there is something here that they need to pay attention to. With the new pedestrian traffic on the streets it encourages in-fill development. Businesses will come to the area to enjoy the atmosphere that is present and to be a part of what makes the community unique. That will bring the economic viability that the town needs to maintain the health of the community. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Livingston, Billings, Bozeman, MT Project Management, Electrical Engineering, Landscape Architecture F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Livingston Road Reconstruction Experience; Livingston, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Livingston Clint Tinsley 406.222.1142 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) • 2009 Asphalt Overlay Project - Engineering services to assist the City in preparing bid documents for asphalt paving in various locations in the City. Prep of bid docs and bidding admin support. Includes submitting docs for approval by City. Construction Administration, layout staking and onsite testing. $6,250 in fees. • 2007 Reconstruction of C&D Streets including Callender Street from D Street up to B Street, $53,000 fees • 2006 Reconstruction of E-G Streets from Park Street to Callender Street, reconstruction of Callender Street from D Street to H Street, and repairs to Park Street from E Street to H Street, City of Livingston. $68,000 in fees • 2004 City of Livingston - Street Reconstruction - Reconstruction of I through L Streets from Park to Callender & Callender from H to L Street, Design, Bidding and CA services, $60,000 in fees • 2004 City of Livingston - Street Reconstruction - Street reconstruction of M through O Streets from Callender Street to Park Street, $18,000 • 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Livingston, Billings, Bozeman, MT Project Management, Landscape Architecture, Civil Engineering, Planning, Survey F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Fleshman Creek Restoration; Park County, Montana PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Park County Jim Durgan; County Commissioner 406.222.4106 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) This project is aimed at mitigating flood risks and improving fish habitat along an urban reach of Fleshman Creek which flows through a former side channel of the Yellowstone River through Livingston, Montana. With an estimated overall project cost of $3.4 million this project is being funded using FEMA pre-disaster flood mitigation, MT DNRC Reclamation and Development Grants Program, National Fish and Wildlife Foundation, and Montana Fish and Wildlife Conservation Trust grants along with in-kind contributions from Park County, Trout Unlimited, and the Livingston School District. With the primary focus of the project involving improving hydraulic conveyance at higher flow levels, the project will consist of replacement of six road crossings and will also include approximately one mile of creek restoration in an effort to improve fish and Aquarian habitat at typical flow levels. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CTA Architects Engineers Livingston, Billings, Bozeman, MT Project Management, Surveying, Civil Engineering, Landscape Architecture, Planning SECTION G KEY PERSONNEL MATRIX XG. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT 28. EXAMPLE PROJECTS LISTED IN SECTION F 1 2 3 4 5 6 7 8 9 10 Erik Garberg, PE Project Manager / Transportation and Stormwater Engineer Pat White, PE Civil Engineer / Utility Extensions X X Kris Desper, PE Civil Engineer / Stormwater Caleb Minnick, PE Civil Engineer / Flood Plain/Stream Permitting X X X Ron Isackson, PE Civil Engineer / Design X X X Debra Rosa, RLA Landscape Architect X X X Tim Mullholland, PE Environmental Engineer George Bornemann, PLS Survey Team Leader / ROW X X X X X Doug Riley Planner Stephanie Ray Public Outreach Kieron Hunt Urban Development Market Analyst Alan Bronec, PE, LEED AP Electrical Engineer / Lighting X X X X Kris Good, RCDD Telecon / Fiber Engineer 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Livingston Streetscape Master Plan; Livingston, MT 6 Silver Park; Missoula, MT 2 Shilo Road Streetscape, Billings, MT 7 Missoula Parks Redevelopment; Missoula, MT 3 Milwaukee Road Trail; Bozeman, MT 8 Libby Main Street Revitalization; Libby, MT 4 Red Lodge Streetscape; Red Lodge, Montana 9 Livingston Road Reconstruction Experience; Livingston, MT 5 North 7th Improvements; Bozeman, Montana 10 Fleshman Creek Restoration; Park County, Montana SECTION H ADDITIONAL INFORMATION City of Bozeman LED Street Lighting | CTA Architects Engineers Who We Are Organized in 1938, CTA has grown to provide a wide variety of building services to its clients. Each year CTA completes more than 1,200 projects, translating into $400 million in construction costs. Projects include educational facilities, medical clinics, hospitals, residences, planning, recreational, commercial, and industrial developments. A unique advantage of CTA is our broad base of experience. Besides architectural services, CTA provides mechanical, electrical, structural and civil engineering, landscape architecture, interior design, and a range of specialists in such areas as cost estimating, code review, and roofing. Our comprehensive approach and staff of 390+ professionals allows CTA to provide our clients with a full service architecture firm and some of the best talent available. CTA can balance budgets, schedule, design and construct today’s technically complex projects. We also provide service in non-traditional areas such as value engineering, energy studies, indoor air quality, American Disability Act (ADA) compliance, and roofing consultation. Our expertise in these areas adds value to each client’s project. Our offices are located in Billings, Bozeman, Missoula, Great Falls, Helena, Kalispell, Red Lodge and Livingston, Montana; Gillette and Jackson, Wyoming; Boise, Idaho; Denver, Colorado; Seattle, Washington; Austin, Texas; New Orleans, Louisiana; Vancouver, British Columbia; and Regina, Saskatchewan. CTA is known for its responsiveness to the needs of clients throughout the United States and in some international areas. In today’s ever-changing world, CTA continually evolves to provide comprehensive services fulfilling each client’s needs. By the Numbers 390 + professional problem solvers $400m+ annual construction volume 77 years in business 95 + LEED accredited professionals 18 locations 1 customer-driven mission Our Services ARCHITECTURE ENGINEERING Civil · Electrical · Environmental Value · Industrial Hygiene Mechanical · Security · Structural Refrigeration · Fire Protection BUILDING COMMISSIONING CONSTRUCTION ADMINISTRATION FACILITY MANAGEMENT GRAPHIC DESIGN / MULTIMEDIA DESIGN INTERIOR DESIGN / FURNISHINGS IT / COMMUNICATION SYSTEMS LAND PLANNING LANDSCAPE ARCHITECTURE MARKET ANALYSIS ROOFING / BUILDING ENCLOSURE CONSULTING SPACE PLANNING SUSTAINABLE DESIGN / LEED® 9 City of Bozeman LED Street Lighting | CTA Architects Engineers EXPERTISE CTA integrates the skills and expertise of more than 20 different technical disciplines into hand-picked teams for any given project. With multiple disciplines working side by side, sharing individual know-how and thriving on the energy inspired by collaboration, CTA teams develop progressive designs for a wide range of projects in the six Market Sectors that we serve: Commercial, Education, Government, Healthcare, Living and Retail. HIGH PERFORMANCE At CTA, we pride ourselves on an approach that we have termed High Performance. It is the product of uniting talent, passion and expertise with the company’s mission; developing integrated teams of top notch architects, designers, engineers, interior designers, landscape architects, project managers and visionaries working together in creating a pinnacle of both form and function. THE EXPERIENCE We recognize and celebrate the many relationships that occur and are maintained throughout the course of creating dynamic environmental spaces. From the initial meeting, to the final reveal of any project, the ever-present interactions between clients, designers and building professionals comprise what we commonly refer to as, The Experience. In short, The Experience is the essence of every point of contact and every nuance associated with CTA. The CTA Approach CTA is an “all-in-one” architecture engineering firm with the comprehensive resources it takes to guide a project from conception to utilization of the facilities. Every design resource needed is housed within one innovative firm – CTA. Solid Solutions CTA focuses on designing within context. We listen to the client and create answers to their needs while focusing on functionally and environmentally friendly designs. Expedited Service / Less Hassles More time spent advancing your project and less time spent coordinating with outside entities. Accountability One company, providing an ultimate level of accountability. The buck stops here. Creative Teamwork At CTA, we work together as a team, combining our unique talents and resources which show in our results. 10 PART II GENERAL QUALIFICATIONS ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) N/A PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER CTA Architects Engineers 2002 (Branch) 139221167 2b. STREET 5. OWNERSHIP 411 East Main Street, Suite 101 a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE Corporation Bozeman MT 59715 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE N/A Kurt Ratz, AIA/Associate/Regional Office Manager 7. NAME OF FIRM (If block 2a is a branch office) CTA Architects Engineers 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (406) 556-7100 kurtr@ctagroup.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Cushing Terrell and Associates 1938 063730378 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (1) FIRM (2) BRANCH 02 Administrative 24 1 A01 Acoustics, Noise Abatement 1. 06 Architect 57 5 C08 Codes; Standards; Ordinances 1. 08 CADD Technician 34 3 C18 Cost Estimating; Cost Engineering 2. 12 Civil Engineer 5 3 E03 Electrical Studies and Design 5. 15 Construction Inspector 1 - E07 Energy Conservation; New Energy Sources 1. 21 Electrical Engineer 11 1 25 Fire Protection Engineer 1 - F03 Fire Protection 1. 37 Interior Designer 11 1 G06 Graphic Design 1. 39 Landscape Architect 7 3 H04 Heating; Ventilating; Air Conditioning 6. 42 Mechanical Engineer 32 1 H05 Health Systems Planning 1. 57 Structural Engineer 10 1 H09 Hospital and Medical Facilities 7. 61 Value Engineer - - I05 Interior Design; Space Planning 3. 48 Project Manager 7 - L03 Landscape Architecture 2. 38 Land Surveyor 2 - P08 Plumbing and Piping Design 4. 36 Industrial Hygienist 7 - S04 Sewage Collection; Treatment and Disposal 4. 24 Environmental Scientist - - Architect/Engineer in Training 82 8 S09 Structural Design; Special Structures 6. Refrigeration Engineer - - S13 Storm Water Handling and Facilities 2. Electrical/Mechanical Designer 36 - V01 Value Analysis; Life-Cycle Costing 1. Building Envelope 5 - Building Codes Specialist - - Other Employees 45 1 Included above are 90 LEED®-APs Total 377 28 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 8 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 9 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE May 15, 2015 c. NAME AND TITLE Wayne Freeman, RLA, ASLA / Associate ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) N/A PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER CTA Architects Engineers 2004 (Branch) 181430534 2b. STREET 5. OWNERSHIP 121 South Main Street a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE Corporation Livingston MT 59047 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE N/A George Bornemann, PLS/CFedS/Regional Office Manager 7. NAME OF FIRM (If block 2a is a branch office) CTA Architects Engineers 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (406) 222-0104 georgeb@ctagroup.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Cushing Terrell and Associates 1938 063730378 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (1) FIRM (2) BRANCH 02 Administrative 24 1 A01 Acoustics, Noise Abatement 1. 06 Architect 57 - C08 Codes; Standards; Ordinances 1. 08 CADD Technician 34 2 C18 Cost Estimating; Cost Engineering 2. 12 Civil Engineer 5 1 E03 Electrical Studies and Design 5. 15 Construction Inspector 1 - E07 Energy Conservation; New Energy Sources 1. 21 Electrical Engineer 11 - 25 Fire Protection Engineer 1 - F03 Fire Protection 1. 37 Interior Designer 11 - G06 Graphic Design 1. 39 Landscape Architect 7 - H04 Heating; Ventilating; Air Conditioning 6. 42 Mechanical Engineer 32 - H05 Health Systems Planning 1. 57 Structural Engineer 10 - H09 Hospital and Medical Facilities 7. 61 Value Engineer - - I05 Interior Design; Space Planning 3. 48 Project Manager 7 - L03 Landscape Architecture 2. 38 Land Surveyor 2 2 P08 Plumbing and Piping Design 4. 36 Industrial Hygienist 7 - S04 Sewage Collection; Treatment and Disposal 4. 24 Environmental Scientist - - Architect/Engineer in Training 82 1 S09 Structural Design; Special Structures 6. Refrigeration Engineer - - S13 Storm Water Handling and Facilities 2. Electrical/Mechanical Designer 36 - V01 Value Analysis; Life-Cycle Costing 1. Building Envelope 5 - Building Codes Specialist - - Other Employees 45 1 Included above are 90 LEED®-APs Total 377 8 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 8 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 9 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE May 15, 2015 c. NAME AND TITLE Wayne Freeman, RLA, ASLA / Associate ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) N/A PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER CTA Architects Engineers 1938 063730378 2b. STREET 5. OWNERSHIP 13 North 23rd Street a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE Corporation Billings MT 59101 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE N/A Brad Sperry, AIA/Associate/Regional Office Manager 7. NAME OF FIRM (If block 2a is a branch office) CTA Architects Engineers 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (406) 248-7455 brads@ctagroup.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Cushing Terrell and Associates 1938 063730378 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (1) FIRM (2) BRANCH 02 Administrative 24 7 A01 Acoustics, Noise Abatement 1. 06 Architect 57 21 C08 Codes; Standards; Ordinances 1. 08 CADD Technician 34 5 C18 Cost Estimating; Cost Engineering 2. 12 Civil Engineer 5 1 E03 Electrical Studies and Design 5. 15 Construction Inspector 1 - E07 Energy Conservation; New Energy Sources 1. 21 Electrical Engineer 11 3 25 Fire Protection Engineer 1 - F03 Fire Protection 1. 37 Interior Designer 11 4 G06 Graphic Design 1. 39 Landscape Architect 7 1 H04 Heating; Ventilating; Air Conditioning 6. 42 Mechanical Engineer 32 5 H05 Health Systems Planning 1. 57 Structural Engineer 10 4 H09 Hospital and Medical Facilities 7. 61 Value Engineer - - I05 Interior Design; Space Planning 3. 48 Project Manager 7 1 L03 Landscape Architecture 2. 38 Land Surveyor 2 - P08 Plumbing and Piping Design 4. 36 Industrial Hygienist 7 1 S04 Sewage Collection; Treatment and Disposal 4. 24 Environmental Scientist - - Architect/Engineer in Training 82 18 S09 Structural Design; Special Structures 6. Refrigeration Engineer - - S13 Storm Water Handling and Facilities 2. Electrical/Mechanical Designer 36 7 V01 Value Analysis; Life-Cycle Costing 1. Building Envelope 5 4 Building Codes Specialist - - Other Employees 45 29 Included above are 90 LEED®-APs Total 377 111 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 8 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 9 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE May 15, 2015 c. NAME AND TITLE Wayne Freeman, RLA, ASLA / Associate ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) N/A PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER CTA Architects Engineers 1995 (Branch) 944595065 2b. STREET 5. OWNERSHIP 306 W. Railroad Avenue, Suite 104 a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE Corporation Missoula MT 59802 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE N/A Kent Bray, AIA/Principal/Regional Office Manager 7. NAME OF FIRM (If block 2a is a branch office) CTA Architects Engineers 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (406) 728-9522 kentb@ctagroup.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Cushing Terrell and Associates 1938 063730378 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (1) FIRM (2) BRANCH 02 Administrative 24 2 A01 Acoustics, Noise Abatement 1. 06 Architect 57 5 C08 Codes; Standards; Ordinances 1. 08 CADD Technician 34 7 C18 Cost Estimating; Cost Engineering 2. 12 Civil Engineer 5 - E03 Electrical Studies and Design 5. 15 Construction Inspector 1 - E07 Energy Conservation; New Energy Sources 1. 21 Electrical Engineer 11 2 25 Fire Protection Engineer 1 - F03 Fire Protection 1. 37 Interior Designer 11 1 G06 Graphic Design 1. 39 Landscape Architect 7 1 H04 Heating; Ventilating; Air Conditioning 6. 42 Mechanical Engineer 32 7 H05 Health Systems Planning 1. 57 Structural Engineer 10 - H09 Hospital and Medical Facilities 7. 61 Value Engineer - - I05 Interior Design; Space Planning 3. 48 Project Manager 7 - L03 Landscape Architecture 2. 38 Land Surveyor 2 - P08 Plumbing and Piping Design 4. 36 Industrial Hygienist 7 - S04 Sewage Collection; Treatment and Disposal 4. 24 Environmental Scientist - - Architect/Engineer in Training 82 7 S09 Structural Design; Special Structures 6. Refrigeration Engineer - - S13 Storm Water Handling and Facilities 2. Electrical/Mechanical Designer 36 8 V01 Value Analysis; Life-Cycle Costing 1. Building Envelope 5 - Building Codes Specialist - - Other Employees 45 3 Included above are 90 LEED®-APs Total 377 43 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 8 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 9 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE May 15, 2015 c. NAME AND TITLE Wayne Freeman, RLA, ASLA / Associate ADDITIONAL SUPPORTING MATERIALS The qualifications of professional personnel to be assigned to the project (please see full resumes for each team member in Section E of the SF330 submittal) Erik Garberg, PE As a Civil Engineer, Erik’s background has touched on all aspects of Civil/Municipal Engineering and Land Development. His 15 years of experience extends from working with solid waste districts to earthen dam inspection. While working for groups as varied as local airport authorities to large scale private land developers. In addition to his technical background, Erik has spent significant time developing public policy as a City Councilman/ Commissioner and on numerous planning and zoning boards. This work provides him insight into municipal finance and budgeting, public process, and entitlements. Doug Riley Doug joined CTA as a Planner with over 22 years of local government planning experience in Montana, Colorado and Michigan. While primarily focusing on development review and entitlement projects, his experience also includes several special community planning efforts and updates to growth management plans. Stephanie Ray Stephanie’s background in public communication will directly benefit this effort. She is adept as using traditional means such as local media outlets, as well as innovative outreach strategies such as open houses and creative stakeholder meetings to maximize community involvement, input, and buy-in. Kris Good, RCDD With over 30 years in the telecommunications and security industry, Kris, has been instrumental in assisting customers define the key elements in infrastructure, technology, and special systems projects. Focusing on the design of these systems from start to finish, Kris has helped customers find the correct systems to fit their needs, while effectively managing budgets and schedules. At the leading edge of new technologies and trends, Kris, has a unique perspective to see duplication of systems, and vulnerabilities, and to suggest effective design strategies that save time and money. Kris, has watched as the industry has transformed from the days of divestiture, to the beginning of IP based systems to new wireless technologies, and fiber optic design. Related experience on similar projects Section F of the SF 330 submittal, features 10 projects that highlight experience that is directly relevant to addressing and meeting the general goals outlined by the Northeast Urban Renewal District. CTA’s integrated service sector approach will allow us to efficiently bring a wide variety expertise to this effort. CTA’s team provides services as varied as retail market analysis to drinking water treatment plant design. In addition to the projects in our SF-330 additional relevant experience includes: Gardiner Gateway Project Gardiner, MT CTA’s licensed professional land surveyors employ the latest technology to provide the most accurate and efficient surveys. Our goal is to produce surveys that contain complete, accurate, and accessible information. Licensed in multiple states, CTA staff is also able to complete Certified Federal Surveys. This project, funded primarily through the Federal Lands Access Program, is focused on enhancing access to Yellowstone Nation Park through the North Entrance in Gardiner. CTA has been an integral part of this project having completed a preliminary engineering report for the portions of the work within Park County, providing topographic survey of the project area, working through rights-of-way issues and acting as Park County’s representative on the project steering committee. CTA also completed a drainage report as part of the initial preliminary engineering report and is now in the process of performing a Value Engineering review of the 50% design completed by the Federal Highway Administration. South Kalispell Urban Renewal Plan Kalispell, MT CTA was hired by the City of Kalispell to complete this large 700+ acre urban planning exercise to provide guidance for the future development within the South Kalispell Area, including the future of the City of Kalispell Airport. The project team’s primary goal was to engage the public using a variety of outreach methods to gain as much community feedback as possible. The public outreach process consisted of meeting individually with primary stakeholders and interest groups, having public open forum meetings, creating a project website (http:// southkalispellurbanrenewal.com/),conducting a public survey using the project website as well as the open meeting format, presenting emerging themes to the public in a public charrette workshop. Other forms of media were utilized as well, including radio, television, and newspapers, and direct mailing. Capability to meet project schedule and budget requirements We understand that some of the projects associated with this effort are designated while others are not, therefore we will approach this criteria generally, emphasizing our philosophy and track record of always respecting our clients’ time and often limited funds. Without a specific project this criteria can only be addressed generally. CTA annually manages hundreds of millions of dollars of construction for clients as varied as the Federal Government to “mom and pop” coffee shops. In addition to our project approach description proved in Section H, the graphic below is meant to illustrate how CTA brings 3-dimesional thinking to project management. By valuing multiple criteria against a traditional project timeline we continue to focus the project back on its original, goals, thus allowing us to maximize the all the strengths of our multidisciplinary team. Location of firm in relation to project While CTA has offices across the US and Canada the project would be managed and served from our Bozeman office. 411 East Main Street Suite 101 Bozeman, MT 59715 By the Numbers 400+ professionals $400m+ annual construction volume 77 years in business 95+ LEED accredited professionals 18 locations 1 customer-driven mission Offices UNITED STATES COLORADO | Denver IDAHO | Boise LOUISIANA | New Orleans MINNESOTA | Minneapolis MONTANA | Billings, Bozeman, Great Falls, Helena, Kalispell, Livingston, Missoula, and Red Lodge TEXAS | Austin WASHINGTON | Seattle WYOMING | Gillette and Jackson CANADA BRITISH COLUMBIA | Vancouver SASKATCHEWAN | Regina Present and projected workloads Our current workload is moderate and our forecasts show us remaining at the moderate level for the foreseeable future – which is the next six to eight months time period. The size of our firm and our capabilities will allow us to commit the necessary planning specialists and technical professionals to any project associated with this effort to make sure your time, budget, and quality expectations are met. Recent and current work for the City of Bozeman shows attention to detail North Park | Bozeman, MT Working with the City of Bozeman and Montana Department of Natural Resources and Conservation, CTA developed a long range master plan for the project as well as a market feasibility assessment and financial feasibility assessment for this 250 acre parcel. This project proposes planning for light industrial, commercial, flex office space, a hotel and meaningful expansion of parks and open space. A planned bridge across Interstate 90 links two sections of the City of Bozeman along the parameter of the project. CTA has developed the Preliminary Engineering Report for the project. Recent and current work for the City of Bozeman in existing TIF Districts • North 7th Improvements • Montana State University – Innovation Campus • North Park ENGINEERINGcta civil engineering experience Livingston, MT • Sewer main replacement • Street reconstruction • Water and sewer extensions • Water main replacement • WWTP improvements Geraldine, MT • Wastewater lagoon system Denton, MT • Wastewater lagoon system Bozeman, MT Hillcrest – site improvements for 62,000 sq. ft addition • Relocation of water and sewer mains • Site grading • New access streets to underground parking • Storm drainage improvements Columbus, MT Stillwater Community Hospital – site improvements for addition • Relocation of water and sewer mains • Site layout and design • Relocation of surface storm water drainage • Design of new parking lot • Town of Columbus • Wastewater system replacement Helena, MT Secure Female Facility • New water service • New sewer main • Irrigation system • Pump station Montana Department of Fish, Wildlife & Parks (fishing access) • Road design • Parking lot design • Fishing structure design • Boat ramp design • Vault toilets • Camper sites Green River, WY Sweetwater School District #2 • Site Drainage (roof) • Supplementary fire supply line design Worland, WY • Site survey • Parking lot improvement design CTA Civil Engineers gained their diverse expertise and experience by providing professional engineering on a wide range of projects in and for the municipalities listed below. • Missoula • Billings • Red Lodge • Colstrip • Cooke City • Park County • Yellowstone County • Carbon County • Kalispell • Laurel • Conrad • Roundup • Hardin • Glasgow • Washington • Colorado Project details and references provided upon request. Livingston, MT Green River High School, Green River, WY 1106jh ENGINEERSCIVIL NON-DISCRIMINATION AFFIRMATION FORM CTA Architects Engineers, hereby affirms it will not discriminate on the basis of race, color, religion, creed, sex, age, marital status, national origin, or because of actual or perceived sexual orientation, gender identity or disability in the performance of work performed for the city of Bozeman, if a contract is awarded to it, and also recognizes the eventual contract, if awarded, will contain a provision prohibiting discrimination as described above and that this prohibition shall apply to the hiring and treatment of the CTA Architects Engineers employees and to all subcontracts it enters into in performance of the agreement with the city of Bozeman. Signature of Bidder: Person authorized to sign on behalf of the bidder Thank you for the opportunity! CTA Architects Engineers 411 East Main Street | Suite 101 Bozeman, MT 59715 406.556.7100 www.CTAGROUP.com OFFICES United States COLORADO | IDAHO | LOUISIANA | MINNESOTA | MONTANA | TEXAS WASHINGTON | WYOMING Canada BRITISH COLUMBIA | SASKATCHEWAN