Loading...
HomeMy WebLinkAboutC3. NW Energy Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Hyalite Sourdough Water Treatment Plant Project – Northwestern Energy Incentive. MEETING DATE: May 18th, 2015 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize acceptance of the Northwestern Energy Incentives for installation of energy efficient components. BACKGROUND: Attached is a copy of the Efficiency Plus (E+) Rebate Program Applications which have been submitted to Northwestern Energy for the Water Treatment Plant. After completion of the project, our consultants HDR became aware of this program that was being offered by Northwestern Energy. The boiler and variable speed drive pumps that were installed on the project are eligible for the incentive program, so the attached applications were prepared and submitted. The incentive could total $97,807.45 based on the pump motor horsepower and boiler input rating. This consent item is being submitted in accordance with Administrative Order No. 2014-01 – Adoption of Grant Application and Reception Policy. UNRESOLVED ISSUES: None ALTERNATIVES: If the Commission chooses not to accept the incentive, any checks received will be returned to Northwestern Energy. FISCAL EFFECTS: Potential Incentive/Rebate of $97,807.45 Attachments: Northwestern Energy Applications and Supporting Documentation Report compiled on: 5/5/15 82 83 85 87 88 89 90 91 93 94 95 97 99 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 119 120 121 123 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152