Loading...
HomeMy WebLinkAbout32A BPS Letter_123114 _______________________________________________________________________________________________________ December 31, 2014 Kevin Jacobsen, P.E. Project Engineer Morrison-Maierle, Inc. 2880 Technology Boulevard West Bozeman, Montana 59718 Via email: kjacobsen@m-m.net@dowlhkm.com Subject: Preliminary Plat of The Lakes at Valley West Subdivision – Phase 1 & 2 Dear Mr. Jacobsen, Referencing your letter received December 29th, 2014 concerning the evaluation of the subject development. We would expect that the 59 residential units planned for Phase 1 & 2 would generate the following students:  Pre-K to 5th 14 Students  6th to 8th 7 Students  9th to 12th 9 Students As of this date, the proposed development will be in the Meadowlark Elementary School, Chief Joseph Middle School and Bozeman High School attendance areas. Population growth and demographic shifts in the future may necessitate boundary realignments to existing schools which could modify the designated attending schools. Similarly, if a designated school attendance area’s student population exceeds the school’s capacity; attendance at an alternate school may be required. Infrastructure, such as sidewalks, should be constructed for the entire project irrespective of when actual homes are developed to provide a Safe Route to School pathway for students to safely traverse the developed and existing roadways. Our existing bus system can accommodate the estimated number of additional students. Please let us know if there are any changes to the proposed development as this could modify the above student projections. Sincerely, Todd Swinehart, PE cc: Steve Johnson, Deputy Superintendent of Operations – Bozeman Public Schools Vance Ruff, Transportation Coordinator – Bozeman Public Schools Todd Swinehart, PE Director of Facilities (406) 522-6009 todd.swinehart@bsd7.org Bozeman Public Schools 404 West Main, PO Box 520 Bozeman, MT 59771-0520 www.bsd7.org