Loading...
HomeMy WebLinkAbout30B Durston-Laurel Construction Proposal95.00'R.O.W.CENTER OF ROADWAY14.00'BLVD2.00'MINOR ARTERIAL SECTION15.00'TURN LANE12.00'DRIVE LANE12.00'DRIVE LANE5.00'BIKE5.00'SDWK1.00'1.00'5.00'BIKE18.00'BLVD6.00'SDWK2.00'25.00'TBC TO CL25.00'TBC TO CL20.00'25.00'15.00'8.00'23.00'23.00'EXISTINGROAD CL(APPROX.)3%3%PROPOSED ROAD SECTIONEXISTING ROAD SECTION3%2%2%45.00'50.00'2%2%8.00'15.00'3%NOTES:1. EXISTING ROADWAY DIMENSIONS ARE APPROXIMATE AND VARY OVER THE LENGTH OF THE PROJECT.2. EXISTING EDGE OF ASPHALT WILL BE SAWCUT 1.0' AND NEW PAVEMENT WILL BEGIN THERE.3. THE NORTH HALF OF THE ROADWAY IS IN PLACE TO THE TOP BACK CURB FOR THE ENTIRETY OF THE PROJECT, BUT ONLY PORTIONS OF THE NORTH HALF CONTAIN BOULEVARD AND SIDEWALK.4. CENTER OF RIGHT-OF-WAY IS SHOWN AS CENTER OF 90' R.O.W. EVEN THOUGH THE SOUTH HALF WILL DEDICATE 50' OF R.O.W. THE EXCESS R.O.W. ON THE SOUTH HALF WILL BE INCREASED BOULEVARD WIDTH.2880 Technology Blvd- WestBozeman, MT 59718Phone: (406) 587-0721Fax: (406) 922-6702REVISIONSSHEET NUMBERPROJECT NUMBERDRAWING NUMBERVERIFY SCALE!THESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!DATEDESCRIPTIONNO.BYN:\5352\002\ACAD\EXHIBITS\ROADWAY SECTIONS\TYPICAL ROADWAY SECTIONS.DWG PLOTTED BY:COOPER KRAUSE ON Jan/20/2015COPYRIGHT MORRISON-MAIERLE, INC., 2015APPR. BY:DATE:DATE:BY:DSGN. BY:Q.C. 9109.VW-WingXFIG.2BOZEMANMONTANAKDJKDJKDJ01/2015MINOR ARTERIAL SECTIONTHE LAKES AT VALLEY WESTDURSTON ROAD 90.00'R.O.W.CENTER OF R.O.W.7.00'BLVD7.00'BLVD6.00'SDWK6.00'SDWK11.00' EASTBOUND TURN LANE12.50'BLVD6.00'SDWK6.00'SDWK12.50'BLVDAT TYPICAL CURB BULB LOCATIONSCOLLECTOR STREET SECTION3%3%8.00'PARKING5.00'BIKE LANE10.00'DRIVING LANE14.00'RAISED MEDIAN8.00'PARKING5.00'BIKE LANE10.00'DRIVING LANE0.50'CURB0.50'CURB2%2%2%2%62.00'TBC TO TBC11.00'WESTBOUND TURN LANE18.50'TBC-TBC12.50'BLVD6.00'SDWK6.00'SDWK12.50'BLVD5.00'BIKE LANE10.00'DRIVING LANE5.00'BIKE LANE10.00'DRIVING LANE3.00'RAISED CONCRETEMEDIAN3.00'RAISED CONCRETEMEDIAN2880 Technology Blvd- WestBozeman, MT 59718Phone: (406) 587-0721Fax: (406) 922-6702REVISIONSSHEET NUMBERPROJECT NUMBERDRAWING NUMBERVERIFY SCALE!THESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!DATEDESCRIPTIONNO.BYN:\5352\002\ACAD\EXHIBITS\ROADWAY SECTIONS\TYPICAL ROADWAY SECTIONS.DWG PLOTTED BY:COOPER KRAUSE ON Jan/20/2015COPYRIGHT MORRISON-MAIERLE, INC., 2015APPR. BY:DATE:DATE:BY:DSGN. BY:Q.C. 9109.VW-WingXFIG.3BOZEMANMONTANAKDJKDJKDJ01/2015COLLECTOR STREET SECTIONTHE LAKES AT VALLEY WESTLAUREL PARKWAY SHEET NUMBERPROJECT NUMBERDRAWING NUMBERCOPYRIGHT MORRISON-MAIERLE, INC., 2015APPR. BY:DATE:DATE:BY:DSGN. BY:Q.C. 5352.002XEX.1BOZEMANMONTANACPKKDJKDJ01/2015QCBYQCDATEDURSTON ROAD AND LAUREL PARKWAYSTREET IMPROVEMENTSEXHIBIT 1010010020050HORIZ. SCALEIN FEETPHASE 1: DURSTON ROADCOTTONWOOD ROAD PHASE 2: LAUREL PARKWAY WESTGATE AVENUE NOTE:ALL ROADWAYS WILL BE COMPLETED TO CITY STANDARDSINCLUDING: STEETS, CURB AND GUTTER, SIDEWALK,DRAINAGE FACILITIES, UTILITIES, AND RELOCATION OFDITCHES AND WETLANDS WHEN NECESSARY.LOCAL STREETWESTMORLANDDRIVE Exhibit 2Project Funding ProposalThe Lakes at Valley West - Roadway ImprovementsDurston Road and Laurel ParkwayItemSub ItemTotal Estimated CostThe Lakes at Valley WestImpact Fee FundsOther Funding SourceDurston RoadThe Lakes PUD FrontageCurb and Gutter28,200$ 28,200$ Excavation and Gravel97,760$ 17,775$ 79,985$ Asphalt51,935$ 51,935$ Sidewalk63,450$ 63,450$ Street Lights52,500$ 15,000$ 37,500$ Signing and Striping30,000$ 30,000$ Culverts50,000$ 15,000$ 35,000$ Bronken Park FrontageCurb and Gutter24,420$ 24,420$ Excavation and Gravel84,656$ 69,264$ 15,392$ Asphalt44,974$ 44,974$ Sidewalk67,155$ 67,155$ Street Lights37,500$ 37,500$ Signing and Striping25,000$ 25,000$ Culverts45,000$ 38,000$ 7,000$ Ditch Relocation200,000$ 200,000$ Subtotal902,550$ 139,425$ 649,158$ 113,967$ Contingency at 20%180,510$ 27,885$ 129,832$ 22,793$ Engineering and Planning at 20%180,510$ 27,885$ 129,832$ 22,793$ Total Durston Road1,263,569$ 195,194$ 908,821$ 159,554$ Laurel ParkwayDurston to South Edge of The LakesCurb and Gutter64,800$ 32,400$ 32,400$ Excavation/Gravel/Median Landscape170,100$ 90,205$ 79,895$ Asphalt75,600$ 44,374$ 31,226$ Sidewalk72,900$ 72,900$ Street Lights22,500$ 15,000$ 7,500$ Signing and Striping25,000$ 2,000$ 23,000$ Misc. Storm Drainage Improvements25,000$ 20,000$ 5,000$ Subtotal455,900$ 276,878$ 179,022$ -$ Contingency at 20%91,180$ 55,376$ 35,804$ -$ Engineering and Planning at 20%91,180$ 55,376$ 35,804$ -$ Total Laurel Parkway638,260$ 387,630$ 250,630$ -$ Total Cost Durston Road and Laurel Parkway1,901,829$ 582,824$ 1,159,451$ 159,554$