Loading...
HomeMy WebLinkAboutC4. Right of Way Easements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Project Engineer Craig Woolard, Director of Public Works SUBJECT: Authorize the City Manager to sign a Right of Way Agreement, Public Drainage Easement Agreement, Public Utility and Access Easement, Public Drainage Easement, and Temporary Construction Permit with the J&D Family Limited Partnership. MEETING DATE: April 20, 2015 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign a Right of Way Agreement, Public Drainage Easement Agreement, Public Utility and Access Easement, Public Drainage Easement, and Temporary Construction Permit with the J&D Family Limited Partnership. BACKGROUND: On April 13, 2015 the City Commission authorized additional street impact fee expenditures for the Cottonwood Road project to provide for its construction from Alpha Drive to Fallon Street. The project impacts property commonly known as the J.C. Billion Auto Dealership which is owned by the J&D Family Limited Partnership. Compensation for impacts has been negotiated with Mr. Joe Billion, general manager of the partnership, and agreed as provided in the attached Right of Way Agreement, Public Drainage Easement Agreement, and Temporary Construction Permit. The rate of compensation on a $/sq. ft. basis was determined by a property appraisal completed by Joki & Associates in July 2014 in accordance with standard appraisal practices for commercial real estate. The compensation was calculated by multiplying the impacted area of property by the appraised rate. Compensation is provided for a Public Utility and Access Easement as memorialized in the Right of Agreement at a total amount of $35,063.50. This easement will provide for public access and utilities from Cottonwood Road to Auto Plaza Drive as shown on the exhibit provided with the easement. The access design onto Cottonwood Road provides for full turning movements and aligns with the existing access on the east side of the road shared by First Security Bank and Alpine Orthopedic. Compensation is provided for a Public Drainage Easement as memorialized in the Public Drainage Easement Agreement at a total amount of $28,068.00. The easement will contain a stormwater detention pond sized to handle runoff from full principal arterial roadway section in accordance with City engineering design standards. 18 Compensation is provided for a Temporary Construction Permit at a total amount of $2,647.20. The construction permit allows for the use of a strip of land of varying width on Mr. Billion’s property to facilitate the roadway construction. ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: The current FY’15 budget contains $100,000 in the Street Impact Fee CIP for ‘right of way acquisition’. Total compensation to Mr. Billion amounts to $65,778.70. The cost to obtain the property appraisals is borne by the City as well, at a total fee of $8,000. The total cost for the Cottonwood Road project to the right of way acquisition line item in the approved street impact fee CIP is $73,778.70. There is a sufficient balance in the street impact fee CIP to cover this expense. ATTACHMENTS: Right of Way Agreement Public Drainage Easement Agreement Public Utility and Access Easement Public Drainage Easement Temporary Construction Permit Report compiled on: April 14, 2015 19 20 21 22 23 24 25 26 27 28 29 30 31