PROFESSIONAL SERVICES AGREEMENT
FOR
CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY
MMI. No. 0417.075
THIS IS AN AGREEMENT made as of g23 al 2015, between
THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana,
59771-1230 (OWNER) and Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-
1113 (ENGINEER).
WHEREAS the parties previously entered into a Professional Services Agreement dated
October 13, 2014, herein referred to as the Original Agreement, for professional engineering services
for the Capital Improvement Projects Field Survey Project; and
WHEREAS, the scope of the Original Agreement included preliminary design services only;
and
WHEREAS, the scope of Amendment No.I to the Original Agreement included additional
preliminary design services; and
WHEREAS, the parties desire to amend provisions of the Original Agreement to include
additional preliminary design engineering services for the project.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS
CONTAINED HEREIN, the parties agree as follows:
The conditions and provisions set forth in the attached EXHIBIT C-2 — SCOPE OF SERVICES FOR
CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY AND EXHIBIT(S) D-2 - FEE
ESTIMATE are hereby incorporated in and made part of this Agreement.
ARTICLE 4 - Basic Engineering Services
Section 4.2 is included as part of this amendment and is modified as follows:
The last sentence of Section 4.2 of the Original Agreement is replaced with the following:
The Preliminary Design Phase will be completed and submitted by the end of June 2015. Task 500 shall be
completed and delivered to OWNER around early May, 2015. Task 600 shall be completed and delivered to
OWNER around mid-April, 2015.
Article 6 - Compensation For Engineerinp, Service
Article 6.1 of the original agreement is modified as follows:
6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER
6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering
Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of
$152,526.55 for such services.
6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services
(sections 4.1 through 4.3) shall not exceed the following ceilings:
$11,061.40 (7 % of design fee) until the Task 100 has been completed and submitted to the OWNER
and review authorities.
$152,526.55 (100 % of design fee) until the Tasks 100, 200, 300A, 400A, 500 and 600 have been
completed and submitted to the OWNER and review authorities.
Except as specifically amended herein, the Original Agreement shall remain in full force and effect
and the parties shall be bound by all terms and conditions therein.
2
In witness whereof, the Parties hereto do make and execute this Agreement.
CITY OF BOZEMAN, MONTANA
BY:
(City Manager)
DATE: 3- Z 3— i r -
ATTEST:
MORRISON-MAIERLE, INC.
&
:
BY
(Vice -President)
DATE: 1.749A', -e-4 a2D/�
Ad
AdMORMSON
_449i MMERLE,[NC,
Exhibit C-2 - Scope of Services for Capital Improvement Projects Field Survey
March, 2015
Preliminary Design Phase
The preliminary design phase will proceed following written authorization to proceed from the
owner. The topographic survey shall occur during this phase.
This phase includes specific tasks and sub -tasks that will be provided for the Capital
Improvement Projects Field Survey. Each task encompasses a specific survey area within the
City of Bozeman and the sub -tasks define the work elements for each task.
The tasks defined for this project include the following and are illustrated on the attached figures
within Exhibit C-2:
Task 400A - Kagy Boulevard (includes one block of Lincoln Street)
Task 500 - N. 19th Avenue
Task 600 - Kagy Boulevard MDT Control and Cadastral Survey
Task 400A is modified from Amendment #1 to remove specific portions of Kagy
Boulevard (see Figure 4A).
Task 500 to be completed and delivered to the City of Bozeman early May 2015 (see
below and Figure 5).
Task 600 to be completed and delivered to the City of Bozeman/MDT mid-April 2015
(see below).
The following sections describe each sub -task as well as identifying the deliverable for each sub -
task.
Task 500
Sub -task 001
Office Research and Computations
Task Description — Complete research and computations as well as preparation of survey
equipment and files required for field survey.
Task deliverable — N/A
A, MORRISON
Aid MMERLE,ix.
An r 0-W Cw,V—y
Sub -task 002
Horizontal and Vertical Field Control
Task Description — Establish vertical / horizontal control and provide horizontal control
points and vertical benchmarks at each intersection or at intervals not to exceed 1,000
feet. Verify existing boundaries of properties in order to accurately create easement
exhibits.
Task deliverable — N/A
Sub -task 003
Topographic Field Survey
Task Description — Complete a topographic design survey of the area east of the N. 19`h
Avenue right of way roughly 50-100 feet wide as noted on the attached Figure 5. Survey
includes surface features and subsurface utilities, including depth information on water,
sewer, and storm utilities. Manholes shall have center of lid and center of manhole
located. Horizontal locations of underground utilities provided by utility locate personnel
using pin flags and paint markings. Underground utility materials and sizes to be noted
based on locates and City of Bozeman provided service cards and record drawings.
Advise city staff of any discrepancies between survey and service cards/record drawings.
City of Bozeman to provide vacuum excavation services as needed for valve boxes and
sewer and storm manholes/inlets.
Task deliverable — N/A
Sub -task 004
Office Survey Data Processing
Task Description — Download survey data and prepare topographic mapping drawings
using standard Morrison-Maierle line work and symbols.
Task deliverable — N/A
Sub -task 005
Field Survey Verifications
Task Description — Review topographic survey drawings for completeness and accuracy
by walking the project area with drawings in hand. Based on field review, complete
additional survey as necessary and update survey drawings.
Task deliverable — N/A
A IMORMSON
_44199 MAIERLE,INC.
All 0111.•)Ce ?PUfIY•
Sub -task 006
Easement Exhibit (four parcels)
Task Description — Create four (4) easement exhibits for Tract 2, Lot 1; Tract 3, Lot 1;
Tract 6, Lot 1; and Tract 7, Lot 3 in the Gardner — Simmental Plaza Subdivision.
Coordinate with City of Bozeman on required easement length, widths, etc.
Task deliverable — N/A
Sub -task 007
Deliverables
Task Description — Prepare project submittal package.
Task deliverable — Topographic mapping exhibits (both paper and electronic) for each
survey area. Overall control exhibits (both paper and electronic) for each survey area.
Topographic and control exhibits may be combined. Electronic AutoCad files shall
utilize a Civil 3D 2013 compatible format. Copies of all field notes. Certified easement
exhibits (4) in pdf format.
Sub -task 008
Coordination — City, Utilities
Task Description — Project coordination and utility locate coordination.
Task deliverable — N/A
Sub -task 009
Quality Assurance / Quality Control
Task Description — This task includes effort associated with project coordination and
quality control/assurance.
Task deliverable — N/A
Task 600
(Task 600 and all sub -tasks are per Montana Department of Transportation Survey
Standards. Extents of survey are from S. 19th Avenue to S. Willson Avenue. Activities
and sub -tasks are noted on the attached Exhibit D-2. Deliverables will include a control
survey and cadastral survey to the City of Bozeman/MDT)
a wnladls
'11a wnladls
3AV HIU 'S
O
Ln
AVM M33119
w
Z
v
O
'3AV HIL 'S
Wo Ivosoe
'1113 IV38o8 U)
}w
w�
> U
�a
� M
�Lo
LL tl
0 II
Q �
3AV HILL 'S Q a
0
Q
z
w
w
OW
a>
�D
J U)
Q. w
6 L
a~
w
NO
0
LL
O
w
0
w
w
ui
a
0
F-
ui
a
M
rn
ui
0
m
C)
O
a
Y
Exhibit D-2 - Fee Estimate N10wom
City of Bozeman, MT - Capital Improvement Projects Field Survey 144AIgRLG..A
Prepared For: Robert Murray Jr., P. E.
Survey / Engineering Services
Mar -2015
TotalTask Avenue a'frai;i1?fru•'s%i;•:;i:;4i::33 $12,652.00
L The reduction In cost due to Task 40104 (removal of t1-3.2 acres ofKagy Roulevardbehveen S.19th Avenue and S. llth Avenue from contract) equals the cost of Task 507.
N:\0417\075\Contracts-Client\Contracts\Contract Amend #2\Exhibit D-2 - Engineering Fee Estimate.xts 3/11/2015
AssignedTask
LaborStaff
..
500 - N.19th Avenue
..
501. Office Research and Computations
Land Surveyor III
2.00
$114.00
$228.00
Land Surve or II
4.00
$102.00
$408.00
502. Horizontal and Vertical Field Control
Crew
Two Person Survey$
12.00
175.00 _
$2,100.00
Land Surveyor III
2.00
$114.00
228.00
Two Person Survey Crew
16.00
_
$175.00
_
$2,800.00
503. Topographic Field Survey
Senior Engineer I
2.00
$128.00
$256.00
Land Surveyor III
3.00
$114.00
$342.00
504. Office Survey Data Processing
Land Surveyor II
2.00
$102.00
$204.00
Engineering Technician II
10.00
$102.00
$1,020.00
505. Field Survey Verifications
Senior Engineer I
2.00
$128.00
$256.00
Land Surveyor II
2.00
$102.00
$204.00
Senior Engineer I
2.00
$128.00
$2S6.00
506. Easement Exhibit (four parcels)
Land Surve or II
8.00
$102.00
$816.00
Engineerina Technician II
6.00
$102.00
$612.00
507. Deliverables
Senior Engineer I
2.00
$128.00
$256.00
Enqineerina Technician II
4.00
$102.00
$408.00
508. Coordination - City, Utilities
Senior Engineer I
2.00
$128.00
$256.00
Land Surveyor III
4.00
114.00
456.00
509. Duality Assurance uall Control
Su ervisin En ineer III
2.00
172.00
344.00
Subtotal - Labor Costs
87.00:1113
;S{11:f111 •'•11:1$11,450.00
Direct ExpensesQuantity•.oCharge.
TotalExpense
Technologyand Communications
87.00
6.00
522.00
Vehicle ml
60.00
0.75 1
45.00
GPS/Total Station (days)
3.00
200.00
600.00
Survey Materials (days)
3.00
5.00
15.00
Deliverable Package
1
1 $20.00 1
$20.00
Subtotal - Direct
Expenses
-1-$1,202.00
TotalTask Avenue a'frai;i1?fru•'s%i;•:;i:;4i::33 $12,652.00
L The reduction In cost due to Task 40104 (removal of t1-3.2 acres ofKagy Roulevardbehveen S.19th Avenue and S. llth Avenue from contract) equals the cost of Task 507.
N:\0417\075\Contracts-Client\Contracts\Contract Amend #2\Exhibit D-2 - Engineering Fee Estimate.xts 3/11/2015
Exhibit D-2 - Fee Estimate J ! MORRISON
City of Bozeman, MT - Capital Improvement Projects Field Survey AA19 NIAIERLE iv:
Prepared For; Robert Murray Jr., P. E.
gIIPVPv / Fnnineerina Services
Mar -2015
Task Total - Kagy Control and Cadastral Survey (MDT)
1, Extents ofsumey are from S. 19ffi A venue to S. W11wn A venue.
N:\0417\075\Contracts-Client\Contracts\Contract Amend #2\Exhibit D-2 - Englneering Fee Estimate.As 3/11/2015
Labor..
LaborTask
600 - Kagy Control - Activity 108
Assigned
Hours
Rate
601. Survey Coordination QA
Surve Mana er
8.00
$148.00
$1,184.00
602. Control Survey Plan
Land Surveyor III
8.00
$114,00
$912.00
603. Meet w MDT
Survey Manager
3.00
$148.00
$444.00
604. Recon Recover and Set Control
Two Person Survey Crew
8.00
$175.00
$1,400.00
605. Horizontal GPS Static Control Survey
Two Person Survey Crew
16.00
$175.00
$2,800.00
606. Vertival Control Survey. Diff Levels
Two Person Survey Crew
16.00
$175.00
$2,800.00
607. Download GPS Processing
Land Surveyor II
8.00
$102.00
$816.00
608. Control Diagram
Land Surve or II
8.00
$102.00
$816.00
609. Control Point Abstracts
Land Surve or II
8.00
$102.00
$816.00
610. Compile Dellverables
Land Surveyor II
8.00
$102.00
$816.00
Senior Engineer I
8.00
128.00
1024.00
611. Submit, Revise, Finalize Deliverables
Land Surve or II
6.00
102.00
612,00
10S.00
ti;:s %:issi zr:%%is:is s
1 1 1
600 - Kagy Cadastral - Activity 120
612. Survey Coordination QA
Survey Manager
2.00
$148.00
$296.00
613. Data Research
Land Surveyor II
16.00
$102.00
$1,632.00
614. Pre -Calculate Record Surveys
Land Surveyor II
12.00
$102.00
1 224.00
615. PLSS Ties - A
Two Person Survey Crew
16.00
$175.00
$2,800.00
616. RI ht of Way Ties - A
Two Person Survey Crew
24.00
$175.00
$4,200.00
617. Property Corner Ties - A
Two Person Survey Crew
8.00
$175.00
$1,400.00
618. Corner Search - B Ties
Two Person Survey Crew
16.00
$175.00
$2,800,00
619. Survey Data Processing
Land Surveyor II
8.00
$102.00
$816.00
Land Surveyor III
4.00
$114.00
$456.00
620. Boundary Analysis
Land Surveyor II
4.00
$102.00
408,00
621. Search or Set Monuments
Two Person Survey Crew
8.00
$175.00
$1,400.00
622. Draltlng Certificate of Survey
Land Surve or II
40.00
$102.00
$4,080.00
623. Review Revise Finalize
Land Surveyor II
8.00
$102.00
$816.00
624. Corner Records
Land Surveyor II
4.00
$102.00
$408.00
Senior Engineer I
12.00
128.00
1 536.00
625. Submit, Revise, Finalize Deliverables
Land Surve or II
12.00
102.00
1224.00
Subtotal - Labor
Costs
194.r •
%s l i
•
Technologyliff
and Communications
299.00
6.00
$1,794.00
Vehicle ml
125.00
0.75
93.75
GPS otdlStatfon(days)11.00
$200.00
2 200.00
Survey Materials (days)
11.00
$5.000
Deliverable Package
2
DirectSubtotal -
150.00
300.00
Task Total - Kagy Control and Cadastral Survey (MDT)
1, Extents ofsumey are from S. 19ffi A venue to S. W11wn A venue.
N:\0417\075\Contracts-Client\Contracts\Contract Amend #2\Exhibit D-2 - Englneering Fee Estimate.As 3/11/2015
Exhibit D-2 - Fee EstimateMolzRlsav
City of Bozeman, MT -Capital Improvement Projects Field Survey -A-AA MERLE...
Prepared For: Robert Murray Jr., P.E.
Summary - Survey / Engineering Services
Mar -2015
Task
100 - West Olive St.
included under orig. contract
Total
Acres
3.3
Total
Cost
$11,061.
200 - East Olive St,
included under orig. contract
3.2
$11,061.40
300A - Wilson Ave. Incl. one block of Lincoln St.
modified orig. scope, cost remains unchanged)
16.3
$43,012.50
400A - Ka Boulevard
modffied orig. scope, area and cost reduced
10.3
$30,360.50
500 - N.19th Avenue
3.2
$12,652.00
600 - Ka Boulevard MDT Control CadastraI
Total Project
Cost
N A
36.3 $IS2,526.55
44 378.75