HomeMy WebLinkAbout15- ADDENDUM 1 MT Ave Fiber Optic Project
MEASUREMENT AND PAYMENT 1
SECTION 00100
MEASUREMENT AND PAYMENT
The quantities listed in the Bid Form are estimates for the purpose of bidding only. Payment to the
Contractor will be made based on the actual satisfactorily completed work quantities measured in the
field. Under the terms of this contract, the unit price as contained in this Bid Form shall be applicable to
quantity overruns.
The following measurement and payment sections do not necessarily name every incidental item
required by the Contract Documents to complete the work. Cost of all such incidental items shall be
included in the various related bid items.
Item 101: (Taxes, Bonds, Insurance) To be paid on the first progress pay estimate one-hundred percent
(100%) upon mobilization to begin construction, only if the bid price for this item is less than five
percent (5%) of the total price. For that portion of the taxes, bonds, and insurance greater than five
percent (5%), if any, payment shall be made on the basis of the percentage of the work completed of
each progress estimate.
Item 102: (Mobilization) Fifty percent (50%) to be paid on the first progress estimate when mobilizing
to begin construction, and fifty percent (50%) to be paid following substantial completion and
acceptance of the work.
Item 103: (Base Bid) Measurement shall be made on a lump sum basis. Payment at the contract unit
price shall constitute full compensation to provide, install, and test the proposed fiber optic infrastructure
as described in the contract documents from the City Hall termination to manhole #7 at the EOC,
including the installation of a 24-strand fiber optic cable per the Special Provisions Specification
271500, and other work necessary or incidental for completion of this item.
Item 104: (Miscellaneous Work) The item Miscellaneous Work has been provided in the proposal for
any work and/or materials which may be encountered during construction, but which is not addressed
elsewhere in the contract. Miscellaneous work will be measured by the respective unit for material
and/or work performed as directed in writing by the Engineer. Payment for Miscellaneous Work,
measured as provided above, will be at agreed upon prices or on force account basis. The number of
units in dollars set down in the contract is an estimated amount only, which may be adjusted up or down
by the Engineer in accordance with the needs of the project.
Item 201: (Additive Alternate #1) Measurement shall be made on a lump sum basis. Payment at the
contract unit price shall constitute full compensation to provide, install, and test the proposed fiber optic
conduit from the EOC to Oak Street as described in the contract documents and other work necessary or
incidental for completion of this item.
Item 301: (Additive Alternate #2) Measurement shall be made on a lump sum basis. Payment at the
contract unit price shall constitute full compensation to provide, install, and test the proposed 144-strand
fiber optic cabling from manhole #1 to manhole #9 at Oak Street as described in the contract documents
and other work necessary or incidental for completion of this item.