Loading...
HomeMy WebLinkAbout15- ADDENDUM 1 MT Ave Fiber Optic Project MEASUREMENT AND PAYMENT 1 SECTION 00100 MEASUREMENT AND PAYMENT The quantities listed in the Bid Form are estimates for the purpose of bidding only. Payment to the Contractor will be made based on the actual satisfactorily completed work quantities measured in the field. Under the terms of this contract, the unit price as contained in this Bid Form shall be applicable to quantity overruns. The following measurement and payment sections do not necessarily name every incidental item required by the Contract Documents to complete the work. Cost of all such incidental items shall be included in the various related bid items. Item 101: (Taxes, Bonds, Insurance) To be paid on the first progress pay estimate one-hundred percent (100%) upon mobilization to begin construction, only if the bid price for this item is less than five percent (5%) of the total price. For that portion of the taxes, bonds, and insurance greater than five percent (5%), if any, payment shall be made on the basis of the percentage of the work completed of each progress estimate. Item 102: (Mobilization) Fifty percent (50%) to be paid on the first progress estimate when mobilizing to begin construction, and fifty percent (50%) to be paid following substantial completion and acceptance of the work. Item 103: (Base Bid) Measurement shall be made on a lump sum basis. Payment at the contract unit price shall constitute full compensation to provide, install, and test the proposed fiber optic infrastructure as described in the contract documents from the City Hall termination to manhole #7 at the EOC, including the installation of a 24-strand fiber optic cable per the Special Provisions Specification 271500, and other work necessary or incidental for completion of this item. Item 104: (Miscellaneous Work) The item Miscellaneous Work has been provided in the proposal for any work and/or materials which may be encountered during construction, but which is not addressed elsewhere in the contract. Miscellaneous work will be measured by the respective unit for material and/or work performed as directed in writing by the Engineer. Payment for Miscellaneous Work, measured as provided above, will be at agreed upon prices or on force account basis. The number of units in dollars set down in the contract is an estimated amount only, which may be adjusted up or down by the Engineer in accordance with the needs of the project. Item 201: (Additive Alternate #1) Measurement shall be made on a lump sum basis. Payment at the contract unit price shall constitute full compensation to provide, install, and test the proposed fiber optic conduit from the EOC to Oak Street as described in the contract documents and other work necessary or incidental for completion of this item. Item 301: (Additive Alternate #2) Measurement shall be made on a lump sum basis. Payment at the contract unit price shall constitute full compensation to provide, install, and test the proposed 144-strand fiber optic cabling from manhole #1 to manhole #9 at Oak Street as described in the contract documents and other work necessary or incidental for completion of this item.