REPORT TO: Honorable Mayor and City Commission
FROM: Tim Cooper, Assistant City Attorney Wendy Thomas, Director of Community Development
SUBJECT: Authorize the Director of Public Works to approve the Homes at Bridger Peak
Estates Subdivision Final Plat, Application P14048
MEETING DATE: January 5, 2015
AGENDA ITEM TYPE: Consent
RECOMMENDATION: That the City Commission approve the Final Plat for the Homes at Bridger Peak Estates Major Subdivision Final Plat, Application P14048 and authorize the Director of Public
Works to execute the same on behalf of the City of Bozeman upon review and approval by the City
Attorney’s Office.
BACKGROUND: On October 7, 2013, the City Commission approved the findings of fact completing
the preliminary plat approval to subdivide 1.9 acres together with the required supplementary plans and information to create ten (10) single-household residential lots, one (1) one open space parcel (for
stormwater management), and the remaining area as an alley. The developer has applied for final plat
review and approval for the Homes at Bridger Peak Estates subdivision. The preliminary plat was
unanimously approved (5:0) by the City Commission on October 7, 2013.
Staff has concluded that all terms and conditions of the preliminary plat approval have been met. All improvements have been made, including installation of sidewalks, landscaping, and completion of
seeding. Therefore, no improvements agreement is required.
UNRESOLVED ISSUES: None determined at this time.
ALTERNATIVES: 1) Approve the final plat as presented and recommended.
2) Deny the final plat.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property
tax revenues from new development, along with increased costs to deliver municipal services to the property.
Attachments: Staff Memo; Final Plat
Report compiled on December 12, 2014
Commission Memorandum
42
Development Review Division Policy and Planning Division Building Division
CITY OF BOZEMAN
DEPARTMENT OF COMMUNITY DEVELOPMENT
Alfred M. Stiff Professional Building
20 East Olive Street
P.O. Box 1230
Bozeman, Montana 59771-1230
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net
MEMORANDUM
TO: TIM COOPER, ASSISTANT CITY ATTORNEY
FROM: HEATHER DAVIS, ASSOCIATE PLANNER
SUBJECT: FINAL PLAT REVIEW FOR THE HOMES AT BRIDGER PEAKS
ESTATES MAJOR SUBDIVISION, PLANNING FILE NO. P14048
DATE: NOVEMBER 24, 2014
Legends Studio Inc., on behalf of Ken Walker, (Applicant), has made application to the City of
Bozeman Department of Community Development for Final Plat review and approval for the Homes at
Bridger Peaks Estates Major Subdivision, a 10 lot subdivision.
The City Commission granted preliminary plat approval to subdivide 1.9 acres to create a subdivision of ten (10) single-household residential lots, common space, and an alley. Attached is a copy of the signed
Findings of Fact and Order dated November 18, 2013. No Improvement Agreement is required for this
subdivision, because all necessary infrastructure improvements are constructed.
Based on the summary review provided below, the Development Review Committee, the City
Engineering’s Department and the Department of Community Development have reviewed the application against the conditions of preliminary plat approval; and as a result, find that the final plat
application may be approved by the City Commission.
Three (3) original mylars of the Final Plat, original Platting Certificate, a copy of the property owner
association documents and a copy of the Findings of Fact and Order are attached for your review. The
property owner’s association documents and other applicable documents will be recorded and filed with the final plat at the Clerk and Recorder’s Office.
The Community Development staff respectfully requests that you prepare a City Attorney's
Certificate using the attached original Platting Certificate; approve the Certificates of Director of
Public Works and Certificate of Completion "as to form". The final City signatures will be obtained
once the City Commission has approved the final plat.
A complete application was submitted to the Community Development Department on November 21,
2014. Based on the applicant having submitted an application on July 10, 2014 for final plat review and
approval, and further finding that after receiving supplemental information the application was deemed
complete on November 24, 2014, the 45-day (working days) review period for this final plat would
expire on January 29, 2014.
The conditions of preliminary plat approval, which are pertinent to this major subdivision, and how they
have been met are described in the submittal materials.
43
Page 2
Note: The Community Development Department and Engineering Departments have also reviewed
the final plat application against the preliminary plat cited code provisions and found compliance with these code requirements. The Engineering Department has also reviewed and approved the “closure” of the final plat.
Attachments: Three (3) Mylar Final Plats and One (1) Blackline Copy
Applicant’s Written Narrative and Complete Submittal Original Platting Certificate
Copy of Findings of Fact and Order
cc: file
44