HomeMy WebLinkAboutAppendix_B Development Review Procedures Summary
APPENDIXB
DEVELOPMENT REVIEW PROCEDURES SUMMARY
This is a summary of the review procedures contained in the unified development ordinance. It is provided
as an aid to understanding and does not in any way alterthe standards of the ordinance. Please consult the
complete ordinance for details of the various review procedures. The review for application types are
cumulative. For example, a Certificate of Appropriateness with a deviation would require the application
and review for both types of application and would be finally decided by the Gty Commission. A more
detailed outline of the review process is contained in Appendix C and in brochures prepared by the Planning
Department. All references are to the Bozeman Municipal Code.
Table At
(A) (B) (q (D)
APPLICATION TYPE RECOMMENDING DEOSION APPLICABLE
BODY 3 MAKER SECfION #
Sketch Plan None Planning Staff 18.34.050
Signs None Planning Staff 18.52.060
Site Plan2 DRC, DRBI, ADRI, WRB Planning Director (,.bapter 18.34.010
Master Site plan2 DRC, DRBt, ADRI, WRB Gty Commission 18.34.010-100;
18.34.120-210
Final Site Plan (also applies to final DRC Planning Director 18.34.130
CUP)
ConditionalUe Permit 2 DRC, DRB, ADR, WRB Gty Commission dlapter 18.34
Reuse Planning Staff Planning Director 18.34.170
Amendment to Approved Plan Planning Staff, DRC, ADR Planning Director 1834.150
Special Temporary Ue Permit None Planning Director 18.34.190
Planned Unit Development DRC, DRB, WRB2 Gty Commission Chapters 18.34 & 18.36
Certificate of Appropriatenessl ADR, DRB Planning Director 18.34.110
Floodplain Pemllt Engineering Gty Engineer Chapter 18.58
Subdivision Exemption Planning Staff Planning Director Chapter 18.10
Minor or Major Subdivision DRC, ADR, WRB2 Gt)' Commission Chapter 18.06 &
Prelin1inary or Final including 18.66.070
variances plat)
Appendices-13
(A) (B) (C) (D)
APPLICATION TYPE RECOMMENDING DEQSION APPLICABLE
BODY 3 MAKER SECTION #
Deviationl ADR, DRB Gty Cbmmission 18.66.050
Zoning Variancel ADR, DRB Gty Cbmmission 18.66.060
Administrative Decision Appeals2 DRC, DRB, ADR, WRB Gty Cbmmission 18.66.030
Administrative Interpretation Planning Director Gt)' Cbmmission 18.66.040
Appeals
Zone Map Amendment Zoning Cbmmission Gty Cbmmission Chapter 18]0
UDO Text Amendment Zoning Commission Gty Commission Cltapter 18.68
and! or Planning Board
I Responsibility far design wriew lu'1JH':ll A DR ani DRB ~ deterrrind by ~ 18. 62. 0 lOA. 2. e, BM C
20Japter 18.62, BMC, descrihs the wria/s cirom3tana'S Were arK? or m:rre if the A DR, DRB, or WRB participate in prqoct wriew
) Reriew by other a[pKits mry be nquimJ uhen thae a[pKits uaJd be affa:ur1 by a prrjoct.
Appendices-14