HomeMy WebLinkAbout14- HDR Amendment 4 Bozeman Wastewater Treatment Plant Phase 1 Improvements AMENDMENT NO. 4 TO PROFESSIONAL SERVICES AGREEMENT FOR BOZEMAN WASTEWATER TREATMENT PLANT PHASE I IMPROVEMENTS THIS IS AN AGREEMENT made as of td-2 , 2014_between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and HDR Engineering Inc, 8404 Indian Hills Drive, Omaha, NE 68114-4098, (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated April 9, 2007, herein referred to as the Original Agreement, and amended on December 1, 2008, herein referred to as Amendment No. 1; amended on July 16, 2012, herein referred to as Amendment No. 2; and amended on February 25, 2013, herein referred to as Amendment No. 3 for professional engineering services for the Bozeman Wastewater Treatment Plant Improvements; and WHEREAS, the scope of the Original Agreement included preliminary design and design engineering services, Amendment No. 1 included construction services, Amendment No. 2 included TMDL Technical Assistance; Amendment No. 3 to add additional software programming and additional construction observation, startup and observation services associated with repair of Digester No. 3 and extension of the construction period for the Digester No. 3 and Solids Handling Building (Phase 3) Project, and WHEREAS, the parties desire to amend provisions of the Original Agreement, Amendment No. 1, Amendment No. 2, and Amendment No. 3 to add additional corrective action assistance and startup and observation services associated with repair of Digester No. 3, design and procurement assistance with correction of leaking digester mixer seals at Digester No. 1 and Digester No. 2 and additional follow-on technical assistance to the City of Bozeman regarding the Montana DEQ's East Gallatin TMDL process NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth below, are hereby incorporated in and made part of this Agreement. 1 ARTICLE 4 -Basic Engineering Services Section 4.5.5. added to the Original Agreement as follows: "4.5.5. Additional Construction Contract Services. In addition to the services provided under Article 10 (Exhibit A) and Section 4.5.1 of the Original Agreement, the ENGINEER shall provide the Additional Construction Contract Services during construction under SubTask 1800 — Digester Corrective Action Assistance and SubTask 1900—Digester Mixer Seal Repair Assistance," Article 6 - Compensation For Engineering Service Article 6.2 of the Original Agreement and Amendments is replaced with the following: "6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under Sections 4.4 through 4.7 (Tasks 700, 800 & 900 in Exhibit C, and Tasks 1100, 1200, 1300, 1400, 1500, 1600 & 1700 in Exhibit F, and new Tasks 1800 and 1900 in Exhibit H), including General Administration of Construction Contract; Resident Project Representation, Project Documentation, Construction Testing, Bidding, Project Startup & Commissioning, Application Software Programming and Project Closeout, Programming and Digester Liner Repair Observation and Contract Closeout, Added Digester Corrective Action Assistance and Digester Mixer Seal Repair Assistance services shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Bidding Phase, Construction Phase and Project Documentation Services an amount not to exceed $4,890,648 ($129,957{SubTasks 700, 800 and 900 Exhibit C}+$4,767,571 {SubTasks 1100, 1200, 1300, 1400, 1500, 1600, 1700 Exhibit F}+$76,411 {SubTasks 1800 and 1900-Exhibit II) except as provided under 6.2.1.2 and 6.2.4. 6.2.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit, plus reimbursable expenses as provided in 6.2.2. 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Bidding Phase, Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter 2 OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.80 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.3 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the .basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. Additional Services also include those services defined in SubTask 1000 of Exhibit C, in an amount not to exceed $100,000." 6.2.4. Not used. 6.2.5 The OWNER shall pay an amount for TMDL Technical Services rendered by the ENGINEER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15 in an amount not to exceed $20,000. 6.2.6 The OWNER shall pay an amount for additional follow-on TMDL Technical Services rendered by the ENGINEER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15 in an amount not to exceed $5,000." 3 Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. In witness whereof,the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA HDR ENGINEERING, INC. BY: P 47 BY: (City Manager) (Amanda Mclnni '.E. Departmen Manager) DATE: 1 2 U - Li- DATE: Ani/a, oUit ATTEST: •, O 13 . , . 4 A'- � BY*4(11 1 ,. •tCerk) , • -. a r 1 "3' '? a a e ' o y• 1� • 4 EXHIBIT H CITY OF BOZEMAN, MONTANA WASTEWATER RECLAMATION FACILITY (WRF) PHASE 1 EXPANSION ADDITTIONAL SCOPE OF SERVICES Tasks 1 800 Digester No. 3 Corrective Action Assistance 1 900 Digester Mixer Seal Repair Assistance Task 1 800 - Digester No. 3 Corrective Action Assistance Objective: Amendment No. 3 provided for added construction observation and startup assistance services for completion of repairs to the Digester No. 3. The Amendment was based upon a projected project construction completion in May 2013. The corrections to Digester No. 3 are projected to extend as much as 18 months beyond the May 2013 projection. This Task provides for additional technical assistance,field observation and construction engineering administration for completion of the corrective actions that were agreed upon between the City of Bozeman and the Construction Contractor(McAlvain Construction). Subtask 1800. 1- Digester Corrective Action Technical Assistance HDR/MMI will provide assistance to the City for coordination and confirmation of compliance to the corrective actions by the Construction Contractor for repair of the digester interior HDPE liner and concrete walls and roof system. HDR/MMI will provide periodic summaries to the City on the status of the corrective actions and will provide formal certification of the corrective actions at agreed upon stages of the construction process. Subtask 1800.2- Construction Engineering HDR/MMI will consult and advise the City of Bozeman as set forth in the engineering services contract throughout the extended time period associated with the corrections to Digester No. 3, including delayed startup services and SCADA programming that is unable to be completed until the Digester Facility is substantially complete and ready for final commissioning and startup. The City of Bozeman's instructions to the Contractor will be issued through HDR/MMI, who will have limited authority to act on behalf of the City of Bozeman to the extent provided in the Exhibit H -Scope of Services 1 of 4 11/12/2014 Prime Services Agreement(PSA). HDR/MMI will consult with and advise the City of Bozeman as set forth in Section 4.5 and Article 10, Exhibit A of the PSA. Subtask 1800.3 - On-site Construction Observation HDR/MMI will provide periodic resident project representation at the site during completion of corrective actions associated with Digester No. 3, and further outlined in the Final Technical Agreement Concerning Repair of Digester No. 3 Tank, executed on June 17, 2014. HDR/MMI will provide the City of Bozeman Resident Project Representative(s)to assist in carrying out such responsibilities at the site, in accordance with Section 4.5., and Article 11 of Exhibit B of the PSA. Task 1900 - Digester Mixer Seal Repair Assistance Objective: Provide assistance to the City of Bozeman in completing an evaluation of the digester mixer seal leakage and concrete support condition on existing Digesters No. 1 and No. 2. Following the on- site evaluation of the existing mixer installations, provide recommendations in the form of an evaluation memorandum for correction of the mixer seals to eliminate the existing gas leakage and correct mixer concrete support and fasteners anchorage deterioration. Subtask 1900. 1- Mixer Installation Field Evaluation Prior to commencing with the field investigation, HDR will complete a pre-evaluation memorandum which clearly outlines the proposed steps of the field investigation, proposed schedule,needed equipment and access areas, and other information and data needed to complete the field evaluation. HDR will conduct a field evaluation of existing Digesters No. 1 and No. 2 mixers, including evaluation of the integrity of the mixer concrete support bases. The scope of work will not involve evaluation of the existing digester gas handling systems, digester covers and cover insulation, and digester mixing mechanical conditions. It is assumed the City is prepared to install the replacement mixer mechanisms the City currently has on-hand during completion of any recommended corrective actions with the mixer seals. Interior coatings systems will only be evaluated if the digesters are removed from service during the field evaluation. The scope of work assumes entrance into the existing digester facilities will not be required, and confined space ventilation,hazardous gas testing, access hoisting and other necessary facilities for legal confined space entry basin access will not be required. It is assumed all field investigation can be completed from the digester roofs. A one-day field examination of existing facilities will be provided. Deliverables: • Project field investigation pre-visit memorandum. • Field investigation notes and digital photographs. • Equipment seals evaluation worksheets. Exhibit H-Scope of Services 2 of 4 11/12/2014 City Involvement: • Provide mixing equipment shop drawings for digester mixers, including both currently installed equipment and new equipment on-hand that is ready for installation. • Provide one full-time maintenance technician to assist Engineer in one-day evaluation of existing facilities. Subtask 1900.2— Mixer Installation Recommended Action A memorandum summarizing the findings and conclusions of the field evaluation effort will be completed. The memorandum will incorporate the testing information collected, digital photographs, and field notes. The memorandum will provide recommendations for repair and/or replacement digester mixer concrete support bases and sealing systems. The summary memorandum will also summarize all general observations regarding facility integrity. Deliverables: • Summary memorandum(2 hard copies, 1 digital copy). City Involvement: • Assemble and provide background information from City's files including system as- built drawings,previous construction shop drawing documents on coating systems used, and other pertinent construction reports or field reports from previous construction work. Subtask 1900.3 — Corrective Action Implementation Assistance Provide construction technical specifications and associated corrective action sketches for solicitation of quotations for construction services. It is assumed that the project costs will be below $50,000, and procurement of contract installation of the recommended mixer support and seal corrections may be made from solicited quotes. Provide (to the City) an estimated cost amount for construction that is based upon the completed specifications and associated sketches. The specifications and sketches will include the following: • Digester mixer seals, concrete supports and associated protective-coating system requirements. In standard CSI format. • Field inspection specifications of final installation including and equipment baseplate modifications. • Special procedures for correction of concrete or substrate defects noted during the field investigation. Complete necessary procurement package(s) using information included in the field investigation memorandum and technical specifications, solicit price quotations and prepare for Owner Purchase Order procurement under a small works contract(s). Provide price solicitation and procurement assistance to the City for implementation of the recommended corrective actions. Technical assistance to City during construction of remedial actions outlined above will be completed under a separate contract amendment. Quotation and price solicitation services will be provided on a time and material basis with the estimated level of effort as presented in the Exhibit 1-1 -Scope of Services 3 of 4 11/12/2014 attached budget. Engineer will not exceed this level of effort without prior authorization from the City. Deliverables: • Camera-ready specifications, sketches and digital specification files as described above. • Cost quote solicitation packages for soliciting quotes from perspective Contractors. City Involvement: • Review of recommendations provided. • Assemble and provide background information from City's files including system as- built drawings, previous construction shop drawing documents on mixing equipment and coating systems used, and other pertinent construction reports or field reports from previous construction work. • Review of procurement package(s) for implementation of recommended modifications using technical specifications and sketches provided. • Execute Purchase Order(s) for procurement of contract services using information included in the field investigation memorandum and technical specifications, work with Engineer to solicit price quotations and perform procurement. Administration of construction will be coordinated with the Engineer following procurement of a Contractor(s). • Coordination of Engineer's field site visits with City Exhibit H-Scope of Services 4 of 4 11/12/2014 Exhibit 1 City of Bozeman Water Reclamation Facility Phase 1 Expansion Addendum No.4 Engineering Fee Estimate Task Cost Summary Expenses By Task Task Description Direct Labor Task Task Total 1800 Digester No.3 Corrective Action Assistance $ 59,875.20 $ 3,557.40 $ 63,432.60 1900 Digester Mixer Seal Repair Assistance $ 11,730.60 $ 1,247.60 $ 12,978.20 Total Labor and Expenses Cost by Task $ 71,605.80 $ 4,805.00 $ 76,410.80 Expense Summary Expenses Miscellaneous $ 650.00 Travel Expenses $ 1,100.00 Mapping/Photos/Surveys $ - Printing and Photocopying $ 450.00 Technology $ 2,605.00 Total Expenses $ 4,805.00 TOTAL ESTIMATED ENGINEERING SERVICES FEE $ 76,410.80 Amend 04.xlsx Page 1 of 1 11/12/2014