HomeMy WebLinkAbout9 Wastewater Fund Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Administrative Services Director SUBJECT: Adoption of the Wastewater Fund Capital Improvement Plan (CIP) for FY16-20. AGENDA ITEM TYPE: Consent MEETING DATE: December 8, 2014 RECOMMENDATION: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for FY16-20. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. Staff met in October and November to develop the attached draft schedules. The Wastewater Fund CIP tracks the capital equipment replacements and construction projects for Wastewater Operations (collection system) and the Water Reclamation Facility (WRF). Items added: • WW49 – Roll-off Storage Building Construction • WW50 – Refrigerated Automatic Samplers • WW53 – Positive Displacement Lobe Pump • WW57 – WRF Fishing Access – Latrine • WW58 – Topcoat Asphalt • WW59 – Splitter Structure Air Diffuser 75 • WW60 – Nutrient Recovery Process Construction • WW61 – Online Ammonia Probes • WW62 – Methane Cogeneration Project Construction • WW47 – Burrup Lift Station Rehab • WW48 – SLRAT Acoustic Sewer Pipe Assessment Tool • WW56 – Laurel Glen Vehicle Storage Updated Items: • WW33 – Screw Press has been moved from unscheduled to FY17 • WW35 – Commercial Mower has been moved from FY16 to FY18 • WW44 – Flotation Thickener now has a price of $500,000 associated with the unscheduled project. • WW08-16 – WW08-20 have updated costs based on the Wastewater master plan recommendations. The scheduled pipes for replacement are matched with the corresponding street maintenance, water pipe and stormwater pipe replacements. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. If the Commission is does not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY16. Report compiled on: November 24, 2014 Attached: Draft Wastewater Fund CIP 76 Wastewater Fund Capital Improvement Plan Financial Summary Current Year FY15 FY16 FY17 FY18 FY19 FY20 Unscheduled Projected Beginning Reserve Balance Dedicated to CIP 42,000$ (5,660)$ (136,204)$ (345,549)$ (1,163,004)$ (30,207)$ -$ Plus: Wastewater Revenues Dedicated to CIP 1,447,840$ 1,491,275$ 1,536,013$ 1,582,094$ 1,629,557$ 1,678,443$ -$ Less: Scheduled CIP Project Costs (1,495,500)$ (1,621,819)$ (1,745,359)$ (2,399,549)$ (496,759)$ (1,585,863)$ (13,294,755)$ Projected Year-End Cash Dedicated to CIP (5,660)$ (136,204)$ (345,549)$ (1,163,004)$ (30,207)$ 62,374$ (13,294,755)$ Assumptions Made for Revenue Estimates:Current Year FY15 FY16 FY17 FY18 FY19 FY20 Estimated Annual Wastewater Revenues 7,239,200$ 7,239,200$ 7,456,376$ 7,680,067$ 7,910,469$ 8,147,783$ Estimated Annual Increase 0.0%3%3%3%3%3% Total Estimated Revenues 7,239,200$ 7,456,376$ 7,680,067$ 7,910,469$ 8,147,783$ 8,392,217$ Current Revenues Dedicated to CIP %20.0%20.0%20.0%20.0%20.0%20.0% Plus: Increase Dedicated to CIP 0.0%0.0%0.0%0.0%0.0%0.0% Total % Dedicated to CIP 20.0%20.0%20.0%20.0%20.0%20.0% Total Estimated Revenues Dedicated to CIP 1,447,840$ 1,491,275$ 1,536,013$ 1,582,094$ 1,629,557$ 1,678,443$ Projected Projected CURRENT 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 Wastewater Fund Projects & Equipment 77 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY20FY17FY18FY19Wastewater FundGF220FACILITY MGMT.REPLACE WORN OVERHEAD DOORS AND SEALS AT THE SHOP COMPLEX$10,000$10,000Totals by DEPARTMENTWastewater FundGF225FINANCECOGNOS ‐ BUSINESS INTELLIGENCE UPGRADE$14,400GF227FINANCEERP REPLACEMENT "SUNGARD REPLACEMENT/UPGRADE"$83,333$83,333$14,400Totals by DEPARTMENTWastewater FundWW27WRF PLANTWATERSHED STUDY & STREAM MODELING$62,000$60,000$60,000$60,000$61,000WW28WRF PLANTDESIGN PHASE II ‐ WRF PLANT IMPROVEMENTS$5,230,000WW29WRF PLANTMETHANE COGENERATION PROJECT DESIGN$350,000WW33WRF PLANTSCREW PRESS$220,000WW35WRF PLANTCOMMERCIAL MOWER$13,000WW38WRF PLANT#3 PERFORATED SCREEN & WASHER COMPACTOR$140,000WW39WRF PLANTSANDBLAST & PAINT CLARIFIER DRIVES, BEACH, BAFFLES & WEIRS$85,000$85,000WW42WRF PLANTPRIMARY CLARIFIER COVER$350,000$350,000$350,000WW44WRF PLANTFLOTATION THINKENER$500,000WW45WRF PLANTFINAL CLARIFIER LAUNDER COVER$40,000$40,000$40,000WW49WRF PLANTROLL‐OFF STORAGE BUILDING CONSTRUCTION$250,00078 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY20FY17FY18FY19WW50WRF PLANTREFRIGERATED AUTOMATIC SAMPLERS$20,000$10,000WW53WRF PLANTPOSITIVE DISPLACEMENT LOBE PUMP$30,000$15,000WW57WRF PLANTWRF FISHING ACCESS ‐ LATRINE$10,000WW58WRF PLANTTOPCOAT ASPHALT$100,000WW59WRF PLANTSPLITTER STRUCTURE AIR DIFFUSER$30,000WW60WRF PLANTNUTRIENT RECOVERY PROCESS CONSTRUCTION$2,000,000WW61WRF PLANTONLINE AMMONIA PROBES$30,000WW62WRF PLANTMETHANE COGENERATION PROJECT CONSTRUCTION$2,200,000$412,000$325,000$665,000$113,000$426,000$10,850,000Totals by DEPARTMENTWastewater FundPW01WW OPSSHOPS FACILITY EXPANSION PLAN$10,000WW07WW OPSANNUAL WASTEWATER PIPE REPLACEMENT PROGRAM$22,500$22,500$22,500$22,500$22,500WW08‐16WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2016$1,074,919WW08‐17WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2017$1,047,859WW08‐18WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCITON IN 2018.$1,989,611WW08‐19WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2019$48,259WW08‐20WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2020$940,030WW08‐UNWW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION UNSCHEDULED$2,444,755WW47WW OPSBURRUP LIFT STATION REHAB$100,000WW48WW OPSSLRAT ACOUSTIC SEWER PIPE ASSESMENT TOOL$25,000WW51WW OPSREFURBISH #3406 ‐ 2007 CHEVY TV VAN$169,43879 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY20FY17FY18FY19WW52WW OPSREPLACE #2683 ‐ 1999 JOHN DEERE 310SE BACKHOE$105,000WW54WW OPSREPLACE #1783 ‐ 1995 FORD DUMP TRUCK$95,000WW55WW OPSREPLACE #3232 ‐ 2004 3/4 TON FORD PICKUP$33,000WW56WW OPSLAUREL GLEN VEHICLE STORAGE$50,000$1,090,530$1,272,419$1,080,359$2,286,549$70,759$2,444,755Totals by DEPARTMENTSummary for  Wastewater Fund (37 items)Totals by year:$1,585,863$1,621,819 $1,745,359$13,294,755FY20FY16FY17UnscheduledFY19$496,759$2,399,549FY1880 CIP Project Fund Wastewater Fund PROJECT NUMBER GF220 DEPARTMENT FACILITY MGMT. PROJECT NAME REPLACE WORN OVERHEAD DOORS AND SEALS AT THE SHOP COMPLEX FY16 $10,000 FY17 Unscheduled DESCRIPTION OF PROJECT Replace worn door parts and components on 14 overhead garage doors at the Shop Complex. The doors are old enough that the parts are worn and the seals no longer function properly. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Doors will be more operable and the seals will help control the temperature in the building areas. Often the doors stop working and departments have difficulty getting their vehicles out of the building. The upgrades will keep the doors in operation. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED General repair costs will be reduced if doors are more functional. FUNDING SOURCES SPLIT EVENLY: GENERAL FUND, WATER FUND, WASTEWATER FUND New Replacement Equipment Project FY18 FY19 FY20 81 CIP Project Fund Wastewater Fund PROJECT NUMBER GF225 DEPARTMENT FINANCE PROJECT NAME COGNOS - BUSINESS INTELLIGENCE UPGRADE FY16 $14,400 FY17 Unscheduled DESCRIPTION OF PROJECT Upgrade current QREP software. The new software has a wider variety of reports. The newer version is web-based with greater dashboard capability. This software currently produces our expenditure approval list, budget status reports, and general operating reports for multiple departments. ALTERNATIVES CONSIDERED Continue using current version of QREP (v. 7.5) ADVANTAGES OF APPROVAL More functionality for end users, easier access, more user friendly. Fuels creativity with built in communication tools and social netowrking options encouraging collaboration. Evolution of open government - SunGard's Public Sector consultants can help provide the level of transparency and data that meets citizens' expectations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal. FUNDING SOURCES General Fund 33%; Water Fund 33%; Wastewater Fund 33% New Replacement Equipment Project FY18 FY19 FY20 82 CIP Project Fund Wastewater Fund PROJECT NUMBER GF227 DEPARTMENT FINANCE PROJECT NAME ERP REPLACEMENT "SUNGARD REPLACEMENT/UPGRADE" FY16 FY17 Unscheduled DESCRIPTION OF PROJECT Replacing/upgrading the current system installed in 1999. This is the system that runs all the financial, community development, land records, utility and business license, applications. ALTERNATIVES CONSIDERED Continue running current SunGard package. Use SunGard.net as an improvement to the current system, but not a full replacement. ADVANTAGES OF APPROVAL Simplified package. Easier to integrate the various applications/programs. Easier to pull out information for end users. Easier compiliation of Commission reports and packets for Community Development. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Unknown. Dependent on the option chosen. FUNDING SOURCES General Fund 33%; Water Fund 33%; Wastewater Fund 33% New Replacement Equipment Project FY18 FY19 FY20 $83,333 83 CIP Project Fund Wastewater Fund PROJECT NUMBER PW01 DEPARTMENT WW OPS PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY16 FY17 $10,000 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project FY18 FY19 FY20 84 CIP Project Fund Wastewater Fund PROJECT NUMBER WW07 DEPARTMENT WW OPS PROJECT NAME ANNUAL WASTEWATER PIPE REPLACEMENT PROGRAM FY16 $22,500 FY17 $22,500 Unscheduled DESCRIPTION OF PROJECT This item provides for design work to be completed every-other year, in anticipation of the Annual System Upgrades. As the Wastewater Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-urgent projects may be identified and designed under this project heading. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for design of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY18 $22,500 FY19 $22,500 FY20 $22,500 85 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-16 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2016 FY16 $1,074,919 FY17 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Interstate/walmart: N. Rouse Ave - N. 3rd Ave Pea Cannery Line: N. Rouse Ave - End Juniper Street: N. Rouse Ave - E. Tamarack St N. Rouse Ave: Humane Society - Bridger Center Dr Bridger Center Main: Bridger Drive - N End of Main Industrial Dr: Trunk Main - Half way to Griffin. After budget approval July 1, 2015, this project would complete design, bid and begin construction in the Spring/Summer of 2016, at the end of FY16. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY18 FY19 FY20 86 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-17 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2017 FY16 FY17 $1,047,859 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Alley N of Story: S 5th Ave - E. End Alley N of Dickerson: S 5th Ave - E. End, Alley N of Alderson: S 5th Ave - E. End W. College St: S 5th Ave - E. End, W. College St: S 4th Ave - S. 3rd Ave Alley N. of Harrison: S. 5th Ave - S. 4th Ave, Alley N. of Cleveland: S. 5th Ave - S. 4th Ave S. 6th Ave: W. Babcoc St - Alley N. of Olive, S. 6th Ave: W. Story St - W. Grant St S. 7th Ave: Alley N of Olive - W. Story St, S. 7th Ave: W. Story St - W. Harrison W. Olive St: S. 6th Ave - S. 7th Ave, W. Story St: S. 6th Ave - S. 7th Ave Alley btwn 7th & 8th: Alley N of Olive - Alley N. of Koch Alley btwn 7th & 8th: Alley N of Dickerson - W. Harrison St.. After budget approval July 1, 2016, this project would complete design, bid and begin construction in the Spring/Summer of 2017, at the end of FY17. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY18 FY19 FY20 87 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-18 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construciton in 2018. FY16 FY17 Unscheduled DESCRIPTION OF PROJECT Alley N of Babcock: S. 11th Ave-Alley E. of 7th: W Babcock St: S. 11th- S. 10th Ave.: Alley N of Olive: S. 6th Ave-S 7th Ave.: Alley N Of Olive: S. 11th Ave.- Alley E of 8th: Alley btwn 8th&9th: Alley N of Olive-W. College St: S. 9th St.: W. Main St.-Alley N of Olive: Alley btwn 9th&10th: Alley N of Olive- W. College St: S. 10th Ave: W. Main St – W. Harrison St: W. Harrison St: S. 6th Ave – S 10th Ave. After budget approval July 1, 2017, this project would complete design, bid and begin construction in the Spring/Summer of 2018, at the end of FY18. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY18 $1,989,611 FY19 FY20 88 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-19 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2019 FY16 FY17 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Alley W of S 10th Ave: Alley N of Olive- W. Koch St. Alley W of S 10th Ave: N of Dickerson – W. Alderson St. Alley W of S 10th Ave: N of College- W. College St. W. Curtiss St: S. 10th Ave-Alley W of S. 10th. W. Curtiss St.: Alley W of S. 11th. Chequamegon Village: All internal mains. W. Koch St: Alley W of S. 10th- Alley W of S. 12th. Alley W of S 11th Ave: Alley S of Alderson – University. W. Villard St: N. 7th Ave- N. 8th Ave. N. 8th Ave: W. Villard – W. Beall St. N. 8th Ave: W. Beall St – W. Mendenhall St. Alley N of Main St: N. 9th Ave _ N. 7th Ave. Alley W of 8th Ave: W. Durston Rd – W. Villard St. W. Villard St : Alley W of N 8th – N. 9th Ave. N. 9th Ave: W. Villard St – W. Main St. W. Beall St: N. 8th Ave – N. 9th Ave. Alley W of 9th Ave: W. Durston Rd – W. Villard St. W. Villard St: Alley W of 9th Ave – N. 10th Ave. N. 10th Ave : W. Villard St- W. Main St. Alley W. of 10th Ave: W. Durston Rd – W. Mendenhall St. W. Lamme St: N. 9th Ave – N. 11th Ave. After budget approval July 1, 2018, this project would complete design, bid and begin construction in the Spring/Summer of 2019, at the end of FY18. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY18 FY19 $48,259 FY20 89 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-20 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2020 FY16 FY17 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: S. Black: E Main St-E. College St; S, Black Ave: E. College St.-Southern Cul-de-sac: E. Dickerson S. Black Ave-End 3 Cul-de-sacs: S. Bozeman Ave: E Main St- E. Story St: E. Story St: S. Bozeman Ave-Bonner Ln: Dell Place: E. Story St-End: E. Babcock St: W of Bozeman- E of Bozeman: E. Olive St: S. Bozeman Ave.- S Rouse Ave.: Lindley Place: E. Olive St- E. Koch St.: S Church Ave: E Main St- All but last run: E. Babcock St: S. Church Ave- E half a block :E. Olive St: S. Church Ave- S. Rouse Ave: Parkside Main: S. Church Ave- W. end: E. Story St: S, Church Ave- Bonner Ln ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility New Replacement Equipment Project FY18 FY19 FY20 $940,030 90 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-UN DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction Unscheduled FY16 FY17 Unscheduled $2,444,755 DESCRIPTION OF PROJECT ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES New Replacement Equipment Project FY18 FY19 FY20 91 CIP Project Fund Wastewater Fund PROJECT NUMBER WW27 DEPARTMENT WRF PLANT PROJECT NAME WATERSHED STUDY & STREAM MODELING FY16 $60,000 FY17 $60,000 Unscheduled DESCRIPTION OF PROJECT Develop a comprehensive, multi-year watershed study and computer model for the East Gallatin River which would enable the City and DEQ to better determine stream load allocations and develop a more scientifically valid TMDL for the river segment we discharge to. This will require annual field sample collection, laboratory analytical work and detailed computer modeling using calibrated data. This multi-year study would consist of $45,000 in consulting and computer modeling fees for at least two fiscal years (FY14 and FY15) and stream sampling/lab fees of $15,000 each year. Craig recommends we should be prepared to continue this work beyond FY15 as necessary. ALTERNATIVES CONSIDERED Not undertake this work and risk having to accept the TMDL and waste load allocations the DEQ has proposed in their original draft documents. This decision could greatly limit our ability to appeal future nutrient limitations and could result in non- compliance. ADVANTAGES OF APPROVAL This watershed study will greatly enhance the City’s understand of our impact on the East Gallatin River and enable us to more successfully negotiate future permit limitations with the DEQ. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None, unless additional stream sampling is desired in subsequent years. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY18 $60,000 FY19 $61,000 FY20 $62,000 92 CIP Project Fund Wastewater Fund PROJECT NUMBER WW28 DEPARTMENT WRF PLANT PROJECT NAME DESIGN PHASE II - WRF PLANT IMPROVEMENTS FY16 FY17 Unscheduled $5,230,000 DESCRIPTION OF PROJECT In January 2006 Morrison & Maierle Consulting Engineers completed a comprehensive Wastewater Facilities Plan. The plan recommends the City proceed with a 3-phased project schedule that includes the construction of the new Water Reclamation Facility (WRF), capable of handling our increased flows while also reducing the amount of Total Nitrogen discharged to the East Gallatin River. Phase two is expected to include one new primary clarifier, more BNR reactor basins, clarifiers, tertiary membrane filtration, liquid sludge storage tanks, anaerobic digestion, and an effluent re-use pumping station. The capacity expanding (impact fee eligible) elements are: bioreactor basins, clarifiers, and pumping station. It is possible that this phase of the project could be further divided into phase 2A and phase 2B, if necessary. ALTERNATIVES CONSIDERED A variety of treatment technologies and alternatives are presented in the January 2006 Wastewater Facilities Plan. ADVANTAGES OF APPROVAL Major capital expansion of the Bozeman WRF will enable the City to meet its estimated demand for wastewater services and still produce a high quality effluent that is in full compliance with the City’s MPDES discharge permit. Expansion of the Bozeman WRF is consistent with the City’s long-term need to accommodate rapid growth and economic development in the Gallatin Valley. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating & Maintenance Costs: no estimates at this time. FUNDING SOURCES Total Design Cost: $5,230,000. We estimate the majority of the project costs are related to regulation and maintenance issues and would be borne by the Utility Fund. Half are related to capacity expansion, and would be borne by Impact Fees. 50% Wastewater Fund, 50% Wastewater New Replacement Equipment Project FY18 FY19 FY20 93 CIP Project Fund Wastewater Fund PROJECT NUMBER WW29 DEPARTMENT WRF PLANT PROJECT NAME METHANE COGENERATION PROJECT DESIGN FY16 FY17 Unscheduled $350,000 DESCRIPTION OF PROJECT Consistent with the goals of the City’s Climate Action Plan & Sustainability Programs, the Bozeman WRF staff and Public Works Director recommend we move forward with our proposed investigation and installation of a methane recovery and co- generation system. This system will produce an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a generator powered entirely by WRF digester gas. This project has the potential to save the City at least $180,000 in electricity costs and substantially lower the carbon footprint of the new Bozeman WRF. This project would be implemented in 3 phases including (1) a feasibility / cost effectiveness study, (2) project engineering / design and (3) the purchase and installation of appropriate technology for the co-generation of electricity at the Bozeman WRF. Year 1: Project Feasibility Study. Year 2: Project Engineering Design - $350,000. Year 3: Equipment Purchase and Installation - $2,200,000. ALTERNATIVES CONSIDERED Continue to flare our digester methane gas. Micro-turbines and fuel-cells have been analysed and continue to be possible alternative energy recovery technologies for this project. Our research to date suggests the most proven technology currently available to help us accomplish our energy recovery goals is likely to be a GE Jenbacher internal combustion engine and heat recovery system.ADVANTAGES OF APPROVAL Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year. FUNDING SOURCES Wastewater Fund, other grants or community partners. New Replacement Equipment Project FY18 FY19 FY20 94 CIP Project Fund Wastewater Fund PROJECT NUMBER WW33 DEPARTMENT WRF PLANT PROJECT NAME SCREW PRESS FY16 FY17 $220,000 Unscheduled DESCRIPTION OF PROJECT Engineering study and installation of screw press with or without an enclosure. ALTERNATIVES CONSIDERED Increase sludge storage to delay the problem of limited processing capacity. ADVANTAGES OF APPROVAL The second screw press would provide needed redundancy if a screw press breaks down. It would provide extra sludge processing capacity now and for future needs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED If used to increase processing capacity, the extra operating costs would include electricity, polymer use and additional cake hauling. FUNDING SOURCES Wastewater Fund New Replacement Equipment Project FY18 FY19 FY20 95 CIP Project Fund Wastewater Fund PROJECT NUMBER WW35 DEPARTMENT WRF PLANT PROJECT NAME COMMERCIAL MOWER FY16 FY17 Unscheduled DESCRIPTION OF PROJECT Replacement of 2001 Mower for use on the WRF grounds. ALTERNATIVES CONSIDERED Continue replacing parts as needed. ADVANTAGES OF APPROVAL Replacement parts will become more difficult to find as the mower ages. The increasing maintenance will mean less time for groundskeeping. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional operating costs. May reduce maintenance costs. FUNDING SOURCES Wastewater Funds. New Replacement Equipment Project FY18 $13,000 FY19 FY20 96 CIP Project Fund Wastewater Fund PROJECT NUMBER WW38 DEPARTMENT WRF PLANT PROJECT NAME #3 PERFORATED SCREEN & WASHER COMPACTOR FY16 $140,000 FY17 Unscheduled DESCRIPTION OF PROJECT Extensive Engineering will be needed to install an additional influent huber screen in head works building because of limited space. Additional screening capacity is needed because during a storm event this summer the influent flow meter pegged out over 15 mgd. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL THE TWO EXISTING SCREENS ARE RUNNING MOST OF THE YEAR SO IF ONE GOES DOWN THERE IS NO REDUNDANCY. HAVING A THIRD SCREEN WOULD PREVENT A HIGH FLOW EVENT FROM OVER FLOWING THE BYPASS CHANNEL INFLUENT GATE. THIS UNSCREENED FLOW CONTAINS MATERIAL THAT CAN PLUS PIPING AND PUMPS CAUSING DAMAGE & EXTRA MAINTENANCE. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED IF PLACED IN A TWO SCREEN ROTATION, THE ONLY EXTRA COSTS WOULD BE AN ANNUAL INSPECTION WITH PARTS REPLACEMENT PLUS CLEANING OF THE SCREEN & CHANNEL IT IS IN. IF USED TO INCREASE CAPACITY, EXTRA ELECTRICITY WOULD BE USED BUT LESS CHANNEL CLEANING WOULD NEED TO BE PERFORMED. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY18 FY19 FY20 97 CIP Project Fund Wastewater Fund PROJECT NUMBER WW39 DEPARTMENT WRF PLANT PROJECT NAME SANDBLAST & PAINT CLARIFIER DRIVES, BEACH, BAFFLES & WEIRS FY16 $85,000 FY17 $85,000 Unscheduled DESCRIPTION OF PROJECT Sandblast and paint old clarifier drives, beaches, baffles weirs. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL Replace lost & chipping paint on old clarifiers to prevent deterioration of existing infrastructure. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY18 FY19 FY20 98 CIP Project Fund Wastewater Fund PROJECT NUMBER WW42 DEPARTMENT WRF PLANT PROJECT NAME PRIMARY CLARIFIER COVER FY16 FY17 Unscheduled $350,000 DESCRIPTION OF PROJECT INSTALLING A GEODESIC DOME COVER WITH 8 FOOT SIDE WALLS ON A PRIMARY CLARIFIER. THE INSTALLATION WOULD INCLUDE A DOOR, TWO SKYLIGHTS AND A VENT TUBE. ALSO CLARIFIER DRIVE MOTOR AND CONTROLS WOULD HAVE TO BE EXPLOSION PROOF. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL COVERING THE PRIMARY CLARIFIERS WILL ALLOW ODOR CONTROL & ELIMINATE CLEANING & PAINTING. CLEANING & PAINTING OF ALL RAILINGS AND CATWALKS IS AN ON-GOING MAINTENANCE ISSUE TO REMOVE GREASE & DROPPINGS DEPOSITED BY BIRDS. COVERS ON PRIMARY CLARIFIERS WOULD ALLOW SOME CLARIFIERS NOT TO BE USED DURING THE WINTER ALLOWING MORE NEEDED CARBON TO ENTER THE BIO-TRAINS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Only maintenance of odor control would be additional. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY18 FY19 $350,000 FY20 $350,000 99 CIP Project Fund Wastewater Fund PROJECT NUMBER WW44 DEPARTMENT WRF PLANT PROJECT NAME FLOTATION THINKENER FY16 FY17 Unscheduled $500,000 DESCRIPTION OF PROJECT Modify the existing flotation thickener to improve WRF processes. ALTERNATIVES CONSIDERED INCREASE THE BIO-TRAIN MASS, ADD MG(OH)2 AND MICRO C 2000 TO THE BIO-TRAINS TO TREAT THE INCREASED AMMONIA LOAD ADVANTAGES OF APPROVAL Treating the return side stream will reduce the load on the bio-trains and reduce chemical costs associated with these loads. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Electrical costs for compressor, mixer and pumps. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY18 FY19 FY20 100 CIP Project Fund Wastewater Fund PROJECT NUMBER WW45 DEPARTMENT WRF PLANT PROJECT NAME FINAL CLARIFIER LAUNDER COVER FY16 $40,000 FY17 $40,000 Unscheduled DESCRIPTION OF PROJECT To cover effluent launder of one final clarifier a year (4 total) to eliminate algal growth in the launder. THE BRUSH SYSTEM REQUIRES CONTINUAL MAINTENANCE. THERE IS RISK OF BRUSHES BREAKING OFF AND FALLING INTO THE CLARIFIER THAT MAY BLOCK THE WASTING HOPPER ALTERNATIVES CONSIDERED CURRENTLY A BRUSH SYSTEM IS USED TO REDUCE THE AMOUNT OF ALGAL GROWTH WHICH REQUIRES CONTINUAL MAINTENANCE. ADVANTAGES OF APPROVAL COVERING THE CLARIFIERS WILL ELIMINATE CURRENT MAINTENANCE AND HELP REDUCE POTENTIAL HAZZARDS. MAINTENANCE WOULD BE CUT TO TWICE A YEAR ALLOWING OPERATORS TO SPEND TIME ON OTHER DUTIES AT THE PLANT. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduce oeprating costs (time & materials) FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY18 $40,000 FY19 FY20 101 CIP Project Fund Wastewater Fund PROJECT NUMBER WW47 DEPARTMENT WW OPS PROJECT NAME BURRUP LIFT STATION REHAB FY16 $100,000 FY17 Unscheduled DESCRIPTION OF PROJECT This project would involve replacing the 2 existing above grade pumps and primer pumps with 2 submersible pumps in the wet well. This would also involve a new vault with piping and electrical work. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Would replace 2-30 plus year old pumps that have become unreliable. The submersible pumps are far more reliable and do not have to be primed. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY18 FY19 FY20 102 CIP Project Fund Wastewater Fund PROJECT NUMBER WW48 DEPARTMENT WW OPS PROJECT NAME SLRAT ACOUSTIC SEWER PIPE ASSESMENT TOOL FY16 $25,000 FY17 Unscheduled DESCRIPTION OF PROJECT This project will include purchasing of a Acoustic Sewer Pipe assessment tool. This technology can provide a rapid assessment of the need for pipe cleaning and an overall pipe‐condition assessment. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL By not cleaning all sewers there will be savings in fuel, emissions, and water. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund. New Replacement Equipment Project FY18 FY19 FY20 103 CIP Project Fund Wastewater Fund PROJECT NUMBER WW49 DEPARTMENT WRF PLANT PROJECT NAME ROLL-OFF STORAGE BUILDING CONSTRUCTION FY16 FY17 $250,000 Unscheduled DESCRIPTION OF PROJECT CONSTRUCTION OF AN ADDITION TO THE ROLL-OFF LOADING BAY THAT WILL STORE ROLL-OFFS. ALTERNATIVES CONSIDERED MODIFING THE TRUCK STORAGE BUILDING TO HAVE A HEATED AREA TO STORE ROLL-OFFS. ADVANTAGES OF APPROVAL AN ADDITION TO THE ROLL-OFF LOADING BAY TO STORE A ROLL-OFF DURING FREEZING WEATHER WOULD BE HEATED BY EXHAUST AIR FROM THE SOLIDS DE-WATERING BUILDING. THIS WOULD SAVE ENERGY BY ELIMINATING THE COST OF FUEL FOR HEATING THE ROLL-OFF AREA IN THE TRUCK STORAGE BARN. A NEEDED BIOLOGICAL ODOR CONTROL PROCESS WILL BE INCLUDED IN THIS ADDITION. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED OPERATING COSTS COULD BE REDUCED. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 104 CIP Project Fund Wastewater Fund PROJECT NUMBER WW50 DEPARTMENT WRF PLANT PROJECT NAME REFRIGERATED AUTOMATIC SAMPLERS FY16 FY17 $10,000 Unscheduled $20,000 DESCRIPTION OF PROJECT PURCHASE (3) NEW REFRIGERATED SAMPLERS FOR THE INFLUENT, PRIMARY AND EFFLUENT ALTERNATIVES CONSIDERED DO NOTHING. KEEP RUNNING AND REPAIRING THE OLD SAMPLERS UNTIL THEY FAIL COMPLETELY. ADVANTAGES OF APPROVAL THE SAMPLERS WE ARE USING HAVE BEEN IN SERVICE SINCE 2000 AND WE HAVE BEEN REPLACING WORN OUT PARTS. WE NEED TO START REPLACING THEM BEFORE THE ELECTRONIC COMPONENTS FAIL. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NO ADDITIONAL COSTS. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 105 CIP Project Fund Wastewater Fund PROJECT NUMBER WW51 DEPARTMENT WW OPS PROJECT NAME REFURBISH #3406 - 2007 CHEVY TV VAN FY16 FY17 Unscheduled DESCRIPTION OF PROJECT Refurbishment of existing Sewer TV Van routinely replaced every 5 years. Current Van purchased in FY07. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the timely replacement of critical maintenance equipment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund New Replacement Equipment Project FY18 $169,438 FY19 FY20 106 CIP Project Fund Wastewater Fund PROJECT NUMBER WW52 DEPARTMENT WW OPS PROJECT NAME REPLACE #2683 - 1999 JOHN DEERE 310SE BACKHOE FY16 FY17 Unscheduled DESCRIPTION OF PROJECT This vehicle replaces a 1999 John Deere backhoe with 2,904 hours on it. This vehicle is used to dig and backfill ditches that we dig to maintain our distribution and collection systems. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water utility. New Replacement Equipment Project FY18 $105,000 FY19 FY20 107 CIP Project Fund Wastewater Fund PROJECT NUMBER WW53 DEPARTMENT WRF PLANT PROJECT NAME POSITIVE DISPLACEMENT LOBE PUMP FY16 FY17 Unscheduled $30,000 DESCRIPTION OF PROJECT REPLACE UNDERSIZED MOYNO WASTING PUMPS WITH PROPER SIZED LOBE PUMPS. ALTERNATIVES CONSIDERED DO NOTHING. ADVANTAGES OF APPROVAL LOBE PUMPS HAVE A WIDER RANGE OF PUMPING SPEED MAKING THEM A BETTER FIT FOR THE NEEDS OF THE PLANT. THE LOBE PUMPS ARE EASIER TO WORK ON AND THE PARTS ARE NOT AS EXPENSIVE. THE REBUILD PARTS FOR A MOYNO PUMP RUN AROUND $1300 AND THE LOBE PUMPS RUN BETWEEN $500 AND $600 FOR EACH PUMP. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NO CHANGE IN OPERATING COSTS. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 $15,000 FY20 108 CIP Project Fund Wastewater Fund PROJECT NUMBER WW54 DEPARTMENT WW OPS PROJECT NAME REPLACE #1783 - 1995 FORD DUMP TRUCK FY16 FY17 Unscheduled DESCRIPTION OF PROJECT This project will replace a 1995 Ford Dump Truck that has 25,117 miles on it. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Will be a more fuel efficient and lower emissions vehicle. The new vehicle will improve safety of the crews, there would be lower repair costs and it would help maintain current operations levels. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund New Replacement Equipment Project FY18 FY19 FY20 $95,000 109 CIP Project Fund Wastewater Fund PROJECT NUMBER WW55 DEPARTMENT WW OPS PROJECT NAME REPLACE #3232 - 2004 3/4 TON FORD PICKUP FY16 FY17 Unscheduled DESCRIPTION OF PROJECT This project will replace a 2004 Ford Pickup truck with 43,355 miles on it. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund New Replacement Equipment Project FY18 FY19 FY20 $33,000 110 CIP Project Fund Wastewater Fund PROJECT NUMBER WW56 DEPARTMENT WW OPS PROJECT NAME LAUREL GLEN VEHICLE STORAGE FY16 $50,000 FY17 Unscheduled DESCRIPTION OF PROJECT This project will give us the ability to build 2 heated building each containing 3 to 4 bays for needed vehicle and equipment storage. These buildings will be built on city owned land in the Laurel Glen Subdivision. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Ability to storage several hundred thousand dollars of city equipment that is currently store outside in a heated and secure space. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Electricity and natural gas costs. FUNDING SOURCES 100% Waste water total cost 100,000 split with Water Ops. New Replacement Equipment Project FY18 FY19 FY20 111 CIP Project Fund Wastewater Fund PROJECT NUMBER WW57 DEPARTMENT WRF PLANT PROJECT NAME WRF FISHING ACCESS - LATRINE FY16 FY17 Unscheduled $10,000 DESCRIPTION OF PROJECT INSTALL A LATRINE AT THE FISHING ACCESS SITE AT THE BOZEMAN WRF ALTERNATIVES CONSIDERED THERE ARE TWO PUBLIC BATHROOMS IN THE LAB/ADMIN BUILDING 100 YDS. OR LESS FROM THE FISHING ACCESS. ADVANTAGES OF APPROVAL NONE ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED N/A FUNDING SOURCES ?? New Replacement Equipment Project FY18 FY19 FY20 112 CIP Project Fund Wastewater Fund PROJECT NUMBER WW58 DEPARTMENT WRF PLANT PROJECT NAME TOPCOAT ASPHALT FY16 FY17 Unscheduled $100,000 DESCRIPTION OF PROJECT TOP COATING ALL ASPHALT ON THE BOZEMAN WRF SIGHT. ALTERNATIVES CONSIDERED NO ALTERNATIVES CONSIDERED. ADVANTAGES OF APPROVAL EXTEND THE LIFE OF THE ASPHALT ROADS THAT ARE ALREADY IN PLACE. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NA FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 113 CIP Project Fund Wastewater Fund PROJECT NUMBER WW59 DEPARTMENT WRF PLANT PROJECT NAME SPLITTER STRUCTURE AIR DIFFUSER FY16 FY17 Unscheduled $30,000 DESCRIPTION OF PROJECT PURCHASE AND INSTALL DIFFUSERS ON THE AIR LANCES IN THE BIO-TRAIN EFFLUENT SPLITER STRUCTURE. ALTERNATIVES CONSIDERED DO NOTHING. ADVANTAGES OF APPROVAL AIR IS NEEDED IN THE FLOW SPLITTER STRUCTURE TO PREVENT SECONDARY PHOSPHORUS RELEASE. AIR DIFFUSERS PROVIDE A HIGHER OXYGEN TRANSFER RATE TO THE FLOW AND THEREFORE WILL REDUCE THE LOAD ON THE AIR TURBINES SAVING ELECTRICITY. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED WILL SAVE ENERGY AND LOWER OPERATING COSTS. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 114 CIP Project Fund Wastewater Fund PROJECT NUMBER WW60 DEPARTMENT WRF PLANT PROJECT NAME NUTRIENT RECOVERY PROCESS CONSTRUCTION FY16 FY17 Unscheduled $2,000,000 DESCRIPTION OF PROJECT CONSTRUCTION OF NUTRIENT RECOVERY PROCESS TO CAPTURE NITROGEN AND PHOSPHORUS FROM ANAEROBICLY DIGESTED SLUDGE. ALTERNATIVES CONSIDERED DO NOTHING AND LOOSE A COMMODITY THAT IS A BI-PRODUCT OF ANAEROBIC DIGESTION ADVANTAGES OF APPROVAL THE PRODUCTION OF MAGNESIUM AMMONIUM PHOSPHATE TO BE SOLD AS A SLOW RELEASE FERTILIZER WILL RECYCLE LIMITED NUTRIENTS BACK INTO THE ECOSYSTEM. THIS PROCESS WILL REDUCE THE NITROGEN AND PHOSPHORUS IN OUR SIDESTREAM RETURNING TO THE HEAD OF THE PLANT WHICH WILL IN TURN REDUCE THE LOADING ON THE PROCESS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED MAINTENANCE AND OPERATING COSTS THAT WILL BE OFF SET BY INCOME FROM THE SALE OF THE SLOW RELEASE FERTILIZER. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 115 CIP Project Fund Wastewater Fund PROJECT NUMBER WW61 DEPARTMENT WRF PLANT PROJECT NAME ONLINE AMMONIA PROBES FY16 FY17 Unscheduled $30,000 DESCRIPTION OF PROJECT PURCHASE TWO ONLINE AMMONIA PROBES ALTERNATIVES CONSIDERED DO NOTHING AND ALWAYS WAIT 24 HOURS TO SEE IF THE AMMONIA LIMIT WAS MET. ADVANTAGES OF APPROVAL AN ONLINE AMMONIA PROBE WOULD INSTANTLY SHOW THE NEGATIVE EFFECTS OF TOXIC POLLUTANTS, EXCESS WASTING AND COLD TEMPERATURES BEFORE THE 24 HOUR COMPOSITE SAMPLE WAS COMPLETE AND ANALYZED. CONTENTIOUS READOUTS OF AMMONIA LEAVING THE PROCESS WOULD HELP TREMENDOUSLY IN PREVENTING PERMIT VIOLATIONS DUE TO EXCEEDING THE EFFLUENT AMMONIA LIMITS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED MAINTENANCE COSTS OF THE PROBES AND A SMALL ADDITIONAL AMOUNT OF ELECTRICITY. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY18 FY19 FY20 116 CIP Project Fund Wastewater Fund PROJECT NUMBER WW62 DEPARTMENT WRF PLANT PROJECT NAME METHANE COGENERATION PROJECT CONSTRUCTION FY16 FY17 Unscheduled $2,200,000 DESCRIPTION OF PROJECT Consistent with the goals of the City’s Climate Action Plan & Sustainability Programs, the Bozeman WRF staff and Public Works Director recommend we move forward with our proposed investigation and installation of a methane recovery and co- generation system. This system will produce an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a generator powered entirely by WRF digester gas. This project has the potential to save the City at least $180,000 in electricity costs and substantially lower the carbon footprint of the new Bozeman WRF. This project would be implemented in 3 phases including (1) a feasibility / cost effectiveness study, (2) project engineering / design and (3) the purchase and installation of appropriate technology for the co-generation of electricity at the Bozeman WRF. Year 1: Project Feasibility Study. Year 2: Project Engineering Design - $350,000. Year 3: Equipment Purchase and Installation - $2,200,000. ALTERNATIVES CONSIDERED Continue to flare our digester methane gas. Micro-turbines and fuel-cells have been analyzed and continue to be possible alternative energy recovery technologies for this project. Our research to date suggests the most proven technology currently available to help us accomplish our energy recovery goals is likely to be a GE Jenbacher internal combustion engine and heat recovery system.ADVANTAGES OF APPROVAL Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year FUNDING SOURCES Wastewater Fund, other grants or community partners. New Replacement Equipment Project FY18 FY19 FY20 117