HomeMy WebLinkAbout17 Street and Curb CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adoption of the Street and Curb Reconstruction Capital Improvement
Plan (CIP) for FY16-20.
AGENDA ITEM TYPE: Action
MEETING DATE: December 8, 2014
RECOMMENDATION: Adoption of the Street and Curb Reconstruction Capital
Improvement Plan (CIP) for FY16-20.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Staff met in November
to develop the attached draft schedules.
This plan outlines the use of Street Maintenance District dollars that are dedicated to the
reconstruction of streets and curbs. The policy for required matches with Special Improvement
Districts (SID’s) is outlined in Commission Resolution No. 4507.
Items to Note:
• Projects have been identified by Public Works, according to their 15 year capital planning
program.
• The estimated amount of local SID contribution for each project is noted in the item
description.
UNRESOLVED ISSUES: None.
183
ALTERNATIVES: As suggested by the City Commission. If the Commission is does
not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY16.
Report compiled on: November 24, 2014
Attached: Draft – Street and Curb Replacement CIP
184
Street and Curb Reconstructions (combined) Capital Improvement PlanFinancial SummaryCurrent YearFY15FY16FY17 FY18 FY19 FY20UnscheduledProjected Beginning Reserve Balance Dedicated to CIP1,222,433$ 307,152$ 32,629$ 119,330$ 504,571$ 626,667$ Plus: Street Maintenance Assessments Dedicated 634,719$ 647,477$ 653,952$ 660,491$ 667,096$ 673,767$ Plus: SID or other local contribution200,000$ 662,000$ 1,521,750$ 645,750$ 500,000$ 626,500$ Less: Carryover Capital Projects(900,000)$ Less: Scheduled CIP Project Costs(850,000)$ (1,584,000)$ (2,089,000)$ (921,000)$ (1,045,000)$ (1,891,000)$ ‐$ Projected Year‐End Cash Dedicated to CIP307,152$ 32,629$ 119,330$ 504,571$ 626,667$ 35,934$ Assumptions Made for Revenue Estimates:Current YearFY14FY16FY17FY18 FY19 FY20Total Estimated Annual Street Assessment Revenue2,820,973$ 2,849,183$ 2,877,675$ 2,906,451$ 2,935,516$ 2,964,871$ Estimated Annual Increase ‐ Attributed to Annexations1%1%1%1%1%Total Estimated Revenues2,820,973$ 2,877,675$ 2,906,451$ 2,935,516$ 2,964,871$ 2,994,520$ Current Revenues Dedicated to Street & Curb CIP %22.5%22.5% 22.5% 22.5% 22.5% 22.5% Plus: Increase Dedicated to Reconstruction & Curbs0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP22.5%22.5% 22.5% 22.5% 22.5% 22.5%TlEi dRDdi dCIP634 719$647 477$653 952$660 491$667 096$673 767$ProjectedProjectedTotal Estimated Revenues Dedicated to CIP634,719$ 647,477$ 653,952$ 660,491$ 667,096$ 673,767$ CURRENT2,500,0002,000,0001,500,0001,000,000500,0000Street Reconstruction Projects 185
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY20FY17FY18FY19Street and Curb Replacement FundSCR01ENGINEERINGANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM$60,000$60,000$60,000$60,000$60,000SCR03ENGINEERINGW OLIVE (8TH TO TRACY)$1,324,000SCR04ENGINEERINGS GRAND (OLIVE TO HAYES)$2,029,000SCR05ENGINEERINGN GRAND (MENDENHAL TO PEACH)$861,000SCR06ENGINEERINGE OLIVE (TRACY TO CHURCH)$985,000SCR07ENGINEERINGN. WALLACE (LAMME TO TAMARACK)$1,253,000SCR08ENGINEERINGW COLLEGE (8TH TO 11TH)$578,000SCR09ENGINEERINGSOUTH CHURCH (STORY TO BABCOCK)$200,000$1,891,000$1,584,000$2,089,000$921,000$1,045,000Totals by DEPARTMENTSummary for Street and Curb Replacement Fund (8 items)Totals by year:$1,891,000$1,584,000 $2,089,000FY20FY16FY17UnscheduledFY19$1,045,000$921,000FY18186
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR01
DEPARTMENT
ENGINEERING
PROJECT NAME
ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM
FY16
$60,000
FY17
$60,000
Unscheduled
DESCRIPTION OF PROJECT
When a pedestrian ramp is installed, many times the adjacent curbs need to be replaced in order to get drainage to not stop at
new ramp. Smaller curb repairs can be necessary rather than replacing a whole block
ALTERNATIVES CONSIDERED
Continue current operations
ADVANTAGES OF APPROVAL
This will allow completion of smaller projects instead of waiting for an entire block to be repaired
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Cost of Materials
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY18
$60,000
FY19
$60,000
FY20
$60,000
187
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR03
DEPARTMENT
ENGINEERING
PROJECT NAME
W OLIVE (8TH TO TRACY)
FY16
$1,324,000
FY17 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West Olive Street from 8th Street to Tracy, including repairs to failed curbs and gutters. For planning
purposes, project estimates West Olive to function as a Minor Collector, which would require a 50% contribution from property
owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY18 FY19 FY20
188
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR04
DEPARTMENT
ENGINEERING
PROJECT NAME
S GRAND (OLIVE TO HAYES)
FY16 FY17
$2,029,000
Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Grand Street from Olive to Hayes, including repairs to failed curbs and gutters. For planning purposes,
project estimates South Grand to function as a Local Street, which would require a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY18 FY19 FY20
189
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR05
DEPARTMENT
ENGINEERING
PROJECT NAME
N GRAND (MENDENHAL TO PEACH)
FY16 FY17 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North Grand from Mendehal to Peach, including repairs to failed curbs and gutters. For planning purposes,
project estimates North Grand to function as a Local Street, which would require a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY18
$861,000
FY19 FY20
190
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR06
DEPARTMENT
ENGINEERING
PROJECT NAME
E OLIVE (TRACY TO CHURCH)
FY16 FY17 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of East Olive Street from Tracy to Church, including repairs to failed curbs and gutters. For planning purposes,
project estimates East to function as a Minor Collector, which would require a 50% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY18 FY19
$985,000
FY20
191
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR07
DEPARTMENT
ENGINEERING
PROJECT NAME
N. WALLACE (LAMME TO TAMARACK)
FY16 FY17 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North Wallace from Lamme to Tamarack, including repairs to failed curbs and gutters. For planning purposes,
project estimates North Wallace to function as a Minor Collector, which would require a 50% contribution from property
owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY18 FY19 FY20
$1,253,000
192
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR08
DEPARTMENT
ENGINEERING
PROJECT NAME
W COLLEGE (8TH TO 11TH)
FY16 FY17 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West College Street from 8th to 11th, including repairs to failed curbs and gutters. For planning purposes,
project estimates W. College to function as an Arterial, which would require no contribution from property owners.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY18 FY19 FY20
$578,000
193
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR09
DEPARTMENT
ENGINEERING
PROJECT NAME
SOUTH CHURCH (STORY TO BABCOCK)
FY16
$200,000
FY17 Unscheduled
DESCRIPTION OF PROJECT
South Church Street from Story to Babcock. Replace the curb and gutter on both sides of Church Street from Story to Babcock,
including ADA compliant pedestrian ramps at all intersections.
ALTERNATIVES CONSIDERED
Do not replace the curbs at this time
ADVANTAGES OF APPROVAL
This improvement will enhance storm drainage, better define and protext the street edge as well as the boulevard and make snow removal
easier
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY18 FY19 FY20
194