Loading...
HomeMy WebLinkAboutDNRC Application (No City Grant # needed) Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Carolyn Poissant, TOP Design and Development Manager Mitch Overton – Director of Parks and Recreation SUBJECT: Request for Extension of DNRC Grant Completion Date for the Bozeman Creek at Bogert Park Enhancement Project MEETING DATE: December 1, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign Amendment No. 1 to the Department of Natural Resources and Conservation Grant Agreement No. RRG-14-1608 (Attachment 1) extending the grant deadline. BACKGROUND: Resolution No. 4492, the Commission acknowledged receipt of a $100,000 Montana Department of Natural Resources and Conservation grant and allocated up to $440,000 in TOP bond funding for the Bozeman Creek at Bogert Park Enhancement Project. In early 2014, a preliminary design was prepared in order to negotiate access from property owners along the creek adjacent to Bogert Park. One property owner does not wish to permit any construction activity on his/her property. As such, the design will need to be revised and construction, which must occur during the low-flow period, will be delayed until Fall 2015. This amendment will extend the deadline for completion of the project to June 30, 2016. UNRESOLVED ISSUES: None. ALTERNATIVES: As directed by Commission. FISCAL EFFECTS: None. Attachments: DNRC Grant Agreement Amendment No. 1; 2) Project Status Report Report compiled on: November 14, 2014 71 I AND CONSERVATION STEVE BULLOCK, GOVERNOR 1625 ELEVENTH AVENUE DEPARTMENT OF NATURAL RESOURCES -STATE OF MONTANA DIRECTOR'S OFFICE: (406) 444-2074 FAX: (406) 444-2684 October 29,2014 Chris Kukulski City of Bozeman PO Box 1230 Bozeman, MT 59771 RE: Amendment #1 Grant Agreement No. RRG-I4-1608 Enclosed are two originalAmendments for signature. Please have both signed where indicated, and return both to me for execution by the Department of Natuial Resources and Conservation. A fully executed original will be returned to you when comPleted. You may call me at 444-9766 with any questions or concerns that you have. Respectfully, PO BOX 201601 HELENA, MONTANA 59 620 -A601 TRUST LAND MANAGEMENT DIVISION (405\ 444-2074 d*'rE5x{tkt* Lindsay Volpe Program Manager Cc: File w/o Encls (2) DIRECTORIS OFFICE (406\ 444-2074 CONSERVATION & RESOURCE DIVISION (406\ 444-6667 RESERVED WATER RIGHTS COMPACT COMMISSION (4061 444-6841 OIL & GAS DIVISION @051 444-6675 72 FOR DNRC USE ONLY Maximum amount under this agreement: $100,000 Approved Source of Funds - Natural Resource Projects Account No. RRG-14-1608 Accounting Amendment No.1 Accountinq Entitv Name Entitv No. Division rn/9u Lunt 02577 c.s.D. Tf-l-egat-F Approp. No. R.C. No. Percent540t6 3414156 100% Appropriation Authority: HB 6 (2013) Workers' Comp: _ N/A _ Attached _ Exempt _ Will be forwarded AMENDMENT NO. 1 COI.TSERVnTION AN D RESOU RC E DEVELOPM E NT DlVl Sl ON DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION THIS AMENDMENT MADE AND ENTERED INTO BY AND BETWEEN THE MONTANA DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION'S (DNRC) CONSERVATION AND RESOURCE DEVELOPMENT DIVISION HEREINAFTER CALLED.'DNRC", AND, THE CITY OF BOZEMAN, HEREINAFTER CALLED THE ''PROJECT SPONSOR''. The parties to this Agreement in consideration of the mutual covenants and stipulations set out herein hereby agree as follows: THAT because additional time is needed to complete the project, SECTION 2. TERM is hereby amended as follows: SECTION 2. TERM. The Project Sponsor shall have until 06/30/2016, to complete the project and work described in Section 4, Project Scope due top easement issues. DNRC may grant an extension for completion upon request and showing of good cause by the Project Sponsor. A request for extension submitted less than 45 days prior to the termination date may or may not be considered. All other terms and conditions remain unchanged and continue in full force and effect. This Amendment consists of one (1) page. To express the parties' intent to be bound by the terms of this Agreement they have executed this document on the dates set out below. Project Sponsor Date DNRC Date 73 PROJECT STATUS REPORT Grant Agreement No. RRG-14-1608 Bozeman Creek at Bogert Park Enhancement Project Third Quarter - July – September 2014 Submittal Date: October 10, 2014 Project Task # 1 Contract qualified consulting professional firm(s) to prepare final design plans and specifications. COMPLETED - February 2012 Project Task # 2 Prepare and submit all necessary regulatory permits; revise final designs if necessary. UNDERWAY – expected completion May 2015 • Geotechnical investigation regarding park shelter footings - completed January 2013 • Preliminary Design and Hydrologic Report – completed May 2012 • Prepare final design with revised hydraulics – expected completion May 2015 • Submit FEMA LOMC application - expected completion May 2015 Project Task # 3 Prepare bid package and solicit proposals for construction. Expected completion July 2015 Project Task # 4 Construct the project, including the following tasks: 1) Construct channel and inset floodplain 2) Construct floodplain revetment 3) Construct west bank stabilization 4) Install new irrigation lines 5) Reset power pole and overhead power lines 6) Install public access site 7) Re-vegetate riparian corridor 8) Install new footbridge 9) Install new trail system 10) Install new playground features Anticipated contract award October 2015 Expected completion June 2016 74