Loading...
HomeMy WebLinkAboutAmendment 1 PSA Morrison Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Capital Improvement Projects Field Survey - Amendment No. 1 MEETING DATE: December 1st, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign Amendment No 1 to the Professional Services Agreement. BACKGROUND: Attached is a copy of the partially executed Amendment No. 1 with Morrison Maierle, Inc. for the Capital Improvement Projects Field Survey. Kagy Boulevard has been tabbed as the next project funded in part by the City’s Urban Funds. A design for the reconstruction of Kagy was completed in the 1980’s. Since that time, changes have occurred along the corridor to both utilities and surface improvements. All of those changes will need to be incorporated into the plans before the project can be utilized for construction. This amendment will add surveying the corridor to our current CIP survey project. The amendment also will remove 2 blocks on Willson that we don’t need done and replace them with 2 blocks on the south end of Willson and a block on Lincoln between Willson and Grand. The cost per acre included in this amendment is the same as was approved under the original contract. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: If approved, this amendment will increase the fee by $43,012.50 from $65,135.30 to $108,147.80. Attachments: Amendment No. 1 Report compiled on: 11/10/14 20 21 22 23 24 25 26 27 28 29 30 31