Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Library Depreciation Fund Capital Improvement Plan
(CIP) for Fiscal Years 2016-2020.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 17, 2014
RECOMMENDATION: Adopt the Library Depreciation Reserve Capital Improvement
Plan (CIP) for Fiscal Years 2016-2020.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing the various parts of the plan forward as items on the Consent agenda. We
will be prepared to address questions, if they arise, at the public meeting.
The Library Director, City Manager, and other city staff met in October to develop an initial
Capital Plan for the equipment and capital needs of the Library. This plan was proposed to and
approved by the Library Board at their meeting on October 15, 2014. LIB06 – Public
PC/Laptop Replacements was moved from FY17 to FY16 and increased the amount requested
to meet actual replacement schedule; LIB09 – Banner Replacement, Library Exterior was
moved back to FY18 as the banners are still in good shape;
Item of Note:
20
• LIB04 – Upgrade Circulation Book Drop Software: Replace 3 self-check machines
was added for FY16 for $38,000.
• LIB12 – Pedestrian Access – Library Parking Lot – This item’s cost is currently
unknown. The Library staff is in the process of having Western Transportation Institute
study the layout and suggest appropriate improvements. The item was included in the CIP
packet as an indicator that the project will be coming.
• LIB13 – Reconfiguration of Existing Building Space – This item’s cost is currently
unknown. The item was included as an indicator that the project will be coming.
• LIB14 – Implementation of Landscape Master Plan – This item’s cost is currently
unknown. The Library is paying for a completed Master Plan from their State Aid funds,
which will determine the appropriate action and cost of this item.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY16.
Report compiled on: November 10th, 2014
Attached: Library Depreciation Reserve CIP
21
Library Depreciation Reserve Fund
Capital Improvement Plan
Financial Summary Current Year
FY15 FY16 FY17 FY18 FY19 FY20 Unscheduled
Projected Beginning Reserve Balance Dedicated to CIP 366,902$ 327,898$ 244,898$ 260,198$ 255,804$ 271,722$
Plus: Estimated Annual Unspent Appropriations 1,200$ 15,000$ 15,300$ 15,606$ 15,918$ 16,236$ -$
Less: Scheduled CIP Project Costs (40,204)$ (98,000)$ -$ (20,000)$ -$ -$ -$
Projected Year-End Cash Dedicated to CIP 327,898$ 244,898$ 260,198$ 255,804$ 271,722$ 287,958$
Assumptions Made for Revenue Estimates:
FY16 FY17 FY18 FY19 FY20
Estimated Annual Library Budget 1,500,000$ 1,530,000$ 1,560,600$ 1,591,812$ 1,623,648$
Estimated Amount of Budget left Unused 1%1%1%1%1%
Estimated Annual Unspent Appropriations 15,000$ 15,300$ 15,606$ 15,918$ 16,236$
Current Budget Amount Dedicated to CIP %100.0%100.0%100.0%100.0%100.0%
Plus: Increase Dedicated to Capital Improvements %0.0%0.0%0.0%0.0%0.0%
Total % Dedicated to CIP 100.0%100.0%100.0%100.0%100.0%
Total Estimated Revenues Dedicated to CIP 15,000$ 15,300$ 15,606$ 15,918$ 16,236$
Projected
Projected
CURRENT
120,000
100,000
80,000
60,000
40,000
20,000
0
Library Depreciation Fund Projects & Equipment
22
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY20FY17FY18FY19Library Depreciation ReserveLIB04LIBRARYUPGRADE CIRCULATION BOOK DROP SOFTWARE; REPLACE 3 SELF‐CHECK MACHINES$38,000LIB06LIBRARYPUBLIC PC/LAPTOP REPLACEMENTS$50,000LIB09LIBRARYBANNER REPLACEMENT, LIBRARY EXTERIOR$20,000LIB10LIBRARYWAINSCOTING ‐ ADDED TO MEETING ROOMS, RESTROOM AREAS$10,000LIB12LIBRARYPEDESTRIAN ACCESS ‐ LIBRARY PARKING LOT$0LIB13LIBRARYRECONFIGURATION OF EXISTING BUILDING SPACE$0LIB14LIBRARYIMPLEMENTATION OF LANDSCAPE MASTER PLAN$0$98,000$20,000Totals by DEPARTMENTSummary for Library Depreciation Reserve (7 items)Totals by year:$98,000FY20FY16FY17UnscheduledFY19$20,000FY1823
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB04
DEPARTMENT
LIBRARY
PROJECT NAME
UPGRADE CIRCULATION BOOK DROP SOFTWARE; REPLACE 3 SELF-CHECK MACHINES
FY16
$38,000
FY17 Unscheduled
DESCRIPTION OF PROJECT
The Library has automated check-in at the book drops; this software was installed in 2006 and needs to be updated to continue
to be effective. We have three, 3M self-check machines that allow Library patrons to check their own materials out. These are
controlled by software that will be outdated in the next year, so we need to replace them with three new self-check machines.
ALTERNATIVES CONSIDERED
We can choose not to update the check-in software or the self-checks, but this would mean that the automated check-in ceases
to work and the self-checks will become less reliable and ultimately out of order.
ADVANTAGES OF APPROVAL
Updating this check-in software and self-check machines allows the Library to continue to offer efficient, accurate service to our patrons. We
will be able to continue to monitor the whereabouts of our Library books and materials accurately and responsibly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation fund
New
Replacement
Equipment
Project
FY18 FY19 FY20
24
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB06
DEPARTMENT
LIBRARY
PROJECT NAME
PUBLIC PC/LAPTOP REPLACEMENTS
FY16
$50,000
FY17 Unscheduled
DESCRIPTION OF PROJECT
The Library provides 28 public computers in a lab setting as well as 16 checkout laptops. The majority will have been in place
with daily use for 4 years.
ALTERNATIVES CONSIDERED
Alternatively, the computers and laptops will be pushed for an additional year.
ADVANTAGES OF APPROVAL
Keeping a public service up to date with technology.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18 FY19 FY20
25
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB09
DEPARTMENT
LIBRARY
PROJECT NAME
BANNER REPLACEMENT, LIBRARY EXTERIOR
FY16 FY17 Unscheduled
DESCRIPTION OF PROJECT
The colorful banners that hang on the front of the Library’s exterior are a key focal point for the Library and an important part of
its beauty. The banners will be twelve years old in FY18. We would like to be able to replace them before they become worn
and shabby.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Replacing the banners in a timely manner will keep the Library’s appearance up and maintain its beauty.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18
$20,000
FY19 FY20
26
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB10
DEPARTMENT
LIBRARY
PROJECT NAME
WAINSCOTING - ADDED TO MEETING ROOMS, RESTROOM AREAS
FY16
$10,000
FY17 Unscheduled
DESCRIPTION OF PROJECT
Add wainscoting to the meeting rooms’ walls and to the hallway in the public restroom area, off of the lobby, to prevent scarring
and gouging of the walls.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
The walls are damaged accidentally by chairs, tables, wheelchairs and routine activity. The wainscoting would prevent damage to the plaster and
protect the paint on the walls.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18 FY19 FY20
27
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB12
DEPARTMENT
LIBRARY
PROJECT NAME
PEDESTRIAN ACCESS - LIBRARY PARKING LOT
FY16
$0
FY17 Unscheduled
DESCRIPTION OF PROJECT
Installation and re-construction of pedestrian-friendly features in the Library Parking lot. Patrons parking on the west side of the
parking lot have to cross through vehicle traffic and around curbing/medians to access the Library entrance. In addition, proposed
renovations of the old Harrington Building adjacent to the Library have included adding a pedestrian pathway, crossing from
Wallace to the Library parking lot. This improvement to pedestrian access to the parking lot is expected to have consequences
for how many people will be crossing through this heavily used lot. Accessability requirements for line-of-travel and the
need to navigate the existing curbs are a concern. Some parking spaces may have to be eliminated. Will require re-design of the
parking lot (a Facilites Management General Fund request) with construction costs coming from the Library Depreciation
Reserve. Without design work completed, Costs are UNKNOWN at this point.
ALTERNATIVES CONSIDERED
Leave parking lot configuration the way it is - without a pedestrian path from Wallace.
ADVANTAGES OF APPROVAL
Improved safety for pedestrians trying to access the Library or cross the library property.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18 FY19 FY20
28
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB13
DEPARTMENT
LIBRARY
PROJECT NAME
RECONFIGURATION OF EXISTING BUILDING SPACE
FY16
$0
FY17 Unscheduled
DESCRIPTION OF PROJECT
The Library’s Strategic Plan for 2013-2017 includes reviewing current Library space usage and ensuring that we are using it as
efficiently and effectively as possible. We are working with local architect, Rob Pertzborn, to see what options we have for
possibly reconfiguring some of our existing space. The Strategic Plan also calls for more space that can be used by local
businesspeople and patrons for planning and creative purposes. We have begun meeting with the architect but no decisions have
been made and the project is still in initial phases, so no dollar amount has been determined yet.
ALTERNATIVES CONSIDERED
Leaving the interior space utilization as it currently exists.
ADVANTAGES OF APPROVAL
The Library’s two public meeting rooms are booked months in advance, so people ask the Library staff for quiet space to have small meetings
frequently. One of our goals is to have a public work space that would include a 3-D printer and other materials conducive to creativity. That
could only be accomplished by making some changes to the current space configuration, and would answer the requests from the public.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18 FY19 FY20
29
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB14
DEPARTMENT
LIBRARY
PROJECT NAME
IMPLEMENTATION OF LANDSCAPE MASTER PLAN
FY16
$0
FY17 Unscheduled
DESCRIPTION OF PROJECT
The Library currently has no completed Grounds Master Plan. We want to work with a landscape architect to develop a plan
that will replace high-maintenance plants with low-maintenance, drought-resistant plantings that will enhance the Library’s
grounds and maintain the Library’s appearance as a community jewel. This would also complement the landscaping that has been
done by the owners of the Harrington building on south Wallace, adjacent to the Library’s west property line, and accommodate
any upgrades to the parking lot that would be made this year. Because the project is in the initial phases, there is no estimate of
cost yet.
ALTERNATIVES CONSIDERED
Maintain the current grounds appearance.
ADVANTAGES OF APPROVAL
The Library staff gets regular complaints and comments from our customers regarding the weeds in the ‘dog bones” of the parking lot, and the
sometimes unkempt flower beds and grounds. City Facilities staff do their best to keep the grounds mowed but weeding the current rocky
spaces is almost impossible due to their design. The current plantings are high-maintenance and time-intensive, which makes keeping them
healthy and attractive very difficult. We would like to keep the Library’s appearance up and remain a place that community members are proud
of; a landscaping master plan will help us do that.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY18 FY19 FY20
30