HomeMy WebLinkAbout14- Gaston Engineering for CIP Survey PROFESSIONAL SERVICES AGREEMENT THIS IS AN AGREEMENT made as of OVNtaL d (, zil , between THE CITY OF BOZEMAN, a Municipal Corporation,Bozeman,Montana,59715(OWNER)and Gaston Engineering & Surveying P.C. Montana,(ENGINEER). Whereas the accomplishment of the work and services described in this Agreement is essential to the OWNER'S public works improvement program. Whereas the OWNER intends to and has selected the ENGINEER to provide necessary and professional engineering services for the project. Whereas the ENGINEER represents that it is willing and qualified to perform the professional engineering services for this project described in this Agreement. Therefore, in consideration of the foregoing recitals and the mutual covenants and conditions contained herein, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C: Scope of Services for 2014 Capital Improvement Projects field Survey, and EXHIBIT D: Surveying Fee Estimate, are hereby incorporated in and made part of this Agreement. ARTICLE 1 -ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: Perform a topographic survey to be used for Capital Improvements Projects. Prepare site map and deliverables (Hard copy and Digital)for use by owner. 1.2. The scope of services under this contract is set forth in this agreement and the attached EXHIBITS. ARTICLE 2-ENGINEER'S RESPONSIBILITIES 2.1. ENGINEER shall perform for OWNER professional engineering services in all phases of the Project to which this Agreement applies as hereinafter provided. These services will include, but not be limited to, serving as OWNER' professional engineering representative for the Project, providing professional engineering consultation and advice and furnishing customary civil and structural engineering services incidental thereto. 2.2. The ENGINEER shall fumish all labor,materials,equipment,supplies, and incidentals necessary to conduct and complete the ENGINEER'S portions of the Project and to prepare and deliver to the OWNER all data, reports, plans, specifications,and recommendations as designated herein. 2.3. The ENGINEER shall ascertain such information as may have a bearing on the work from local units of government, public, and private organizations and shall be authorized to procure information from other authorities as to the extent of these contacts and the results thereof. 2.4. The ENGINEER'S work shall be in accordance with the standards of sound engineering practices. 2.5. The ENGINEER shall name a Principal-In-Charge for the duration of the project. The Principal-In-Charge shall be Julie Gaston P.E. 2.6. The ENGINEER shall name a Project Manager who shall be the liaison between the ENGINEER and the 1 OWNER. The Project Manager shall be Dennis Foreman,PLS .The OWNER may name a Task Director who would be the liaison between the ENGINEER and the OWNER during the design segment of the Project. 2.7. The ENGINEER shall submit an estimated progress schedule at the beginning of the work,and monthly progress reports thereafter until the project is completed. ARTICLE 3-OWNER'S RESPONSIBILITIES 3.1 The OWNER shall name a Task Director who shall be the liaison between the ENGINEER and the OWNER during DESIGN segment of the Project. The Task Director designated shall be Robert J. Murray, Jr., P.E. 3.2 The OWNER shall have the right of review and examination of the ENGINEER'S work at all times. 3.3 The OWNER shall make available all records(record drawings,construction records,etc.)indicating the existing configuration of the city utilities. 3.4 The OWNER will be responsible for Advertising Bid Openings. 3.5 The OWNER shall attend the pre-bid conferences, bid openings, pre-construction conferences, construction progress and other job related meetings,substantial completion inspections and final payment inspections. ARTICLE 4-BASIC ENGINEERING SERVICES The ENGINEER shall render professional Engineering Services as follows: 4.1 PRE-DESIGN INVESTIGATION PHASE After written authorization to proceed,ENGINEER shall: 4.1.1 Consult with OWNER to clarify and define OWNER's requirements for the Project and review available data. n 12 Advise OWNER as to the neeessity of OWNER's ., eyidi..g oF obtaining ffem other data or sen and'assist'OWNER in ebta'....::b.�..... data... .............. 1.1.3 ldentif�and analyze requirements of governmental HiithBFities having jurisdiction to approve the des+*gn 4.1.4. Provide analyses of OWNER's needs, planning surveys, site evaluations and comparative studies of prospective sites and solutions. 4.1.5. Provide a general eeenemie analysis of OWNER's requirements applieable te YaFieus alternatives. deser-iptions and maps,prepafing a property owner's and assessments role lists ineluding project assessment eests based on the preliminai=y project cost estimates, and providing technical information at SID pi heayingso if applicably 4.1.7. Prepare a Report containing schematic layouts, sketches and conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved (including applicable requirements of governmental authorities having jurisdiction as aforesaid) and the alternative solutions available to OWNER and setting forth ENGINEER's findings and recommendations. This Reportwill be accompan itefflized: Constnietien Cost, allewanee for- engineering costs and by ENGINREWs opinion of probable easts for the Project, ineluding the following which will be separa4ely eneies, and (on the basis e and eansultants, for the cost of land and rights of wa�,, feF eempensation for- er damages to , interest and finanoing b sueh costs, allowanee, etc. are hereinafter-called "Total Pfoject 11 4.1.8. Furnish I copies and an electronic copy of the Study and Report documents and review them in person with OWNER. The Pre design investigation Phase will be eempleted and submitted within — calendar days &!!owing written authorization r.. /13ALN1;R to ENGINEER to proceed with that phase of ser.,;,,e� 4.2 PRELIMINARY DESIGN PHASE After acceptance of the pre-design report and receipt of written authorization to proceed with the Preliminary Design Phase,ENGINEER shall: 4:2.1. in eansultation with OWNER determine general s e extent and ehai:a.ter of the Project 4.2.2. ENGINEER shall then prepare a]?Feliminat-y Design Report,preliminary plans and speeifieations and-a r;tte de pt; for the_Rr et 4.2.3. Preliminar-N,Desien Report: Speeifir.items to he addFessed in the design report will inelude,but a limited to: rirrrrcc�c� Summafy of eenstruction requirements with apprepr-iate drawings fef eaeh task ineluded i the pfefeet. 4.2.3.2. Plans for pr-avi ding water and sewer services for affeeted propeFties dtifing constfuetion. 4.2.3.3. C,....mary geetesh.,iral report for s ci fi.tasks,if needed 4.2.3.4. Speeial design eensideratiefis tbr Prejeet tasks with conditions not eevered in standard GeHSOUGtion methods or-speeifieations. 4z2.3.5. A tFafnc eent yr plan for each project task,if necessary. 4.2.4. Design and Construction Survey: The ENGINEER shall conduct a design field survey of the project areas, as necessary, for locating existing utilities (such as gas, power, telephone, TV cables, water and sewer lines, irrigation facilities, fences, and approach driveways), existing right-of-way and easements, and making measured drawings of or investigating conditions of existing facilities. The ENGINEER shall provide suitable horizontal and vertical reference control points for the construction phase. 4.2.5. Permits and Riehts ef Wayi The ELNGD11SER shall obtain appreved pefmits, licenses, anWer easement bidding. These apPFGValS will be coordinated with the 03AENER and will be made on easement and pefH+k SeFviees will be based en data available ffem design sur-veys and Gouftheuse reeer-ds. 4.2.6. Geeteehnioal Explorations-and The 1Nf,11'lIJER shall coadtiet sush geotechn explorations and afialysis as neeessat), feF prejeet design and bidding. A geateeknieal report will be prepafed infer-matien will be obtained b, existing geeteehfiieai data available and using additional back test pits and Sail bOFi 3 The ENGINEER shall furnish eepies ef a geotechnioal repat4 as requested to 03AENER f-6F use by OWNER a Cantraeters, and review the results of the report with Gentmeters in a pre bid meeting. The FepaFt is t prepEved feF design purposes;ENGINEER will net be responsible if-it is used by others for other purposes. 4 2 7 U«el:.«.:.,. , Plans and c eeifteatieas Prepare pfeliminar-y eenstruetion plans and specifications F t' h' h .1 the a ..1 Fe.,t.. es of e..eh project task . 4 opinion ef probable Tetal Project Costs to the OWNER, 4.2.9. ENGINEER shall prepare and furnish complete paper and electronic copies of the topographic survey utilizing AutoDesk Civil 3D 2013 software. OWNER and at the safne time furnish cepies as diFeeted by OWNER te ageneies afi&ar- pai4ies h regulatei-y Fesponsibilities or- direct financial partiraipation in an), part of the Prejeet; previde all), teeh eriteria, written descriptiens md design data necessary for serauf:ing peEmits or-approval from authorities having jurisdietion tO Feview and appFeN,e the design, and assist - . - -ing suGh approvals; and review documents in person with 0��iElk and review autheFities, and, if necessary, conduct a plan in hand site f:eNi All changes affeed to bePA,een ENGINEER and OWNER will be Heted in a memerandum from the ENGINE + the OWNER and ineorporated into the final..laps and s cifieatie The Preliminary Design Phase will be completed and submitted within 110 calendar days following written authorization from OWNER to ENGINEER to proceed with that phase of services. 4.3 FINAL DESIGN PHASE—N/A n A written th t' + pfaceed with the Final Design Phase,R1.GPIEE shall: drawings,of suffirient detail to show the geneFal seepe, extent and detailed eharaeter- of the work to be furnished and performed by the Contraetef:(s)suitable for use in the pr-E)ject bidding and Genstruetiall. 4.3.2. Advise OWNER of any adjustments to the West opinion of probable Total Pfajeet Costs eaused-by changes in geneFal seepe, extent or- eharacter or design Fequkements of the Project or Construction C Fu m- ish te OWNER a revised opinion of probable Total Projeet Cests based an the E)Fawings and Speeigeatie 4.3.3. Prepare fbr-Fe-Aem, and appmval by OWNER, its legal eounsel and other advisers, eentmet agfeefflent fimms, general conditions and supplementat), conditions, and (wheFe appFopriate) bid forms, invitations to bid and instFustions to bidders, speeial provisions,teehnieal sperificatiens, a-Rd standard drawings, and at4eF 1:ela ish OWNER six copies and an eleetFenie eapy of the Contract Documents (including d . . ci Pleations mid eentraots) The Final Phase will be complete and submitted within ealeHdaf detys fallowing written autherization fro OWNER to ENGINEER toproceed with that phone of 4.4 BIDDING OR NEGOTIATING PHASE—N/A 4eFvvritten autherization to proceed with the Bidding OFNOgOtiating Phase,ENGINEER sh eentf!ar.t(s) and reeord prespeetive bidders to whern Bidding Deeuments have been issued, reGek,e and pree 64 isstie addenda as appropriate. 4.4.3. Consult with and advise OWNER as to the aeoeptability of the prime Contractor, subOOntffietofs-, suppliefs and other perseas and organizations pr-apased by the prime Gentractor(s) (herein eall "Coatraetar(s)L) 4.4.4. Consult with OWNER cencerning and determine the acceptability of substitute mateitials an equipment proposed by Centraeter(s)when substitution pFieF to the award of contraets is allowed by the Biddmiffg Doeu ments. 4.4.5. Attend the Bid opening, prepare bid tabulation, evaluate bids, assess bidders' responsibility and make awaFd feeemmendatien to 03ALNER. 4.4.6 Faeflitate eentrael award, and the execution and distribution of the eentraot documents for-eenstfueti&n-, materials, equipment RHd sei=viees. Furnish Owner twe efiginal signature sets of exeeuted eeatFaet deeaFflefits exeo,ted „t.- st do ntom ...7 up to three sets of e st.. „t:,, do ntom 4.5 CONSTRUCTION PHASE—N/A Not part of Scope of Services The responsibilities of the ENGINEER during the Construction Phase are summarized as follows: 4.5.1. General Administration of Construction Contract. ENGINEER shall consult with and advise OWNER and act as OWNER'S representative as provided in EXHIBIT A - ENGINEER'S STATUS DURING CONSTRUCTION,attached to and made part of this Agreement and may be further provided under the General Conditions of the contract documents. The extent and limitations of the authority, duties, and responsibilities of the ENGINEER on the construction job site as assigned here-in shall not be modified except as the ENGINEER may otherwise agree in writing. All of OWNER's instruction to Contractor(s) will be issued through ENGINEER who will have authority to act on behalf of OWNER to the extent provided in the General Conditions except as otherwise provided in writing. In addition to the services provided under Article 10 (Exhibit A) the ENGINEER shall provide the following services during construction: 4.5.1.1 Schedule and conduct a pre-construction conference. 4.5.1.2 Provide personnel, equipment and supplies for construction layout and control, including establishment of line,grade,and blue top control staking. 4.5.1.3 Review Contractors'construction schedules and operations,and the Contractors'traffic control plans and its implementation prior to the start of construction. 4.5.1.4 Ascertain that the Contractor has secured required permits needed to accomplish his work. 4.5.1.5 Prepare and provide weekly activity and progress reports to the City's Task Director. 4.5.1.6 ENGINEER shall provide OWNER copies of all correspondence between the ENGINEER and Contractor. 4.5.1.7 Issue stop and resume work orders, in whole or in part, when work is not or cannot be performed in accordance with the Contract Documents, 4.5.1.8 Review and approve, for conformance with the project technical specifications all shop drawings,and other Contractor submittals required by the Contract Documents. 5 4.5.1.9 During construction review Contractors'construction schedules and evaluate conformance and progress under the Contract time provisions. 4.5.1.10 Prepare for OWNER'S approval any plan and specification changes which due to any initial design or engineering deficiencies are required to complete the project original design concept. 4.5.1,11 Inspect the project and when appropriate, and after conferring with OWNER, issue a Certificate of Substantial Completion to the Contractor. 4.5.1.12 Prior to recommending final payment, schedule and conduct with the OWNER a final project inspection and submit a report to the OWNER documenting any outstanding items or deficiencies requiring correction prior to final payment. Upon satisfactory project completion ENGINEER shall certify in writing to the OWNER, and any required regulatory agencies, that the construction was completed in accordance with the approved plans and specifications and is performing in accordance with the design concept. 4.5.1.13 Twenty-three months after project substantial completion schedule and conduct with the Owner a Two Year Warranty Inspection of the project and advise the owner in writing whether project deficiencies exist and if the project is performing in accordance with the design concept. 4.5.2. Resident Project Representative. ENGINEER shall provide a qualified Resident Project Representative at the job site to provide observation of the work as provided in EXHIBIT B-A LISTING OF THE DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE,attached to and made part of this Agreement. The ENGINEER shall submit to the OWNER, for review and acceptance, the resume of each Resident Project Representative who may be assigned to the job site during the course of the Project not less than 10 calendar days prior to the pre-construction meeting. Any subsequent change in the resident representative shall also be subject to the OWNER'S approval. 4.5.3 Limitations of Responsibilities. ENGINEER will not be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, and ENGINEER will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents; however, nothing contained in this agreement shall be construed to release ENGINEER from liability for failure to properly perform duties and responsibilities assumed by ENGINEER in the Contract Documents. 4.6. PROJECT DOCUMENTATION-N/A Not part of Scope of Services ENGINEER shall furnish OWNER with (a) one mylar copy, two paper copies, and an electronic copy of the Project Record Drawings ("As-Builts"), (b) written monthly progress reports, and (c) a project notebook containing such correspondence and documentation as requested by OWNER. 4.7. CONSTRUCTION TESTING-N/A Not part of Scope of Services The inspection services shall include material testing and verification of contract compliance with job site requirements, plans and specifications. The ENGINEER shall provide and maintain detailed documentation of the following material testing: 1) Concrete strength,air content and slump 2) Embankment,trench backfill,and gravel and pavement densities 6 3) Aggregate gradations 4) Plant mix strength,flow and asphalt content ARTICLE 5-ADDITIONAL SERVICES 5.1. If OWNER wishes ENGINEER to perform any of the following Additional Services, OWNER shall so instruct ENGINEER in writing, and ENGINEER shall perform or obtain from others such services and will be paid therefor as provided in the Agreement: 5.1.1. Legal land surveys performed to obtain data for preparing easements and rights-of-way descriptions. 5.1.2. Preparation of applications and supporting documents for governmental agencies in addition to those required under Basic Services; preparation or review of environmental studies and related services; and assistance in obtaining environmental approvals. 5.1.3. Services resulting from significant changes in the general scope, extent or character of the Project or major changes in documentation previously accepted by OWNER where changes are due to causes beyond ENGINEER's control. 5.1.4. Providing renderings or models. 5.1.5. Preparing documents for alternate bids requested by OWNER for work not executed or for out-of- sequence work. 5.1.6. Providing other services not otherwise provided for in the Agreement, including services normally furnished by the OWNER as elsewhere herein described. 5.1.7. Furnishing the services of independent professional associates or consultants for other than Basic Services. 7 5.2. When required by the Contract Documents in circumstances beyond ENGINEER's control, ENGINEER shall perform or obtain from others any of the following Additional Services as circumstances require during construction and without waiting for specific instructions from OWNER, and ENGINEER will be paid therefor as provided in this Agreement: 5.2.1. Services in connection with work directive changes and change orders to reflect the changes requested by OWNER if the resulting change in compensation for Basic Services is not commensurate with the additional services rendered. 5.2.2. Services in making revisions to Drawings and Specifications occasioned by the OWNER'S acceptance of substitutions proposed by Contractor(s); services after the award of each contract in evaluating and determining the acceptability of an unreasonable or excessive number of substitutions proposed by Contractor; and evaluating an unreasonable or extensive number of claims submitted by Contractor(s)or others in connection with the work. 5.2.3. Services resulting from significant delays, changes or price increases occurring as a direct result of materials,equipment or energy shortages. 5.2.4. Additional or extended services during construction made necessary by (1) work damage by fire or other causes during construction, (2) a significant amount of defective or neglected work of any Contractor, (3) acceleration of the progress schedule involving services beyond normal working hours, (4) default by any Contractor. ARTICLE 6-COMPENSATION FOR ENGINEERING SERVICE 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $44,614.13 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.4)shall not exceed the following ceilings: $ 13,384.24 DO%of design fee)until Task 1 has been submitted to the OWNER. $ 44,614.13 (100% of design fee) until Tasks 2 and 3 has been submitted to the OWNER and review authorities. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.4) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing, shall be compensated in accordance with the following: 6.2.1 The ONW;ER shall pay foF Construetion Phase and PFE�jeet Doeumentation Services an amount not-to exceed exeept as provided under 6.2.1.2 and 6.2.4. 8 .--- Labor Cost times a faetor of for setviees r-endered whieh shall cover-DireGt LabeF, Direct 1 ebOF Overhead General p Adfninistf4iveOverhead a Profit, Agreement paragraphnegotiated compensation for these seB,iees, and pFief to perfer-Ening serviees in excess ef the eentrae eeiling, the ENGINF;F;R shall gi,,,e OWNER wFitten notice thffe6f, Promptly thereafter OWNER and ENGINEER Shall Feview the seepe and progress efthe prejeetwork. ENGPIEER shall obtain written authadzation frem 03AENER, prior to any additional costs being ineur+ed undeF pafagraph 6.2.4.3. if i is determined that due to a ehaiige in pfejeet scope undeF f additional compensation, OWNER and ENGINEER may negafiAe terms as provided under the ENGD;EER is entitled te agreed in writing pursuant to 9.16. 6.2.1.3 Costs 9xseeding 9sti!p@fgj QDmp,2m@!ign. Except as allowed under 5.2.1,when the total eos eempensation feF these sep,4ees,the OWNER shall pay on!), for-the direet eests incuffed in exeess e the estimated eampeiisatieft. These eosts eansist of an amount equal to 4he ENGINEER'S Direet Labor Cast times a fiavettor off for seB,iees rendered whieh shall inelude Dif!eet The arneunt and terms ef an), additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated an audited payroll DireGt LaboF Overhead, and General & AdministFative OveFheRd GE)Sts,-but shall He't include any alla,anee for pFefit 6.2.2. Reimbursable Expe-ses, as defined in seetion 7.4 of this Agreement, fer Basie Sen,ices and Approved Additienal Sen,iees shall be paid te the ENGINEER by the OWNER in the actual amount of!he eests ineurFe RngineeF and$ for all other reifnbursable expenses. The estimated reimbursable expenses ar-e identified in Exhibit 6.23. Failed Test 9xvense- The ENGINEER shall maintain aiid provide to the OsAq,4ER, a feeard ef-the easts asseeiated with failing qualk�, control tests perfeFfned for the OWNER duFing the eeurse ef 4he 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.00 , or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. ARTICLE 7-MEANING OF TERMS 7.1 AGREEMENT As used herein the term "this Agreement" refers to the contents of this document and its Exhibits attached hereto and referred to as if they were part of one and the same document. 7.2 CONSTRUCTION COSTS The construction cost of the entire Project(herein referred to as "Construction Cost") means the total cost to OWNER of those portions of the entire Project designed and specified by ENGINEER, but it will not include ENGINEER's compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include OWNER's legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER, 9 7.3 DIRECT LABOR COSTS Direct Labor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, drafters, specification writers,estimators,other technical and business personnel;but does not include indirect payroll related costs or fringe benefits. For the purposes of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principals $ 58.00 /hour Professional Engineer $ 51.00 /hour Engineer III $ 48.00 /hour Engineer II $ 44.00 /hour Engineer I $ 41.00 /hour Engineer Technician $ 32.50 /hour Sr Professional Land Surveyor $ 51.00 /hour Professional Land Surveyor $ 47.00 /hour Land Surveyor LSI $ 36.00 /hour Land Surveyor I $ 32.50 /hour Technician $ 25.50 /hour Sr CADD Draftsman $ 37.00 /hour CADD Draftsman $ 34.00 /hour GPS Survey Crew $ 58.50 /hour Survey Crew w/Robotic $ 58.50 /hour Two Person Survey Crew $ 56.00 /hour Clerical $ 18.50 /hour 7.4 REIMBURSABLE EXPENSES Reimbursable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining bids or proposals from Contractor(s); subsistence and transportation of Resident Project Representatives and their assistants; toll telephone calls and telegrams; reproduction of reports, Drawings, Specifications, Bidding Documents and similar Project-related items;and if authorized in advance by OWNER,overtime work requiring higher than regular rates. In addition,when compensation for Basic Services is on the basis of Direct Labor Costs method of payment,Reimbursable Expenses will also include the amount billed to ENGINEER by special consultants employed by ENGINEER and authorized by OWNER (other than as an authorized Additional Services) and will also include expenses incurred for computer time and other specialized equipment, including an appropriate charge for previously established programs and expenses of photographic production techniques. ARTICLE 8-PAYMENT PROVISIONS 8.1 TIMES OF PAYMENTS. ENGINEER may submit monthly statements for Basic Services and approved Additional Services rendered and for Reimbursable Expenses incurred; however, payments shall not exceed the ceilings provided in 6.1 and 6.2. Final payment shall be made only after acceptance of the project by the OWNER. If OWNER disputes the amount of the billing, OWNER will notify the ENGINEER in writing within ten (10) calendar days of the receipt of bill of the dispute. 8.2 REQUESTS FOR PAYMENT. Each request for payment shall include a documentation summary of the period incremental man hours incurred,direct labor rates and billed rates,detail of reimbursable costs,total period billing, and total cumulative billing. When requested by OWNER services for distinct project segments shall be accounted and billed separately. 10 8.3 PAYMENT UNDER TERMINATION. In the event of termination by the OWNER upon the completion of any phase of the Basic Services,progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER also will be reimbursed for the charges of pre-approved independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for services rendered during that phase on the basis of the payment provisions of the Agreement. In the event of any such termination, ENGINEER will be paid for unpaid pre- approved Additional Services and unpaid Reimbursable Expenses which are authorized under this agreement. ARTICLE 9-GENERAL CONSIDERATIONS 9.1 TERMINATION OF AGREEMENT 9.1.1 The sole right is hereby reserved to the OWNER to terminate this Engineering Agreement for any and all causes or for its convenience at any time upon fifteen(15)days written notice to the ENGINEER. 9.1.2 If termination for default is effected by the OWNER,an equitable adjustment in the price provided for in this Agreement shall be made, but (1) no amount shall be allowed for anticipated profit on unperformed services or other work,and(2)any payment due to the ENGINEER at the time of termination may be adjusted to cover any additional costs to the OWNER because of the ENGINEER's default. If termination for convenience is effected by the OWNER,the equitable adjustment shall include a reasonable profit, as determined by owner, for services or other work performed. The equitable adjustment for any termination shall provide for payment to the ENGINEER for services rendered and expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by the ENGINEER relating to commitments which had become firm prior to the termination. 9.1.3 Upon receipt of a termination action under paragraph 9.1.2, the ENGINEER shall (1) promptly discontinue all affected work(unless the notice directs otherwise),and(2)deliver or otherwise make available to the OWNER within ten (10) days copies of all data, design drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by the ENGINEER in performing this Agreement,whether completed or in process. 9.1.4 In the event this Contract is terminated prior to completion, the original copies of the ENGINEER'S data,recommendations,plans,specifications,analysis and other related documents prepared by the ENGINEER prior to said termination shall be delivered to and become the property of the OWNER. 9.1.5 Upon termination,the OWNER may take over the work and may award another party an Agreement to complete the work under this Agreement. 9.1.6 OWNER'S right to terminate is in addition to any other remedies OWNER may have under the law. 9.2 INSPECTION AND AUDIT All books, papers, records, payrolls, vouchers and invoices relating to costs and expenditures incurred as to the performance of the services by the ENGINEER hereunder shall be made available to the OWNER, or their authorized representatives for audit and review, at the ENGINEER'S respective offices at all reasonable times during the contract period and for three years from the date of final payment. 9.3 EMPLOYMENT The ENGINEER warrants that he has not employed or retained any company or persons,other than a bona fide employee, working solely for the ENGINEER, to solicit to secure this contract, and that he has not paid or agreed to pay any company or person,other than bona fide employees working solely for the ENGINEER,any fee,commission,percentage, brokerage fee,gifts or any other considerations contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty,the OWNER shall have the right to annul the Contract without liability or in its 11 discretion to deduct from the price or consideration or otherwise recover the full amount of such fee, commission, percentage,brokerage fee,gift or contingent fee. All employees of the ENGINEER or other persons while engaged in the performance of work or services required by the ENGINEER shall be considered employees of the ENGINEER only and not of the OWNER. 9.4 NONDISCRIMINATION The ENGINEER will have a policy to provide equal employment opportunity in accordance with all applicable state and federal anti-discrimination laws,regulations,and contracts. The ENGINEER will not refuse employment to a person,bar a person from employment,or discriminate against a person in compensation or in a term,condition,or privilege of employment because of race,color,religion,creed,political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation, gender identity, physical or mental disability,except when the reasonable demands of the position require an age,physical or mental disability,marital status or sex distinction. The ENGINEER shall be subject to and comply with Title VI of the Civil Rights Act of 1964;Section 140,Title 2,United States Code,and all regulations promulgated thereunder. The ENGINEER shall require these nondiscrimination terms of its sub-consultants providing services under this agreement. 9.5 SUBLETTING OR ASSIGNING OF WORK The ENGINEER shall not sublet or assign any of the work covered herein without prior written approval of the OWNER. 9.6 STANDARD OF CARE In providing services under this agreement,the ENGINEER will perform in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. If any service should be found to be not in conformance with this standard, the ENGINEER shall, at the OWNER's request,re- perform the service at its own expense. Engineer shall also, at its own expense, make such changes, modifications or additions to the project which is made necessary as a result of the initial non-performance or the re-performance of services. The OWNER's rights herein are in addition to any other remedies the OWNER may have under the law. 9.7 LEGAL RELATIONS: 9.7.1 The ENGINEER shall, consistent with the standard care, comply with those Federal, State, and Local laws and ordinances applicable to the work to be done. 9.7.2 The ENGINEER agrees to defend, indemnify and hold harmless the OWNER, its officers, directors, agents and employees from and against any suit,cause of action,claim,cost,expenses,obligation and liability of any character, including attorney's fees, which is brought or asserted for any bodily injury, death, or physical damage to property received or sustained by any person,persons,property, business or any other entity,arising out of or resulting from,or in connection with the ENGINEER'S negligent performance of the work specified in this agreement. 9.7.3. The ENGINEER agrees to defend, indemnify and hold harmless the OWNER, its officers, directors, agents and employees, should OWNER, its officers, directors, agents or employees be named as a defendant in any action where the OWNER'S alleged liability arises from the negligent performance of the ENGINEER'S work herein described. The obligations of the ENGINEER to defend,indemnify and hold harmless the OWNER will apply to any suit,cause of action,claim,cost or obligation including,without limitation,those alleged under 12 the common law or pursuant to a federal or state statute or regulation including those arising in tort, trespass, nuisance,and strict liability. 9.7.4 In the event the OWNER is found proportionately responsible for any damages ultimately awarded to a plaintiff or plaintiffs in any lawsuit, the ENGINEER will be responsible for only those damages, costs, or liabilities as are attributable to the ENGINEER'S percent of fault as compared with 100%of the fault giving rise to the damages. Should the OWNER be found responsible for negligence by its own officers,directors,agents or employees,then in that event the OWNER agrees to reimburse the ENGINEER for the reasonable attorney's fees and costs incurred in any defense of the OWNER in an amount proportional to the fault attributed to the OWNER. The indemnity required herein shall not be limited by reason of the specification of any particular insurance coverage in this Agreement. 9.7.5 Should either OWNER or ENGINEER be held responsible, for any damages, costs or liabilities resulting from intentional misconduct by any officer, director, agent or employee in connection with the work specified in this Agreement,then in that event,that party shall defend, indemnify and hold harmless the other as to any damages, costs or liabilities that result from or arise out of that intentional misconduct, including reasonable attorney's fees and costs which shall include costs and salary of the city attorney or other in-house counsel. Further,notwithstanding the obligations set forth in paragraphs 9.7.2 and 9.7.3 above,the ENGINEER agrees to defend OWNER where the OWNER'S alleged liability arises from intentional misconduct by the ENGINEER. Should the OWNER be found responsible for intentional misconduct by its own officer,director, agent or employee,then OWNER agrees to reimburse ENGINEER for the reasonable attorney's fees and costs incurred in any defense of the OWNER. 9.7.6 The ENGINEER shall perform this agreement as an independent contractor,and as such, is responsible to the OWNER only as to the results to be obtained in the work herein specified,and to the extent that the work shall be done in accordance with the terms,plans and specifications. The ENGINEER shall have and maintain complete control over all of its employees, subcontractors, agents and operations, being responsible for any required payroll deductions and providing required benefits, such as, but not limited to worker's compensation with statutory limits,and unemployment insurance. 9.8 INSURANCE The ENGINEER shall secure and furnish to the OWNER certificate of insurance, therein, naming the OWNER as an additional insured,to include thirty(30)days notice of cancellation or non-renewal. Without limiting any of ENGINEER's obligations hereunder, ENGINEER shall secure and maintain, until the work is completed and accepted by the OWNER, insurance coverage naming the OWNER as additional insured with minimum insurance coverage as follows: 13 Type of Coverage Limits Employers'Liability: 100 000.per accident General Liability: Bodily Injury&Property Damage Single and combined $ 1,000,000,per accident General Aggregate: S 2,000,000. Excess Liability Coverage(umbrella) $1,000,000.each occurrence Automobile: BodilyIInjury covering all $ 1,000,000 each person automobiles,trucks, tractors,trailers,or $ 1,000,000 each occurrence other automotive equip- ment whether owned or rented by Engineer or owned by employees of Engineer. Property Damage covering 100,000 each occurrence all automobiles,trucks, tractors,trailers or other automotive equipment whether owned or rented by Engineer or owned by employees of Engineer OR Bodily Injury&Property $1,000,000 each occurrence Damage Single and combined In addition to the above insurance coverage, the ENGINEER shall secure and maintain, until the work is completed and accepted by the OWNER, and without naming OWNER as an additional insured, professional errors and omissions coverage as follows: Professional Errors&Omissions: $ 1,000,000 per claim and aggregate each occurrence 9.9 ENDORSEMENT The ENGINEER shall place his endorsement on all drawings and other data furnished by him. 9.10 OWNERSHIP OF DOCUMENTS 14 The parties admit and agree the documents produced under this agreement are not intended or represented to be suitable for reuse by OWNER or any other individual on any other project. Any reuse without written verification or adaptation by ENGINEER will be at OWNER's sole risk and without liability or legal exposure to ENGINEER, or to ENGINEER's independent professional associates or consultants. Files in electronic media format of text, data, graphics, or of other types that are furnished by ENGINEER to OWNER are only for convenience of owner. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. 9.11 PUBLIC INFORMATION The ENGINEER shall not issue any statements, releases or information for public dissemination without prior approval of the OWNER. 9.12 PROPRIETARY RIGHTS If patentable discoveries or inventions should result from work required herein,all rights accruing from such discoveries or inventions shall be joint property of the ENGINEER and the OWNER. Provided that the OWNER, state agencies or political subdivisions and the United States Government shall have the irrevocable, nonexclusive, nontransferable and royalty-free license to use each invention in the manufacture, use and disposition, according to law, of any article or material,and in the use of any method that may be developed as part of the work described and contemplated herein. 9.13 RECORDS The ENGINEER shall maintain accounting records and other evidence pertaining to the cost incurred and to make the records available at all reasonable times during the Contract term and for one (1) year from the date of final payment. Such accounting records and other evidence pertaining to the cost incurred will be made available for inspections by OWNER. 9.14 SUCCESSORS IN INTEREST The covenants, agreements and all statements in this Contract apply to and shall be binding on the heirs, personal representatives,successors and assigns of the respective parties. 9.15 ATTORNEY'S FEES AND COSTS That in the event it becomes necessary for either Party of this Contract to retain an attorney to enforce any of the terms or conditions of this Contract or to give any notice required herein,then the prevailing Party or the Party giving notice shall be entitled to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel to include City Attorney. 9.16 MODIFICATIONS AND AMENDMENTS That any amendment or modification of this Contract or any provisions herein shall be made in writing or executed in the same manner as this original document and shall after execution become a part of this Contract. 15 In witness Whereof,the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN,MONTANA ENGINEER /in - BY: BY: i 'Aa&k-, (City Manager) President) DATE: DATE: ATTEST" BY: lJ1 16 Exhibit C: 2014 Capital Improvement Proiects Field Survey Scope of Services October 2014 Preliminary Design Phase- The preliminary design phase (which includes the topographic survey) will begin once authorization to proceed is obtained from the owner. The tasks defined for this project are: Task 1: Grand Avenue: Peach St to Main St Task 2: Grand Avenue: Main St to Garfield St Task 3: Aspen Street: North 7`h Avenue to 5"' &North 5`E' Street: Tamarack St to Peach St Task 1 is to be completed as a first priority and delivered to the City of Bozeman as soon as possible. The remaining Tasks 2 and 3 will be completed and delivered to the City of Bozeman as soon as possible within the contract terms and depending on snow cover. The following describes the specific subtasks that will be accomplished for all of Tasks 1-3. Subtask A Horizontal and Vertical Field Control Description—Establish vertical/horizontal control. Provide two horizontal control points and one vertical benchmark for each block. May provide combined horizontal and vertical control on one point. Subtask B Topographic Field Survey Description—Complete a topographic survey of the right of way including areas necessary to locate curb boxes. Survey includes surface features (curb, gutter, sidewalk, driveways, asphalt, trees, fences, etc.) and subsurface utilities, including depth information on water, sewer, and storm drainage. Underground utilities that are marked by utility locate personnel will be surveyed with horizontal locations. City of Bozeman to provide vacuum excavation services as needed for valve boxes, sewer and storm drain manholes. Subtask C Site Map Preparation Description—Download survey data and prepare a topographic site map drawing using standard line work and symbols as provided by the City of Bozeman. AutoCAD Civil 3D 2013 software will be used for site map preparation. Subtask D Field Verification and Quality Assurance Description—Review site map drawings for accuracy with on-site walkthrough. Any revisions or redlines will be completed as necessary to update site map. Subtask E Prepare Final Deliverables Description—Prepare project files to include topographic site map (electronic and paper format), field notes,and photographs. Site map will include control locations and benchmarks. Electronic AutoCAD files will be in Civil 3D 2013 format. Subtask F Project Management and Coordination with Utilities Description—Project Management of personnel, staff, and equipment; and coordination of utility locates. Gaston Engineering& Surveying, P.0 Exhibit D - Surveying Fee Estimate: City of Bozeman 2014 Capital Improvements Project Field Survey Prepared By: Gaston Engineering &Surveying, P.C. Pre aced For:City of Bozeman; Bob Murra , P.E. Oct-14 Topographic Task #of Blocks Total Cost Task 1:Grand-Peach to Main 7 Blocks $11,895.25 Task 2: Grand-Main to Garfield 12 Blocks $23,791.50 Task 3:Aspen/N 5th 5 Blocks $8,927.38 Exhibit D - Surveying Fee Estimate: City of Bozeman 2014 Capital Improvements Project Field Survey Prepared By: Gaston Engineering &Surveying, P.C. Prepared For: City of Bozeman; Bob Murray, P.E. Oct-14 Grand: to Main Task Personnel Assigned Labor Labor Rate Total Cost Hours Horizontal and Vertical Field Control GPS Survey Crew 4 $175.00 $700.00 GPS Survey Crew 10 $175.00 $1,750.00 Topographic Field Survey Survey Crew w/Robotic 20 $175.00 $3,500.00 Site Map Preparation Land Surveyor L.S.I. 8 $102.00 $816.00 Professional Engineer 10.5 $148.00 $1,554.00 Land Surveyor L.S.I. 3 $102.00 $306.00 Field Verification and Quality Assurance Sr. Professional Land Surveyor 2 $148.00 $296.00 P.L.S. Sr. Professional Land Surveyor Prepare Final Deliverables P.L.S. 1 $148.00 $148.00 Land Surveyor L.S.I. 3 $102.00 $306.00 Project Management and Coordination with Sr. Professional Land Surveyor 5 $148.00 $740.00 Utilities P.L.S. Land Surveyor L.S.I. 3 $102.00 $306.00 Subtotal-Labor 69.5 $10,422.00 Expenses Unit Qty Unit Price Total Expense Vehicle(miles) 71 $0.75 $53.25 Field Electronics&Telecommunications 36 $6.00 $216.00 Survey Equipment-GPS/Robotic(days) 5 $225.00 $1,125.00 Survey Materials 9 $6.00 $54.00 Administration/Office Supplies 1 $25.00 $25.00 Subtotal-Expenses $1,473.25 Total • Peach to $11,895.25 Exhibit D - Surveying Fee Estimate: City of Bozeman 2014 Capital Improvements Project Field Survey Prepared By: Gaston Engineering&Surveying, P.C. Prepared For: City of Bozeman; Bob Murray, P.E. Oct-14 Grand: Garfield Task Personnel Assigned Labor Labor Rate Total Cost Hours Horizontal and Vertical Field Control GPS Survey Crew 8 $175.00 $1,400.00 Topographic Field Survey GPS Survey Crew 20 $175.00 $3,500.00 Survey Crew w/Robotic 35 $175.00 $6,125,00 Site Map Preparation Land Surveyor L.S.I. 15.5 $102.00 $1,581.00 Professional Engineer 27 $148.00 $3,996.00 Land Surveyor L.S.I. 4 $102.00 $408.00 Field Verification and Quality Assurance Sr. Professional Land Surveyor 2 $148.00 $296.00 P.L.S. Sr. Professional Land Surveyor 4 $148.00 $592.00 Prepare Final Deliverables P.L.S. Land Surveyor L.S.I. 6 $102.00 $612.00 Project Management and Coordination with Sr. Professional Land Surveyor 14 $148.00 $2,072.00 Utilities P.L.S. Land Surveyor L.S.I. 2 $102.00 $204.00 Subtotal-Labor 137.5 $20,786.00 Expenses Unit Qty Unit Price Total Expense Vehicle(miles) 142 $0.75 $106.50 Field Electronics&Telecommunications 72 $6.00 $432.00 Survey Equipment-GPS/Robotic(days) 10 $225.00 $2,250.00 Survey Materials 32 $6.00 $192.00 Administration/Office Supplies 1 $25.00 $25.00 Subtotal-Expenses $3,005.50 Total • . Garfield Exhibit D - Surveying Fee Estimate: City of Bozeman 2014 Capital Improvements Project Field Survey Prepared By: Gaston Engineering &Surveying, P.C. Prepared For: City of Bozeman; Bob Murray, P.E. Oct-14 AspenTask 3- • . Peach Labor Task Personnel Assigned Labor Rate Total Cost Hours Horizontal and Vertical Field Control GPS Survey Crew 2 $175.00 $350.00 Topographic Field Survey GPS Survey Crew 10 $175.00 $1,750.00 Survey Crew w/Robotic 14 $175.00 $2,450.00 Site Map Preparation Land Surveyor L.S.I. 4 $102.00 $408.00 Professional Engineer 6.5 $148.00 $962.00 Land Surveyor L.S.I. 2 $102.00 $204.00 Field Verification and Quality Assurance Sr. Professional Land Surveyor 2 $148.00 P $296.00 .L.S. Land Surveyor L.S.I. 3 $102.00 $306.00 Prepare Final Deliverables Sr. Professional Land Surveyor 2 $148.00 $296.00 P.L.S. Project Management and Coordination with Sr. Professional Land Surveyor 5 $148.00 $740.00 Utilities P.L.S. Land Surveyor L.S.I. 2 $102.00 $204.00 Subtotal-Labor 52.5 $7,966.00 Expenses Unit Qty Unit Price Total Expense Vehicle(miles) 52.5 $0.75 $39.38 Field Electronics&Telecommunications 28 $6.00 $168.00 Survey Equipment-GPS/Robotic(days) 3 $225.00 $675.00 Survey Materials 9 $6.00 $54.00 Administration/Office Supplies 1 $25.00 $25.00 Subtotal-Expenses $961.38 TotalAspen • Peach