Loading...
HomeMy WebLinkAbout11. Four Points Minor SubdivisionPage 1 of 28 Application P14041 Staff Report for the Four Points Minor Subdivision Public Meeting Date: City Commission meeting is October 13, 2014. Item: Four Points Minor Subdivision Preliminary Plat application to allow the subdivision of 54.28 acres into one public park, 2 lots for multi-household development, and 2 lots with restricted development subject to further subdivision review. Project Location: The subject property is generally located between Davis Lane and Ferguson Avenue, south of the existing Cattail Street right-of-way, and north of Kimberwicke Street. The parcel is legally described as Lot 2A1 of Certificate of Survey No. 2202C, a tract of land being remainders of Tract 2A of COS No. 2202A, and Tract 4A1 of COS No. 2202B, located in the SE ¼ of Section 34, Township 1 South, Range 55 East, PMM, City of Bozeman, Gallatin County, Montana. Recommendation: Approval with conditions Recommended Motion: Having reviewed and considered the application materials, public comment, and all information presented, I hereby adopt the findings presented in the staff report for application P14041 and move to approve the preliminary plat with conditions and subject to all applicable code provisions. Report Date: Monday, October 06, 2014 Staff Contact: Brian Krueger, Development Review Manager Agenda Item Type: Action-Quasi Judicial EXECUTIVE SUMMARY Project Summary The property owner, Michael Tracy, and applicant, Four Points, MT LLC, both at 31922 Paseo Monte Vis, San Juan Capo, CA 92675-3415, and represented by Madison Engineering, have submitted an application to subdivide a 54.28-acre parcel into 5 lots: one public park, 2 lots for multi-household development, and 2 lots with restricted development subject to further subdivision review. The majority of the site (51.94 acres) is zoned R-4 (Residential High Density), with the remaining 2.64 acres along the western side of the site, across from the Chief Joseph Middle School, zoned R-3 (Residential Medium Density). The project is proposed to be developed in phases: Phase I consists of dedication of a 5.36-acre public park (Lot 1) along Ferguson Avenue, and development of multi-household housing on 2.64 acres of the area zoned R-3 (Lot2); Phase II includes development of 2.83 acres of the area zoned R-4 with multi-household housing; Future Phases include Lots 4 and 5, zoned R-4, that are constrained by roughly 21 acres of wetlands and stream corridors. These are restricted lots that will be subject to additional subdivision review prior to development authorization. Off-site wetland mitigation has been provided for approximately two acres of wetlands impacted by road construction for Cattail Street and Kimberwicke Street. The applicant has received infrastructure approval from the Engineering Division to construct Cattail Street and Ferguson Avenue and the construction of those streets is ongoing and is anticipated to be completed this fall. The rights-of-way for Cattail 166 P14041 Staff Report for the Four Points Minor Subdivision Page 2 of 28 Street and Ferguson Avenue, both collector roadways, were granted with the annexation of the property. Figure 1: Four Points Minor Subdivision Preliminary Plat This subdivision is a first minor subdivision from a tract of record; and therefore, does not require Planning Board review or a public hearing. The final decision for a First Minor Subdivision from a Tract of Record Preliminary Plat must be made within 35 working days of the date it was deemed adequate for review, or in this case by November 4, 2014 Unresolved Issues No unresolved issues have been identified at this time. Advisory Board Recommendations The Development Review Committee (DRC), Wetlands Review Board (WRB) and Recreation & Parks Advisory Board (RPAB) have all reviewed the project and made affirmative recommendations to the City Commission. Public Comment Sandie Hammer submitted comments regarding traffic congestion and the inadequacy of the transportation system to meet the demands of development in the northwest part of the city. She specifically calls out the need for a signal at Baxter Lane and Davis Lane, and the need to extend Ferguson Avenue form Baxter Lane to Oak Street. A letter was also received from Christine L. Koch expressing concerns about weeds, lack of property maintenance, crowding in nearby schools, noise pollution, garbage and traffic congestion. A staff response to public comments is provided in Appendix E. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 167 P14041 Staff Report for the Four Points Minor Subdivision Page 3 of 28 3. Deny the application based on the Commission’s findings of non-compliance with the applicable subdivision criteria contained within the staff report; or 4. Continue review on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 SECTION 1 –MAP SERIES ........................................................................................................... 4 SECTION 2 – REQUESTED VARIANCES ................................................................................. 8 SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL ............................................ 8 SECTION 4- CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ...................... 11 SECTION 5- RECOMMENDATIONS AND FUTURE ACTIONS ........................................... 12 SECTION 8 - STAFF ANALYSIS............................................................................................... 13 Applicable Subdivision Review Criteria, Section 38.03.040, BMC................................. 13 Primary Subdivision Review Criteria, Section 76-3-608 Mont. Code Ann. .................... 15 Preliminary Plat Supplements ........................................................................................... 15 APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY..................................... 23 APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND.................... 24 APPENDIX C – NOTICING AND PUBLIC COMMENT ......................................................... 24 APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF ................................. 25 APPENDIX E – PUBLIC COMMENT AND ADDITIONAL INFORMATION ...................... 25 168 P14041 Staff Report for the Four Points Minor Subdivision Page 4 of 28 SECTION 1 –MAP SERIES Map 1: Surrounding Zoning and Land Use 169 P14041 Staff Report for the Four Points Minor Subdivision Page 5 of 28 VicinityV I Map 2: Vicinity Map Map 2: Vicinity Map 170 P14041 Staff Report for the Four Points Minor Subdivision Page 6 of 28 Map 3: Preliminary Plat, above – Map 4: Phasing Plan, below 171 P14041 Staff Report for the Four Points Minor Subdivision Page 7 of 28 Map 5: Park Master Plan Concept 172 P14041 Staff Report for the Four Points Minor Subdivision Page 8 of 28 SECTION 2 – REQUESTED VARIANCES No variances have been requested in conjunction with this preliminary plat application. SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. Mandatory compliance with the explicit terms of Chapter 38, Bozeman Municipal Code (BMC) does not constitute conditions of approval. The conditions of approval may require compliance with more than the minimum standards in order to conform to the physical and economic development of the City, and to the safety and general welfare of the future lot owners and of the community at large. The applicant must comply with all provisions of the Bozeman Municipal Code which are applicable to this project. Recommended Conditions of Approval: Planning 1. The plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies; one (1) PDF copy; and five (5) paper prints. The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as a separate document from the Plat. This accompanying sheet may either be on a same sized mylar sheet or a letter or legal paper document with up to 11x17 exhibits. 2. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed, and shall include a digital copy (pdf) of the entire Final Plat submittal. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 4. The subdivider shall provide a covenant on the property consistent with the language of Section 85-7-2212 Montana Code Annotated in regards to the agricultural water user facility. 5. The subdivider shall provide the appropriate easements for the agricultural water user facilities in compliance with Section 76-3-504(1)(k) Montana Code Annotated that are in locations of appropriate topographic characteristics and sufficient width to allow the physical placement and unobstructed maintenance of open ditches or belowground pipelines for the delivery of water for irrigation to persons and lands legally entitled to the water under an appropriated water right or permit of an irrigation district or other 173 P14041 Staff Report for the Four Points Minor Subdivision Page 9 of 28 private or public entity formed to provide for the use of the water right on the subdivision lots. 6. Lots 4 and 5 shall be platted as undevelopable lots in accordance with Section 38.39.080.B.6 BMC, with the following language placed on each undevelopable lot of the final plat “Lot development subject to further subdivision review.” No public improvements shall be required for the undevelopable lot until it is subdivided as a lot which is not subject to this restriction. This language shall be placed on the conditions of approval sheet of the plat: “NOTICE IS HEREBY GIVEN to all potential purchasers of Lot X, of the Four Points Minor Subdivision, City of Bozeman, Gallatin County, Montana, that the final plat of the subdivision was approved by the Bozeman City Commission without completion of on and off site improvements required under the Bozeman Municipal Code, as is allowed in Chapter 38.39 of the Bozeman Municipal Code. As such, this Restriction is filed with the final plat that stipulates that any use of this lot is subject to further subdivision, and no development of this lot shall occur until all on and off site improvements are completed as required under the Bozeman Municipal Code. THEREFORE, BE ADVISED, that Building Permits will not be issued for Lot X, of the Four Points Minor Subdivision, City of Bozeman, Gallatin County, Montana until all required on and off site improvements are completed and accepted by the City of Bozeman. No building structure requiring water or sewer facilities shall be utilized on this lot until this restriction is lifted. This restriction runs with the land and is revocable only by further subdivision or the written consent of the City of Bozeman.” 7. Prior to final plat approval, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the City of all dedicated parkland and any open space proposed to be conveyed to the City and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the City. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat with the original of such deed returned to the City. For personal property installed upon dedicated parkland or City owned open space, the subdivider shall provide the City an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 8. All references on the final plat or in property owners’ association documents to multi-family shall be replaced with multi-household. 9. All references on the final plat or in property owners’ association to a homeowners’ association shall be replaced with property owners’ association. 10. All references on the final plat or in property owners’ association documents to the Four Points Major Subdivision shall be replaced with the Four Points Minor Subdivision. 11. Note number 4 shall be removed from sheet 3 of 3 of the final plat and replaced with the applicable easements required by Section 38.23.060.BMC to be shown directly on the survey. 12. Note number 7 shall be removed from sheet 3 of 3 of the final plat and be replaced with a 30 foot wide trail corridor in the proposed trail alignment. 174 P14041 Staff Report for the Four Points Minor Subdivision Page 10 of 28 13. The note “existing ditch to be piped” on Lot 4 shall be removed from the exhibit on sheet 3 of 3 of the final plat until further subdivision review of Lot 4. 14. Note number 11 on sheet 3 of 3 of the preliminary plat shall be removed from the final plat. 15. Note number 9 on sheet 3 of 3 of the final plat shall not include “and/or future park Maintenance District.” 16. On sheet 3 of 3 of the final plat all references and lines related to building setbacks shall be removed. 17. Pursuant to BMC Section 38.23.100, note number 10 on sheet 3 of 3 of the final plat shall be revised to read “Areas designated as WETLANDS on Lot 3 are subject to a 50-foot setback”, and 50-foot wetland setbacks depicted on Lots 4 and 5 shall be removed. 18. The proposed sidewalk bisecting the Public Park (Lot 1) shall be shown on the final plat and constructed in a slight meandering configuration per recommendation of the Recreation & Parks Advisory Board. 19. Building permits shall not be issued on Lot 2 or Lot 3 until the road improvements on the Cattail Street extension from Davis Lane to Ferguson Avenue, and on Ferguson Avenue from the Cattail Street extension southward to Kimberwicke Street have been completed and accepted by the City Engineer. 20. The final plan shall contain the following language in a plat note to be placed on the conditions of approval sheet, placing future landowners on notice of the presence of high groundwater in the area of the subdivision: “Due to the potential of high groundwater tables in areas of the subdivision, it is not recommended that residential dwellings or commercial structures with crawlspaces, full or partial basements be constructed without first consulting a professional engineer licensed in the State of Montana and qualified in the certification of residential and commercial construction”. Engineering 21. The applicant shall provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: a. Street improvements to Baxter Lane including paving, curb/gutter, sidewalk, and storm drainage (unless currently filed with the property). b. Street improvements to Davis Lane including paving, curb/gutter, sidewalk, and storm drainage (unless currently filed with the property). c. Signalization of the intersection of Baxter Lane and Davis Lane. The document filed shall specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. 22. All streets contained within the subdivision shall be within dedicated public right-of-way and built to city standards. 23. Secondary accesses will be required with each individual phase of this development as the project proceeds from one phase to the next. 24. Future phases of development may be required to provide additional traffic analysis at their time of application. 175 P14041 Staff Report for the Four Points Minor Subdivision Page 11 of 28 25. No direct access from individual lots to Cattail Street or Davis Lane will be approved. 26. Any proposed public street lighting shall be LED. 27. The necessary right of way shall be dedicated with the final plat for the following streets: a. Ferguson Avenue (collector street) – 90 feet. b. Cattail Street (collector street) – 90 feet. c. Davis Lane (minor arterial street) – 100 feet. d. Kimberwicke Street (non-standard street) – 90 feet. f. Street A (local street) – 60 feet. g. Street B (local street) – 60 feet. 28. Street names ‘Street A’ and ‘Street B’ shall be named before final plat. Street names must be approved by the City Engineer and Gallatin County road office prior to final plat approval. SECTION 4- CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS 1. Section 38.23.060.B.BMC requires Private utility easements. Private utilities include, but are not limited to, natural gas, electricity, telephone, cable and fiber optic lines. The developer shall provide private utility easements necessary to extend private utilities to the development, and to provide for the construction and maintenance of private utilities within the development. 1. General. a. Building setbacks shall be coordinated with all provided utility easements. If a utility easement will be greater than the building setback required by this chapter, a note to that effect shall be placed on the final plat and/or final site plan as appropriate. b. Where a utility easement is to be located in an existing, dedicated right-of-way, an encroachment permit must be obtained from the local or state street or road department having jurisdiction. c. If placed in a city right-of-way, easements shall be in a location required by and agreed upon in writing by all of the appropriate utility companies and the review authority. 2. Easement size. a. Front yard utility easements. Front yard utility easements shall be ten feet wide, and shall always be provided unless written confirmation is submitted to the planning department from all utility companies providing service indicating that front yard easements are not needed. b. Rear yard utility easements. The provision of rear yard utility easements is not mandatory unless they are required by any or all of the utility companies to adequately serve the development. If provided, rear yard utility easements on each lot shall be six feet wide if adjacent to a public alley and ten feet if not adjacent to a public alley. c. Side yard utility easements. The provision of side yard utility easements is not mandatory unless they are required by any or all of the utility companies to adequately 176 P14041 Staff Report for the Four Points Minor Subdivision Page 12 of 28 serve the development. If provided, the width of the side yard utility easement shall be determined on a case-by-case basis based on the needs of the utility companies. 2. Section 38.23.060.D requires Easements for agricultural water user facilities. 1. Except as noted in subsection D.2 of this section, the developer shall establish appropriate irrigation facility easements that: a. Are in locations of appropriate topographic characteristics and sufficient width to allow the physical placement and unobstructed maintenance of active open ditches or below ground pipelines. The easement shall facilitate the delivery of water for irrigation to persons and lands legally entitled to the water under an appropriated water right or permit of an irrigation district or other private or public entity formed to provide for the use of the water right; (1) The easements shall ensure the conveyance of irrigation water through the land to be developed to lands adjacent to or beyond the development's boundaries in quantities and in a manner that are consistent with historic and legal rights; and (2) A minimum easement width of ten feet is required on each side of irrigation canals and ditches. b. Are a sufficient distance from the centerline of the irrigation facility to allow for construction, repair, maintenance and inspection of the ditch or pipeline; and c. Prohibit the placement of structures or the planting of vegetation other than grass within the irrigation facility easement without the written permission of the facility owner SECTION 5- RECOMMENDATIONS AND FUTURE ACTIONS Development Review Committee The Development Review Committee (DRC) reviewed the preliminary plat application on September 3, 10 and 17, 2014 and found that the application, with conditions, is in general compliance with the adopted growth policy, the Montana Subdivision and Platting Act and the Unified Development Code. The DRC recommends conditional approval of the preliminary plat application. Wetlands Review Board The Wetlands Review Board (WRB) reviewed the preliminary plat application on September 17, 2014 and voted unanimously to recommend approval of the proposed off-site compensatory mitigation of 1.95 acres of wetland impacted by road construction at a 1:1 ratio as permitted by the US Army Corps of Engineers. The WRB also concurred that is appropriate to remove the 50-foot wetland setback shown on sheet 3 of 3 of the preliminary plat on Lots 4 and 5, as development will be restricted until further subdivision review, at which time the WRB will review the wetland setbacks proposed for those lots. Recreation & Parks Advisory Board The Recreation and Parks Advisory Board (RPAB) reviewed the preliminary plat application on September 18, 2014 and commented that the current plan is basically unchanged from the 177 P14041 Staff Report for the Four Points Minor Subdivision Page 13 of 28 proposal the Board reviewed in April 2014. The Board also recommends that the sidewalk bisecting the park, as the safe route to school takes precedence over having a larger uninterrupted play space. A slight meander in this sidewalk would be preferable. Condition 18 addresses this recommendation. City Commission The City Commission is scheduled to consider the application at their October 13, 2014 meeting. Subsequent subdivisions of the subject property are subject to the provisions of BMC Section 38.03.010. SECTION 8 - STAFF ANALYSIS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other pertinent information available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.03.040, BMC. The site is not within an overlay district and does not have any applicable special use review criteria unique to the project. The proposed subdivision meets minimum design standards for subdivision lots and access pursuant to Section 38.23.030, BMC. Code provisions requiring plan corrections are listed under Section 4. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project, prior to receiving final plan approval. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, do not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As noted in recommended condition 1, the final plat must comply with State statute, the Administrative Rules of Montana, and the Bozeman Municipal Code. 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act 1. Pursuant to Section 38.03.040.A.5 (f), BMC conditional approval of the preliminary plat shall be in force for not more than one calendar year. Prior to that expiration date, the applicant may submit a letter of request for the extension of the period to the Director of Community Development for consideration. The City may at the written request of the applicant, extend its approval for a mutually agreed upon time. More than one extension 178 P14041 Staff Report for the Four Points Minor Subdivision Page 14 of 28 may be requested for a particular subdivision. Each request shall be considered on its individual merits as provided for in Section 38.03.040.A.5 (g), BMC. 2. Pursuant to Section 38.03.060.A.1, BMC the applicant shall submit with the application for final plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval has been satisfactorily addressed, and specifically (tab, page, paragraph, etc.) where this information can be found. 3. Pursuant to Section 38.23.060.A, BMC all easements, existing and proposed, shall be accurately depicted and addressed on the final plat and in the final plat application. 4. The final covenants, conditions, restrictions and easements shall be submitted with the final plat application for review and approval by the Planning Department and shall contain, but not be limited to, the provisions required in Section 38.38.020, BMC. 5. Pursuant to Section 38.39.010., if it is the developer’s intent to file the final plat prior to installation, certification, and acceptance of all required improvements by the City of Bozeman, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the Preliminary Plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act A subdivision pre-application was submitted on March 26, 2014. The pre-application was reviewed by the Development Review Committee (DRC) on April 9, 16 and 23, 2014 and summary review comments were forwarded to the applicant in preparation of the preliminary plat application. A preliminary plat application was submitted on July 23, 2014 and was deemed unacceptable for initial review on August 1, 2014. Revised application materials were submitted on August 20, 2014 and deemed acceptable for initial review. The preliminary plat was reviewed by the DRC on September 3, 10 and 17, 2014. On September 17, 2014, the DRC determined that the application and additional supporting materials submitted were adequate for continued review, and further recommended approval with conditions and code provisions to be forwarded to the City Commission for consideration. Public notice was sent to property owners of record within 200 feet of the subject property via first class mail, on September 11, 2014. Notice was also posted on the site September 12, 2014. On October 2, 2014 this minor subdivision staff report with a recommendation of conditional approval was forwarded to the City Commission, which is scheduled to make a final decision on the application at their October 13, 2014 public meeting. The final decision for a First Minor Subdivision from a Tract of Record Preliminary Plat must be made within 35 working days of the date it was deemed adequate for review, or in this case by November 4, 2014. 179 P14041 Staff Report for the Four Points Minor Subdivision Page 15 of 28 4) Compliance with Chapter 38, BMC and other relevant regulations Based on review of the DRC, and the Department of Community Development, all applicable regulations appear to be met. Code provisions and site specific requirements are included in this report for City Commission consideration. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities As noted under Staff Finding 2) 3. above, and required by Section 38.23.060.A, BMC, all easements, existing and proposed, shall be accurately depicted and addressed on the final plat and in the final plat application. Therefore, all utilities and necessary utility easements will be provided and depicted accordingly on the final plat. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel As shown on the preliminary plat, proposed Lots 1 through 3 have legal and physical access exceeding minimum requirements in Section 38.24.090 (2) as follows: Lot 1, a Public Park, has access along frontages on Ferguson Avenue, Kimberwicke Street, and Milkhouse Avenue. Lot 2 has frontage along Kimberwicke Street, Milkhouse Avenue, and Street ‘A’; and Lot 3 has frontage on Street ‘A’ and Kimberwicke Street. Lot 4 and Lot 5, both restricted lots, are subject to further subdivision review. Condition 25 recommends that no direct access from individual lots to Cattail Street or Davis Lane be approved Primary Subdivision Review Criteria, Section 76-3-608 Mont. Code Ann. Primary subdivision review criteria are not applicable to first minors from a tract of record, and therefore, are not included in this report. Preliminary Plat Supplements A subdivision pre-application plan review was completed by the Development Review Committee on April 23, 2014. The following summary comments address the supplemental information required under Article 38.41, BMC. 38.41.060.A.1 Surface Water Surface waters on the property include wetlands, spring ditches and various other waters of the United States (WUS) as described in the Waters of the US Delineation Report prepared by Vaughn Environmental Services, dated November 20, 2013. The report identified thirteen wetlands within the project area. Two of the wetlands are classified as isolated, non- jurisdictional wetlands based on lack of connection to a water of the US. The remaining 17.04 acres of wetlands are classified as jurisdictional. In sum, WUS cover approximately 27 percent of the proposed subdivision site. The Spring Ditch is a perennial stream flowing from south to north through the west half of the project site. The wetland fringe adjacent to the stream channel is approximately 2-3 feet wide 180 P14041 Staff Report for the Four Points Minor Subdivision Page 16 of 28 with one-foot high banks. Trees and shrubs planted in 2005 as part of the mitigation required for the Baxter Meadows Subdivision are still developing. The stormwater ditch to the east of the Spring Ditch has a straight channel and is densely vegetated with cattails. Water in this ditch ponds at the downstream manhole intake prior to its discharge into Spring Ditch. A recent evaluation of current conditions by Vaughn Environmental found a lack of available and suitable land for wetland and stream restoration or creation within the project boundaries. The total proposed impacts to WUS are 1.95 acres which would be impacted by the construction of Cattail Street, Kimberwicke Street, and Street A. Due to lack of on-site mitigation opportunities, the applicant has elected to provide off-site mitigation at a 1:1 ratio to compensate for the 1.95 acres to be impacted by road construction. The US Army Corps of Engineers (USACE) has approved purchase of mitigation back credits in the Upper Missouri Mitigation Bank, located near Twin Bridges, MT in Madison County. The subdivision site is located within the same watershed. The WRB reviewed the proposal and recommended approval of the provision of off-site mitigation. 38.41.060.A.2 Floodplains The proposed subdivision site is not located within the regulated floodplain. The property is designated in an area having no special flood hazards, and is not within the 100-year floodplain on FEMA Map Panel No. 0804D. 38.41.060.A.3 Groundwater Monitoring of groundwater conditions was performed across the site using 15 monitoring wells. Monitoring between February 15th and June 24th, 2014 revealed that the majority of the site is impacted by seasonal high groundwater within six feet of the ground surface. The average depth to groundwater across the entire site throughout the monitoring period was 4.46 feet. The shallowest depths to groundwater were observed in the central-western and southeastern portions of the property, with average depths of less than three feet. Due to high ground water conditions across the site, the construction of roads, utilities and foundations will likely require temporary dewatering, to be determined at time of year construction begins. Restrictions on crawl space depths or requirement of slab-on-grade foundations in certain areas of the project may also be required. Condition 20 requires a plat note placing future landowners on notice of potential high groundwater tables and the need to consult with a professional engineer prior to designing or building any structures. Subdivision covenants will include a section on minimum finished floor elevations (above street grades) to fully inform buyers of high groundwater conditions. In addition, Note #1 on the preliminary plat advises of high groundwater conditions, and states that the finish floor of all residential structures shall not be less than two feet above the established elevation from the top of the curb of the adjoining street. Installation of municipal water and sanitary sewer services will reduce any concerns regarding the potential of groundwater degradation from private on-site sanitation disposal systems. 181 P14041 Staff Report for the Four Points Minor Subdivision Page 17 of 28 38.41.060.A.4 Geology, Soils and Slopes An Abbreviated Geotechnical Report prepared by Allied Engineering identified several geotechnical issues related to the site’s subsurface conditions that have the potential to increase costs of site and building development. The issues identified include: 1) high groundwater; 2) deep gravels; and 3) very moist to wet soils. To address these issues, specific recommendations are provided in the report related to building crawl space depth limitations, designing road beds well above the existing ground, underground utility installation, road design, and building foundations. 38.41.060.A.5 Vegetation The site has over 17 acres of diverse wetland and waterways vegetated with grasses, sedges, rushes, willows and a variety of wetland species. The balance of the property is comprised of grassland area heavily infested with noxious weeds (largely thistle). Noxious weeds shall be controlled as directed by the approved Gallatin County Weed Control District Management Plan dated July 9, 2014 that was submitted with the application. Approximately 15 acres of the 17 acres of wetlands delineated on the property in 2013 will be preserved. A 50-foot wetland setback is recommended by to be shown on the final plat along the wetlands on Lot 3. Condition 17 addresses this recommended setback. The setback for wetlands and streams in future phases of the project will be determined through additional subdivision review required prior to authorizing development on Lots 4 and 5. To protect vegetation and critical areas from construction impacts, construction will be completed mid-summer following peak surface water flows and Best Management Practices (BMPs) will be employed between the edges of rights-of-way for road construction, and any wetlands, streams or spring ditches. 38.41.060.A.6 Wildlife The Montana Department of Fish, Wildlife & Parks (FWP) reviewed the subdivision proposal and commented that although the project is located near existing development, there may be deer, foxes, raptors, pheasants and other birds present. The agency’s primary concern is related to impacts on fish and potential harm to local waterways. FWP recommends avoiding any road or infrastructure construction activity near surface waters, or disturbance of riparian or wetland vegetation, and situations that might deliver pollutants to surface waters. Drainage control is also recommended to avoid increasing sediment or other contaminants that might be carried into local waterways. 38.41.060.A.7 Historical Features According to a Phase I Cultural Resource Evaluation of the proposed subdivision site performed by Anthro Research, Inc., two cultural resource sites are (were) located in the project area: 1) the Spring irrigation ditch system, and 2) the NPRR Low Line. These two historic sites may be significant relative to National Register Criteria A, namely “associated with events that have 182 P14041 Staff Report for the Four Points Minor Subdivision Page 18 of 28 made a significant contribution to the broad patterns of our history” (irrigation and agricultural development and early transportation systems). However, field reconnaissance evaluations conducted July 16, 2014 indicated that subsequent surface, land modifications during the past 100+ years have resulted in land of “sufficient integrity to convey the significance”. Because it was determined that no adverse impacts would result to a cultural resource, project approval was recommended. However, if cultural resources are discovered during site preparation and construction, they should be evaluated in terms of National Register significance. 38.41.060.A.8 Agriculture There are no existing or proposed agricultural uses on this property, nor is it part of a viable farm unit. The site was not used for agricultural production during the regular last season. The property adjacent to the subdivision site on the north contains agricultural farm land, is used for grazing cattle, and is fenced along its south boundary. The fence is not on the proposed subdivision property, and will continue to be maintained by the landowner. A covenant for the subdivision will require pets to be on a leash at all times when off the owner’s property. In additions, all pets must be restrained and controlled when near ponds, creeks, in open space, in parks or on a trail system. 38.41.060.A.9 Agricultural Water User Facilities There are no existing or proposed agricultural water user facilities on the property. The Waters of the US Delineation Report submitted with the application identifies the location, extent, and characteristics of the jurisdictional WUS located within the site. Supplemental information submitted by the applicant includes a correction to this report, noting that the USGS map included in the report shows the Spring Ditch diverging from Farmer’s Canal. However, more recent mapping and a field investigation show that Spring Ditch arises from a culvert north of Oak Street and southeast of the Regional Park, and that it appears to be fed by historic drain tiles located on the property south of where the channel starts. The source of the Section Line Ditch is also the Farmer’s Canal around two miles south of the project site. Although Farmer’s Canal is an agricultural water source, the water on site will not be used for agricultural purposes, nor will the subdivision result in any impact to agricultural water user facilities. A Farmer’s Canal Board member submitted a letter dated August 18, 2014 stating that the proposed impacts to the Section Line Ditch and the Spring Ditch are acceptable if construction is started in the fall, with a request for notification prior to starting construction. Prior to conducting any construction during spring or summer, the Farmer’s Canal Board requests notification regarding potential impacts to downstream agricultural water users, particularly the effects of dewatering on sub-irrigation. The Farmer’s Canal Board expects the subdivision association to ensure that ditches running through the subdivision stay clean and free of debris. Code Requirement 2 under Section 4 of this staff report requires a correction for final plat approval that addresses BMC Section 38.23.060.D regarding easements for agricultural water facilities. 183 P14041 Staff Report for the Four Points Minor Subdivision Page 19 of 28 38.41.060.A.10 Water and Sewer New water and sanitary sewer infrastructure will be installed on site to serve future development. The new infrastructure will require connection to City-owned water and wastewater facilities installed as part of the Baxter Meadows Subdivision. There are existing water and sewer mains in Ferguson Avenue, Cattail Street, Kimberwicke Street, as well as running north-south through the site. An existing sanitary sewer lift station is located just south of the proposed Cattail Street extension in the northwest corner of Lot 5 as shown on the preliminary plat. The water and sewer facilities for Baxter Meadows Subdivision were designed to accommodate development on the subject property; therefore, adequate capacity has been built in to the existing system for this project. The City Engineering and Water and Sewer Divisions have reviewed the plans and find there is adequate capacity to serve the subdivision. Final approval of the water distribution system and sewage collection/disposal system will be obtained through normal approval procedures of infrastructure and final plat review by the City Engineering Division, Superintendent of Water/Sewer, and Montana Department of Environmental Quality. 38.41.060.A.11 Stormwater Management A preliminary stormwater management plan was provided in the application. The system is designed to remove solids, silt, oils, grease and other pollutant from the runoff from the private and public streets and all lots. The lots will remain under one owner and the stormwater detention facilities will be located within easements. Storm water from Phase 1 streets and Lot 1 development will be collected in curbs and gutters and transported in storm sewers to a detention basin located in the northeast corner of the public park as shown in a revised drawing submitted after project review by DRC and RPAB. This stormwater facility location was determined through coordination with the City Engineering Division during street improvements infrastructure review and permitting for the extension of Ferguson Avenue and Cattail Street. Outlet structures control the release rate from the detention basins to preconstruction runoff rates. 38.41.060.A.12 Streets, Roads and Alleys Cattail Street: The proposed subdivision requires the extension of Cattail Street approximately 2,670 feet west of Davis Lane to Ferguson Avenue, centered along the northern property boundary of the site and within a 90-foot wide easement. Currently, a gravel roadway exists where Cattail Street is to be extended. Upon full construction, the Cattail Street extension will have a pavement width of 48 feet; however, the developer is only building approximately two- thirds of the southern portion of the street. The northern third of the street will be built when development occurs on the adjacent land to the north. The street section for Cattail Street from south to north includes: a 6' sidewalk, a 14' boulevard (5’ boulevard along wetlands), 24' pavement section centerline (10.5' drive lane, 5' bike lane, 8' parking lane to face of 6” curb), and an 11' pavement section from centerline to the northern edge of pavement. Impacted wetlands will be mitigated off-site as discussed above in the staff report. 184 P14041 Staff Report for the Four Points Minor Subdivision Page 20 of 28 Kimberwicke Street: A portion of Kimberwicke Street along the south-eastern part of the subdivision site will be extended in a future phase approximately 743 feet east to connect with Davis Lane. The street section for this extension will provide continuity with the existing design along the southern boundary of the site. It will have a 35-foot pavement width (including 6” curbs),6.5-foot wide boulevards and 5-foot wide sidewalks along the north side of the street. The Kimberwicke extension will impact approximately 4,500 square feet of wetland #1, which will be mitigated for off-site as discussed above in the staff report. Ferguson Avenue: Ferguson Avenue will be improved from Kimberwicke Street approximately 883 feet north to the Cattail Street Extension. Currently, this portion of the roadway is asphalt millings. Upon full construction, Ferguson Ave will have a pavement width of 48 feet within a 90-foot wide easement; however, the developer is only building approximately two-thirds of the eastern portion of the street. The western third along the Chief Joseph Middle School frontage will be built in the future. The street section for Ferguson Avenue includes: a 6' sidewalk, a 14' boulevard, 24 feet of pavement (including a 6” curb) to the centerline (10.5' drive lane, 5' bike lane, 8' parking lane to face of curb), and 11' of roadway from centerline to the western edge of pavement. Local Streets: Three local streets will be constructed within the subdivision to provide resident access to Kimberwicke and Cattail Streets. There will be no direct local street access to Davis Lane from the subdivision. The three local streets will all be 35 feet wide within a 60' right-of- way and will total approximately 2885 linear feet of new roadway. A roundabout is proposed at the intersection of two of the local streets to aid in traffic flow and control. All local streets 185 P14041 Staff Report for the Four Points Minor Subdivision Page 21 of 28 will have 6.5-foot wide boulevards and 5-foot wide sidewalks on both sides of the street. All roads are designed per Montana Public Works Standard Specification with the City of Bozeman Modifications as well as the Montana Department of Transportation Standards. All streets within the subdivision shall have dedicated rights-of-way and be built to city standards. Construction Schedule: Roadway construction for the Cattail Street extension and Ferguson Avenue improvements as described above has commenced and is programmed to be completed later this fall if weather conditions permit. Condition 19 is recommended to prohibit issuance of building permits for Lots 2 and 3 until the improvements on the Cattail Street extension and Ferguson Avenue have been completed and accepted by the City Engineer. Traffic Impact Studies: A Preliminary Traffic Impact Study prepared by Marvin & Associates for the subdivision was submitted with the application. As exact trip generation numbers based on number on units to be built are not yet available, relative traffic impacts cannot be accurately determined at this stage in the review process. The trip generation attributable to the Four Points Subdivision is estimated to be between 3,000 and 5,000 Average Daily Trips (ADT). The greatest potential impacts would be at Davis Lane intersections as the highest volumes of subdivision traffic would access Davis Lane. It is likely that mitigating measures may be required at the intersection of Davis Lane and Baxter Lane. Additionally, left turn lanes on Davis Lane at the intersections of Kimberwicke Street and Cattail Lane will likely be warranted in the future. Stop control on minor streets will facilitate the operation of these intersections at acceptable levels of service. Current conditions have been estimated, and subsequent information will contain new traffic data, trip generation numbers, and supporting calculations. Condition 24 recommends additional traffic analyses be required with future development reviews. 38.41.060.A.13 Utilities There are existing private utilities in Cattail Street, Ferguson Avenue and Kimberwicke. Northwestern Energy participated in review of the project as a member of the Development Review Committee to ensure provision of electricity and natural gas service to the subdivision. In addition, Northwestern has advised that they will work concurrently and in cooperation with other utilities and services, including telephone, internet, and cable TV providers to provide for 186 P14041 Staff Report for the Four Points Minor Subdivision Page 22 of 28 their respective infrastructure in joint utility trenches. All utilities will be located underground and per City of Bozeman Standards. Private utility easements are required on the final plat. 38.41.060.A.14 Educational Facilities A letter from the Bozeman Public Schools Director of Facilities, Todd Swinehart, was submitted with the application. This letter discusses the school system's ability to accommodate the increased enrollment as a result of Four Points Subdivision. 38.41.060.A.15 Land Use The 54.28-acre property is currently vacant land with zoning of R-3 (Residential Medium Density) and R-4 (Residential High Density). The preliminary plat shows two lots proposed for multi-household development and dedication of a public park in Phase 1. The remaining two lots shown are constrained by relatively large wetlands and will be restricted from development subject to future subdivision review. 38.41.060.A.16 Parks and Recreation Facilities A first minor subdivision is exempt from providing parkland pursuant to Section 38.27.020.B, BMC. However, the applicant proposes to dedicate public park land in the amount of 5.082 acres in the first phase of the project. A Park Master Plan has been submitted for this public park that describes park amenities including a Community Center with a playground, and provides information on vegetation, irrigation, trails and maintenance. RPAB reviewed the park plan and forwarded a positive recommendation, with a request to change the sidewalk that bisects the site east to west providing a safe route for students on the way to and from school. Sheet 3 of 3 of the preliminary plat includes a table summarizing park land requirements, indicating a total of 6.03 acres of required parkland for the entire subdivision, based on 0.03 acres per unit at 12 units per developable acre, which excludes future parkland dedication and wetlands. Note #1 on this table indicates that additional parkland will be provided in Lot #5 as determined through subsequent development reviews. 38.41.060.A.17 Neighborhood Center Plan A neighborhood center plan is included in the Park Master Plan submitted with the application and reviewed by RPAB. 38.41.060.A.18 Lighting Plan Subdivision lighting is proposed at intersections on streets within the subdivision, and on perimeter streets as shown on the lighting plan. Cut sheets were provided indicating proposed lighting is in conformance with applicable code requirements. Final design of the lighting system is required with the infrastructure plan submittal and shall be in accordance with the City’s adopted Engineering Design Standards and Specifications. 38.41.060.A.19 Miscellaneous The subdivision will not impact access to any public lands and there are no identified health or safety hazards on or near the subject property. 187 P14041 Staff Report for the Four Points Minor Subdivision Page 23 of 28 38.41.060.A.20 Affordable Housing Currently, the Workforce Housing Ordinance (Ordinance 1710) had been suspended by the City Commission; therefore workforce housing is not required with this development. APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY Approximately fifteen percent (eight acres) of the subject property is zoned R-3 (Residential Medium Density), with the remaining eighty-five percent (forty-six acres) zoned R-4 (Residential High Density). The portion of the site zoned R-3 lies along the western side of the parcel across from Chief Joseph Middle School. Phase I of the project includes dedication of approximately 5 acres for a public park in the portion of the site zoned R-3. Phase I also includes two lots for multi-household development; Lot 2 that is zoned R-3, and Lot 4 zoned R- 4. The remaining lots shown on the preliminary plat are zoned R-4 and are restricted from development until further subdivision review. A large portion (twenty-one acres) of Lots 4 and 5 contains wetlands to be preserved as open space with public access. The intent of the R-3 residential medium density district is to provide for the development of one- to five-household residential structures near service facilities within the city. It should provide for a variety of housing types to serve the varied needs of households of different size, age and character, while reducing the adverse effect of nonresidential uses. The intent of the R-4 residential high density district is to provide for high-density residential development through a variety of housing types within the city with associated service functions. This will provide for a variety of compatible housing types to serve the varying needs of the community's residents. Although some office use is permitted, it shall remain as a secondary use to residential development. Secondary status shall be as measured by percentage of total building area. Adopted Growth Policy Designation: The residential land use category has been assigned to the proposed subdivision property on the Future Land Use Map in the Bozeman Community Plan. This category designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential designation indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development. The dwelling unit density expected within this classification varies between 6 and 32 dwellings 188 P14041 Staff Report for the Four Points Minor Subdivision Page 24 of 28 per net acre. A higher density may be considered in some locations and circumstances. A variety of housing types can be blended to achieve the desired density. Large areas of single type housing are discouraged. In limited instances the strong presence of constraints and natural features such as floodplains may cause an area to be designated for development at a lower density than normally expected within this category. All residential housing should be arranged with consideration of compatibility with adjacent development, natural constraints such as watercourses or steep slopes, and in a fashion which advance the overall goals of the Bozeman growth policy. The residential designation is intended to provide the primary locations for additional housing within the planning area. APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND Project Description The proposal includes the subdivision of one existing tract of land of approximately 54 acres into five lots. In Phase I, Lot 1 will be dedicated as a public park, Lots 2 and 3 will be available for initial development with multi-household housing, and lots 4 and 5 will be restricted subject to further subdivision review prior to authorizing development. This subdivision is a first minor subdivision from a tract of record and does not require Planning Board review or a public hearing. Water and sewer will connect to city services. All stormwater runoff will be managed on site in retention ponds. APPENDIX C – NOTICING AND PUBLIC COMMENT A subdivision pre-application was submitted on March 26, 2014. The pre-application was reviewed by the Development Review Committee (DRC) on April 9, 16 and 23, 2014 and summary review comments were forwarded to the applicant in preparation of the preliminary plat application. A preliminary plat application was submitted on July 23, 2014 and was deemed unacceptable for initial review on August 1, 2014. Revised application materials were submitted on August 20, 2014 and deemed acceptable for initial review. The preliminary plat was reviewed by the DRC on September 3, 10 and 17, 2014. On September 17, 2014, the DRC determined that the application and additional supporting materials submitted were adequate for continued review, and further recommended approval with conditions and code provisions to be forwarded to the City Commission for consideration. Public notice was sent to property owners of record within 200 feet of the subject property via first class mail, on September 11, 2014. Notice was also posted on the site September 12, 2014. On October 3, 2014 this minor subdivision staff report with a recommendation of conditional approval was forwarded to the City Commission, which is scheduled to make a final decision on 189 P14041 Staff Report for the Four Points Minor Subdivision Page 25 of 28 the application at their October 13, 2014 public meeting. The final decision for a First Minor Subdivision from a Tract of Record Preliminary Plat must be made within 35 working days of the date it was deemed adequate for review, or in this case by November 4, 2014. APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF Owner: Michael Tracy, 31922 Paseo Monte Vis, San Juan Capo, CA 92675-3415 Applicant: Four Points, MT LLC, 31922 Paseo Monte Vis, San Juan Capo, CA 92675-3415 Representative: Madison Engineering, 895 Technology Boulevard, Ste 203, Bozeman, Mt 59718 Report By: Valerie Sutton, Senior Planner, Brian Krueger, Development Review Manager and Dustin Johnson, Development Review Engineer APPENDIX E – PUBLIC COMMENT AND ADDITIONAL INFORMATION The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Public Comment List: 1.Sandie Hammer, submitted comments via email on September 30, 2014 related to concerns about traffic congestion on the roadway system. 2. Christine L. Koch, submitted a letter dated October 1, 2014 related to concerns about weeds, lack of property maintenance, and traffic congestion . Copies of Public Comment Received: 9-29-14 To Whom It May Concern on the Community Development Department, I can only speak for myself as I have not physically spoken with the other board members, but one of my fellow members sent me a link as he was concerned when he heard another multi- family project was being projected for Baxter Meadows with little or no public input. We were all shocked when we saw the 195 apartment complex going up with NO ACCESS road to Davis Lane!!!! I project each of those apartments will come with 2 cars apiece, bringing a minimum of 400-800 more trips a day onto Baxter Lane, alone!!! I cannot even begin to fathom who thought that was a good idea. I tried (unsuccessfully) to plead our case for the completion of Cottonwood Road to Baxterl, on the west side of the new Soccer Complex. Oh no, again your office folded with Flanders Mill (a garbage built road-not to city standards) and Baxter being the only access. Now we, the 190 P14041 Staff Report for the Four Points Minor Subdivision Page 26 of 28 taxpaying residents of our landlocked "island" at Baxter Meadows, will not only have M-F to deal with unbelievable traffic, but on weekends, too. Thank you so much. Now, again we hear about Four Points Subdivision, a multi-family development that is going to pave Cattail to Davis (this should have been done when the school was built). What about the other end of FERGUSON-from Baxter to OAK!!!! I have heard residents complain just as loudly about Durston and Ferguson as the planning was just not thought out well. Oak should be punched through, also. Davis and Baxter need a light, but you can't have one as you do not have the Right of Way. You just continue to allow more subdivisions without the infrastructure to uphold it! Please consider those of us that are becoming landlocked. I would hate to ever see an emergency in this area, during the busy time as it could be a catastrophe. I personally will not vote for the new "Law and Justice Center" when we have the powers at be, only hearing a few taxpayer's voices. I will be at the meeting on October 16 at 6:30. Sincerely, Sandie Hammer 4229 Fjord Court Bozeman, MT 59718 (406)581-3033/587-9882 sandie@sandiehammer.com I am sending a hard copy to Community Development Department C/O Valerie Sutton or Bryan Krueger 203 E. Olive St. PO Box 1230 Bozeman, MT 59771-1230 191 P14041 Staff Report for the Four Points Minor Subdivision Page 27 of 28 192 P14041 Staff Report for the Four Points Minor Subdivision Page 28 of 28 Staff Response to Public Comment: Traffic issues: The Four Points Minor Subdivision has proposed to construct Ferguson at the western boundary of their development and Cattail Street at their northern boundary. All of the lots created with this subdivision will require further review by the development review committee prior to any issuance of any building permits. The construction of Ferguson and Cattail Streets will finally provide an additional route east out of Baxter Meadows onto Davis. Public Works is aware of the increasing demand for improvements to the transportation network on the west end of town. At this time there are multiple RFPs for engineering design work for Oak Street, Durston Road, Cottonwood Road, and the intersection of Baxter and Davis. In addition, the developer for the Flanders Mill Subdivision has agreed to construct Ferguson Avenue from Baxter Lane to Oak Street with their first phase with the hopes of completing the street in 2015. Public right-of-way is currently available for Ferguson – Baxter to Oak Street, as well as for the extension of Oak-Ferguson to Flanders Mill. Crowding in nearby schools: A letter dated July 22, 2014, from Todd Swinehart, PE, Director of Facilities for Bozeman Public Schools, states that the proposed subdivision is currently within the Meadowlark Elementary School, Chief Joseph Middle School and Bozeman High School attendance areas. Approximately 18 new students expected with development of Phase I of the subdivision, with 8 students in Pre-K, 4 students in 6-8, and 6 students in 9-12 grades. Mr. Swinehart advises that population growth and demographic shifts in the future may necessitate boundary realignments to existing schools which could modify the designated attending schools. If a designated school attendance area’s student population exceeds the school’s capacity, attendance at an alternate school may be required. Mr. Swinehart also states that the existing bus system can accommodate the estimated number of additional students. Weeds and general nuisance issues: The applicant submitted a copy of an approved Weed Management Plan for the Four Points Minor Subdivision stating that noxious weeds shall be treated by July 1 of each year with a follow-up treatment by October 15 of each year (if needed). According to a July 9, 2014 cover memo from John Ansley, Coordinator of the Gallatin County Weed District, attached to the Weed Management Plan, Final Plat Approval will be denied or delayed if noxious weed treatment has not occurred. Other nuisance complaints are handled through the city’s code enforcement process. 193 194 195 196 197 (406) 586-0262 | (406) 586-5740 FAX Suite 203, bozeman, mt 59718 895 Technology Boulevard PROJECT SURVEYOR: DRAWN BY: REVIEWED BY: DATE:PROJECT NO. Sec.T.R. 1/4 1 OF SHEETSec.T.R. 1/4 586.4490 Fax 586.5599 Office Bozeman, MT 59715 Suite B 1970 Stadium Drive, 3 FOUR POINTS MINOR SUBDIVISION THIS SURVEY WAS PERFORMED FOR FOUR POINTS MT LLC THE PURPOSE OF THIS SURVEY IS TO CREATE A 5-LOT MINOR SUBDIVISION COS 2202C 064-738-19-14 NH TG NH 34 1 S.5 E. City of Bozeman, Montana Director of Public Works _____________________________________________________________ DATED this _____________ day of __________________, ____________. being dedicated to such use. City of Bozeman for the public use of any and all lands shown on the plat as conform to the law, approves it, and hereby accepts the dedication to the the accompanying plat has been duly examined and has found the same to I, Director of Public Works, City of Bozeman, Montana, do hereby certify that CERTIFICATE OF DIRECTOR OF PUBLIC WORKS Treasurer of Gallatin County ____________________________________________________ DATED this______ day of ___________, _______ and levied on the land to be surveyed have been paid. examined and that all real property taxes and special assessments assessed do hereby certify that the accompanying Subdivision Plat has been duly I, _________________________the Treasurer of Gallatin County, Montana CERTIFICATE OF COUNTY TREASURER Clerk and Recorder of Gallatin County ____________________________________________________ Document Number ____________________ Records of the Clerk and Recorder, Gallatin County, Montana. and recorded in Book ___________ of Plats on Page _______________, at _________ o’clock ____.M. this _______ day of ___________ my office at: Montana, do hereby certify that the foregoing instrument was filed in I, ____________________Clerk and Recorder of Gallatin County, CERTIFICATE OF CLERK AND RECORDER A NATNOM ROYEVRUS DNAL LANOISSE FORP DERETSI GERNo. 13601 LS GNAUCK THOMAS City of Bozeman, Montana Director of Public Works _________________________________________________________ DATED this _____________ day of __________________, ____________. review. is excluded from the requirement for Montana Department of Environmental Quality facilities. Therefore, under the provisions of §76-4-125(2)(d) MCA, this subdivision and can be provided with adequate storm water drainage and adequate municipal of the Bozeman growth policy which was adopted pursuant to §76-1-601 et seq., MCA, City of Bozeman, Montana, a first-class municipality, and within the planning area Gallatin County, Montana, is within the Four Points Minor Subdivision, DEPARTMENT OF ENVIRONMENTAL QUALITY REVIEW CERTIFICATE OF EXCLUSION FROM MONTANA City of Bozeman, Montana Director of Community Development _____________________________________________________________ DATED this _____________ day of __________________, ____________. of the Subdivision and Platting Act, §76-3-101 et. seq., MCA, and the Bozeman Municipal Code. Subdivision Plat has been duly reviewed, and has been found to conform to the requirements I, Director of Community Development, do hereby certify that the accompanying Minor CERTIFICATE OF GOVERNING BODY Montana Registration No. 13,601 L.S. Thomas Gnauck, PLS _______________________________ Dated this 3rd day of July, 2014. and the Bozeman Municipal Code. the Montana Subdivision and Platting Act (MCA 76-3-101 through 76-3-625), accompanying plat and as described in accordance with the provisions of Four Points Minor Subdivision, and platted the same as shown on the certify that between March 22nd, 2013, and July 3rd, 2014 I surveyed I, Thomas Gnauck, the undersigned, Registered Land Surveyor, do hereby CERTIFICATE OF SURVEYOR My commission expires 11/26/2015 Bozeman, MT 59715 895 Technology Boulevard Residing at: Notary Public for the State of Montana Chris Budeski Signature ______________________________________________ the day and year herein above written. and acknowledged to me that said L.L.C. executed the same. Witness my hand and seal the person who signed the foregoing instrument as Luke Tracy of FOUR POINTS MT LLC. a Notary Public in and for said state, personally appeared Luke Tracy, known to me to be On this ______________day of _____________________________, 2014, before me, County of _______________________) s.s. State of _________________________) Luke Tracy By: ____________________________________________________ FOUR POINTS MT LLC GALLATIN COUNTY, STATE OF MONTANA TOWNSHIP 1 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, No. 2202C LOCATED IN THE SOUTHEAST ONE-QUARTER OF SECTION 34, A MINOR SUBDIVISION OF A TRACT 2A1 OF CERTIFICATE OF SURVEY PRELIMINARY PLAT - CERTIFICATES and across each area designated on this plat as "Utility Easement" to have and to hold forever. the construction, maintenance, repair and removal of their lines and other facilities in, over, under, cable television, water or sewer service to the public, the right to the joint use of an easement for whether public or private, providing or offering to provide telephone, electric power, gas, internet, The undersigned property owners, hereby grant unto each and every person, firm or corporation, Cattail Street, Kimberwicke Street, Ferguson Avenue, Milkhouse Avenue and Streets A & B. dedicated to the public for which the city accepts responsibility for maintenance include: dedicated to public use. The lands included in all streets, avenues, alleys and parks or public squares obligation to maintain the lands included in all streets, avenues, alleys and parks or public squares hereby City accepts no responsibility for maintaining the same. The owners agree that the City has no avenues, alleys, and parks or public squares dedicated to the public are accepted for public use, but the for the public use and enjoyment. Unless specifically listed herein, the lands included in all streets, parks or public squares shown on said plat are hereby granted and donated to the City of Bozeman City of Bozeman, Gallatin County, Montana; and the lands included in all streets, avenues, alleys and The above described tract of land is to be known and designated as Four Points Minor Subdivision SUBJECT to all easements of record or apparent from a visual inspection of the property. containing 54.278 acres, more or less. thence South 89 41’ 46" West a distance of 532.20 feet to a to the Point of Beginning thence South 81 55’ 55" West a distance of 66.53 feet to a TD&H yellow plastic cap; thence South 89 42’ 34" West a distance of 278.56 feet to a TD&H yellow plastic cap; thence South 48 21’ 31" West a distance of 90.16 feet to a TD&H yellow plastic cap; thence South 89 41’ 02" West a distance of 10.00 feet to a calculated position; thence South 89 41’ 02" West a distance of 203.12 feet to a TD&H yellow plastic cap; thence South 89 42’ 15" West a distance of 682.03 feet to a TD&H yellow plastic cap; thence North 00 13’ 33" West a distance of 44.89 feet to a TD&H yellow plastic cap; thence South 89 42’ 03" West a distance of 715.83 feet to a TD&H yellow plastic cap; thence South 89 42’ 03" West a distance of 50.00 feet to a TD&H yellow plastic cap; of said Tract 2A1; thence South 00 14’ 42" West a distance of 897.16 feet to the calculated position of the southeast corner corner of said Section 34; thence North 89 51’ 42" East a distance of 2648.41 feet to the calculated position of the east one-quarter of said Tract 2A1; thence North 00 20’ 40" East a distance of 928.31 feet to the calculated position of the northwest corner of said Tract 2A1; thence South 89 41’ 46" West a distance of 45.00 feet to the calculated position of the southwest corner Beginning at a TD&H yellow plastic cap near the southwest corner of said Tract 2A1; Principal Meridian Montana (P.M.M), Gallatin County, Montana being more particularly described as follows: Clerk and Recorder located in the Southeast One-Quarter of Section 34, Township 1 South, Range 5 East, A tract of land being Lot 2A1 of Certificate of Survey No. 2202C, on record with the Gallatin County the following described tracts of land, to-wit: subdivided and platted into lots, blocks, roads and alleys, as shown by this plat hereunto included, We, the undersigned property owners, do hereby certify that we have caused to be surveyed, CERTIFICATE OF DEDICATION 198 50.25’ S 21 06’ 50" W (406) 586-0262 | (406) 586-5740 FAX Suite 203, bozeman, mt 59718 895 Technology Boulevard N 89 51’ 44" E - 2648.43’ (R) N 89 51’ 42" E - 2648.41’ (C)BASIS OF BEARINGSS 00 14’ 42" W - 897.22’ (R)S 00 14’ 42" W - 897.16’ (C)S 89 41’ 57" W - 715.80’ (R) S 89 42’ 03" W - 715.83’ (M) S 89 41’ 57" W - 50.00’ (R) S 89 42’ 03" W - 50.00’ (C) S 89 41’ 57" W - 682.07’ (R) S 89 42’ 15" W - 682.03’ (M) S 89 41’ 57" W - 203.06’ (R) S 89 41’ 02" W - 203.12’ (M) S 89 41’ 57" W - 10.00’ (R) S 89 41’ 02" W - 10.00’ (C) N 00 18’ 03" W - 45.00’ (R) N 00 13’ 33" W - 44.89’ (M)S 48 25’ 27" W - 90.20’ (R) S 48 21’ 31" W - 90.16’ (C)S 89 41’ 57" W - 278.47’ (R) S 89 42’ 34" W - 278.56’ (M) S 81 56’ 02" W - 66.61’ (R) S 81 55’ 55" W - 66.53’ (M)S 89 41’ 57" W - 532.19’ (R) S 89 41’ 46" W - 532.20’ (M) S 89 41’ 57" W - 45.00’ (R) S 89 41’ 46" W - 45.00’ (C)N 00 20’ 56" E - 928.28’ (R)N 00 20’ 40" E - 928.31’ (C)248.24’223.96’30’ 30’29.94’36.59’ 284.36’N 00 20’ 40" E - 883.17’N 89 51’ 42" E - 280.52’N 00 00’ 00" W - 440.06’N 00 00’ 00" W - 314.09’161.92’ N 90 00’ 00" E56.98’S 65 42’ 49" E196.65’ N 90 00’ 00" E 100.00’N 00 00’ 00" E441.20’N 00 00’ 00" E138.00’N 00 00’ 00" W366.28’137.85’70.00’166.65’ 161.92’496.13’60.28’138.16’56.98’60.28’107.93’N 16 37’ 51" E90.84’N 49 31’ 26" W185.02’N 02 06’ 15" W60.28’N 22 40’ 22" ES 00 14’ 42" W - 807.30’S 89 41’ 30" W - 716.20’ 166.65’56.98’ 161.92’ 60.00’ S 00 00’ 00" E 30’ 30’30’ 30’355.25’2293.16’ 50’ 50’C1C2C4C3C5 C6 C7 C8 C9 50’ 30’ 50’ 30’ N 89 51’ 42" E - 2212.97’ 1025.89’1187.08’ 30.00’ 367.68’ 60.27’ N 00 00’ 00" W 96.14’ N 00 00’ 00" W N 90 00’ 00" E - 574.25’ 621.75’ N 90 00’ 00" E 361.44’N 00 00’ 00" WL = 93.87’ »¿˛ = 26´ 53 R = 200.00’ CURVE L = 93.87’ »¿˛ = 26´ 53 R = 200.00’ CURVE RADIUS DELTA LENGTH CHORD BEARING CHORD LENGTH CURVE TABLE CURVE PROJECT SURVEYOR: DRAWN BY: REVIEWED BY: DATE:PROJECT NO. Sec.T.R. 1/4 2 OF SHEET Scale 1" = ’ Sec.T.R. 1/4 586.4490 Fax 586.5599 Office Bozeman, MT 59715 Suite B 1970 Stadium Drive, 3 FOUR POINTS MINOR SUBDIVISION THIS SURVEY WAS PERFORMED FOR FOUR POINTS MT LLC THE PURPOSE OF THIS SURVEY IS TO CREATE A 5-LOT MINOR SUBDIVISION PROJECT AREA N (As Noted) The Eastern Boundary of Lot 2A1 BASIS OF BEARING COS 2202C 064-738-19-14 NH TG NH 34 1 S.5 E. 100 2.618 acres LOT 2 2.838 acres LOT 3 4.423 acres LOT 4 31.739 acres LOT 5 P.O.B.FERGUSON AVENUECATTAIL STREET DAVIS LANEKIMBERWICKE STREET KIMBERWICKE STREET KIMBERWICKE STREET MILKHOUSE AVENUEGALLATIN GREEN BOULEVARDVAQUERO PARKWAYUN-PLATTEDOF SECTION 34NE… & E‰E‰NW…CATTAIL CREEK SUB. PH 2ALOT 1, BLOCK 10UNPLATTEDSECTION 35S‰N‰NW…SW…UNPLATTEDPLAT J-353-DPH 1SUBDIVISIONBAXTER MEADOWS PHASE 2B PLAT J-506LOT 1, BAXTER MEADOWS SUBPHASE 2B PLAT J-506BAXTER MEADOWS SUBLOT RPHASE 6 PLAT J-466 PARK E, BAXTER MEADOWS SUB PHASE 6 PLAT J-466OPEN SPACE, BAXTER MEADOWS SUBPHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 5, BLOCK 16 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 4, BLOCK 16 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 3, BLOCK 16 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 2, BLOCK 16 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 1, BLOCK 16 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 11, BLOCK 15 PHASE 6 PLAT J-466BAXTER MEADOWS SUBLOT 1, BLOCK 15 PHASE 2C PLAT J-410 BAXTER MEADOWS SUB LINEAR PARK PHASE 2C PLAT J-410BAXTER MEADOWS SUBLOT 7, BLOCK 10CATTAIL CREEK SUB. PH 2ALOT 5, BLOCK 11THIS SUBDIVISION DEDICATED BY 50’ R.O.W. THIS SUBDIVISION DEDICATED BY 45’ R.O.W. THIS SUBDIVISION DEDICATED BY 45’ R.O.W. THIS SUBDIVISION DEDICATED BY 45’ R.O.W. DEDICATED BY THIS SUBDIVISION: TYPICAL UTILITY EASEMENTS AS EXTERIOR BOUNDARIES INTERIOR BOUNDARIES 10’ 10’20’20’SEC. 34 SEC. 35 STREET A DOC. #2074573 45’ STREET EASEMENT DOC. #2103143 50’ STREET EASEMENT PER PLAT J-506 90’ R.O.W. 60’ R.O.W. DOC. #2103143 90’ STREET EASEMENT 30’ 30’EXISTING 8" PVC SANITARY SEWER MAIN 5.359 acres PUBLIC PARK LOT 1 OF STREET A FOR THE FUTURE EXTENSION AND UTILITY EASEMENT 60’ PUBLIC ROAD OF STREET B FOR THE FUTURE EXTENSION AND UTILITY EASEMENT 60’ PUBLIC ROAD STREET BPER DOC. No. 2117814 ACCESS EASEMENT SEWER & WATER & GALLATIN COUNTY, STATE OF MONTANA TOWNSHIP 1 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, No. 2202C LOCATED IN THE SOUTHEAST ONE-QUARTER OF SECTION 34, A MINOR SUBDIVISION OF A TRACT 2A1 OF CERTIFICATE OF SURVEY PRELIMINARY PLAT - BOUNDARIES Calculated One-Quarter Corner Position Calculated Corner Position Found Property Corner Alpine Aluminum Cap Adjoining Property Line Easement Line Property Boundary Line 21.374 acres 5.359 acres 20.244 acres 7.301 acres 54.184 acres SUBDIVISION AREAS Total Road Right-Of-Way Residential Lots Dedicated Parkland Wetland Open Space (Public Access) LEGEND VICINITY MAP NOT TO SCALE 280.00’110.80’110.08’ 220.00’87.06’86.49’ 220.00’87.06’86.49’ 280.00’110.80’110.08’ 180.00’76.30’75.73’ 120.00’50.87’50.49’ 180.00’76.30’75.73’ 120.00’50.87’50.49’ 27.49’24.75’ C1 C3 C2 C7 C6 C5 C4 C9 C8 17.50’ 199 (406) 586-0262 | (406) 586-5740 FAX Suite 203, bozeman, mt 59718 895 Technology Boulevard 46854685 4685 WV MH MH 4690 469046904690469046904690 46904690 46904690 4690 469046904690469046904690 469046904690469046904690 4690 4690469046904690 4690 4690 46 90 46904690 4690 WV MH MH WV WV WV MH MH WV WVWV GMPM MH 4695469546954695469546954695469546954695469546954695 4695 469546954695469546954695469546954695 4695469546954 69 5469546954695 469546954695469546954695 4695469546954695469546954695469546954695 4695 4695 4695 46954695 4695 46954695469546954695469546954 6 95469546954695 MH MH WV MH MH WV WV WV MH WVWV MH MH WV MH WVWV 47004700470047004700 47004700470047004700 47004700470047004700470047004700470047004700470047004700470047004700470047004700470047004700470047004700 4700 4700 470047004700 4700 470047004700 WV MH WV MH WVWVWV WV MH WV MH WV WV WV MH WVWV WV WV MH MH WV WV MH 47054705WV S PROJECT SURVEYOR: DRAWN BY: REVIEWED BY: DATE:PROJECT NO. Sec.T.R. 1/4 3 OF SHEET Scale 1" = ’ Sec.T.R. 1/4 586.4490 Fax 586.5599 Office Bozeman, MT 59715 Suite B 1970 Stadium Drive, 3 FOUR POINTS MINOR SUBDIVISION THIS SURVEY WAS PERFORMED FOR FOUR POINTS MT LLC THE PURPOSE OF THIS SURVEY IS TO CREATE A 5-LOT MINOR SUBDIVISION N (As Noted) The Eastern Boundary of Lot 2A1 BASIS OF BEARING COS 2202C 064-738-18-14 NH TG NH 34 1 S.5 E. 100 FERGUSON AVENUECATTAIL STREET DAVIS LANEKIMBERWICKE STREET KIMBERWICKE STREET KIMBERWICKE STREET MILKHOUSE AVENUEGALLATIN GREEN BOULEVARDVAQUERO PARKWAYDEDICATED BY THIS SUBDIVISION: TYPICAL UTILITY EASEMENTS AS EXTERIOR BOUNDARIES INTERIOR BOUNDARIES 10’ 10’20’20’SEC. 34 SEC. 35 STREET A MH WV WETLAND AREA WETLAND AREA WETLAND AREA EXISTING 8" DI WATER MAIN EXISTING 8" PVC SANITARY SEWER MAIN EXISTING UNDERGROUND POWER LINE EXISTING UNDERGROUND GAS MAIN 8" DI WATER MAIN 8" PVC SANITARY SEWER MAIN EXISTING UNDERGROUND POWER LINE & TELEPHONE EXISTING UNDERGROUND GAS MAIN EXISTING UNDERGROUND POWER LINE & TELEPHONE EXISTING 8" PVC SANITARY SEWER MAIN EXISTING UNDERGROUND TELEPHONE LINE EXISTING 8" DI WATER MAIN EXISTING 8" PVC SANITARY SEWER MAIN EXISTING 8" PVC SANITARY SEWER MAIN EXISTING 8" PVC SANITARY SEWER MAIN EXISTING 8" WATER MAIN EXISTING ASPHALT PARKING EXISTING CONCRETE CURB & GUTTER EXISTING DITCH TO BE PIPED EXISTING STREAM EXISTING GRAVEL ACCESS ROAD SETBACK 50’ WETLAND SETBACK 50’ WETLAND SETBACK 50’ WETLAND PUBLIC ACCESS OPEN SPACE PUBLIC ACCESS OPEN SPACE PUBLIC ACCESS OPEN SPACE STREET BLIFT STATION EXISTING SANITARY SEWER PUBLIC PARK LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 SETBACK 50’ WETLAND GALLATIN COUNTY, STATE OF MONTANA TOWNSHIP 1 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, No. 2202C LOCATED IN THE SOUTHEAST ONE-QUARTER OF SECTION 34, A MINOR SUBDIVISION OF A TRACT 2A1 OF CERTIFICATE OF SURVEY PRELIMINARY PLAT - CONDITIONS OF APPROVAL Luke Tracy By: ____________________________________________________ Four Points MT LLC by law or by local regulations. be made by amendments to covenants, zoning regulations, easements, or other documents as allowed shown hereon is current as of 8-18-14. Changes to any land-use restrictions or encumbrances may final plat approval and all conditions of subdivision application have been satisfied. The information The text and/or graphics shown hereon represent the requirements by the governing body for CERTIFICATE OF CONDITIONS OF APPROVAL Homes on corner lots to have the same orientation as adjacent homes on street.11. Areas designated as WETLANDS are subject to a 50-foot setback.10. association (Four Points Homeowners) and/or future park Maintenance District. All Open Space and Public Access areas are to be owned and maintained by the homeowners 9. (Four Points Homeowners) and/or future park Maintenance District. All Public Parks are dedicated to the city, but maintained by the homeowners association8. SETBACK 20’ BUILDING SETBACK 20’ BUILDING SETBACK 20’ BUILDING SETBACK 15’ BUILDINGSETBACK 15’ BUILDING SETBACK 15’ BUILDING SETBACK 15’ BUILDING SETBACK 15’ BUILDING SETBACK 15’ BUILDING SETBACK 15’ BUILDINGMILKHOUSE AVENUESETBACK 50’ WETLAND SETBACK 50’ WETLAND SETBACK 15’ BUILDING FRONTAGE DAVIS LANE ALONG ALL 1’ NO-ACCESS STRIP 30-foot trail easements are to be provided within wetland setback areas.7. upon the lot. within 30 days said sidewalk for their lot(s) regardless of whether other improvements have been made hereon, any lot owner who has not constructed said sidewalk shall, without further notice, construct to occupancy of any structure on the property. Upon the third anniversary of the recordation of the plat City standard residential sidewalks shall be constructed on all public street frontages of a property prior6. Municipal Code (B.M.C.) said easement shall apply. If a utility easement is greater than the building setback required under Chapter 38 of the Bozeman5. All lots are subject to a 20-foot wide side yard utility easement.4. A 1-foot wide vehicular No-Access easement exists for Lots along Davis Lane.3. All downstream water user facilities will not be impacted by this Subdivision.2. than two (2) feet above the established elevation from the top of curb of the adjoining street. of residential and commercial construction. The finish floor of all residential structures shall be not less first consulting a professional engineer licensed in the State of Montana and qualified in the certification residential dwellings or commercial structures with full or partial basements not be constructed without Due to the potential of high ground water tables in the areas of this subdivision, it is recommended that1. NOTES Water Valve Sewer Manhole Water Line Sewer line Fence Line Overhead Power Line Underground Power Line Underground Telephone Line Underground Gas Line Underground Fiber Optic Line 1’ No-Access Strip Setback Line Adjoining Property Line Easement Property Boundary Line 21.651 acres 5.082 acres 20.244 acres 7.301 acres 54.278 acres SUBDIVISION AREAS Total Road Right-Of-Way Residential Lots Dedicated Parkland Wetland Open Space (Public Access) LEGEND 200 LOT 15.359 ACRESZONED R-3LOT 22.643 ACRESZONED R-3LOT 32.827 ACRESZONED R-4LOT 44.427 ACRESZONED R-4BAXTERMEADOWSSUBDIVISIONPHASE IBAXTERMEADOWSSUBDIVISIONPHASE 6BAXTERMEADOWSSUBDIVISIONPHASE 6BAXTERMEADOWSSUBDIVISIONPHASE 6BAXTERMEADOWSSUBDIVISIONPHASE 2BBAXTERMEADOWSSUBDIVISIONPHASE 2C& 2DBAXTERMEADOWSSUBDIVISIONPHASE 2BS1/2 NW1/4SW1/4S35 T01S R5ES1/2 NW1/4SW1/4S35 T01S R5ECATTAILCREEKSUBDIVISIONPHASE 2ACATTAILCREEKSUBDIVISIONPHASE 2A &2BNE1/4 & E1/2E1/2 NW1/4S34 T01S R5EDAVIS LANE CATTAIL STREETFERGUSON AVENUEKIMBERWICKE STREETMILKHOUSE AVENUE STREET AKIMBERWICKE STREETPHASE IPHASE IIFUTURE PHASELOT 532.478 ACRESZONED R-4STREET B SHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXOFFOUR POINTSPHASING PLANC1FOUR POINTS MINOR SUBDIVISION PHASING PLAN BOZEMAN, MT 11" =0SCALE100'200'50'100'VICINITY MAPPLANPRELIMINARYPHASE IPHASE IIFUTURE PHASE201 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 1 of 10 Four Points Subdivision Additional Subdivision Preliminary Plat Supplements Sec. 38.41.060., BMC 1. Surface Water 2. Floodplains 3. Groundwater 4. Geology, Soils and Slope 5. Vegetation 6. Wildlife 7. Historical Features 8. Agriculture 9. Agriculture Water User Facilities 10. Water and Sewer 11. Stormwater Management 12. Streets, Roads and Alleys 13. Utilities 14. Educational Facilities 15. Land Use 16. Parks and Recreation Facilities 17. Neighborhood Center Plan 18. Lighting Plan 19. Miscellaneous 20. Affordable Housing 202 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 2 of 10 Introduction This report presents the proposed Four Points Subdivision for review and approval as a 5-lot minor subdivision in the northwest section of Bozeman, Montana. The site is situated north of Kimberwicke Street and the Baxter Meadows Subdivision, east of Ferguson Avenue, south of Cattail Street, and west of Davis Lane (COS 2202C, Lot 2A1). This parcel was originally slated for development as part of the Baxter Meadows Subdivision. Currently, the 54.28-acre property is primarily vacant land, and the developer wishes to subdivide the land for the purposes of creating multi-family housing with an emphasis on park space and wetlands habitat. There are approximately 17 acres of wetlands and stream channels on the property. The majority of these sensitive areas will be protected, and any impacted areas for road development will be mitigated for off site. The land currently includes a sanitary sewer lift station as well as two gravel access roads and sewer and water main infrastructure running north-south across the site. There is also sanitary sewer main infrastructure in Ferguson Ave and Cattail St, all of which was previously developed as part of Baxter Meadows Subdivision. These existing mains will be utilized to provide service to the development. Cattail Street will be extended west of Davis Lane parallel to the north property boundary. The location of Cattail Street is dictated by the City of Bozeman street grid. Three additional interior streets will be constructed to access the residential units. The project's goals reflect those of the Bozeman 2020 Community Plan in which the City emphasizes the balance between regional growth and the preservation of natural resources and recreational opportunities. The overall development will occur in five phases with a mix of residential uses and park space being provided. 51.94 acres are zoned R-4 and 2.64 acres are zoned R-3. The first phase of the project includes the development of a 5.08 acre park as Lot 1 and the development of the 2.64 acres of R-3 as Lot 2. Phase II of the project includes the development of 2.83 acres of R-4 as Lot 3. Lots 4 and 5 are zoned R-4 and will be developed in future phases and will likely go through additional subdivision review. New water and wastewater infrastructure will be installed on site to serve the development's residents. The new infrastructure will require connection to the existing City-owned water and wastewater facilities installed as part of the Baxter Meadows Subdivision. There are existing water and sewer mains in Ferguson Avenue, Cattail Street, Kimberwicke Street, as well as running north-south through the site. The design these Baxter Meadows Subdivision facilities accounted for the development of the proposed Lot 2A1, so adequate capacity already exists in the system for the additional demands resulting from the development of Lot 2A1. The extension of Cattail Street as well as Kimberwicke Street will provide access to the development from both the north and south, respectively, via the development of local streets. During the first phase of construction it is proposed , Cattail Street, Ferguson and Milkhouse Avenue will be constructed, and a portion of local Street A (yet to be named) will be constructed. 203 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 3 of 10 The remainder of Street A as well as Kimberwicke Street and an additional local street will be constructed in future phases of the project. All streets will be constructed per the City of Bozeman standards. 1. Surface Water The surface waters that exist currently within the proposed subdivision are wetlands, various waters of the U.S., and spring ditches. Please reference the accompanying map, Waters of the U.S. Impact, provided in Section 9B, for the delineated surface waters. As shown this map, 1.78 acres (77,567 sf) of the existing wetlands will be affected due to either the extension of Cattail Street and Kimberwicke Street. All impacted wetland areas will be mitigated for off-site. There will be 50 foot development setbacks will be applied to surface water. Description of Impacts The Spring Ditch (W-3) flows from south to north through the west half of the property. The wetland fringe next to the channel was widened for mitigation for Baxter Meadows in 2005. The stream channel has a well-developed and diverse understory with little erosion. The stream is approximately 2 to 3 feet wide with 1 foot high banks. Trees and shrubs planted in 2005 are still developing. The stormwater ditch on the east side of W-3 is a straight channel densely vegetated with cattails. Water in the ditch ponds at the downstream manhole intake prior to the discharge to Spring Ditch. The 1 foot deep pond is vegetated with common spikerush and cattails. Wetland 1 encompasses 10.77 acres of palustrine wetland. The west and south edges of the pre-existing wetland were expanded in 2005 for mitigation for Baxter Meadows. Trees and shrubs were planted on the upland buffer west and south of the wetland. A pre-existing willow shrub overstory is located in the northeast corner of W-1. Wetland 4 was a pre-existing palustrine wetland that will be impacted by development. The south boundary of the wetland contains several willow shrubs. Wetland 5 is a mitigation palustrine wetland within the floodplain of the Spring Ditch that was constructed in 2005 and will not be impacted. There are no woody species in W-5. Water of the US 13 is a stormwater pond with little wetland vegetation on the rocky bank slopes. Waters of the US No. 11 and wetlands 2, 9, and 10 that have developed in the borrow ditches north and south of the Cattail Street alignment will be impacted by the road construction. The only structure is a maintenance shed at the north boundary that houses the sewer pump for Baxter Meadows. 204 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 4 of 10 2. Floodplains The proposed Four Points Subdivision is not included in the jurisdictional area of the floodplain regulations. The property is located on Panel 0804D of the Official FEMA Floodplain Maps, which is not a printed panel as it is designated as an area with no special flood hazards and not within the 100-year floodplains. 3. Groundwater Monitoring of groundwater conditions has been conducted across the site in 2014 via 15 monitoring wells, the locations and depths of which are shown in Section8 D. Between February 15th and June 24th, seven measurements were recorded in each well. Our monitoring has shown that the majority of the site is impacted by seasonal high groundwater within six feet of the ground surface. The average groundwater across the entire site over the duration of the monitoring period was 4.46 feet. The shallowest water was observed in the central-western part of the property at depths as shallow as 1.33 feet and an average depth of 2.57 feet over the monitoring period. The southeastern portion of the property also had notably shallow groundwater at depths as shallow as 2.03 feet and an average depth of 2.96 feet. Due to the site's high groundwater table, the construction of roads, utilities, and foundations will likely require temporary dewatering, the amount of which will depend on local conditions and the time of year that the construction commences. In order to prevent groundwater and moisture- related problems in the subdivision's homes, there will need to be restrictions with respect to the depth of crawl spaces and also the possible requirement of slab-on-grade foundations in certain areas of the subdivision. This will be determined once the roadways are designed. The subdivision covenants will include a section on minimum finished floor elevations (above street grades) to fully inform all property buys of the high groundwater. Central sewer and water, connecting to the City of Bozeman, are proposed for this project. This will minimize the potential for groundwater degradation. Channeling storm-water flows into detention basins will limit discharges to pre-development rates and will control surface water runoff. In addition, these basins will reduce the amount of sediments and contaminants within the surface runoff, thus limiting the potential for contamination of downstream aquifers. 4. Geology; soils; slopes. A geotechnical report for the property prepared by Allied Engineering is provided in Section 10B. 205 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 5 of 10 5. Vegetation The parcel has over 17 acres of diverse wetland and waterways vegetated with grasses, sedges, rushes, willows and may other wetland species. Otherwise, the site is grassland area that is heavily infested with noxious weeds. Noxious weeds shall be controlled as directed by the approved Gallatin County Weed Control District Management Plan. A map of the noxious weed infestation is provided with the approved Noxious Weed Management Plan in Section 7B. The project will preserve approximately 15 out of 17 acres of wetlands delineated on the property in 2013, and all impacted wetland areas will be mitigated for off-site. Appropriate setbacks will be applied to all sensitive areas such as wetlands and streams to preserve these critical areas. To protect vegetation from construction impacts, construction will be completed during mid-summer following peak surface water flows and Best Management Practices will be placed between the edge of the right-of-ways for road construction and any wetlands, streams or spring ditches. 6. Wildlife. The Department of Fish, Wildlife & Parks has evaluated the site and has reported that the site may host deer, foxes, raptors, pheasants, and other birds. FWP's principle concern is for impacts to fish, as is typical for this type of development and its potential to harm local waterways. FWP recommends avoiding the following: activity near surface waters, disturbance of riparian or wetland vegetation, and situations that might deliver pollutants to surface water. A letter from FWP with more detailed discussion is provided in Section 4. Effects from human activity will be minimal because the site does not contain significant wildlife aside from in the wetlands and watercourse areas, which will be substantially preserved. The subdivision is subject to the City of Bozeman animal control laws that require licensing of pets and leashes on dogs. All the lands included in all streets, avenues, alleys and public parks or public squares shall be donated to the City of Bozeman for public use and enjoyment, providing additional public access to the area. 206 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 6 of 10 7. Historical features According to Larry Lahren, Ph.D. of Anthro Research Inc., the entire site is (was) a cultural resource site, with two areas in particular identified in the subject area: the Spring irrigation ditch system and the NPRR Low Line. These two sites may be significant to the broad patterns of our history as irrigation, agricultural development, and early transportation systems. However, field reconnaissance evaluations on July 16, 2014 indicated that subsequent surface, land modifications during the past 100 plus years have resulted in a lack of sufficient integrity to convey the significance. Therefore, Dr. Lahren suggests the proposed project will not adversely affect any National Register properties and recommends project approval. Protective measures of the two significant areas identified will include periodic monitoring during site preparation and construction. If cultural resources are discovered during this process, the will be evaluated in terms of National Register significance by the project archaeologist and a mitigation plan will be designed and implemented. Upon completion of the monitoring, a final report of findings and recommendations will be submitted to the Montana State Historic Preservation Office. The full written comments received from Dr. Larhen are provided in Section 10G with a plat overlay of the cultural resource evaluation area. 8. Agriculture There are no existing or proposed agricultural uses for this property, nor is the property part of a viable farm unit or was it under production during the last regular season. The property adjacent to the north of the Four Points Subdivision contains agricultural farm land, grazing cattle and a fence along the boundary. The fence is not on the Four Points Subdivision property and will continue to be maintained by the landowner. According to the Four Point Community Association Covenants, all pets shall be on a leash at all times when off the owner's property. All pets must be restrained and controlled when near ponds, creeks, in open space, in parks or on the trail system. 207 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 7 of 10 9. Agricultural water user facilities There are no existing or proposed agricultural water user facilities on the property. The Water of the US Delineation Report in Section 10A identifies the location, extent, and characteristics of the jurisdictional wasters of the United States located within the property. However, a correction must be noted for Section 1.1 of this report. The USGS map shows the Spring Ditch, a perennial stream, diverging from the Farmer's Canal as stated in the report, however this map appears to be out of date. A review of Google Earth as well an onsite review by Barbara Vaughn, environmental specialist, shows that Spring Ditch arises from a culvert north of Oak Street and southeast of the Regional Park. It appears to be fed by historic drain tiles located on the property south of where the channel starts. The source of the Section Line ditch is the Farmer's Canal approximately 2 miles south of the site, as originally stated in Section 1.1 of the report. Although the Farmer's Canal is an agricultural water source, the water on site will not be used for agriculture, nor will there be any impact to agricultural water user facilities as a result of this subdivision. Comments from the Farmer's Canal representative regarding the proposed subdivision have been included in Section 4 Agency Letters & Responses. 10. Water and sewer New water and wastewater infrastructure will be installed on site to serve the development's residents. The new infrastructure will require connection to the existing City-owned water and wastewater facilities installed as part of the Baxter Meadows Subdivision. There are existing water and sewer mains in Ferguson Avenue, Cattail Street, Kimberwicke Street, as well as running north-south through the site. The design these Baxter Meadows Subdivision facilities accounted for the development of the proposed Lot 2A1, so adequate capacity already exists in the system for the additional demands resulting from the development of Lot 2A1. The Baxter Meadows Subdivision water and wastewater design report is provided in Section 10 C & D. 11. Stormwater management A stormwater management plan is included in Section 10E. The system is designed to remove solids, silt, oils, grease and other pollutants from the runoff from the private and public streets and all lots. The lots will remain under one owner and the storm water detention facilities will be located within easements. 208 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 8 of 10 12. Streets, roads and alleys The proposed subdivision requires the extension of Cattail Street approximately 2,670 feet west of Davis Lane to Ferguson Avenue, centered along the northern property boundary of the site (COS 2202C, Lot 2A1) and within a 90 foot wide easement. Currently, a gravel roadway exists where Cattail Street is to be extended. Upon full construction, the Cattail Street extension will be 48 feet wide from TBC to TBC, however the developer is only building approximately two- thirds of southern portion of the street. The northern third of the street will be built with the development of the adjacent land to the north. The developer will build Cattail Street from south to north as follows: a 6' sidewalk, a 14' boulevard (5' boulevard along wetlands), 24' pavement section from TBC to centerline (10.5' drive lane, 5' bike lane, 8' parking lane to face of curb), and 11' pavement section from centerline to the northern edge of pavement. Impacted wetlands will be mitigated off-site. A portion of Kimberwicke Street on the south-eastern part of the property will be extended in a future phase approximately 743 feet east to connect with Davis Lane. Kimberwicke will be extended to provide continuity with the existing design along the southern boundary of the site. It will be 35 feet wide from TBC to TBC with a 6.5 foot wide boulevards and 5 foot wide sidewalks along north side of the street. The Kimberwicke extension will impact approximately 4500 square feet wetland #1, which will be mitigated for off-site. Ferguson Avenue will also be paved from Kimberwicke Street approximately 883 feet north to the Cattail Street Extension. Currently, this portion of the roadway is asphalt millings. Upon full construction, Ferguson Ave will be 48’ wide from TBC to TBC within a 90' wide easement, however the developer is only building approximately two-thirds of the eastern portion of the street. The western third will be built in the future. The developer will build Ferguson Ave from east to west as follows: a 6' sidewalk, a 14' boulevard, 24' of roadway from TBC to centerline (10.5' drive lane, 5' bike lane, 8' parking lane to face of curb), and 11' of roadway from centerline to the western edge of pavement. Three local streets will be constructed throughout the project to provide resident access to Kimberwicke and Cattail Streets. There will be no direct local street access to Davis Lane from the subdivision. The three local streets will all be 35 feet wide from TBC to TBC within a 60' ROW and will total approximately 2885 feet of new roadway. There will be a roundabout at the intersection of two of the local streets to aid in traffic flow and control. All local streets will also have 6.5 foot wide boulevards and 5 foot wide sidewalks on either side of the street. All roads are designed per Montana Public Works Standard Specification with the City of Bozeman Modifications as well as the Montana Department of Transportation Standards. 209 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 9 of 10 All construction activities in the area will be required to have adequate dust control and erosion control practices based on City and MDEQ standards. Temporary erosion control will also be provided at dead ends of streets between each phase of construction. All interior local roads will be constructed by the developer and maintained through construction. Upon acceptance of road improvements, these roads will be maintained by the City of Bozeman. A Preliminary Traffic Impact Study has been prepared by Marvin & Associates for the subdivision and is provided in Section 10H. At the present time, platting documents have not advanced to a stage where definitive residential development numbers are available. Therefore, exact trip generation numbers cannot be developed to determine relative traffic impacts. The trip generation attributable to the Four Points Subdivision is estimated to be between 3,000 and 5,000 ADT. The greatest potential impacts would be at Davis Lane intersections as the highest volumes of subdivision traffic would access Davis Lane. It is likely that mitigating measures may be required at the intersection of Davis Lane and Baxter Lane. Additionally, left turn lanes on Davis Lane at the intersections of Kimberwicke Street and Cattail Lane will likely be warranted in the future. Stop control on minor streets will facilitate the operation of these intersections at acceptable levels of service. Current conditions have been estimated, and subsequent information will contain new traffic data, trip generation numbers, and supporting calculations. 13. Utilities There are existing private utilities in Cattail Street, Ferguson Avenue and Kimberwicke. Northwestern Energy has been contacted to ensure electricity and natural gas service to the subdivision. A copy of the preliminary plat has been sent for review and comment. In addition, Northwestern has advised that they will work concurrently and in cooperation with other utilities and services, including telephone, internet, and cable TV providers to provide for their respective infrastructure in joint utility trenches. All utilities will be located underground and per the City of Bozeman Standards. 14. Educational facilities A letter from the Bozeman Public Schools Director of Facilities, Todd Swinehart, is included in Section 4. This letter discusses the school system's ability to accommodate the increased enrollment as a result of Four Points Subdivision. 210 Four Points Subdivision Preliminary Plat Supplemental Information Narrative Page 10 of 10 15. Land use The 54.28-acre property is currently vacant land with zoning of R-3 (Residential Medium Density) and R-4 (Residential High Density). The developer wishes to subdivide the land into 5 lots for the purpose of creating multi-family housing with an emphasis on park space and wetlands habitat. The proposed configuration of the minor subdivision is illustrated on the Preliminary Plat provided in Appendix 9A. Lots 1 & 2 will be developed in Phase I of the project, with Lot 1 being open park space (5.36± net acres) and Lot 2 being R3 (2.64± net acres). Lot 3 will be developed as R4 (2.83± net acres) in Phase II. Lot 4 (2.46± net acres) and Lot 5 (12.8± net acres) will be developed as R4 in future phases. The exact types of multi-family housing structures is yet to be determined. 16. Parks and recreation facilities. The required information is provided in the Park Master Plan & Parkland Dedication Summary in Section 7A. 17. Neighborhood center plan. The neighborhood center plan is provided in the Park Master Plan & Parkland Dedication Summary in Section 7A. 18. Lighting plan A lighting plan with the required information is provided in Section 10I. 19. Miscellaneous The subdivision will not affect access to public lands nor are any health or safety hazards on or near the subdivision. 20. Affordable housing Currently, the City of Bozeman does not require “Workforce Housing” with land development. 211 212 213 214 215 216 217 218 219 220 221 222 223 224 Symbol Plant Name (Scientific)Size @ Planting Mature Size Qty Plant Table Emerald Lustre Maple Acer platenoides) Littleleaf Linden (Tilia cordata) Skyline Honeylocust (Gleditsia triacanthos v. Inermis) Colorado Spruce (Picea pungens) 27 10 28 12 1.5-2"50-60' 1.5-2"40-50' 1.5-2"50-60' 8-10'50-60'Four Points Subdivision50 Bronco DriveBozeman, Montana 59718ph 406.539.7030e-mail:customearthdesigns@gmail.compg 1 of 1Date: 20 July 2014Revised: Park Master Plan ConceptProject for: Bozeman, MontanaChad Rempfer, Landscape DesignerC:\Users\Chad\Desktop\Custom Earth Designs\logo\ced_logo.jpgScale 1"=40'-0" Typical Boulevard Planting plan Scale 1"=20'-0"Date: 12 August 2014Revised: October 2014 225 CATTAIL STREETDETENTION POND #1 PLANFIGURE L1.1MADISON ENGINEERING895 TECHNOLOGY BLVD., SUTIE 203 BOZEMAN, MT 59718PHONE (406) 586-0262 FAX (406) 586-5740FOUR POINTS SUBDIVISIONSTORMWATER DETENTION POND #1BOZEMAN, MTDETENTION POND TYPICAL SECTION1" =0SCALE30'601530226 CATTAIL STREETDETENTION POND #2 PLANFIGURE L1.0MADISON ENGINEERING895 TECHNOLOGY BLVD., SUTIE 203 BOZEMAN, MT 59718PHONE (406) 586-7355 FAX (406) 586-7357FOUR POINTS SUBDIVISIONSTORMWATER DETENTION POND #2BOZEMAN, MTDETENTION POND TYPICAL SECTION1" =0SCALE50'10025100227 228 229 230 231 232 233 234 235 236 237 FERGUSON AVENUE CATTAIL STREETDAVIS LANESTREET AKIMBERWICKE ST.DETAIL1 ENV1.0TYPICAL CATTAIL STREET ROADWAY SECTIONPLANWATERS OF THE U.S.1" =0SCALE100'20050100WETLAND IMPACTSWATERS OF THE U.S. IMPACTSSHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXOFFOUR POINTSWETLANDSFOUR POINTS - MAJOR SUBDIVISION WATERS OF THE U.S. IMPACTS BOZEMAN, MTENV1.0238 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com Chris Budeski, P.E. Madison Engineering 895 Technology Blvd. Bozeman, MT 59718 July 15, 2014 Re: Four Points Minor Subdivision Preliminary TIS Please allow this letter to serve as a preliminary Traffic Impact Study (TIS) for the above noted development. The Four Point Minor Subdivision lies within the Baxter Meadows Subdivision, which was originally planned in the 1990s. Numerous traffic impact studies and TIS updates have been completed for subsequent subdivision phases of the subdivision’s master plan. At the present time, all of the land within Four Points Subdivision is vacant. However, apartments are currently under construction south of Kimberwicke Street, east of Vaquero Drive and developers are currently in the process of platting an update to Baxter Meadows Phase 2 property south of Kimberwicke Street, between Caballo Avenue and Davis Lane. At the present time, platting documents have not advanced to a stage where definitive residential development numbers are available. Therefore, exact trip generation numbers can’t be developed to determine relative traffic impacts. When exact development numbers are available in the coming weeks, a final TIS will be completed. Four Point Subdivision is located in the northeast corner of the Baxter Meadows Subdivision and would access Davis Lane to the east, via Cattail Lane and Kimberwicke; Ferguson Avenue to the west; an extension of Cattail Lane to the North; and Ferguson Avenue and Vaquero Parkway to the North. Current City of Bozeman Traffic Impact Study standards require that all major intersections within a one half mile distance of the subdivision be assessed for potential impacts. Thus, intersections that could have potential impacts would be the intersections of Baxter Lane and Davis Lane, Ferguson Avenue and Baxter Lane, Cattail Lane and Davis Lane, as well as Kimberwicke Street and Davis Lane. Existing Conditions The current average daily traffic (ADT) volumes on potentially impacted streets are: Davis Lane – North of Baxter Lane = 4,350 South of Baxter Lane = 4,300 Baxter Lane – West of Davis Lane = 4,000 East of Davis Lane =4,350 Ferguson Avenue = 600 The intersection of Baxter Lane and Davis Lane was recently converted from two-way stop control to four-way stop control based upon the TIS for the Baxter 239 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com Meadows Phase 4 subdivision. The intersection of Ferguson Avenue and Baxter Lane is a three legged, single lane roundabout that can accommodate substantially more traffic than currently exists. Trip Generation Trip generation attributable to the Four Point Subdivision is estimated to be between 3,000 and 5,000 ADT based upon the total land area and variable density levels that could be developed Trip Distribution Distribution of trips would be approximately 30% of the trips to and from the north, 25% to and from the south, 25% to and from the east, and 20% to and from the west. Traffic Assignment The highest volumes of subdivision traffic would access Davis Lane and thus, the highest potential for impacts would be at Davis Lane intersections. Conclusions Given the moderate to high magnitude of trip generation potential associated with this subdivision and potential for impacts on Davis Lane, it is likely that some mitigating measures may be required at the intersection of Davis Lane and Baxter Lane. Since the intersections of Kimberwicke Street and Cattail Lane with Davis Lane will be primary accesses to the subdivision, it is speculated that stop control on the minor streets will allow those intersections to operate at acceptable levels of service. However, left-turn lanes on Davis Lane at both intersections would likely be warranted. Current conditions have been estimated and no other definitive calculations have been performed for the preliminary TIS. Subsequent information will contain new traffic data, trip generation numbers, and supporting calculations. If there are any clarifications or information required at this time, feel free to contact me. Sincerely, Robert R. Marvin, P.E., P.T.O.E. 240 241 242 243 244 245 246 247 248 249 250 251 252 253 _______________________________________________________________________________________________________ July 22, 2014 Brianna Baker, EI Madison Engineering, Inc. 895 Technology Blvd, STE 203 Bozeman, Montana 59718 Via email: brianna@mad-eng.com Subject: Proposed Four Points Subdivision Phase 1 & 2 Tract 2A1 of COS 2202C, N ½ of the SE ¼ of Section 34, Township 01 South, Range 05 East, P.M.M. Dear Ms. Baker, Referencing your letter sent July 15th, 2014 concerning the evaluation of the subject development. We would expect that the developed area for Lots 2 & 3 (comprising 5.47 acres total) could produce 35 multi-family units and would generate the following students:  Pre-K-5 8 Students  6-8 4 Students  9-12 6 Students This does not include the development of Lot 1 (comprised of 5.36 acres) which is being set aside as open park space. As of this date, the proposed development will be in the Meadowlark Elementary School, Chief Joseph Middle School and Bozeman High School attendance areas. Population growth and demographic shifts in the future may necessitate boundary realignments to existing schools which could modify the designated attending schools. Similarly, if a designated school attendance area’s student population exceeds the school’s capacity; attendance at an alternate school may be required. Infrastructure, such as sidewalks, should be constructed for the entire project irrespective of when actual homes are developed to provide a Safe Route to School pathway for students to safely traverse the developed and existing roadways. Our existing bus system can accommodate the estimated number of additional students. Please let us know if there are any changes to the proposed development as this could modify the above student projections. Sincerely, _________________________ Todd Swinehart, PE cc: Steve Johnson, Deputy Superintendent of Operations – Bozeman Public Schools Vance Ruff, Transportation Coordinator – Bozeman Public Schools Todd Swinehart, PE Director of Facilities (406) 522-6009 todd.swinehart@bsd7.org Bozeman Public Schools 404 West Main, PO Box 520 Bozeman, MT 59771-0520 www.bsd7.org 254 Dear Ms. Baker; Thank you for the ability to comment on the proposed Four Points minor subdivision. The subdivision is located near existing development, but may host deer, foxes, raptors, pheasants, and other birds. We applaud the interest in keeping existing wetlands and open space, and encourage developers to retain existing vegetation undisturbed as much as possible. If present on the sites, mature cottonwoods should be retained for raptor perching and nesting. Based on the materials you have provided, our principle concern for impacts to fish at this time is generic to this type of development and its potential to harm local waterways. In general you should plan to avoid any activity (road building and associated infrastructure, building construction, utility placement) near surface waters that might destabilize existing channel configurations. You will want to avoid disturbing riparian or wetland vegetation. And you will want to avoid situations that might deliver pollutants to surface waters as can happen for example when paved surfaces concentrate oil or other petroleum products that can be washed into channels by rain or snowmelt. Drainage within the development is a critical consideration to avoid increasing sediment or other contaminants that might be delivered to local waterways. Julie Cunningham FWP Wildlife Biologist 406-994-6341 juliecunningham@mt.gov Michael W. Vaughn FWP Fisheries Biologist 406-994-6938 mvaughn@mt.gov 255 256 257 258 259 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 BAXTER MEADOWS SUBDIVISION PHASE I BOZEMAN ELEMENTARY DISTRICT NO 7 404 W MAIN ST BOZEMAN, MT 59715-4579 CERTIFIED MAIL NE1/4 & E1/2 E1/2 NW 1/4 SECTION 34 T01S R05E GEORGE E WESTLAKE 15008 SE GRAHAM RD VANCOUVER, WA 98683-8541 CERTIFIED MAIL CATTAIL CREEK SUBDIVISION PHASE 2A & 2B BLOCK 11 LOT 4 JASON W ROYLANCE 125 LAKE CREEK RD SALMON, ID 83467-5136 BLOCK 11 LOT 5 ELAINE S LOCATI 20 CLOVER VIEW DR HELENA, MT 59601-0251 CERTIFIED MAIL S1/2 N1/2 E1/2 NW 1/4 SW1/4 SECTION 35 T01S R05E RONALD AAFEDT PO BOX 375 HARDIN, MT 59034-0375 CERTIFIED MAIL S1/2 NW 1/4 SW1/4 SECTION 35 T01S R05E LARRY D KIRKPATRICK & KAREN LANZ 6496 DAVIS LN BOZEMAN, MT 59718-8863 CERTIFIED MAIL TRACT IN W1/2 SW 1/4 SECTION 35 T01S R05E PURINTON & CO INC PO BOX 20777 BILLINGS, MT 59104-0777 BAXTER MEADOWS SUBDIVISION PHASE 2B BAXTER MEADOWS APARTMENTS LLC 9980 S 300 W STE 310 SANDY, UT 84070-3654 CERTIFIED MAIL BAXTER MEADOWS PHASE 2C & 2D RECORD OWNER WBC LP PO BOX 11060 BOZEMAN, MT 59719-1060 CERTIFIED MAIL BLOCK 10 LOT 1 CHRISTOPHER D & JENNAE C LIBERTY 2490 LASSO AVE BOZEMAN, MT 59718-8039 CERTIFIED MAIL BLOCK 10 LOT 2 MICHAEL W & KATHRYN J HETHERINGTON 2472 LASSO AVE BOZEMAN, MT 59718-8039 BLOCK 10 LOT 3 DONALD W OLSSON PO BOX 10025 BOZEMAN, MT 59719-0025 260 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 BLOCK 10 LOT 7 SETH J & LISA C HEDGE 2493 FERGUSON AVE BOZEMAN, MT 59718-8052 CERTIFIED MAIL BLOCK 10 LOT 8 JUSTIN ROBERT PRIGGE 2479 FERGUSON AVE BOZEMAN, MT 59718-8052 BLOCK 10 LOT 9 CHAD A ERIKSSON 2451 FERGUSON AVE BOZEMAN, MT 59718-8052 BAXTER MEADOWS SUBDIVISION PHASE 6 BLOCK 14 LOT 5 DALLAS FINANCIAL LLC 2504 W MAIN ST STE I PMB 140 BOZEMAN, MT 59718-3966 CERTIFIED MAIL BLOCK 15 LOT 1 JACOB J NELSON 1045 REEVES RD STE E BOZEMAN, MT 59718-7701 CERTIFIED MAIL BLOCK 15 LOT 2 CHRISTINE L KOCH 2488 FERGUSON AVE BOZEMAN, MT 59718-8052 BLOCK 15 LOT 3 MICHAEL V & JORDAN MICHAEL PRESTER 3696 BATCHWEAVE RD BELGRADE, MT 59714-8668 BLOCK 15 LOT 4 WYATT A HICKS 2454 FERGUSON AVE BOZEMAN, MT 59718-8052 BLOCK 15 LOT 5 CHERYL J ECKYL 2442 FERGUSON AVE BOZEMAN, MT 59718 BLOCK 15 LOT 11 S & P FINANCIAL LLC 2504 W MAIN ST STE I PMB 140 BOZEMAN, MT 59718-3966 CERTIFIED MAIL BLOCK 15 LOT 12 MICHAEL T VIVIAN & REGINA A CAROLAN 2487 MILKHOUSE AVE BOZEMAN, MT 59718 BLOCK 15 LOT 13 MITCHELL KANE URDAHL 2479 MILKHOUSE AVE BOZEMAN, MT 59718-7355 BLOCK 15 LOT 14 SHANA SKRADSKI 2465 MILKHOUSE AVE BOZEMAN, MT 59718-7355 BLOCK 15 LOT 15 RONALD S & SHANEY B EVANS 2451 MILKHOUSE AVE BOZEMAN, MT 59718 261 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 BLOCK 16 LOT 1 LELAND, PAULA & CORRIE KRUGERUD 1541 SEYMOUR LAKE RD WISE RIVER, MT 59762 CERTIFIED MAIL BLOCK 16 LOT 2 TRAVIS & TERESA VERGE 3874 KIMBERWICKE ST BOZEMAN, MT 59718 CERTIFIED MAIL BLOCK 16 LOT 3 JOE OWENS 3858 KIMBERWICKE ST BOZEMAN, MT 59718-5702 CERTIFIED MAIL BLOCK 16 LOT 4 COLLIN ALLEN McCULLOUGH 3834 KIMBERWICKE ST BOZEMAN, MT 59718-5702 CERTIFIED MAIL BLOCK 16 LOT 5 TRENTON J & ALISA LISTER 3814 KIMBERWICKE ST BOZEMAN, MT 59718 CERTIFIED MAIL BLOCK 16 LOT 6 JERRY L & CONNIE L & AMANDA J OLSON 320 ERICKSON GATE LEE, IL 60530-9727 BLOCK 16 LOT 7 HILLARY A SMITH 2477 GALLATIN GREEN BLVD BOZEMAN, MT 59718-7379 BLOCK 16 LOT 8 CODY & MONIQUE WENZEL 2467 GALLATIN GREEN BOULEVARD BOZEMAN, MT 59718 BLOCK 16 LOT 9 BRIAN & KERI THORPE 2459 GALLATIN GREEN BOULEVARD BOZEMAN, MT 59718 BLOCK 16 LOT 18 PAMELA SUSAN HEPOLA 50 E RIVERCREST DR HOUSTON, TX 77042-2501 BLOCK 16 LOT 19 MATTHEW WIELAND 2482 MILKHOUSE AVE BOZEMAN, MT 59718-7355 BLOCK 16 LOT 20 TREVOR SMITH 82 MAKENNA CT BOZEMAN, MT 59718-6639 BLOCK 16 LOT 23 MICHAEL STEVEN BARRETT 2448 MILKHOUSE LANE BOZEMAN, MT 59718 CATTAIL CREEK SUBDIVISION PHASE 2A BLOCK 10 LOT 1 WHISPERING PINES CONDOS: RECORD OWNER WARBLER DEVELOPMENT LLC PO BOX 10968 BOZEMAN, MT 59719 CERTIFIED MAIL 262 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 UNIT #1 JESSICA SORENSON 2920 4TH AVE S GREAT FALLS, MT 59405-3139 CERTIFIED MAIL UNIT #2 NB RENTAL LLC 449 12TH AVE SW SIDNEY, MT 59270 CERTIFIED MAIL UNIT #3 STERLING TRUST COMPANY CUSTODIAN 6800 PATTERSON RD BOZEMAN, MT 59715-7827 CERTIFIED MAIL UNIT #3 KIMBERLY MEYER 6800 PATTERSON RD BOZEMAN, MT 59715-7827 CERTIFIED MAIL UNIT #3 JEFFERY MEYER 6800 PATTERSON RD BOZEMAN, MT 59715-7827 CERTIFIED MAIL UNIT #4 WILLIAM D & TAMARA K VANDENBOS 453 FRANCES HEIGHTS RD VALIER, MT 59486 CERTIFIED MAIL UNIT #5 LEIF E & SHARON S CHRISTIANSEN 43 NAFTZINGERTOWN RD MOHRSVILLE, PA 19541-9782 CERTIFIED MAIL UNIT #6 CHRISTOPHER HAYDEN 2663 TYPHA CT, UNIT 6 BOZEMAN, MT 59718 CERTIFIED MAIL UNIT #7 MICHELE L SNOWBERGER PO BOX 1295 BELGRADE, MT 59714-1295 CERTIFIED MAIL UNIT #8 CHARLES SENNER, INC. 3003 ARBUCKLE LN SPRING HILL, TN 37174-5211 CERTIFIED MAIL UNIT #9 RUTH NOEMI ROSALES GARCIA 3333 TURTLE CREEK DR APT 324 PORT ARTHUR, TX 77642-8088 CERTIFIED MAIL UNIT #10 LOGAN J & KRISTEN R SCHELVAN 2621 TYPHA CT, UNIT 10 BOZEMAN, MT 59718-7173 CERTIFIED MAIL UNIT #11 TIMOTHY B ARMFIELD 2621 TYPHA CT, UNIT 11 BOZEMAN, MT 59718-7173 CERTIFIED MAIL UNIT #12 JAMES & AZURE TARPEY 281 SADDLE PEAK CIR BOZEMAN, MT 59715-8440 CERTIFIED MAIL 263 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 UNIT #13 BRIAN KILBURN 2608 TYPHA CT, UNIT 13 BOZEMAN, MT 59718-7179 CERTIFIED MAIL UNITS #14 & #15 GARRETT & EMILY KRUSHEFSKI 3209 LILY DR BOZEMAN, MT 59718-6089 CERTIFIED MAIL UNIT #16 FRAISER DANFORTH OPEL 2420 NW QUIMBY ST, APT 10 PORTLAND, OR 97210-2661 CERTIFIED MAIL UNIT #16 GORDON LEE OPEL 2420 NW QUIMBY ST APT 10 PORTLAND, OR 97210-2661 CERTIFIED MAIL UNIT #17 JULIA B. ROBERTS 2642 TYPHA CT, UNIT 17 BOZEMAN, MT 59718-7180 CERTIFIED MAIL UNIT #18 DANIEL & DAWN MILLER 638 McCOY RD BELT, MT 59412 CERTIFIED MAIL UNIT #19 ERICA N & GWENETTE L PERRY 2642 TYPHA CT, UNIT 19 BOZEMAN, MT 59718-7180 CERTIFIED MAIL UNIT #20 JEFFERY D & NANCY E BINGMAN PO BOX 160003 BIG SKY, MT 59716-0003 CERTIFIED MAIL UNIT #21 CHARLES JOHN TURNER 4040 S MOUNTAIN VIEW RD MOLT, MT 59057-2157 CERTIFIED MAIL UNIT #22 LAVERNE SORENSON 2694 TYPHA CT, UNIT 22 BOZEMAN, MT 59718-7181 CERTIFIED MAIL UNIT #23 JACKIE A KASTELITZ 2694 TYPHA CT, UNIT 23 BOZEMAN, MT 59718-7181 CERTIFIED MAIL UNIT #24 LINDA & JAMES CLARK PO BOX 524 BOZEMAN, MT 59771 CERTIFIED MAIL 264 Four Points Subdivision COS 2202C Lot 2AI Adjoiner's List July 21, 2014 CATTAIL CREEK SUBDIVISION PHASE 2A & 2B CORNERSTONE CONDOMINIUMS: EVERT WIERDA & JAMES WIERDA 13707 CAMP CREEK ROAD MANHATTAN, MT 59741 UNIT #2714A BRENT R & CALLAN M NAGY 2714 FEN WAY APT A BOZEMAN, MT 59718 UNIT #2714B TENEEA HYAMS 26 N PLUM CREST CIRCLE SPRING, TX 77382 UNIT #2714C KATHRYN A BUSHNELL & JENNIFER FLINT 2714 FEN WAY APT C BOZEMAN, MT 59718 UNIT #2728A CHRISTIAN GURLEY 2728 FEN WAY AVE, APT A BOZEMAN, MT 59718 UNIT #2728B STEPHEN PATRICK YOUNG 2728 FEN WAY APT B BOZEMAN, MT 59718 UNIT #2728C ANNE WANGSGARD & CRAIG GAGNE 65 DRIFTER DRIVE BOZEMAN, MT 59718 UNIT #2728D SEAN F & ELIZABETH A SMITH 13 WITHERSPOON ST WHITE HOUSE STATION, NJ 08889 265 266 Piezometer Well Ground Elevation 02.15.14 04.01.14 04.08.14 04.26.14 05.09.14 05.21.14 06.24.14 Average #1 4694.44 6.75 5.32 5.68 6.07 4.37 4.35 4.75 5.33 #2 4695.18 6.50 4.33 4.72 5.05 5.13 5.16 5.33 5.17 #3 4694.36 5.50 1.33 1.82 2.30 2.21 2.26 2.55 2.57 #4 4698.12 6.00 3.74 4.39 4.79 4.85 4.67 4.74 4.74 #5 4699.24 5.50 3.76 4.12 4.51 4.44 4.42 4.55 4.47 #6 4698.7 5.50 3.97 4.28 4.28 4.38 4.38 4.33 4.45 #7 4694.62 5.75 2.16 2.53 2.78 2.71 2.72 2.88 3.08 #8 4700.7 6.25 5.90 6.23 5.28 5.81 5.48 4.82 5.68 #9 4697.68 6.00 3.58 4.10 3.75 4.10 4.08 3.84 4.21 #10 4692.52 6.00 2.39 2.87 3.07 3.02 3.13 3.29 3.40 #11 4696.41 5.50 3.96 4.65 4.50 4.50 4.59 4.55 4.61 #12 4697.98 6.50 4.73 5.17 4.97 5.04 5.05 5.19 5.24 #13 4699.33 6.25 4.74 5.26 4.88 4.99 4.99 5.03 5.16 #14 4702.27 7.00 5.48 5.71 5.46 5.78 5.70 5.66 5.83 #15 4701.13 4.00 2.03 2.48 2.93 2.94 3.12 3.19 2.96 Four Points Major Subdivision Groundwater Depths Depth Below Ground Elevation 267