REPORT TO: Honorable Mayor and City Commission
FROM: Tim Cooper, Assistant City Attorney Wendy Thomas, Director of Community Development
SUBJECT: Authorize the Director of Public Works to approve the Southbridge Phase 3
Subdivision Final Plat, Application P14038
MEETING DATE: October 6, 2014
AGENDA ITEM TYPE: Consent
RECOMMENDATION: That the City Commission approve the Final Plat for the Southbridge Phase 3 Major Subdivision Final Plat, Application P14038 and authorize the Director of Public Works to
execute the same on behalf of the City of Bozeman upon review and approval by the City Attorney’s
Office.
BACKGROUND: On April 25, 2011, the City Commission approved the findings of fact completing
the preliminary plat approval to subdivide 34.966± acres together with the required supplementary plans and information to create eighty-three (83) single-household residential lots, two (2) multi-family
residential lots, one (1) neighborhood center and the remaining area as parks, open spaces, streets and
alleys. The developer has applied for final plat review and approval for the third and final phase of
Southbridge Phase II (Meadow Creek Phase II) subdivision. The preliminary plat was unanimously
approved (5:0) by the City Commission on March 21, 2011.
Staff has concluded that all terms and conditions of the preliminary plat approval have been met. An
improvements agreement has been completed for the future installation of sidewalks, park
improvements, and completion of seeding. The appropriate financial guarantee has been received.
UNRESOLVED ISSUES: None determined at this time.
ALTERNATIVES: 1) Approve the final plat as presented and recommended.
2) Deny the final plat.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the
property.
Attachments: Staff Memo; Final Plat
Report compiled on August 28, 2014
Commission Memorandum
1
163
CITY OF BOZEMAN
DEPARTMENT OF COMMUNITY DEVELOPMENT
Alfred M. Stiff Professional Building
20 East Olive Street
P.O. Box 1230
Bozeman, Montana 59771-1230
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net
MEMORANDUM
TO: TIM COOPER, CITY ATTORNEY’S OFFICE STACY ULMEN, CITY CLERK
FROM: TOM ROGERS, AICP
SUBJECT: FINAL PLAT REVIEW FOR THE SOUTHBRIDGE PHASE 3 MAJOR
SUBDIVISION, PLANNING FILE NO. P14038
DATE: SEPTEMBER 178, 2014
Madison Engineering, Inc., on behalf of Southbridge Development, LLC, (Applicant), have made
application to the City of Bozeman Department of Community Development for Final Plat review and
approval for the Southbridge Phase 3 Major Subdivision, a 35 lot subdivision.
The City Commission granted preliminary plat approval to subdivide 34.966 acres to create a subdivision with eighty-three (83) single-household residential lots, two (2) multi-household residential
lots, one (1) neighborhood center and the remaining area as parks, open spaces, streets and alleys.
Attached is a copy of the signed Findings of Fact and Order dated March 21, 2011. An Improvement
Agreement is required for this subdivision for the installation of sidewalks and Interim Park
Landscaping and the associated playground equipment. All other necessary infrastructure improvements are constructed.
Based on the summary review provided below the Development Review Committee, the City
Engineering’s Department and Department of Community Development have reviewed the application
against the conditions of preliminary plat approval; and as a result, find that the final plat application
may be approved by the City Commission.
Three (3) original mylars of the Final Plat, original Platting Certificate, copy of the property owner
association documents and a copy of the Findings of Fact and Order are attached for your review. The
property owner’s association documents and other applicable documents will be recorded and filed with
the final plat at the Clerk and Recorder’s Office.
The Community Development staff respectfully requests that you prepare a City Attorney's Certificate using the attached original Platting Certificate; approve the Certificates of Director of
Public Works and Certificate of Completion "as to form". The final City signatures will be obtained
once the City Commission has approved the final plat.
A complete application was submitted to the Community Development Department on August 28, 2014.
Based on the applicant having submitted an application on July 10, 2014 for final plat review and approval, and further finding that after receiving supplemental information (Improvement Agreement
Development Review Division Policy and Planning Division Building Division
164
Application, fees, and Letter of Credit) the application was deemed complete on September 16, 2014,
the 45-day (working days) review period for this final plat would expire on November 20, 2014.
The conditions of preliminary plat approval, which are pertinent to this major subdivision, and how they have been met are described in the submittal materials. Two exceptions to this is that it was determined
that a subdivision improvements agreements are required for uninstalled sidewalks and park area
seeding. We have those agreements in hand and the financial guarantee was provided by irrevocable
standby Letter of Credit No. 2014531185 and 2014531186 from First Interstate Bank, 2800 West Main Street, P.O. Box 1890, Bozeman, MT 59771.
Note: The Community Development Department and Engineering Departments have also reviewed
the final plat application against the preliminary plat cited code provisions and found compliance
with these code requirements. The Engineering Department has also reviewed and approved the “closure” of the final plat.
Attachments: Three (3) Mylar Final Plats and One (1) Blackline Copy
Applicant’s Written Narrative and Complete Submittal Original Platting Certificate Signed Improvements Agreements
Copy of Findings of Fact and Order Waiver of right to Protest Park District
cc: file
Page 2
165
(406) 586-0262 | (406) 586-5740 FAX
Suite 203, bozeman, mt 59715
895 Technology Boulevard
PROJECT SURVEYOR:
DRAWN BY:
REVIEWED BY:
DATE:PROJECT NO.
Sec.T.R. 1/4
1 OF
SHEETSec.T.R. 1/4
586.4490 Fax
586.5599 Office
Bozeman, MT 59715
Suite B
1970 Stadium Drive,
3
SOUTHBRIDGE SUBDIVISION PHASE 3
City of Bozeman, Montana
Director of Public Works
_________________________________________________________
DATED this _____________ day of __________________, ____________.
review.
is excluded from the requirement for Montana Department of Environmental Quality
facilities. Therefore, under the provisions of §76-4-125(2)(d) MCA, this subdivision
and can be provided with adequate storm water drainage and adequate municipal
of the Bozeman growth policy which was adopted pursuant to §76-1-601 et seq., MCA,
City of Bozeman, Montana, a first-class municipality, and within the planning area
Gallatin County, Montana, is within the Southbridge Subdivision Phase 3,
DEPARTMENT OF ENVIRONMENTAL QUALITY REVIEW
CERTIFICATE OF EXCLUSION FROM MONTANA
City of Bozeman, Montana
Director of Public Works
_____________________________________________________________
DATED this _____________ day of __________________, ____________.
being dedicated to such use.
City of Bozeman for the public use of any and all lands shown on the plat as
conform to the law, approves it, and hereby accepts the dedication to the
the accompanying plat has been duly examined and has found the same to
I, Director of Public Works, City of Bozeman, Montana, do hereby certify that
CERTIFICATE OF DIRECTOR OF PUBLIC WORKS
Treasurer of Gallatin County
____________________________________________________
Dated this______ day of ___________, _______
and levied on the land to be surveyed have been paid.
examined and that all real property taxes and special assessments assessed
do hereby certify that the accompanying Subdivision Plat has been duly
I, _________________________the Treasurer of Gallatin County, Montana
CERTIFICATE OF COUNTY TREASURER
Clerk and Recorder of Gallatin County
____________________________________________________
Document Number ____________________
Records of the Clerk and Recorder, Gallatin County, Montana.
and recorded in Book ___________ of Plats on Page _______________,
at _________ o’clock ____.M. this _______ day of ___________
my office at:
Montana, do hereby certify that the foregoing instrument was filed in
I, ____________________Clerk and Recorder of Gallatin County,
CERTIFICATE OF CLERK AND RECORDER
A
NATNOM ROYEVRUS DNAL LANOISSEFORPDERETSI
GERNo. 13601 LS
GNAUCK
THOMAS
SB PH 3
064-728-14-14
NH
TG
TG
23 2 S.5 E.
and across each area designated on this plat as "Utility Easement" to have and to hold forever.
the construction, maintenance, repair and removal of their lines and other facilities in, over, under,
cable television, water or sewer service to the public, the right to the joint use of an easement for
whether public or private, providing or offering to provide telephone, electric power, gas, internet,
The undersigned property owners, hereby grant unto each and every person, firm or corporation,
and 23rd Avenues, Chipset Street and Blackwood Road.
dedicated to the public for which the city accepts responsibility for maintenance include 20th, 21st, 22nd
dedicated to public use. The lands included in all streets, avenues, alleys and parks or public squares
obligation to maintain the lands included in all streets, avenues, alleys and parks or public squares hereby
City accepts no responsibility for maintaining the same. The owners agree that the City has no
avenues, alleys, and parks or public squares dedicated to the public are accepted for public use, but the
for the public use and enjoyment. Unless specifically listed herein, the lands included in all streets,
parks or public squares shown on said plat are hereby granted and donated to the City of Bozeman
City of Bozeman, Gallatin County, Montana; and the lands included in all streets, avenues, alleys and
The above described tract of land is to be known and designated as Southbridge Subdivision Phase 3
SUBJECT to all easements of record or apparent from a visual inspection of the property.
containing 11.374 acres, more or less.
thence North 00 59’ 31" East a distance of 377.94 feet to the Point of Beginning
thence North 88 54’ 37" West a distance of 843.28 feet to an Alpine aluminum cap;
of South 75 05’ 54" West and a chord length of 99.18 feet to an Alpine aluminum cap;
having a radius of 180.00 feet, a central angle of 31 58’ 59", a chord bearing
thence southwest a distance of 100.48 feet along a tangential curve concave northwest
thence South 59 06’ 25" West a distance of 75.73 feet to an Alpine aluminum cap;
thence North 30 54’ 42" West a distance of 63.90 feet to an Alpine aluminum cap;
thence South 59 05’ 18" West a distance of 60.00 feet to an Alpine aluminum cap;
of North 27 40’ 00" West and a chord length of 24.91 feet to a a calculated position;
having a radius of 220.00 feet, a central angle of 06 29’ 23", a chord bearing
thence northwest a distance of 24.92 feet along a non-tangential curve concave southwest
thence North 89 56’ 53" West a distance of 158.43 feet to an Alpine aluminum cap;
thence South 00 03’ 06" West a distance of 352.28 feet to a calculated position;
thence South 88 55’ 36" East a distance of 135.16 feet to a Gaston yellow plastic cap;
thence South 04 53’ 54" East a distance of 41.97 feet to a Sanderson Stewart yellow plastic cap;
thence South 88 54’ 37" East a distance of 758.62 feet to a calculated position;
thence North 00 17’ 41" East a distance of 41.96 feet to an Alpine aluminum cap;
thence South 88 55’ 36" East a distance of 354.67 feet to a calculated position;
Subdivision Phase 2;
Beginning at an Alpine aluminum cap at the southwest corner of Remainder Tract A, of Southbridge
being more particularly described as follows:
Township 2 South, Range 5 East, Principal Meridian Montana (P.M.M), Gallatin County, Montana
with the Gallatin County Clerk and Recorder located in the Southeast One-Quarter of Section 23,
A portion of Lot 1 of the Amended Plat of Southbridge Subdivision Phase 2, on record
the following described tracts of land, to-wit:
subdivided and platted into lots, blocks, roads and alleys, as shown by this plat hereunto included,
We, the undersigned property owners, do hereby certify that we have caused to be surveyed,
CERTIFICATE OF DEDICATION
My commission expires 11/26/2015
Bozeman, MT 59715
895 Technology Boulevard
Residing at:
Notary Public for the State of Montana
Chris Budeski
Signature
______________________________________________
Witness my hand and seal the day and year herein above written.
Development L.L.C. and acknowledged to me that said L.L.C. executed the same.
to me to be the person who signed the foregoing instrument as a memeber of Southbridge
a Notary Public in and for said state, personally appeared Andrew D. Holloran, known
On this ______________day of _____________________________, 2014, before me,
County of _______________________)
s.s.
State of _________________________)
Andrew D. Holloran, Member Southbridge Development L.L.C.
By: ____________________________________________________
Southbridge Development L.L.C.
THIS SURVEY WAS PERFORMED FOR SOUTHBRIDGE DEVELOPMENT L.L.C.
THE PURPOSE OF THIS SURVEY IS TO CREATE A 32-LOT SUBDIVISION
STATE OF MONTANA
RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY,
SOUTHEAST ONE-QUARTER OF SECTION 23, TOWNSHIP 2 SOUTH,
OF SOUTHBRIDGE SUBDIVISION PHASE 2 LOCATED IN THE
A SUBDIVISION OF A PORTION OF LOT 1 OF THE AMENDED PLAT
FINAL PLAT - CERTIFICATES
Director of Public Works
______/______/2014______________________________________
Registration No. 10825 PE
Chris Budeski, PE
______/______/2014______________________________________
Member Southbridge Development L.L.C.
Andrew D. Holloran
______/______/2014______________________________________
infrastructure improvements, subject to the above indicated warranty.
the City of Bozeman, and the City hereby accepts possession of all public
The subdivider grants possession of all public infrastructure improvements to
for a period of two years from the date of acceptance by the City of Bozeman.
The subdivider hereby warrants against defects in these improvements
Sidewalks fronting private lots.2.
Seeding of public parks and boulevards fronting public parks and open spaces1.
the Improvements Agreement for Southbridge Subdivision Phase 3:
The following improvements have been financially guaranteed in accordance with
Street lighting6.
Public parks landscaping and irrigation5.
Boulevard sidewalks fronting public park and open spaces4.
Public alley including asphalt pavement3.
Public street roadways including curb, gutter and asphalt pavement2.
Water, sewer and storm services and mains1.
Installed Improvements:
accompanying this plat.
or financially guaranteed and covered by the improvements agreement
have been installed in conformance with the approved plans and specifications,
of this title or as a condition(s) of approval of Southbridge Subdivision Phase 3,
certify that the following improvements, required to meet the requirements
professional engineer licensed to practice in the State of Montana, hereby
I, Andrew D. Holloran, Subdivider, and I, Chris Budeski, a registered
CERTIFICATE OF COMPLETION OF IMPROVEMENTS
Montana Registration No. 13,601 L.S.
Thomas Gnauck, PLS
_______________________________
Dated this 14th day of August, 2014.
and the Bozeman Municipal Code.
the Montana Subdivision and Platting Act (MCA 76-3-101 through 76-3-625),
accompanying plat and as described in accordance with the provisions of
Southbridge Subdivision Phase 3, and platted the same as shown on the
certify that between March 22nd, 2013, and August 14th, 2014 I surveyed
I, Thomas Gnauck, the undersigned, Registered Land Surveyor, do hereby
CERTIFICATE OF SURVEYOR
166
(406) 586-0262 | (406) 586-5740 FAX
Suite 203, bozeman, mt 59715
895 Technology Boulevard N 00 59’ 31" E - 377.94’S 88 55’ 36" E - 354.67’
S 88 54’ 37" E - 758.62’
S 88 55’ 36" E - 135.16’S 00 03’ 06" W - 352.28’N 89 56’ 53" W - 158.43’
N 88 54’ 37" W - 843.28’
63.90’
N 30 54’ 42" W75.73’S 59 06’ 25" W
60.00’S 59 05’ 18" W
41.96’
N 00 17’ 41" E
41.97’
S 04 53’ 54" E
N 00 17’ 41" E - 260.03’S 88 54’ 37" E - 143.81’S 88 54’ 37" E - 154.97’
S 88 54’ 37" E - 514.43’
N 59 06’ 25" E - 105.72’S 30 54’ 42" E - 93.89’
S 30 54’ 42" E - 107.74’N 01 04’ 01" E - 130.01’S 88 54’ 37" E - 607.27’N 00 17’ 41" E - 88.04’75.84’N 06 43’ 10" E69.65’N 01 00’ 18" EN 00 24’ 13" W - 169.32’100.03’
S 88 54’ 37" E
100.03’
S 88 54’ 37" E
101.37’
S 88 54’ 37" E
98.63’
S 88 54’ 37" E
97.68’
S 88 54’ 37" E
102.01’
S 88 54’ 37" E
100.61’107.87’85.00’77.68’77.68’77.70’77.68’59.30’85.12’85.12’57.64’77.70’77.69’77.70’77.65’42.34’34.86’38.32’100.03’99.57’6.29’77.70’5.51’13.19’15’15’30.00’30.00’
76.39’66.28’66.28’66.28’66.28’66.28’66.28’74.95’30.00’30.00’40.55’109.06’58.05’75.00’66.28’66.28’66.28’66.28’66.28’66.28’74.99’100.00’100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E100.00’N 01 05’ 23" E99.97’N 01 05’ 23" EN 88 54’ 37" W
73.61’63.89’4.88’61.79’6.98’59.69’9.08’57.59’11.18’55.49’13.28’53.39’15.38’98.96’
28.58’
49.15’100.01’100.01’75.00’66.67’66.67’66.67’66.67’66.67’66.67’72.91’
68.77’68.77’68.77’68.77’65.99’
75.71’95.09’N 16 40’ 01" E272.86’N 14 53’ 57" E9
8.0
0’N 28 0
6’ 1
1" WN 00 03’ 06" E - 352.45’148.92’
9.51’
125.65’9.51’
121.14’
80.49’140.43’21.14’
N 25 14’ 52" E
30.00’347.94’C55C58C56C57C59C60C61
C62
C32
C
4
6C6
3 C64 C65C66block 6
block 7block 110.43’
N 01 04’ 01" E
35.03’30.01’
30.12’
4.56’
S 04 52’ 00" E
S 17 36’ 07
" E - 17
0.
3
3
’
75.00’68.77’
2.78’161.28’N 00 24’ 11" W173.64’N 04 14’ 53" ECURVE RADIUS DELTA LENGTH CHORD BEARING CHORD LENGTH
180.00’100.48’99.18’
220.00’24.92’24.91’
150.00’14.96’14.95’
150.00’18.65’18.64’
180.00’22.38’22.36’
120.00’12.00’11.99’
150.00’12.18’12.17’
180.00’14.61’14.61’
120.00’64.21’63.44’
150.00’83.73’82.65’
180.00’80.87’80.19’
150.00’83.72’82.64’
120.00’66.98’66.11’
165.00’13.39’13.39’
CURVE TABLE
C32
C46
C55
C56
C57
C58
C59
C60
C61
C62
C63
C64
C65
C66
PROJECT SURVEYOR:
DRAWN BY:
REVIEWED BY:
DATE:PROJECT NO.
Sec.T.R. 1/4
2 OF
SHEET
Scale 1" = ’
Sec.T.R. 1/4
586.4490 Fax
586.5599 Office
Bozeman, MT 59715
Suite B
1970 Stadium Drive,
3
SOUTHBRIDGE SUBDIVISION PHASE 3
SB PH 3
064-728-14-14
NH
TG
TG
23 2 S.5 E.
(C)
(R)
(M)
R.O.W.
P.O.B.N
PHASE I
SOUTHBRIDGE SUBDIVISION
BASIS OF BEARING SOUTH 22ND AVE.LANCE DRIVESOUTHBRIDGE PH 2BLOCK 6LOT 1SOUTHBRIDGE PH 2BLOCK 6LOT 2SOUTHBRIDGE PH 2BLOCK 6LOT 3SOUTHBRIDGE PH 2BLOCK 6LOT 4SOUTHBRIDGE PH 2BLOCK 6LOT 5SOUTHBRIDGE PH 2BLOCK 6LOT 6SOUTHBRIDGE PH 2BLOCK 6LOT 7SOUTHBRIDGE PH 2BLOCK 1LOT 8SOUTHBRIDGE PH 2(SHADY LANE PARK)PUBLIC PARK A(FUTURE PHASE)SOUTHBRIDGEBLOCK 10LOT 1(FUTURE PHASE)SOUTHBRIDGEBLOCK 10LOT 18(FUTURE PHASE)
SOUTHBRIDGE
BLOCK 9
LOT 22
(FUTURE PHASE)
SOUTHBRIDGE
BLOCK 9
LOT 1 (FUTURE PHASE)SOUTHBRIDGEBLOCK 8LOT 1(FUTURE PHASE)SOUTHBRIDGEBLOCK 8LOT 2JACOBS STREET (FUTURE PHASE)PUBLIC ACCESSOPEN SPACESOUTH 19TH AVENUE110’ R.O.W.SOUTH 23RD AVE.P.O.B.SOUTHBRIDGE PH 2REMAINDER TRACT AREMAINDER TRACTMEADOW CREEK PH 1(FUTURE PHASE)
SOUTHBRIDGE
BLOCK 12
LOT 24
60 SOUTHBRIDGE PH 1SHADY LANE PARKSTATE OF MONTANA
RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY,
SOUTHEAST ONE-QUARTER OF SECTION 23, TOWNSHIP 2 SOUTH,
OF SOUTHBRIDGE SUBDIVISION PHASE 2 LOCATED IN THE
A SUBDIVISION OF A PORTION OF LOT 1 OF THE AMENDED PLAT
FINAL PLAT - BOUNDARIES
THIS SURVEY WAS PERFORMED FOR SOUTHBRIDGE DEVELOPMENT L.L.C.
THE PURPOSE OF THIS SURVEY IS TO CREATE A 32-LOT SUBDIVISION
PROJECT AREA
DEDICATED BY THIS SUBDIVISION:
TYPICAL UTILITY EASEMENTS AS
WITH ALLEYS
REAR LOT BOUNDARIES
10’6’ALLEY
WITH AVENUES/STREETS
FRONT LOT BOUNDARIES
STREETorAVENUECalculated
Record
Measured
Right-of-Way
Point of Beginning
Found Sanderson/Stewart Yellow Plastic Cap
Set 2" Alpine Aluminum Cap
Calculated Position
Right-of-Way Centerline
Easement Line
Future Adjoining Property Line
Adjoining Property Boundray Line
Property Boundary Line
7767 ft†
7770 ft†
7775 ft†
8673 ft†
8919 ft†
7722 ft†
7624 ft†
7698 ft†
7570 ft†6628 ft†6628 ft†6628 ft†6628 ft†6628 ft†6628 ft†7497 ft†
7431 ft†6667 ft†6667 ft†6667 ft†6667 ft†6667 ft†6667 ft†8864 ft†
9127 ft†6877 ft†6877 ft†6877 ft†6877 ft†6877 ft†6877 ft†7569 ft†
0.32 ac.
0.87 ac.
0.90 ac.
0.868 acres
1.222 acres
5.350 acres
3.934 acres
Phase Total
Road Right-Of-Way
Residential Lots
Dedicated Parkland
Common Open Space
11.374 acres
SUBDIVISION AREAS
LEGEND SOUTH 20TH AVE.S
O
U
T
H 20
T
H
A
VE.VICINITY MAP NOT TO SCALE
LOT 8LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8
LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15LOT 16
LOT 9
LOT 10
LOT 11
LOT 12LOT 13
LOT 14
LOT 15
LOT 16
ACCESS
PUBLIC
OPEN SPACE
PUBLIC PARK
SHADY LANE
PUBLIC PARK
SHADY LANE
SUBDIVISION)
(DEDICATED BY THIS
R.O.W.
167
(406) 586-0262 | (406) 586-5740 FAX
Suite 203, bozeman, mt 59715
895 Technology Boulevard
block 6
block 7block 1PROJECT SURVEYOR:
DRAWN BY:
REVIEWED BY:
DATE:PROJECT NO.
Sec.T.R. 1/4
3 OF
SHEET
Scale 1" = ’
Sec.T.R. 1/4
586.4490 Fax
586.5599 Office
Bozeman, MT 59715
Suite B
1970 Stadium Drive,
3
SOUTHBRIDGE SUBDIVISION PHASE 3
SB PH 3
064-728-14-13
NH
TG
TG
23 2 S.5 E.
N
PHASE I
SOUTHBRIDGE SUBDIVISION
BASIS OF BEARING SOUTH 22ND AVE.LANCE DRIVE
JACOBS STREET
SOUTH 19TH AVENUE110’ R.O.W.SOUTH 23RD AVE.60 50’ 50’STR
EAM SE
TB
AC
K
50’ 50’
STREAM SETBACK
25’ 19TH YARD SETBACK
STATE OF MONTANA
RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY,
SOUTHEAST ONE-QUARTER OF SECTION 23, TOWNSHIP 2 SOUTH,
OF SOUTHBRIDGE SUBDIVISION PHASE 2 LOCATED IN THE
A SUBDIVISION OF A PORTION OF LOT 1 OF THE AMENDED PLAT
FINAL PLAT - CONDITIONS OF APPROVAL
THIS SURVEY WAS PERFORMED FOR SOUTHBRIDGE DEVELOPMENT L.L.C.
THE PURPOSE OF THIS SURVEY IS TO CREATE A 32-LOT SUBDIVISION
R.O.W.
FRONTAGE
SOUTH 19TH
ALONG ALL
1’ NO-ACCESS STRIP
Right-of-Way
1’ No-Access Strip
Setback
Easement Line
Future Adjoining Property Line
Adjoining Property Boundray Line
Stream Centerline
Property Boundary Line
DEDICATED BY THIS SUBDIVISION:
TYPICAL UTILITY EASEMENTS AS
WITH ALLEYS
REAR LOT BOUNDARIES
10’6’ALLEY
WITH AVENUES/STREETS
FRONT LOT BOUNDARIES
STREETorAVENUE Andrew D. Holloran, Member Southbridge Development L.L.C.
By: ____________________________________________________
Southbridge Development L.L.C.
easements, or other documents as allowed by law or by local regulations.
Changes to any land-use restrictions or encumbrances may be made by amendments to covenants, zoning regulations,
and all conditions of subdivision application have been satisfied. The information shown hereon is current as of 8-12-14.
The text and/or graphics shown hereon represent the requirements by the governing body for final plat approval
CERTIFICATE OF CONDITIONS OF APPROVAL
Lots adjacent to South 19th Avenue shall have a 25-foot setback from South 19th Avenue. 11.
Homes on corner lots to have the same orientation as adjacent homes on street.10.
Areas designated as WETLANDS are subject to a 50-foot setback.9.
(Southbridge Homeowners) and/or future park Maintenance District.
All Open Space and Public Access areas are to be owned and maintained by the homeowners association8.
Homeowners) and/or future park Maintenance District.
All Public Parks are dedicated to the city, but maintained by the homeowners association (Southbridge7.
upon the lot.
within 30 days said sidewalk for their lot(s) regardless of whether other improvements have been made
hereon, any lot owner who has not constructed said sidewalk shall, without further notice, construct
to occupancy of any structure on the property. Upon the third anniversary of the recordation of the plat
City standard residential sidewalks shall be constructed on all public street frontages of a property prior6.
Municipal Code (B.M.C.) said easement shall apply.
If a utility easement is greater than the building setback required under Chapter 38 of the Bozeman5.
are subject to a 6-foot wide utility easement.
All lots are subject to a 10-foot wide front yard utility easement except lots adjoined by an Alley, which 4.
A 1-foot wide vehicular No-Access easement exists for Lots along South 19th Avenue.3.
All downstream water user facilities will not be impacted by this Subdivision.2.
than two (2) feet above the established elevation from the top of curb of the adjoining street.
of residential and commercial construction. The finish floor of all residential structures shall be not less
first consulting a professional engineer licensed in the State of Montana and qualified in the certification
residential dwellings or commercial structures with full or partial basements not be constructed without
Due to the potential of high ground water tables in the areas of this subdivision, it is recommended that1.
NOTES
LEGEND SOUTH 20TH AVE.S
O
U
T
H 20
T
H
A
VE.
LOT 8LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8
LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15LOT 16
LOT 9
LOT 10
LOT 11
LOT 12LOT 13
LOT 14
LOT 15
LOT 16
ACCESS
PUBLIC
OPEN SPACE
PUBLIC PARK
SHADY LANE
PUBLIC PARK
SHADY LANE
SUBDIVISION)
(DEDICATED BY THIS
R.O.W.
168