Loading...
HomeMy WebLinkAboutBozeman Deaconess MOB5 Easements_9 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Dustin Johnson, Project Engineer Richard Hixson, City Engineer SUBJECT: Bozeman Deaconess Hospital Medical Office Building (MOB) 5 – Release and Reconveyance and Water/Sewer Pipeline Easements MEETING DATE: September 22, 2014 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign BACKGROUND: Attached is a copy (original to Stacy Ulmen), of the partially executed release and reconveyance of a previous water pipeline and access easement and new water and sewer pipeline and access easements. Engineering staff has reviewed the easements and found them to be acceptable. Bozeman Deaconess has proposed to build a new large medical office building which required the movement of the original water and sewer mains. These documents remove the old easement and replace it to better reflect the placement of the new mains. FISCAL EFFECTS: N/A ALTERNATIVES: As suggested by the City Commission. Attachments: Release and Reconveyance of Easements Water Pipeline and Access Easement Sewer Pipeline and Access Easement Report compiled on: 9/12/14 90