Loading...
HomeMy WebLinkAboutWetland Checklist & Narrative Wetland Review Checklist & Checklist Narrative WETLAND REVIEW CHECKLIST The following information shall be submitted for all regulated activities proposed for regulated wetland areas. This checklist shall be completed and returned as part of the submittal. Any item checked "No" or "N/A" (not applicable) must be explained in a narrative attached to the checklist. Incomplete submittals will be returned to the applicant. Wetland Review Information Yes No N/A 1. A description of the proposed activity M ❑ ❑ 2. A description of why avoidance and less damaging alternatives have been rejected, if M ❑ ❑ applicable 3. A site plan which shows the delineated wetland boundary, the property boundary, all existing M ❑ ❑ and proposed structures and roads,watercourses and drainageways on the property. Include the date of plan preparation and changes, and north point indicator. A scale of 1 inch to 20 feet,but not less than 1 inch to 100 feet,is suggested 4• The exact locations and specifications for all proposed regulated activities, and the direct and ❑ ❑ indirect impact of such activities 5. The source, type and method of transport and disposal of any fill material to be used, and 0 ❑ ❑ certification that the placement of fill material will not violate any applicable state or federal statutes and regulations 6• Copies of any Section 404 wetland permits already obtained for the site ❑ 0 ❑ 7. Stormwater Management Permit Application required ❑ ❑ Page 3 (Weiland Review Checklist—Prepared 11/24/03;revised 9/22/04,revised 11/14/11) Four Points Subdivision Wetland Review Checklist Narrative Explanation of Items Marked "No" or "N/A" Wetland Review Information Requirements 6. Copies of any Section 404 wetland permits already obtained for the site. Response: NO - Section 404 Permits have been submitted but not approved as of the time of this Preliminary Plat submittal. 7. Stormwater Management Permit Application required Response: NO -A Stormwater Management Permit Application will be submitted prior to construction.