THIS AGREEMENT is made and entered into this _L`� day of
October , 1993 , by and between Peter Bade , hereinafter called the
"Developer" , and the City of Bozeman, a Municipal Corporation of
the State of Montana, hereinafter called the "City-" .
WHEREAS , it is the intent and purpose or the Deti'eloper to meet
the conditions of approval of a Minor- Site Plan application to
construct a 2 , 500 sq. ft . building intended for m-1 zoning; district
uses on the property in question; and
WHEREAS , it is the intent of the Developer to obtain Final
Site Plan approval ; and
WHEREAS , it is the intent and purpose of both the Developer
and the Cite to hereby enter into an Agreement c,,hich will guarantee
the full and satisfactory; completion of the required improvements
on the property hereinafter described ; and it is the intent of this
Agreement , .rnd of the parties hereto , i.o satisfy the improvements
guarantee requirements for the conditional approval of said Minor-
Site Plan.
NOW, THEREFORE , in consideration of the mutual covenants and
conditions contained herein, it is hereby- agreed as follows :
1 , Pr oper•ty Description
'Phis Agreement pertains to anti includes those properties i,hich
are designated and identified as Lot 1 of C .O . S , ;:C-23-L in the
Northern Pacific Addition, City of Bozeman, Gallatin County,
Montana , and more commonly described as 621 North Wallace Avenue .
2 . Improvements
This Agreement specifically includes the installation of
parkins; lot , landscaping , access and other- improvements as
illustrated on the plans and specifications hereto attached and
made a part of this :1,_greement , as "Exhibit A" . The estimated cost
of said improvements is attached and made a part of this Aggreement ,
as "Exhibit B" .
1
This Improvements Agreement also pertains to Cottonwood Street
paving improvements , which includes paving from Wallace Avenue to OM \
the subject property east property line to a City Standard ( �
width . Construction of curb 3 7J
gutter, sidewalk, and storm draiiia� e
facilities shall be required on the south side of Cottonwood Street
only .
3 . Financial Guarantee , Time for Completion of Im1")rovements
If' occupancy of any structure is to occur prior to the
installation of all required on-site improvements , the Improvements
Agreement must be secured by a financial guarantee , as may be
deemed acceptable by the City , payable to the City- of Bozeman, in
an amount equal to one and one-half times the estimated cost of the
installation of any required improvements not completed at that
time . Said method of security- shall be valid for a period of not
less than twelve ( 12 ) months . In any event , all required
improvements shall be completed within nine ( 9 ) months of occupancy
in order to avoid default on the method of security.
Prior to occupancy of the building , the applicant shall
provide a satisfactory- one-rear financial guarantee for the paving,
improvements to Cottonwood Street , as required in Section 2 above .
Construction of the street improvements ( including curb, gutter and
sidewalk ) shall be completed within one year of occupancy; but
shall not be initiated until the Cottonwood Street water line
replacement project has been completed by the Cite of Bozeman.
4 . Inspection
Representatives of the City shall ha--e the right to enter upon
the property at any reasonable time in order to inspect it and to
determine if the Developer are in compliance with this Ag-reement ,
and the Developers shall permit the City- and its representatives to
enter upon and inspect the property at any reasonable time .
5 . Default
Time is of the essence of this Agreement . If the Developer
shall default in or' fail to fully perform any of its obligations in
conformance with the time schedule under this Agreement , and such
default or failure shall continue for a period of thirty ( 30 ) days
2
after written notice specifying the default is deposited in the
United States mail addressed to the Developer at P. 0 . Bo:: 1621 ,
Bozeman, MT 59771-1624 or such other address as the Developer shall
provide to the City from time to time , without being completely
remedied, satisfied , and discharged, the Cite may elect to enforce
any of the following specified remedies :
A ) The City may , at its option, declare the financial
guarantee to be forfeited and secure the complete
construction and inspection of the improvements described
herein.
1 . The Ci.ty' s representative , contractors, and
ena,ineers shall have the right to enter upon the
property- and perform such work and inspection, and
the Developer shall permit and secure any
additional permission required to enable them to do
SO .
B ) The City may enforce any other remedy provided by law .
6 . Warranty
The Developer shall warrant against clef ects in these
improvements for a period of one year from the date of their
written acceptance by the Governing Body . Any required landscaping
must be maintained in a healthy, growing condition at all times .
.any plant that dies must be replaced with another liming plant that
complies with the approved landscape plan .
7 . Governip_v__Law
This Agreement shall be construed according to the laws of the
State of Montana .
8 . Modifications or Alterations
No modifications or amendment of this Agreement shall be
valid , unless evidenced by a writing signed by the parties hereto .
9 . Invalid Provision
The invalidity- or unenforceability of any provision of this
Agreement shall not affect the other provisions hereof , and this
Agreement shall be construed in all respects as if such invalid or
unenforceable provision were omitted .
3
10 . No Assignment
It is expressly agreed that the Developer, shall not assign
this Agreement in whole , or in part , without prior written consent
to City.
11 . Successors
Except as provided in paragraph 10 , this Agreement shall be
binding upon, enure to the benefit of , and be enforceable by the
parties hereto and their respective heirs , successors and assigns .
' 4
Peter Bad
STATE OF MONTANA )
. ss
County of Gallatin )
On this _-} day of October , 1993 , before me , a Notary Public
for the State of Montana, personally appeared Peter Bade , known to
me to be the person who executed the foregoing Improvements
Agreement and acknowledged to me that he executed the same .
IN WITLESS WHEREOF , I have hereunto set my hand and affixed my
Notarial Seal the dad- and year first above written.
Notary Public -lor State of Montana
Residing at
� C-
Commission Expires :_ —
THE CITY OF BOZEMAN
Phillip J F bes
Director of Public Service
STATE OF MONTANA )
: ss
County of Gallatin )
On the - day of _ 1993 , before me , a Notary
Public for the State of Montana, personally appeared Phillip J.
Forbes , known to me to be the person described in and who executed
the foregoing instrument as Director of Public Service of the City
of Bozeman, whose name is subscribed to the within instrument and
acknowledged to me that he executed the same for and on behalf of
said Citt .
IN WITNESS WHEREOF , I have hereunto set my hand and affixed my
seal on the day and year first written above .
?votary Public 'oT• St� to of Montana
Residi g at:
Commission Expir s : 9
l
"EXHIBIT B" ESTIMATED COST OF IMPROVEMENTS
PETER BADE
624 NORTH WALLACE .AVENUE
-----------------------------------------------------------------------------------------
PROJECT : Z-9399 - Minor Site Plan application to construct a 2 , 500 sq. ft . building
inteded for M-1 zoning district uses
DEVELOPER: Peter Bade
----------------------------------------------------------------------------------------
ITEM _ SQ_FT ,1L:v ._FT . COST/UNIT — EST . COST
Curb Gutter 125 ln. ft . S9 . 00/111. ft . S1 , 125 . 00
Road Paring 125 ln . ft . 3i 'width Gaston Eng . S3 , 655 . 00
Sidewalk 192 ln. ft . 5 ' width $1 . 90/sq . ft . $1 , 824 . 00
Parking Lot Paving 3310 sq . ft . $0 . 56/sq. ft . $1 , 854 . 00
Parking Lot Concrete 162 ln . ft . $3 . 10/ln. ft . S 551 . 00
Plantings per Site Plan $ 325 . 00
Landscaping , general 2565 sq . ft . S0 . 21/sq. ft . S 539 . 00
Bike rack ( 1 ) $130 . 00 $ 130 . 00
Disabled Parking Sign ( 1 ) $ 25 . 00 $ 25 . 00
TOTAL S10 , 028 . 00
x 1 . 5
$1 5042 . 00
Approved by: Date :
Engineering Department