Loading...
HomeMy WebLinkAboutMeadow Creek Subdivision Conditions Dec 2008Bozeman Recreation & Parks Advisory Board  P.O. Box 1230 · Bozeman, MT · 59771 Park Master Plan Modifications PLANNER: Dave Skelton  FROM: Recreation and Parks Advisory Board SUBJECT: Meadow Creek Subdivision – Park Master Plan Modification REVIEWED ON: 12/19/2008 COMMENTS:    The Recreation and Parks Advisory Board has been asked to review modifications to the Meadow Creek Park Master Plan as a condition of an extension to their preliminary plat approval. It is necessary to modify the plan so that it represents the actual conditions that exist. The addition of storm water detention ponds that were not in the original plan still leaves the project with sufficient parkland to satisfy their dedication requirement of roughly 20 acres. Developer has agreed to decrease the slope of the detention ponds’ banks. A previously planned trail that cut across the playing field area in Lerner Park has been removed from the plan and has not been developed. This gives the active recreation area more flexibility in potential field layouts and we consider the loss of trail to have no measurable effect on bike/ped traffic connections. Trees and shrubs in Lerner Park that were in the original plan have been moved to the park periphery to expand the active play area. We think this is a better design than the original. We have agreed to revisit ditch in the north end of Lerner Park in the spring to see if it is suitable, or if some modification would be desirable. RECOMMEN DATION:  It is our opinion that the changes to the Park Master Plan will in the end provide an improvement to the active recreation opportunities in the development. We feel that this condition of approval has been satisfactorily met. FISCAL EFFECTS: n/a ALTERNATIVES:   n/a