HomeMy WebLinkAbout06- Subdivision Improvements on Baxter Meadows PUD Phase 3 Inter-office Original to:
City of Bozeman
Planning Department
20 East Olive Street
SUBDIVISION IMPROVEMENTS AGREEMENT
BAXTER MEADOWS PUD PHASE 3lSUBDIVISION
THIS AGREEMENT is made and entered into this b tt" day of lVret'J'44 C`r2006,
by and between Baxter Meadows West, LLC, Michael E. Potter, President, Potter Clinton
Development, Inc., Managing Member of Baxter Meadows West, LLC &Thomas L. Clinton, Vice
President, Potter Clinton Development, Inc., Managing Member of Baxter Meadows West, LLC
3985 Valley Commons Dr., Bozeman, MT 59718,hereinafter called the "Subdivider", and the City
of Bozeman,a Municipal Corporation and political subdivision of the State of Montana,with offices
at 411 East Main Street, P.O. Box 1230, Bozeman, MT 59771-1230,hereinafter called the "City".
WHEREAS,it is the intent and purpose of the Subdivider to meet the conditions of approval
of a major subdivision preliminary plat application Baxter Meadows PUD Phase 3 Subdivision to
subdivide approximately 83 acres into approximately 129 Iots,streets, alleys,parks and open space
on property located northeast of the intersection of Baxter Lane and Harper Puckett Road and legally
described as Lots 1 and 2,Block 7,Baxter Meadows Subdivision PUD Phase I and Tract I of the
amended plat of Baxter Meadows Subdivision PUD Phase 1 Tract 1,located in the SW t/a of Section
34, TIS, R5E, PMM, City of Bozeman, Gallatin County, Montana; and
WHEREAS, it is the intent of the Subdivider to obtain Final Plat approval on that portion of
Baxter Meadows PUD Phase 3 described as Baxter Meadows PUD Phase 3A; and
WHEREAS, it is the intent and purpose of both the Subdivider and the City to hereby enter
into an Agreement which will guarantee the full and satisfactory completion of the required
improvements on the property hereinafter described; and it is the intent of this Agreement,and of the
parties hereto, to satisfy the requirements and guarantee improvements for the conditional approval
Subdivision Improvements Agreement page lof 7
Baxter Meadows Phase 3A PUD (4Z-05266) and Subdivision (#P-05266)
of said subdivision application.
NOW, THEREFORE, in consideration of the mutual covenants and conditions contained
herein, it is hereby agreed as follows:
1. Property Description
This Agreement pertains to and includes those properties which are designated and identified
as Baxter Meadows PUD Phase 3A,a portion of Lots 1 and 2,Block 7,Baxter Meadows Subdivision
PUD Phase 1 and Tract 1 A of the amended plat of Baxter Meadows Subdivision PUD Phase 1 Tract
1,located in the SW t/a of Section 34,T 1 S,RSE,PMM,City of Bozeman,Gallatin County,Montana.
2. Improvements and Time for Completion of Improvements
This Agreement includes all on-site and off-site subdivision improvements as shown in the
Preliminary Plat Application,as conditioned in the Preliminary Plat approval, and as required by the
Bozeman Municipal Code. Improvements include those below and listed in the attached Exhibit A,
which is made part of this agreement.The list and cost of said improvements has been estimated by
T.D. & H, Inc., 215 West Mendenhall, Ste C-1, Bozeman, MT 59715.
The Subdivider hereby agrees that the following improvements must be installed within one
(1) year of the City Commission final plat approval: water, sewer, stormwater facilities,
transportation facilities (streets, street lights, trails, sidewalks adjacent to public lands etc.) narks
and common open space facilities and landscanina. The Subdivider hereby agrees that sidewalks
adjacent to individual lots must be installed within three(3) years of the City Commission final plat
approval, or with Building Permits for individual lots, whichever occurs first. In any event, all
required improvements shall be completed within the time frame provided herein for the completion
of the improvements in order to avoid default on the method of security
3. Financial Guarantee
It is the Subdivider's intent to file the final subdivision plat prior to the completion of
subdivision improvements. Therefore, this Agreement shall be secured by a financial guarantee
valid for at least eighteen (18) months which is one hundred and fifty (150) percent of the
estimated cost of said improvements. The financial guarantee is in the form of a
;. ,.�-- �g issued by in the
amount of$ Y-!9- 1 o F' dated
Subdivision Improvements Agreement page 2 of 7
Baxter Meadows Phase 3A PUD (#Z-05266)and Subdivision (#P-05266)
4. Inspection
Representatives of the City shall have the right to enter upon the property at any reasonable
time in order to inspect it and to determine if the Subdivider is in compliance with this Agreement,
and the Subdivider shall permit the City and its representatives to enter upon and inspect the property
at any reasonable time.
5. Default
Time is of the essence for this Agreement. If the Subdivider shall default in or fail to fully
perform any of its obligations in conformance with the time schedule under this Agreement,and such
default or failure shall continue for a period of thirty (30) days after written notice specifying the
default is deposited in the United States mail addressed to the Subdivider at Baxter Meadows West,
LLC,3985 Valley Commons Dr.,Bozeman,MT 59718,or such other address as the Subdivider shall
provide to the City from time to time,without being completely remedied,satisfied,and discharged,
the City may elect to enforce any of the following specified remedies:
a. The City may, at its option,declare the financial guarantee to be forfeited and secure
the complete construction and inspection of the improvements described herein. The
City's representative, contractors, and engineers shall have the right to enter upon the
property and perform such work and inspection, and the Subdividers shall permit and
secure any additional permission required to enable them to do so. In the event that
any funds remain from the financial guarantee upon completion of all improvements,
such funds shall be promptly returned to the Subdividers.
b. The City may enforce any other remedy provided by law.
6. Indemnification
The Subdivider shall indemnify,hold harmless, and defend the City of Bozeman against any
and all claims, at Subdivider's own expense, arising out of or resulting from the acts or omissions of
Subdivider or his/her agents, employees, or contractors, whether negligent or otherwise, in
connection with the performance of work described in this agreement.The City shall be responsible
for any claims arising from negligence or willful misconduct on the part of the City or its agents or
employees,except the Subdivider shall be responsible for those claims of negligence and misconduct
arising from the Subdivider, his/her agents, or employees not providing to the Municipality, its
agents or employees, information relevant to the subject matter of this agreement.The parties shall
Subdivision Improvements Agreement page 3 of 7
Baxter Meadows Phase 3A PUD (#Z-05266) and Subdivision (#P-05266)
cooperate in the defense of Claims and shall furnish records, information, and testimony and attend
proceedings, as may be reasonably necessary.
7. Warranty
The Subdivider shall warrant against defects of all improvements and that these
improvements are made in a good and workman-like manner for a period of one (1) year from the
date of their written acceptance by the Governing Body.
8. Governing Law and Venue
This Agreement shall be construed under and governed by the laws of the State of Montana.
In the event of litigation concerning this Agreement, venue is in the Eighteenth Judicial District
Court, Gallatin County, State of Montana.
9. Attorney's Fees
In the event it becomes necessary for either party to this Agreement to retain an attorney to
enforce any of the terms or conditions of this Agreement,then the prevailing party shall be entitled to
reasonable attorney's fees and costs, , including fees, salary and costs of in-house counsel including
City Attorney.
10. Modifications or Alterations
No modifications or amendment of this Agreement shall be valid,unless agreed to in writing
by the parties hereto.
11. Invalid Provision
The invalidity or unenforceability of any provision of this Agreement shall not affect the
other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or
unenforceable provision were omitted.
12. No Assignment
The responsibilities and benefits of this Agreement to the Subdividers may not be assigned
without the express written approval of the City. Such approval may not be withheld unreasonably,
but any unapproved assignment is void. There is no prohibition on the right of the City to assign its
rights under this Agreement.The City shall release the original Subdividers from their liability under
this agreement if it accepts and approves a proper assignment from any developer or lender who
obtains the property.
Subdivision Improvements Agreement page 4 of 7
Baxter Meadows Phase 3A PUD (#Z-05266)and Subdivision (#P-05266)
13. Successors
Except as provided in paragraph 12, this Agreement shall be binding upon, enure to the
benefit of, and be enforceable by the parties hereto and their respective heirs,successors and assigns.
14. Filing
The Subdivider shall have this Agreement recorded in the Office of the Gallatin County Clerk
and Recorder at the same time the Final Plat is filed.
CORPORATION
Baxter eadows West, LLC
Michael E. Potter, President,
Potter Clinton Development, Inc.
Managing Member of Baxter Meadows West, LLC
Baxter Meadows West, LLC
Thomas L. Clinton, Vice President
Potter Clinton Development, Inc,
Managing Member of Baxter Meadows West, LLC
STATE OF I'n r41 )
:ss
County of L---?!a
Cc )
On this day of L =��e r 2006, before me, the undersigned, a Notary
Public for the State of Montana, personally appeared Michael E. Potter, known to me to be the
President,Potter Clinton Development, Inc.,Managing Member of Baxter Meadows West LLC and
Thomas L. Clinton, known to me to be the Vice President, Potter Clinton Development, Inc.,
Managing Member of Baxter Meadows West, LLC, the corporation that executed the within
instrument, and acknowledged to me that he executed the same for and on behalf of said corporation.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and
year first above written.
(Signature above)
Subdivision Improvements Agreement page 5 of 7
Baxter Meadows Phase 3A PUD (#Z-05266) and Subdivision (#P-05266)
i1
(Seal) (Printed Name above)
Notary Public for State of Mo tana _
Residing at: e� JL2
Commission Expires: - I D
(Use 4 digits for expiration year)
THE CITY OF BOZEMAN
4WI,
Andrew C. Epple, AICP
Planning Director
STATE OF MONTANA )
:ss
County of Gallatin ) \
On this -0 � day of �v� tnbHc� 2006, before me, a Notary Public for the State of
Montana, personally appeared Andrew C. Epple,AICP, known to me to be the person described in
and who executed the foregoing instrument as Planning Director of the City of Bozeman, whose
name is subscribed to the within instrument and acknowledged to me that he executed the same for
and on behalf of said City.
IN WITNESS WHEREOF,I have hereunto set my hand and affixed my seal on the day and year first
written above.
J
(Signature above)
(Seal) ��`:' r `- •�'>, (Printed Name above)
�TARI,q f VC0 Notary Public for State of Montana
Residing at: �_
# •. SL •• *' Commission Expires: L,
N •, Q-
a2�,�, (Use 4 digits for expiration year)
OF M
Subdivision Improvements Agreement page 6 of 7
Baxter Meadows Phase 3A PUD (#Z-05266) and Subdivision (#P-05266)
Exhibit A: Cost Estimate
Subdivision Improvements Agreement page 7 of 7
EXIHBIT A
ENGINEER'S CERTIFICATE
REGARDING
Incomplete Subdivision Infrastructure
Baxter Meadows Subdivision, Phases 3A
October 2, 2006
This document relates to the above referenced tract of land also including a portion of the
remainder of Tract 2A of certificate of survey No. 2202A located in the southwest quarter
of Section 34, Township 1 South, Range 5 East, P.M.M., City of Bozeman, Gallatin
County, Montana.
The incomplete work as of the above date includes street improvements for Baxter
Meadows Subdivision Phase 3A Infrastructure. Also attached is the schedule of values,
based on bid schedules for this project. Unit prices show that the total improvements
amount totals $685,119.07. 1 certify that based on existing conditions at this time in
Bozeman the attached cost estimate totaling $1,027,678.60 is a realistic cost for the
improvements outlined above.
Respectfully Submitted,
Keith Waring,
TAIV��
KEITH E.
WAR11J a
Plo. 15161 PE • Ua
F µ.� E PJ
Phase 3A Improvements Agreement-Schedule of Values
EST. UNIT
DESCRIPTION QUANTITY UNIT PRICE AMOUNT
Phase 3A Interior Improvements:
ROADIMPROVEMENTS
5'WIDE SIDEWALK W/4"CRUSHED 58,460.00 SF $3.751 $219,225.00
ROAD TOTAL $219,225.00
SIGNAGE AND PAVEMENT MARKINGS
DEAD END BARRICADE 3.00 EA $800.00 $2,400.00
REMOVE EXTG BARR 2.00 EA $300.00 $600.00
STOP SIGN 2.00 EA $500.00 $1,000.00
STOP SIGN W1 STREET NAMES 13.00 EA $600.00 $7,800.00
PED XING W/SUPP ARROW 6.00 EA $750.00 $4,500.00
FLEX DELINEATOR POST 40.00 EA $90.00 $3,600.00
YELLOW PAINT curb at bulbs 475.00 LF 1 $2.501 $1,187.50
SIGN&MARKING TOTAL $21,087.50
DETENTION POND
6"PVC 40.00 LF $20.00 $800.00
10"PVC 104.00 LF $22.00 $2,288.00
RIP RAP 4.00 LS $1,000.00 $4,000.00
POND A EXC INCL EROSION CONT MAT TOPSOIL&SEED 0.10 LS $4,000.00 $400.00
POND B EXC INCL EROSION CONT MAT TOPSOIL&SEED 0.10 LS $4,000.00 $400.00
POND D EXC INCL EROSION CONT MAT TOPSOIL&SEED 1 0.10 LS $4,000.00 $400.00
POND H EXC INCL EROSION CONT MAT TOPSOIL&SEEO 1 0.10 LS $4,000.001 $400.00
DETENTION POND TOTALS $8,688.00
STREET LIGHTS
STREET LIGHT BASES 26.00 EA $1,000.00 $26,000.00
PHASE 3A INTERIOR IMPROVEMENTS SCHEDULE TOTAL $275,000.50
EST. UNIT
DESCRIPTION QUANTITY UNIT PRICE AMOUNT
BAXTER LANE STREET IMPROVEMENTS-WEST PORTION ONLY
Street Improvements Site Earthwork 0.1 LS $ 75,500.00 $ 3,775.00
Sidewalks-6"thick w/fiber 64311 SF 1 $ 4.50 $ 28,939.50
ISeeding 11 LS 1 $ 1,200.00 $ 1,200.00
STREET IMPROVEMENTS TOTAL $ 33,914.50
Stormdrain Improvements
Ri Ra 0.5'thickness 201 SF 1 $ 28.00 $ 560.00
STORMDRAIN TOTAL $ 560.00
Sign and Striping $ _
Double Centerline Striping 15111 LF 1 $ 0.60 $ 906.60
Remove and Relocate Road Sin 3 EA $ 300.00 $ 900.00
SIGN AND STRIPING TOTAL $ 1,806.60
BAXTER LANE-WEST PORTION-SCHEDULE TOTAL: $ 36,281.10
EST. UNIT
DESCRIPTION QUANTITY UNIT PRICE AMOUNT
OAK&19TH STREET IMPROVEMENTS-BMW PORTION ONLY
ROADIMPROVEMENTS
REMOVE SIDEWALK 431.05 SY $10.19 $4,392.40
REMOVE CURB&GUTTER 1,770.40 LF $11.23 $19,881.59
EXCAVATION-UNCLASSIFIED 2,591.50 CY $6.00 $15,549.00
TOPSOIL-SALVAGING&PLACING 178.00 CY $13.76 $2,449.28
CRUSHED AGGREGATE COURSE 1,866.00 CY $17.09 $31,889.94
COVER-TYPE 2 2,113.00 SY $0.78 $1,648.14
PLANT MIX GR D-COMMERCIAL 459.00 TON $65.60 $30,110.40
EMULS ASPHALT CRS-2P 3.75 TON $338.37 $1,268.89
RCP IRR 12 IN CLASS 4 UL 47.00 LF $34.87 $1,638.89
CURB INLET GRATE 1.00 EA $1,000.00 $1,000.00
SIDEWALK-CONCRETE 4 IN 449.75 SY $45.79 $20,594.05
TRUNCATED DOMES 4.50 SY $411.68 $1,852.56
GUTTER-CONC VALLEY 38.00 SY $64.321 $2,444.16
CONCRETE-CLASS DID 1.00 LS $1,800.00 $1,800.00
CURB&GUTTER-CONC 1,735.15 LF $14.11 $24,482.97
SEEDING AREA NO 1 0.50 ACRE $647,51 $323.76
FERTILIZING AREA NO 1 0.50 ACRE $283.29 $141.65
CONDITION SEEDBED SURFACE 0.50 ACRE $161.88 $80.94
REMOVE CURB INLETS 3.00 EA $400.00 $1,200.00
ADJUST MANHOLES 1.00 EA $1,500.001 $1,500.00
GEOTEXTILE-SEP/STAB-HIGH 3,212.50 SY $1.56 $5,011.50
COMB 48 IN T 3 MH-CURB INL 2.00 EA $3,500.00 $7,000.00
RESET FIRE HYDRANT 3.00 EA $1,400.00 $4.200.00
DRAINAGE PIPE ARCH 51 IN 18.00 LF $144.82 $2.606.76
TRAFFIC CONTROL 1.00 LS 1 $14,680.00 $14,680.00
MOBILIZATION 1.00 LS $34,359.50 $34,359.50
ROAD TOTAL $232,106.37
SIGNAGE AND PAVEMENT MARKINGS
REMOVE PAVEMENT MARKINGS jP313.10
0 LF $1.00 $5,141.00
SIGNS-ALUM.SHEET INCR IV 5 SF $45.00 $2,958.75
RESET SIGNS 0 EA $165.00 $247.50
REMOVE SIGNS 0 EA $50.00 $350.00
POSTS-STEEL U SIGN LB $6.50 $0.00
POSTS-TUBULAR STEEL-SQ-PERF LB $5.50 $1,722.05SQ.TUBULAR SLIP BASE BKWY-3 IN EA $390.00 $975.00
DELINEATOR DESIGN A EA $40.00 $0.00
DELINEATOR DESIGN D EA $40.00 $0.00
CURB MARKING-YELLOW GAL $120.00 $360.00
WORDS&SYMBOLS-WHITE PAINT GAL $130.00 $1,170.00
WORDS&SYMBOLS-WHITE EPDXY GAL $350.00 $2,100.00
STRIPING-WHITE PAINT 23.00 GAL $80.00 $1,840.00
STRIPING-YELLOW PAINT 3.00 GAL $80.00 $240.00
STRIPING-WHITE PLASTIC 4 IN 165.00 LF $12.00 $1,980.00
STRIPING-WHITE PLASTIC 8 IN 335.00 LF $17.00 $5,695.00
STRIPING-WHITE PLASTIC 24 IN 80.00 LF $35.00 $2,800.00
STRIPING-YELLOW PLASTIC 4 IN 0.00 LF $12.00 $0.00
STRIPING-YELLOW PLASTIC 8 IN 222.50 LF $17.00 $3,782.50
STRIPING-YELLOW PLASTIC 24 IN 25.00 LF $35.00 $875.00
REMOVE PLASTIC STRIPING 1880.00 LF $5.00 $9,400.00
STRIPING-WHITE EPDXY 24.50 GAL $150.00 $3,675.00
WORDS&SYMBOLS-WHITE PLASTIC 275.00 SF $25.00 $6,875.00
MOBILIZATION 1.00 LS $2,609.55 $2,609.55
SIGN&MARKING TOTAL $54,796.35
TRAFFIC SIGNAL
FOUNDATION-CONCRETE 7.00 CY $1,500.00 $10,500.00
CONDUIT,STEEL,1.5 IN RIGID 20.00 LF $18.00 $360.00
CONDUIT,STEEL,2 IN RIGID 15.00 LF $23.00 $345.00
CONDUIT,STEEL,2 1/2 IN RIGID 30.00 LF $25.00 $750.00
CONDUIT,PLASTIC,1 1/2 IN 80.00 LF $10.00 $800.00
CONDUIT,PLASTIC,2 IN 50.00 LF $12.00 $600.00
CONDUIT,PLASTIC,21/2 IN 300.00 LF $14.00 $4,200.00
PULL BOX,CONCRETE TYPE 2 2.00 EA $450.00 $900.00
PULL BOX,CONCRETE TYPE 3 0.00 EA $550.00 $0.00
CABLE-COPPER 3 AWG 14-600V 75.00 LF $2.00 $150.00
CABLE-COPPER 7 AWG 14-600V 440.00 LF $3.00 $420.00
CABLE-COPPER 9 AWG 14-600V 955.00 LF $4.00 $3,820.00
CABLE-COPPER 16 AWG 14-600V 0.00 LF $5.00 $0.00
CABLE-COPPER COAXIAL-VIDEO 540.00 LF $5.00 $2,700.00
CONDUCTOR-COPPER AWG 6 600V 650.00 LF $2.00 $1,300.00
CONDUCTOR-COPPER AWG 8 600V 550.00 LF $2.00 $1,900.00
CONDUCTOR-COPPER AWG 10 600V 610.00 LF $2.00 $1,220.00
CONTROLLER-CAB.PEDESTAL TYPE P 1.00 EA $1,500.00 $1,500.00
RESET CONTROLLER-CAB.&CONTROLLER TYPE P 1.00 EA $2,000.00 $2,000.00
SERVICE ASSEMBLY-60 AMP 1.00 EA $2,000.00 $2,000.00
SIGNAL-TRAFFIC 5 COLOR-1 WAY 12-12-12 3.00 EA $1,500.00 $4,500.00
SIGNAL-TRAFFIC 12-12 LED RETROFIT 4.00 EA $250.00 $1,000.00
SIGNAL-PEDESTRIAN RETROFIT 2.00 EA $200.00 $400.00
SIGNAL-PEDESTRIAN RETROFIT SLIPFITTER ASEM. 2.00 EA $300.00 $600.00
SIGNAL STANDARD TYPE 1-120 1.00 EA $1,000.00 $1,000.00
REMOVE&RESET EXISTING POLE 3.00 EA $1,000.00 $3,000.00
DETECTOR-VIDEO 2.00 EA $6,500.00 $13,000.00
SUPPLY&INSTALL EMERGENCY PREEMPT SYSTEM 0.50 EA $12,000.00 $6,000.00
REMOVAL AND SALVAGE 0.50 LS $1,000.00 $500.00
REMOVE&RESET MISC.ITEMS 0.50 LS $1,500.001 $750.00
PUSH BUTTON/PEDESTRIAN 4.00 EA $395.00 $1,580.00
TRAFFIC CONTROL 0.50 LS $30,000.00 $15,000.00
MOBILIZATION 1.00 LS $4,139.751 $4,139.75
TRAFFIC SIGNAL TOTAL $86,934.75
OAK&19TH-BMW PORTION ONLY-SCHEDULE TOTAL $373,837.47
PHASE 3 IMPROVEMENTS AGREEMENT SUMMARY:
ON-SITE(INTERIOR)IMPROVEMENTS: $ 275,000.50
BAXTER LANE(EAST PORTION): $ 36,281.10
OAK&19TH(BMW PORTION): $ 373,837.47
LANDSCAPING $ 401,211.00
TOTAL CONSTRUCTION COSTS: $ 1,086,330.07
TOTAL WITH 50%CONTINGENCY: $ 1,629,495.10
W
i 7 c°
_ J Y
y Q
So � o � o
r' QQ
` �1
a
►n o 0 0 o m in o 0 0 0
p r CD (oy CIS pg g a� S S CD �i o S, po
U S S N O O N co CD in m ci ~ r N O U � CS
n N W) r-- O 1!7
H M O Ql N cV
7 df Nf fA (A a! OA N a a/i N a9 Mf H W N W W -n M N 4, 00 N, df
m O N Q O p
O N act h
N r- O N r' �j Cif � r- N M CD
Q N a N
cn
m
X b
U m T m
0
_ m
G a O E E y _ N of
a� '�
Q.
IJD
Ek m
o
� y cm
cm c m E CD '� m E
U 7rn0. m cn w � J
_ _ a
x x c
w o =O 2 C
cn C En
m
a, Q � F � cn � � Nm P EL � w ¢ cn � m 1— 3
ze �� d es9�Is.�t�Y�Q�gNsez �zT!9szsi�r bs :!e 9fdezf-'Ltr'�0 �—
i
, zz
_ /j
-r W
O
I.J .• _ a.
Q
W
000000o Lom o 0 0 0 0 0 0 0 0 0 00 00o Q
0 0 0 Lfl O ID O f- r 0 0 0 0 0 0 0 0 CG 0 0 0 0 0 0 c7
J O O O m T,- t-- O 4 Oi 0 0 0 LD N O O r` Ln O O O 0 0 0 W
O O In r' O r LD N O LD 0 0 CD Ch LD M LD M r 0 0 O O O Li
Q O O N N Ln c+� N O O M V O -c ti (\ M ti M r 0 W) O LD V)
O It N O Lh �N-• O (D m O m 1" O t- t- NN O Ln Ln C7 c h O =
F- IT
a.
64 69 69 64 64 69 69 69 d3 6g 69 6R 69 69 69 69 64 64 69 6A 64 69� Ef3 69 64 } L
X
O O Ln O O O O r) Ln O O O O Ln O O O O O CIO O O O Q
O O 1+ O O b O O O G O O G O 0 0 0 LD O O o 0 0 C) LD
0 O O c`') !- r L"j L() 0 0 O O O LD M 0 1� r N 0 0 Id) O O O
0 N 0 0 N N O O LD V) �- r 0 f,. 0 0 0 00
0 I- O N r LD r 0 LD Ln
F- IT NN cl O C N C r r 'D
z a)
L
M U
69 4R 64 69 6f3 W-fb} 69 64 64 W U!)- 60, 613 69 601, YR 69 69 69 69 69 Ef}6q cn
j 75
cn cn LL. U.. U- LL Q w U.. U. U_ Q cn >- U- cn U. LL U) Q Q Q Q Q
JJJJJcnU1J Cn J J cn J J J W W
(n ►uLJI (� cn W W W
C
!i
In Ln ((�
C `- r ON LOD eM- (N N r O (D N N � r m Lo M r N M - Ln ca
N ItilLD 7 N N cp r• r IT In (6
cl) d ❑
L
� a
a� W
o U ax) m LL ° o
_ c o co m
E �aa)
m w g
m Ln
fl. O pp O c E L v co c N
p
O m
� o •A� a Yc oc om E E x° La
m N 0 ; n0 0 2 m
h CD cuL aO
A" m o c U U L � -0 N Q - r u o 0 0 0 .6 Q E
c - _ cm c
mo n ° �o txd 3 'G �a�i -6 > > c c c c m co ❑
a) L U7 m E m 1x.. - i N 'D •L:
D J o n m m m m
o .o 00 0 3 a) t '�co a) M co — E `o E a a n a aci
p oc a E a) m m ao a m Z 3CL - L= a Y o 0 0 o oma c
a)
0
W �
x m cn
U (Dc a) m
F' x o o o f c) U)
C!1 W a) m c c > > E t a) '� � a
E- E a) o •- . c D a a) m 0 Lo
0.� cn = •D c m cn w c _
(� Y m m m E E n w a C7 m ,c cn
y L c ro IL a) a) c •0 c o c m
d cs W c ~ ~ a) c � � � > > o o o °) m = UU a`ni LQL m
o m ro n O m m 0 0 a) a) .m m = m a a 0 0 0 m Q ❑
� wcn6 ¢ (),- cn � a n c� ¢ wQ �nm � rm F- v
EXHIBIT A
ENGINEER'S CERTIFICATE
REGARDING
Incomplete Subdivision Infrastructure
Baxter Meadows Subdivision,Phases 3A
November 30, 2007
This document relates to the above referenced tract of land also including a portion of the
remainder of Tract 2A of certificate of survey No. 2202A located in the southwest quarter
of Section 34,Township 1 South,Range 5 East,P.M.M., City of Bozeman, Gallatin
County, Montana.
The incomplete work as of the above date includes sidewalks for Baxter Meadows
Subdivision Phase 3A Infrastructure. Also attached is the schedule of values,based on
bid schedules for this project. Unit prices show that the total improvements amount totals
$174,675.00. I certify that based on existing conditions at this time in Bozeman the
attached cost estimate totaling$262,012.00 is a realistic cost for the improvements
outlined above.
Respectfully Submitted,
Keith War ,
0"O N I'Aly�
KEITH E. '
' WAFTING
:; No. 15161 PE -a:
�0',C
�F ,SCEN S��. �
rur��
Schedule of Values
Phase 3A
ROADIMPROVEMENTS
EST. UNIT
DESCRIPTION QUANTITY UNIT PRICE AMOUNT
5'WIDE SIDEWALK W/4"CRUSHED 46,580.00 SF 1 $3.751 $174,675.00
ROAD TOTAL $174,675.00
TOTAL 174,675.0
TOTAL ALL SCHEDULES= $174,675.00
1.5 x's Total= $262,012.50
_ - r cry. eats �vjud vj1 4.J,�I I`I t-,G
H
Z
W
g
NC
a
Q
IL
gc�v p o oog ti
N g Or 0 7p g Lll
4n to Ln
h Q
nj ui M r- 1--
� a
4q, t 6a in, GQ% 613� 612)-
o O ogoo
r�f O N
o N O � oO Op "
e), cs .9 691 G9 ta V). cs
aQU- D- coQQq
0 13
U
a,
aoi c
a O
E
a v�i
C3 W
W P-1 p ,c o o
m i oo pr cc
Q p - yc_� F cm
a)
di ca w `
U a w ICI a t- 2 ° ° co
cl
V
o aEi
m
a
as �
�+ in �
cc