Loading...
HomeMy WebLinkAboutat a glance NSURB for commission Feb 2010NSURB @ a Glance Blight announced: August 2005 TIF designated: November 2006 Board first met: May 2008 Members are: Andrew Cetraro, Jeff Krauss, Carl Solvie, Kevin Cook, Michelle Wolfe, Mike Hope, Scott Hedglin, Susan Riggs, Taylor Lonsdale, Susan Fraser City Planning staff: Keri Thorpe Current project: complete sidewalk on east side of North 7th between Oak and Peach, along with sidewalk at the northwest corner of the Oak Intersection (stimulus dollars project – must be completed September 2010) DCP: The Design and Connectivity Plan, also known as the Winter Plan, was produced as the first step in the remedy of the blight. It is the guiding document for the actual layout of sidewalks, lighting, everything along North 7th. It is available at: http://www.bozeman.net/bozeman/government/commission/citizen%20advisory%20boards/NSURB/NSURB.pdf Agendas, minutes available at: http://www.bozeman.net/bozeman/government/commission/citizen%20advisory%20boards/NSURB/NSURB.pdf 2010 Expenditure Plan TIF Other 2010 Expenditure Plan Balance 07/01/09 93,316 93,316 Interest 1,000 1,000 TIF allocation for FY10 272,000 272,000 Big Box Funds 232,000 232,000 Community block grant1 16,100 16,100 Stimulus dollars project 110,400 110,400 Total Revenue Available 366,316 358,500 724,816 Engineering plan, professional contract with Allied 50,000 100,000 150,000 N7Rehab – Redevelopment Incentive Program2     Façade/Site Improvements Fund 33,329 33,329 Streetscape Enhance Fund 10.829 10,829 Demolition fund 22,500 22,500 Part time staff and other professional services 10,829 10,829 Construction – Lights, Curb and Gutter, Sidewalk, Landscaping and Irrigation 238,829 258,500 497,329 Total Expenditures 366,316 358,500 724,816 Ending Balance 0 0 0 1community block grant – actuality of dollars yet to be determined 2Pending Commission approval of forthcoming Resolution for N7Rehab Program