HomeMy WebLinkAbout92- Rocky Mountain Timberlands IMPROVEMENTS AGREEMENT
FOR
ROCKY MOUNTAIN TIMBERLANDS MINOR 'SITE PLAN
APPLICATION #Z-9270
THIS AGREEMENT is made and entered into this Z 7 +—lday of
&Tp , e r _ , 1992 , by and between Wayne Joyner, hereinafter
called the "Developer" , and the City of Bozeman, a Municipal.
Corporation of the State of Montana, hereinafter called the "City" .
WHEREAS, it is the intent and purpose of the Developer to meet
the conditions of approval of Minor Site Plan application #Z-9270
allowing site improvements and alterations to the building at 1315
East Main Street; and
WHEREAS , it is the intent of the Developer to obtain Final
Site Plan approval ; and
WHEREAS , it is the intent and purpose of both the Developer
and the City to hereby enter into an Agreement which will guarantee
the full and satisfactory completion of the required improvements
on the property hereinafter described; and it is the intent of this
Agreement; and of the parties hereto , to satisfy the improvements
guarantee requirements for the Final Site Plan approval of said
Minor Site Plan application.
NOW, THEREFORE, in consideration of the mutual covenants and
conditions contained herein, it is hereby agreed as follows:
1 . Property Description
This Agreement pertains to, and includes those properties
which are designated and identified as Certificate of Survey #610,
City of Bozeman, Gallatin County, Montana, and more commonly
described as 1315 East Main Street, Bozeman, Montana,
2. Improvements
This Agreement specifically includes the installation of
landscaping, dumpster enclosure, paving, curbing, sidewalks, and ., .
other improvements illustrated on the
plans and specifications �.;;.;�.,,:•:
attached and made a part of this Agreement, as "Exhibit A" . The
estimated cost of said improvements is attached and made a part of Tµ +
--- -------------------------------------------------------------- ----_.-�+ i^�c.a_ ;
AUG 25 192 17:11 W.H. ANDERSON & ASSOCIATES P 3/7- ''
AI_lin E5 '92 17:11 W.H. HfIDERSOd & ASSOCIATES P.3!7
ROCKY MOUNTAIN TIMBERLANDS
IMPROVEMENTS AGREEMENT
PAGE 2 OF 4:
this Agreement, as "Exhibit B" and "Exhibit 13-1 " .
3. Financial Guarantee. Time for Completion of Improvements
If the use of the structure is to occur prior to the
installation of the improvements, the improvements must be secured
by a financial guarantee, as may be deemed acceptable by the City,
payable to the City of Bozeman, in an amount equal to one and one-
�e jehalf times the estimated cost of the installation of any required
f.
two
N IL improvements Cnot completed at this time. Said method of security
shall be valid for a period of not less than twelve ( 12) months.
In any event, all required improvements on the site as delineated
on Exhibit "A" , which is attached and made a part of this
Agreement, shall be completed within nine ( 9) months of occupancy
F is1s�PrD�Tub.
in order to avoid default on the method of security.
�e4 4 .dE�4nspection
PA'0 ` Representatives of the City shall have the right to enter upon
the property at any reasonable time in order to inspect it and to
r determine if the Developer is in compliance with -this Agreement,
and the Developer shall permit the City and its representatives to
enter upon and inspect the property at any reasonable time.
5 . Default
Time is of the essence of this Agreement. If the Developer
shall default in or fail to fully perform any of its obligations in
conformance with the time schedule under this Agreement, and such
default or failure shall continue for a period of thirty (30) days
after written notice specifying the default is deposited in the
United States mail addressed to the Developer at P.Q. Box 1153,
Bozeman, MT 59771 , or such other address as the Developer shall
provide to the City from time to time, without being completely
remedied, satisfied, and discharged, the City may elect to enforce
any of the following specified remedies:
A) The City may, at its option, declare the financial
guarantee to be forfeited and secure the complete
construction and inspection of the improvements described
----------------------------------
----- --
ROCKY MOUNTAIN .IMBERLANDS
IMPROVEMENTS AGREEMENT
PAGE 3 OF 4 :
herein.
1 . The City's representative, contractors, and
engineers shall have the right to enter upon the
property and perform such work and inspection, and
the Developer shall permit and secure any
additional permission required to enable them to do
SO.
B) The City may enforce any other remedy provided by law,
6. Warranty
The Developer shall warrant against defects in these
improvements for a period of one year from the date of their
written acceptance by the Governing Body. Any required landscaping
must be maintained in a healthy, growing condition at all times.
Any plant that dies must be replaced with another living plant that
complies with the approved landscape plan.
7 . Governing Law
This Agreement shall be construed according to the laws of the
State of Montana.
8 . Modifications or Alterations
No modifications or amendment of this Agreement shall be
valid, unless evidenced by a writing signed by the parties hereto,
9. Invalid Provision
The invalidity or unenforceability of any provision of this
Agreement shall not affect the other provisions hereof, and this
Agreement shall be construed in all respects as if such invalid or
unenforceable provision were omitted.
10, No Assignment
It is expressly agreed that the Developer shall not assign
this Agreement in whole, or in part, without prior written consent
to City.
11 . Successors
Except as provided in paragraph 10, this Agreement shall be
3
-- [-----------------------------------------------------------------------------------------------------
AUG 25 '92 17:13 W.H. ANDERSON & ASSOCIATES P.5i7
ROCKY MOUNTAIN TIMBERLANDS
TMPR0VVMVNTC Ar-UVVMV'hJM
ROCKY MOUNTAIN TIMBERLANDS
IMPROVEMENTS AGREEMENT
PAGE 4 OF 4:
binding upon, enure to the benefit of , and be enforceable by the
parties hereto and their respective heirs su essor -and assigns.
Wayne oy on behalf of
Rocky Z40 tain Timberlands,
its: eN
STATE OF MONTANA )
: ss
County of Gallatin )
C7�/ Ll On this lday of �Ib1992 , before me, a Notary
Public for the State of Montana, personally appeared Wayne Joyner,
known to me to be the person who executed the foregoing
Improvements Agreement and acknowledged to me that he executed the
same .
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
Notarial Seal the day and year first above written.
Notary. Pu�r is fo State of Mon an VV
Residing at
Commission Expires. -2-/- 3
(SEAL)
THE CITY OF BOZEMAN
Phillip J Fo es
Director of Public Service
STATE OF MONTANA )
:ss
County of Gallatin )
On the 21- day of /M4704L '-� , 1992 , before me , a Notary
Public for the State of Montana, personally appeared Phillip J.
Forbes, known to me to be the person described in and who executed
the foregoing instrument as Director of Public Service of the City
of Bozeman, whose name is subscribed to the within instrument and
acknowledged to me that he executed the same for and on behalf of
said City.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
seal on the day and year first written above.
Notary ublic forSt-at g f Montana
Residi at:��y ill
Commis ion Expires: .4 R—
(SEAL)
4
.- ----- ----------------------------------------- ---- -----------------
�p "EXHIBIT B"
11 /
ESTIMATED COST FOR IMPROVEMENTS
---------------------------
..
D -p---w---w-------- ---------w------w-....------r.�w-w-..-..--ww-www-w..-....w- G..
1
U DATE: 22 July 1992
ro ; PROJECT;-Rocky Mtn. Timberlands - 1315- E. Main I
Wayne Joyner A
` DEVELOPER: Y _ EA
L ' -------
-------- ---------------- ---w---
' -------
cost Per Unit F.st .Cost
n Item-
7 -
$ 5,375.007.
I
o Paving: 5, 375 SF $1 0 /SF90.
z Asphaltrr
Q° : 420 SF 3.00/SF 1-.260._0 Ln
n
Concrete
0
u' 390 SF 1.90/SF 741.00 Dy
o ' Sidewalks:
419 LF 8.25/LF 3,457. 00
D ,
U Curbing: 1 600.00
SEE EXHIBIT $-1
Landscape:
Landscape Protection:
1 unit
250.00/unit .. �Q —
Garbage Enclosure:
Exterior Lighting:
Water Improvements;
Sewer Improvements:
Street Improvements: 25.00
disabled space sign 1 unit 25.00/unit
TOTAL 12,788.r),
x 1.5 = $ 19,1&3.33
- Date: 1�-
Approved By City Engineering Office: A � '`�--
K--- ---------------------------------------------------------------------------------------..--------_-
F,JG 25 '92 17:15 W.H. RNDEr N & RSSOCIRTES P.7/7
ROCKY MOUNTAIN TIMBERLANDS
EXHIBIT B-1
Item Quantity Cost/Unit Total
dwarf caragana 7 $ 12 . 50 $ 88 .00
colorado spruce 5 155 .00 775 . 00
summit green ash 2 78 .00 156. 00
purple leaf sand cherry 7 12 . 50 88 . 00
buffalo juniper 3 25.00 75 . 00
tam juniper 6 25 .00 150. 00
dwarf mugo pine 3 29 .00 87 . 00
hops crab 1 49.00 49.00
grass & grading 1 ,009 SF . 21/SF 212 .00
TOTAL $1 , 680.00
",e-'------------------ - -- -