HomeMy WebLinkAbout14- Task Order No. 2 Dowl HKM for Streets and Utilities Land Agent ServicesExhibit A to Master Task Order Agreement for Professional Services TASK ORDER NUMBER 02 Issued under the authority of Professional Services Master Task Order Agreement between the City of Bozeman and DOWL I1KM for: Professional and technical services for the acquisition of right of may, easements and real property to allow for the construction of various street and utilities improvements within the City of Bozeman Task Order Title: Street and Utilities Land Agent Services - Wilson Avenue and Kagv Boulevard This Task Order is dated 20_ between Citv of Bozeman (City) and DOWLBKM (Contractor). The following representatives have been designated for the work performed under this Task Order: City: Rick Hixson, P.E. Contractor: Tony Becken-Gaddo, P.E. SCOPE OF WORK: The scope of work for Task Order No. 2 is detailed in the attached Exhibit A-2 Project Scope of Services. COMPENSATION: Contractor shall be reimbursed on a time and materials basis with a total cost not to exceed $13.340.00. The total cost for Task Order No. 2 is detailed in the attached Project Cost Estimate. Contractor shall invoice no more often than monthly for services provided in the prior month. The provisions of the Professional Services Master Task Order Agreement and any Special Terms and Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work. IN WITNESS WHEREOF, the parties authorized to commit resources of the companies have executed this Task Order: City of Bozeman By:�-- Title: el`i E,V/WtN - Date: x/13117 Contract By: Title: /�'ZCA4a..i Mn JA (_S2 Date: 9-6 • 2 0 / Fed. ID. No. 92-0166301 Exhibit A-2 Project Scope of Services July 29, 2014 Professional Services Agreement for Streets and Utilities Land Agent Services Project Scope of Services Task Order No. 2 The scope of services for this City of Bozeman Right -of -Way Acquisition Project is to Appraise, Acquire and successfully conduct and prepare the necessary meetings, agreements, and legal documents to transfer property titles from private land owners to the City of Bozeman (City). The City will be constructing new road and utility improvements in the near future and intends to acquire the necessary right-of-way (R/W) prior to construction. This project will serve as the R/W acquisition process for the future road and intersection improvements at the intersection of Willson Avenue and Kagy Boulevard in Bozeman, Montana. The intent of this scope of services and corresponding cost estimate is to provide acquisition services on a time and materials, not to exceed basis. Additional costs related to the actual land purchase price, relocation costs paid to property owners, and any costs associated with eminent domain proceedings are not included in this scope of services or cost estimate. The following activities will be conducted as outlined below. 1_0 PROJECT RESEARCH • Obtain and review available preliminary design plans • Obtain and review available project documentation • Coordination meeting with the project team members • Obtain current deeds and ownership information 2_0 INITIAL PROPERTY OWNER CONTACT • Compile contact information • Initiate contact with owners to inform them of this project and the process. 3_0 SURVEY • Control or topographic field surveys are not included in this scope. 4_0 R/W MAPPING & EXHIBITS • Determine proposed R/W acquisition areas for two parcels on the northwest corner of the intersection. Based on coordination efforts between the City and the property owner, it's anticipated the two parcels affected by future road improvements will be purchased in their entirety. • Prepare preliminary deed exhibits. Page 1 of3 BOWL HKM July 29, 2014 • The final deed exhibits will be filed with the clerk and recorder upon finalization of acquisition agreements • QA/QC of deliverables Deliverables: • Preliminary deed exhibits 5_0 TITLE COMMITMENTS • Title commitments will be secured for each parcel requiring property acquisition • Team coordination 6_0 APPRAISALS AND REVIEW APPRAISALS • Appraisals will be conducted for two parcels on the northwest corner of the intersection. • Review appraisals will be conducted for each of the northwest corner parcel appraisals by a second appraisal subconsultant • Team coordination • QA/QC of appraisal reports 7_0 PREPARE CONTRACTS • Prepare preliminary acquisition documents • Prepare preliminary acquisition costs • QA/QC of deliverables Deliverables: • Preliminary acquisition documents including costs MW • Conduct pre-acquisition meeting • Conduct meetings with property owners • Prepare final acquisition documents • Prepare final acquisition costs • QA/QC of deliverables Deliverables: • Final acquisition documents including costs 9_0 R/W AND DESIGN PLAN UPDATES • Based on acquisitions and agreements, updates to the preliminary deed exhibits will be completed, if required. • Modification of road design plans is not included in this scope. 4OkDOWL HKM Page 2 of 3 July 29, 2014 10.0 RELOCATION SERVICES Relocation services are not included in this scope. 11.0 CLOSING Prepare final title transfer documents, and schedule closing date. Attend closing meeting 12.0 FINAL SUBMITTAL AND CLOSEOUT • Deliver completed title transfer documents • Project closeout • QA/QC of deliverables Deliverables: • Final signed title transfer documents Due to the nature of property acquisition work, the time required to work with individual property owners varies significantly. The scope of services as detailed in this document includes all the necessary steps to acquire property from private owners, but much of that work relies on good cooperation and timely responses from all parties. The contingency item serves to capture the possible additional costs incurred during the acquisition process due to challenging situations with property owners. D O W L H K M Page 3 of City of Bozeman RIW Acquisition: Task Order No. 2 Project Cost Estimate DATE: 7/29114 PROJECT NO: 4524.11402.02 EST. PREPARED BY: DOWL HKM PAY SCH.: Time and Materials --NTE ctivity Tasks Total Hours Real Estate Manager Project Manager/ I Coordinator Right of Way/Relocali on Agent Design Engineer Assistant Coordinator Professional Surveyor Survey Crew Clerical WORK TO BE COMPLETED 1.0 PROJECT RESEARCH Obtain a0drevrewpmliminarydesignplws 1 1 0btainandreviewprojectdocumenla0on 1 1 Coordnatiw meeting with the pmje team member 1 1 Obtain wonat needs 1 1 SUBTOTAL(HOURS) 4 0 4 0 0 0 0 0 0 2.0 INITIAL PROPERTY OWNER CONTACT Compile Contact Information 0 IniOale Contact 1 1 SUBTOTAL(HOURS) 1 0 1 0 0 0 0 0 0 3.0 SURVEY Control Survey 0 EH EI Topographical Survey RAN Survey o 0 Not Applicable SeINew RNYPins 0 OP OC 0 SUBTOTAL(HOURS) 0 0 0 0 0 0 0 0 0 4.0 RAN MAPPING a EXHIBITS Detemlinepmp010RNJacquiSNonasas, 2 2 Prepare prellminery deed exhibits 3 1 2 OPNC of Deliverables 1 1 SUSTOTAL(HOURS) 6 1 5 0 0 0 0 0 0 5.0 TITLE COMMITMENTS Secure Title Commitments 1 1 Team Cowdiinfl. 1 1 SUBTOTAL(HOURS) 2 0 2 0 0 0 0 0 0 6.0 APPRAISALS AND REVIEW APPRAISALS Conduct Appraisal(2) 1 1 Conduct Review Appraisal (2) 1 1 Team CooNi..Wn 1 1 A. OA/QC 2 SUBTOTAL(HOURS) 5 1 4 0 0 0 0 0 7.0 PREPARE CONTRACTS Prepare PreliminaIyAcquiswn DowmenN 2 1 1 Prepare Preliminary AWuisibon Costs 1 1 ONQC of Deliverables 1 1 SUBTOTAL(HOURS) 4 1 2 0 0 0 a 0 1 8.0 ACQUISITIONS Conduct pre-acquisibon mee0ng 1 1 Co tower Meetings 12 12 Prepare Fret Acquisition Owwments 2 1 Prepare Final AcquisNon Costs 1 1 OP/oc or Deliverables 2 1 1 SUBTOTAL(HOURS) 18 1 16 0 0 0 0 0 1 9.0 RAV AND DESIGN PLAN UPDATES Update Preliminary Ned Exhibits 1 1 SUBTOTAL(HOURS) 1 0 1 0 0 0 1 0 0 10.0 RELOCATION SERVICES Provide Property Rekofflw 0 Not Applicable SUBTOTALIHOURS) 0 0 0 0 1 0 1 0 0 0 0 BOWL HKM Pagel oft 11.0 CLOSING Prepare Final Tills, Transfer Documents 1 1 Cleans Meetings 2 2 CA/QC 1 1 SUBTOTAL(HOURS) 4 1 3 0 0 0 0 0 0 12.0 FINAL SUBMITTAL AND CLOSEOUT Deliver Completed Tithe Transfer Documents 2 1 1 Proied closeoul 1 i QAIOC of Oelivemblas 0 SUBTOTAL (HOURS) 3 0 2 0 1 0 1 0 1 0 1 0 1 CONTINGENCY Notiation Challenges eg 4 2 2 Total Project Hours 52 7 42 0 0 0 0 0 3 COSTSUMMARY DIRECT LABOR Hours Rate Extension Real Estate Manager BW 7 150.00 1,050.0 Project Manager/Coordinator TBG 42 105.00 4,410.0 Right of Way/Relocation Agent RK 0 140.00 0_oc Design Engineer SZ 0 65.00 0p Assistant coordinate, ZL, CS 0 1 120.00 00 Professional Surveyor TR 0 130.00 0. Survey Crew TR & FM 0 225.00 p Clerical BOZ 3 55.00 165A TOTAL HOURS 52 TOTAL LABOR 55,625.0 DIRECT NONLABOR Miscellaneous (swarm. bn o, Mylass. mawamp<per, la<pban<. pocoge, mrso.ewlbmentrenwl. maps. brows. survey mils. Enpwy boards, etc) Unit Quantlt Rate Computer Hours Per Hour 0. Title Commitments Each 2 Per Paneel $350 700. Vehicle Rental Days Per Day $60 Ooc Mileage Miles 20 Per Mile $0.75 15, Airline Trips Trips Per Tnp $900 a0 Lodging Days Per Day $110 0 oc Meals Days Par Day $511 0,p TOTAL DIRECT NONLABOR 5715.0 OUTSIDE SERVICES AND SUBCONTRACTS LUMP SUM R/W A raisals Joki and Associates 6.000. R/W Review Ap raisals Hall-Widdoss and Co. 1,000.0c TOTAL OUTSIDE SERVICES AND SUBCONTRACTS $7,000.0 RECAPITULATION Total Direct Labor 5,625. Total Direct NonLabor 715. Total Outside Services 8 Subcontracts 7 ppp TOTAL ESTIMATED COST NTE)$13,340.a ztx OOWL HKM Page 2of2