Loading...
HomeMy WebLinkAbout91- IA for Video Lottery Consultants IMPROVEMENTS AGREEMENT FOR VIDEO LOTTERY CONSULTANTS THIS AGREEMENT is made and entered into this day of X)fi-e,X� , 1991 , by and between Larry Lippon , owner of the property at 2311 South 7th Avenue, located in Bozeman , Montana, hereinafter called the "Developer" , and the City of Bozeman , a Municipal Corporation of the State of Montana, hereinafter called the "City" . WHEREAS, it is the intent and purpose of the Developer to meet the conditions of approval for Major Site Plan application #Z-9197 allowing the construction of a one story 3 , 600 square foot office addition , a two story 20,400 square foot office addition , and a 6 , 000 square foot addition to the existing structure, and related parking and landscaping improvements on Tract 1A of Certificate of Survey #1393A, Summit Engineering Annexation in the City of Bozeman, Montana, and more commonly known as 2311 South 7th Avenue. WHEREAS, it is the intent and purpose of the Developer to satisfy the conditions of approval for Major Site Plan application #Z-9197 ; and WHEREAS, it is the intent and purpose of both the Developer and the City to hereby enter into an agreement which will guarantee the full and satisfactory completion of the required improvements r associated with the property hereinafter described; and it is the further intent of this Agreement, and of the parties hereto, to satisfy the improvements guarantee requirements for the Major Site Plan application. NOW THEREFORE, in consideration of the mutual covenants and conditions contained herein, it is hereby agreed as follows: 1 . Property Description This Agreement pertains to, and includes the property which is designated and identified as Tract 1A of Certificate of Survey #1393A, Summit Engineering Annexation in the City of Bozeman , Montana, and more commonly known as 2311 South 7th Avenue. 2 . Improvements This Agreement includes the installation of all required landscaping and site improvements, and other improvements as depicted on the approved Final Landscaping and Final Site Plans including landscaping , paving and curbing, selective removal of existing pavement, sidewalks, and utility improvements. Additionally, this Agreement includes the itemized Final Cost of Improvements which is attached and made a part of this Agreement as "Exhibit B" and "Exhibit B-1 " . 3. Financial Guarantee , Time for Completion of Improvements If occupancy is to occur prior to installation of all required landscaping and site improvements, the Developer shall submit to the City an irrevocable letter of credit or bond in the amount of 150 percent of the cost of all uninstalled improvements. Foreclosure proceedings shall be brought against the letter of credit or bond if the required improvements have not been completed within nine months of the posting date of bond or letter of credit. 4 . Inspection Representatives of the City shall have the right to enter upon the property at any reasonable time in order to inspect it and to determine if the Developer is in compliance with this Agreement, and the Developer shall permit the City and its representatives to enter upon and inspect the property at any reasonable time. 5 . Default Time is of the essence of this Agreement. If the Developer shall default in or fail to fully perform any of its obligations in conformance with the time schedule under this Agreement, and such default or failure shall continue for a period of thirty (30) days after written notice specifying the default is deposited in the United States mail addressed to the Developer at 2311 South 7th Avenue, Bozeman , Montana 59715, or such other address as the Developer shall provide to the City from time to time, without 2 being completely remedied , satisfied, and discharged, the City may elect to enforce any of the following specified remedies: A. ) The City may, at its option, declare the financial guarantee to be forfeited and secure the complete construction and inspection of the improvements described herein; B. ) The City may, at its option, declare that the conditions of approval of the Major Site Plan application have not been satisfied and are in violation of Section 18.52 of the Bozeman Zoning Code and thereby nullify said approval ; or C. ) The City may enforce any other remedy as provided by law. 6 . Warranty The Developer shall warrant against defects in these improvements for a period of one year from the date of their written acceptance by the Governing Body. 7 . Governing Law This Agreement shall be construed according to the laws of the State of Montana. 8 . Modifications or Alterations No modifications or amendment of the Agreement shall be valid , unless evidenced by a writing signed by the parties hereto. 9 . Invalid Provision The invalidity or unenforceability of any provision of this Agreement shall not affect the other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted. 10 . No Assignment It is expressly agreed that the Developer shall not assign this Agreement in whole, or in part, without prior written consent from the City . 3 11 . Sucessors Except as provided in paragraph 10 , this Agreement shall be binding upon , enure to the benefit of , and be enforceable by the parties hereto and their respective heirs, succ sors d assigns. Larry L ' o owner of 2311 outh h Avenue, Boze an , Mon ana STATE OF MONTANA ) : ss County of Gallatin ) On this day of 1991 , before me, a Notary Public for the State of Montana, personally appeared Larry Lippon, known to me to be the owner of the property at 2311 South 7th Avenue, Bozeman, Montana, and acknowledged to me that he executed the same for and on behalf of said establishment. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and year first above written . hz�4 7�,L-,-7� v Notary Public f e State of Montana Residing Commission Expir (SEAL) THE CITY OF BOZEMAN da�l� "J-- Phillip orbes Director of Public Service STATE OF MONTANA ) :ss County of Gallatin ) On the Zs°k day of 1er00F(z 1991 , before me , a Notary Public for the State of Montana, personally appeared Phillip J . Forbes, known to me to be the person described in and who executed the foregoing instrument as Director of Public Service of the City of Bozeman , whose name is subscribed to the within instrument and acknowledged to me that he executed the same for and on behalf of said City . IN WITNESS WHEREOF , I have hereunto set my hand and affixed my seal on the day and year first written above. NotarV Public for the State of Montana Residing at: E`l. A Commission Expires : (SEAL ) 4 "EXHIBIT B" ESTIMATED COST FOR IMPROVEMENTS - ----------------------------------------------------------------------------------------------- j t DATE: 20 SEPTEMBER 91 PROJECT: Video Lottery Consultants Maj. SP DEVELOPER: Larry Lippon w w------------------------w w- w w-----�•---------r-------- -----------r---------------------------- Item- Sq,Ft , /Ln . Ft . Contractor Est , Cost Paving:Asphalt 27, 500 SF 1. 00/SF ' $27, 500 . 00 Concrete Sidewalks : 3 , 960 SF . 90/SF 7, 524. 00 Curbing: 1 , 438 LF 8. 25/LF 11 , 863 . 50 Landscape: SEE EXHIBIT B-1 27, 224. 01 Landscape Protection: Garbage Enclosure: Exterior Lighting: 7 units 350 . 00/unit 2, 450 . 00 Water Improvements : (tier attached) Via Engineer's Estimate 44 , 000 . 00 Sewer Improvements: S� Street Improvements : 2a TOTAL ` ,41 X 1 . 5 GRAND TOTAL round to $2 00 0 Approved By City Engineering Office: Date: r 3 Lt4 -- _ a\ _ � Q EXHIBIT B-1 Video Lottery Consultants Landscaping Estimate item # of units cost/unit total Patmore Green Ash 33 $275 . 00 $9 ,075. 00 Colorado Spruce 13 138. 00 1 , 794. 00 Cotoneaster ill 7 . 50 832 . 50 Prince of Wales Juniper 37 19 . 50 721 . 50 Flowering Crab 3 49 . 00 147 . 00 grass 69 , 781 SF . 21 /SF 14, 654. 01 TOTAL $27 , 224 . 01 VLC WATERMAIN IMPROVEMENTS ENGINEER' S ESTIMATE 9/30/91 ITEM QUANTITY UNIT PRICE TOTAL PRICE 6" Class 51 DIP, Installed 1430 LF $ 22 LF $ 31 ,460 6" Gate Valves w/Box 6 $ 500 ea. $ 3, 000 Fire Hydrant Assembly 1 $ 1 , 600 ea. $ 1 , 600 900 Bends 1 $ 150 ea. $ 150 6" Plugs 4 $ 70 ea. $ 280 6" Tees 4 $ 225 ea. $ 11000 6" x 6" Cross 2 $ 350 ea. $ 700 Connection to existing 2 $ 500 ea. $ 11000 Domestic RPZ Backflow Preventor 1 $ 2 ,000 ea. $ 2 ,000 Fire Service Entrance Riser 2 $ 1 , 500 ea. $ 3 , 000 Total Cost Estimate $ 44, 190