Loading...
HomeMy WebLinkAboutAmendment to Prof. Services Agreement with Tetra Tech_4 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Rick Hixson, City Engineer Craig Woolard, Public Works Director Dustin Johnson, Project Engineer SUBJECT: Amendment to Professional Services Agreement with Tetra Tech Inc. for ongoing post-closure soil gas investigation at the Story Mill Landfill. MEETING DATE: August 25, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize City Manager to sign. BACKGROUND: The City of Bozeman is required by the Montana Department of Environmental Quality (DEQ) to monitor the environmental impacts of the Story Mill Landfill. Tetra Tech (previously Maxim Technologies) has been contracted with the City to serve as a consultant since the mid-1990s. The nature of the contract has been to provide consulting services to the City of Bozeman in the form of sampling, drafting technical reports to the DEQ, and keeping the landfill in compliance with State and Federal regulations. In previous task orders regarding the soil gas investigation Tetra Tech’s research found volatile organic compounds (VOCs) in the soil in the residential area south of the landfill. Based on these results city staff and Tetra Tech determined it was necessary to conduct indoor air sampling on residences in the area of concern. From this indoor air sampling it was determined that sub-slab sampling would be necessary to better understand the migration of soil gas from the landfill. The results of all of these samples were used to decide to install soil gas mitigation systems for those who requested them in the homes of Bridger Creek Phase III at no cost to the homeowner. The attached task order includes resampling of newly installed groundwater monitoring wells, additional cost for deeper groundwater monitoring wells in difficult conditions, and changes to some mitigation systems installed in the homes in Bridger Creek Phase III. The proposed cost for this task order is $37,706.85. Specific names included in the task order have been redacted for this packet in order to respect the privacy of those parties. 19 FISCAL EFFECTS: The entire project will be funded through the Solid Waste Landfill Closure/Post-Closure Fund. ALTERNATIVES: As suggested by the City Commission. Attachments: Task Order and estimated budget from Tetra Tech Inc. Report compiled on: 8/14/14 20 21 22 23