HomeMy WebLinkAbout2014 CIP Field Survey, Morrison Maierle ENGINEERS
SCIENTISTS
CIENTISTS
. 1 1�1�1/J 1V SURVEYORS
WdERLE INC. PLANNERS
� 2880 TECHNOLOGY BLVD WEST PO BOX 1113 BOZEMAN,MT 59771 406-587-0721 FAX 406.587-1176
An Em ia ployee-O -ned Company Szea%A
July 2, 2014 ED
Jut 2.it4 �J
Office of the City Engineer
City of Bozeman
20 E. Olive
PO Box 1230
Bozeman, Montana 59771-12 30
Subject: Proposal Submittal —2014 Capital Improvement Projects Field Survey
Citv Staff:
J
Morrison-Maierle, Inc. is pleased to submit to the City of Bozeman five(5)originals of our proposal for
the proposed 2014 Capital Improvement Projects Field Survey. We have assembled a strong team of
professionals with recent survey experience within the City of Bozeman and are excited to have the
opportunity to work with the City staff on this project. We feel confident that we will.provide the best
quality of service available.
We appreciate your consideration of our qualifications, and look forward to working in partnership with
you for a successful project.
Sincerely,
QMORRdlN-MAIEaE,INC.
Kevin D. Ja obsen, P.E.
Senior Proj ct Engineer
Encl: Non-Discrimination Affirmation Form
"Providing resources in partnership with clients to achieve their goals"
NON-DISCRIMINATION AFFIRMATION FORM
A/§/Ur.Sdn/-�1//C,eGE,1AZ [name of entity submitting]hereby affirms it will not discriminate
on the basis of race, color,religion,creed, sex, age,marital status,national origin,or because
of actual or perceived sexual orientation, gender identity or disability in the performance of
work performed for the city of Bozeman,if a contract is awarded to it,and also recognizes the
eventual contract,if awarded,will contain a provision prohibiting discrimination as described
above and that this prohibition shall apply to the hiring and treatment of the
A1UQA1-1'0&&Z, 1/VC- [name of entity submitting]employees and to all subcontracts it
enters into in performance of the agreement with the city of Bozeman.
0 zc._�
Signature of Bidder:
_ &-� ,,Z—
�erson authorized to sign on behalf of the bidder
+ MOMSON
ENGINEERS
SURVEYORS
PLANNERS
A WdERLE, INC. SCIENTISTS
2880 TECHNOLOGY BOULEVARD WEST•PO BOX 1 i13•BOZEMAN,MT 59771
An Employee-Owned Company OFFICE:406-587-0721•FAX:406-922.6702•wm.m-m.nel
STATEMENT OF QUALIFICATIONS
2014 CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY
CITY OF BOZEMAN
INTRODUCTION
Morrison-Maierle, Inc. is excited to provide professional services to the City of Bozeman for the
2014 Capital Improvement Projects Field Survey. Morrison-Maierle brings together the strength
and knowledge of City of Bozeman infrastructure and experience working on numerous
projects, following the City's standard surveying and drafting requirements. Morrison-Maierle
has done extensive surveying on both City of Bozeman and private projects in the past and will
bring this experience to this contract.
Morrison-Maierle understands the importance of the City of Bozeman Capital Improvement
Projects. These projects help to maintain the city's infrastructure as well as help to reduce
overall maintenance costs. Detailed survey on the front end of these rehabilitation projects is
the first step toward successful design and construction.
-- -
MORMSON
..-t-
Providing resources in partnership with clients to achieve their goals
An Equal Opporruniry Employer
A J MORMSON
AA NNERLE,INC.
PROJECT MANAGEMENT AND STAFFING
The Project Manager for the project will be Kevin Jacobsen, P.E., who has managed numerous
projects for the City of Bozeman. He has recently managed the construction of the North 7th
Avenue Lighting Project and the 2011 Water Renovations Field Survey Project. His knowledge
of City of Bozeman policies and specifications has led to excellent management of these
projects. Mr. Jacobsen has developed a very successful track record, which makes him the
ideal candidate to manage this survey project.
The Quality Assurance will be provided by James Nickelson, P.E. Mr. Nickelson has managed
the construction quality assurance on the Bozeman Water Reclamation Facility and the
Bozeman Water Treatment Plant; in addition to numerous other projects in Bozeman. His
knowledge of City of Bozeman policies and specifications enable him to provide dependable
oversight to this project.
The Surveying supervision will be provided by
Dan Boers, P.L.S., CFedS. He has extensive
surveying experience in Bozeman and is very
familiar with National, State, and City of Bozeman
requirements and specifications. Mr. Boers
served as lead surveyor on many projects
including the following: j
• Bozeman Water Renovations Field
Survey Project
• Bozeman Water Treatment Plant
• North 71h Lighting Design and
Construction Project
• E. Tamarack St., Front St., North Ida
Ave., E. Aspen St. Rehabilitation Project
• E. Peach Street Rehabilitation Project
Mr. Boers will manage the following three }
additional personnel to assist with the surveying
operations, all of whom have done extensive
surveying in the Bozeman area.
• Jon Wilkinson, P.L.S., CFedS '
• Hans Streufert, P.L.S.
• Matt Nelson, Survey Technician
Morrison-Maierle Survey Personnel are headquartered at the Bozeman facility, located at 2880
Technology Boulevard West, within the Bozeman city limits.
City of Bozeman 2014 Capital Improvement Projects Field Survey
MORRISON
Aid MERLE,INC.
Morrison-Maierle will also have available the following surveyors from our Helena and Missoula
offices to assist the Bozeman surveyors, if required.
• Jeffrey Roe, P.L.S
• Robert Blank, Survey Technician
• Mark Waller, Survey Technician
�.;.; Our survey team will provide
y �'•
detailed topographic surveys
of both the above ground and
below ground utilities and
..i`'`�'='�+w� other improvements. Survey
control, both vertical and
horizontal, will be provided for
each street and typically for
each block or two in order to
aid in the construction when it
comes time for actual
construction work to occur. If,
during construction, the city
desires to provide
construction staking, our team
would be happy to provide
this professional service.
Dean Squires will serve as the senior drafting technician on the project. He will work to process
the survey data using Civil 3D 2013 in a clean and well organized fashion. Deliverables will
include detailed hard copy exhibits of each street section, electronic copies of exhibits,
AutoCAD 2013 (or the latest version the city is currently using) files and copies of all survey field
books.
City of Bozeman 2014 Capital Improvement Projects Field Survey
AJ MORRISON
AA MERLE,INC.
PROJECT MANAGEMENT CHART
:r City of Bozeman �';j =. . ,`►fi ,., , :r.E ��, ;
ve
Project Manager Quality Assurance
- Kevin Jacobsen, P.E. James Nickelson, P.E.
_
ryr�s r t �— 1 1p f ��77F��
Survey Manager CAD Drafting Technician
Dan Boers, P.L.S., CFedS Dean Squires
4*
Y U
Survey Technicians
_ 1 Jon Wilkinson, P.L.S., CFedS
Hans Streufert, P.L.S. p
Matt Nelson �3 E•
Jeffrey Roe, P.L.S. - '-
t Robert Blank
Mark Waller
City of Bozeman 2014 Capital Improvement Projects Field Survey
� MORRISON
Aid MAIERLE,INC.
PROJECT TEAM AVAILABILITY
Morrison-Maierle is committed to providing a local team of professionals that provide knowledge
and technical expertise to ensure project success. It is the personal commitment to and
ongoing relationships with the City of Bozeman which allow us to deliver the people and
products required. Other project assignments for our team staff will not impact our ability to
perform on this project.
Team Member Current Workloads Availability
Kevin Jacobsen, P.E. North 7th Avenue Lighting 15%
NE Urban Renewal Projects
Valley West Subdivision
James Nickelson, P.E. City of Bozeman Waste Water Facility Plan 10%
Bozeman Water Treatment Plant
Norton Phase 3 Subdivision
City of Bozeman Materials Testing
Daniel Boers, P.L.S., CFedS Yellowstone International Airport 30%
Northwestern Energy— Hwy 191 Power Pole
Layout, Spanish Peaks, Yellowstone
Mountain Club, Lone Pine Builders,
Legends Phase 3
Jon Wilkinson, P.L.S., CFedS Northwestern Energy Hwy 191 Power Pole 60%
Layout, Northwestern Energy NERC Surveys
Spanish Peaks, Yellowstone Mountain Club,
Middle Creek Phase 2, Valley West Phase 3
MSU College of Business
Hans Streufert, P.L.S. Northwestern Energy Hwy 191 Power Pole 50%
Layout, Norton Ranch Phase 3, Spanish
Peaks, Yellowstone Mountain Club
Matthew Nelson MSU College of Business, MSU Miller Hall, 60%
Northwestern Energy Hwy 191 Power Pole,
Layout, Spanish Peaks, Yellowstone
Mountain Club, Mitchell Development,
Legends Phase 3
From Other MMI Offices Related Projects Availability
Jeffrey Roe City of Anaconda Water Renovations Project 40%
Robert Blank City of Valier Wastewater 40%
Town of Boulder Wastewater
Mark Waller Century Link Easements 30%
City of Bozeman 2014 Capital Improvement Projects Field Survey
'dJ MORRISON
i AMAIERLE,wc.
GENERAL TIME SCHEDULE
Upon review of the Preliminary Scope of Services, we have determined there are approximately
three miles of streets plus several intersections, which yields approximately four miles of survey
work. These streets are very busy and will require more coordination and safety requirements
than in a green field area. We estimate the survey portion of the project to take approximately
three months to complete, with the processing and deliverables taking another month to
complete.
With our current staffing availability, we estimate starting the effort in early to mid-August, with a
projected completion by the end of the year. We would propose to prioritize the street survey
work in coordination with the City Engineer's office to match the Designer's requirements. If
required, we could utilize other Morrison-Maierle offices' surveyors to satisfy the contract
requirements, in addition to several engineer and survey interns available to assist the Morrison-
Maierle professional surveyors.
A
1 L
F
City of Bozeman 2014 Capital Improvement Projects Field Survey
141' City of' Bozeman: 2014 Capital Improvements Field Survey
..AMORRISON Senior Project
AA MMRLE,INC. KEVIN D. JACOBSEN, P.E., LEED AP
MEmao C Engineer
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Amended Plats of Valley West Subdivision Phases 313,3C and 3D, Bozeman,
BS Civil Engineering; 1999 MT. Project Manager for the entitlement, design,surveying, permitting and
Montana State University construction of this 30 lot subdivision.
E.Tamarack St., Front St.. E.Aspen St. and N. Ida Ave. Street Rehabilitation
SPECIALIZATION Project, Bozeman, MT. Project Manager for this street rehabilitation project
Project Management located in an Urban Renewal District. Effort included detailed topographic
Land Development survey and coordination with the City of Bozeman. -
Roadway Design 2013 City of Bozeman Water Main Renovations Project,Bozeman, MT. Provided
Water Resources Analysis/Design project management for the materials testing associated with approximately
Water and Wastewater Analysis/Design one mile of water main rehabilitation. Testing services included soil proctors,
Stormwater Analysis/Design sieve analysis,gradations and field density verification.
Technical Writing
City of Bozeman Water Main Renovations Field Survey, Bozeman, MT. Provided
REGISTRATION project management for the topographic mapping of approximately 30 acres
Professional Engineer: of city right of way. Survey services included above ground features and
Montana No. 13897PE;2004 below ground utilities.
North Dakota No. PE7737;2012 North 7th Lighting Design and Construction Administration Bozeman,MT.
Project Manager for the design and construction of this entryway corridor
LEED(Leadership in Energy and lighting project, located within an Urban Renewal District. Coordinated design
Environmental Design)Accredited surveys, infrastructure design and easement preparation.
Professional;2009
2011 City of Bozeman Water Main Renovations Project, Bozeman, MT. Provided
ACI (American Concrete Institute)Field project management for the materials testing associated with approximately
Testing Technician-Grade 1 3,400 lineal feet of water main rehabilitation. Testing services included soil
proctors,sieve analysis,gradations and field density verification.
PROFESSIONAL East Peach Street Rehabilitation Project, Bozeman, MT. Project Manager for this
SUMMARY street rehabilitation project located in an Urban Renewal District. Effort
included detailed topographic survey, and coordination with the City of
Mr. Jacobsen is a Civil Engineer Bozeman, numerous community boards and neighborhood associations.
specializing in Project Management,design, drafting, and construction Bozeman Water Treatment Plant, Bozeman, MT. Responsible for the
inspection. He has worked on the completion of the site hydrology calculations as well as grading and
management, design and drainage design for this City of Bozeman project.
construction of road, sewer, water, College-Huffine Shared-Use Pathway Project, Bozeman, MT. Managed the
and storm projects within the City of material testing for this City of Bozeman project. Testing services included
Bozeman and surrounding soil proctors, sieve analysis,gradations,field density verification and concrete
communities and is a valuable testing.
resource to any project.
PT Land Planned Unit Development, Bozeman, MT. Project manager for all
PROFESSIONAL ACTIVITIES aspects of this multi-phased project; including infrastructure design,
construction management, and final platting. This 15-lot commercial
Montana Contractors Association subdivision is located in the City of Bozeman and required all aspects
Bozeman Chamber of Commerce of subdivision work including signal design on a principal arterial.
PROFESSIONAL HISTORY Bozeman Water Reclamation Facility, Bozeman, MT. Responsible for the
completion of the potable water main design and site grading/drainage
1999-Present, Morrison-Maierle, Inc. design for this large scale City of Bozeman. Required coordination
Civil Engineer with many parties involved; including the City of Bozeman and
architectural/engineering firms.
Valley West Subdivision, Multiple Phases, Bozeman, MT. Contributed Project
Management, survey, design and construction inspection experience
to all aspects of this multi-phased subdivision. Involvement included
road, water, sewer, and storm analysis and design and quality
assurance during construction.
w««.m-m.net mmi@?ni-m.net PROVIDING RI SWIA i I IN PAR I NI K,nm "'f i n CI II N i. 14) ne nii �,l rni ui ;()All
City of' Bozeman: 2014 Capital Improvement Field Survey
goMOFMSON
00Ali MAIMLE,INC. Senior Project Manager JAMES R. NICKELSON, P.E.
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION North Rouse Avenue Sewer and Water Project, Bozeman, MT. Sewer and water
MS Civil Engineering(Hydraulics); line replacement and upsizing project utilizing 24"and 30"sewer pipe.
1992 City of Missoula-$3,000,000 STEP Sewer, Missoula, MT. Field engineer for
Colorado State University construction inspection and administration of the City's Septic Tank Effluent
BS Civil Engineering; 1987 Pump sewer projects.
Montana State University
Water Reclamation Facility Expansion, Bozeman, MT. Task Manager for site
SPECIALIZATION design and permitting for a $50,000,000 expansion of the City of Bozeman's
Water Reclamation Facility. The facility upgrades include a new head works,
REGISTRATION a new primary effluent pump station, a new and revised bioreactor facility,
Professional Engineer: additional secondary clarifier capacity, an additional digester and ultraviolet
Wyoming No. 11590;2008 disinfection system and a new outfall location. Served as Project Manager for
Montana No.9063PE; 1992 the construction engineering serves for the project.
California No. C46774; 1991 Oak Street, (North 7►h to North Rouse Avenue) Bozeman, MT. Managed this road
reconstruction and extension project for the City of Bozeman from preliminary
PROFESSIONAL design through construction.Tasks included right-of-way acquisition, plan
SUMMARY review,and construction administration.
Durston Road, (North 7"to North 191h Avenue) Bozeman, MT. Managed this
Mr. Nickelson has over 20 years of roadway reconstruction project through the pre-design phase.
experience in planning, designing and
managing civil infrastructure projects. He Water Treatment Plant Replacement, Bozeman, MT. Roles include site design,
is involved in water-wastewater and land permitting, residuals handling, stream intake modifications and construction
development engineering for Morrison- engineering project management for the 22 MGD membrane filtration water
Maierle, Inc. Responsibilities include plant.
agency approvals, water and wastewater
system design,road design and Lyman Creek Reservoir Improvements, Bozeman, MT. Project Manager for the
coordination with agencies. While City of Bozeman's Lyman Creek Reservoir Improvements project. The project
employed with the City of Bozeman, Mr. consists of improvements to the spring water source,expansion of the water
Nickelson was responsible for managing plant capacity, numerous capacity related upgrades and improvements at the
street,water,and wastewater projects. City of Bozeman's Sourdough Reservoir facility.
Mr. Nickelson also reviewed flood plain
permits,assisted in the creation of Northwest Water Line SID 665, Bozeman, MT. Responsible for managing this
Special Improvement Districts and project for the City of Bozeman to expand the service area in the northwest area
provided technical assistance to the of the community.
wastewater treatment plant. While North Rouse Avenue Water Project, Bozeman, MT. Water line replacement
employed at WGM Group,Mr. Nickelson project.
was responsible for designing, observing
construction and contract administration Big Sky Water and Sewer District—Well Project, Big Sky, MT. Responsible for
for civil engineering projects. He was design and permitting of a well to add capacity to the Big Sky Water and Sewer
also responsible for preparing District's Mountain Village Water System.
engineering reports for wastewater and
water facilities. Cemetery Irrigation Evaluation, Bozeman, MT. Review groundwater and surface
PROFESSIONAL ACTIVITIES water options for supplying water for irrigation of the City's cemetery.
Water Renovations Survey Project, Bozeman, MT. Project Manager for design
Water Environmentt Federation
American Society Civil Engineers survey work for the City's scheduled water renovations project.
PROFESSIONAL HISTORY Antler Ridge Subdivision,Big Sky, MT. Hydrologic analysis and hydraulic design
for 240 acre development. Preparation of erosion control plan and storm water
2000-Present, Morrison-Maierle, Inc. discharge permit.
Senior Project Manager
1997-2000,City of Bozeman, Bozeman Storm Water Master Plan, Bozeman, MT. Team leader for
Project Engineer comprehensive City Storm Water Master Plan update.
1991-1997,WGM Group Plan Review, Bozeman,MT. As a staff member of the City of Bozeman's
Civil Engineer Engineering Department and as a contract reviewer responsible for the review of
1989-1991,Colorado State University development proposals and floodplain permits.
Research Assistant
1988-1989, California Department of Parking Garage, Bozeman, MT. Responsible for site design, permitting and
Transportation assistance with funding agency requirements for 450 parking stall garage.
Civil Engineer
%\'\v",.m-m.net ' mmi(q)m-m.net I'Itt)VIDING Itl ItitlRt'I S IN PAR I NI R'Il[P VVI I.11 t'111 N-I S 1() ACIIII \'1 1111 IR c,OA1
i
City of' Bozeman: 2014 Capital Improvements Field Survey
'A MORMSON Professional Land
AA MAIMLE,INC. DANIEL J. BOERS, P.L.S., CFedS
A.6npl-M-0—eOC-np—y Surveyor
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Gallatin County, Montana,Trooper Trail R.I.D., Bozeman,MT. Served as
AAS Land Survey Technician; 1998 Professional Land Surveyor and Task Manager for the GPS control survey,
Nicolet Area Technical College topographic surveys and mapping of the Trooper Trail Corridor, supervised
surveying and mapping,and assembly of survey deliverables.
SPECIALIZATION Bozeman School District No.7, Mandeville Creek Renovation, Bozeman, MT.
Project Manager/Task Manager Served as Professional Land Surveyor and Task Manager for the topographic
Cadastral Surveying surveys and construction staking projects. Supervised the surveying and
Public Land Survey System mapping,and assembly of survey deliverables.
Right-of-Way Retracement East Peach Street Rehabilitation Project, Bozeman, MT. Served as Professional
REGISTRATION Land Surveyor and Task Manager for the GPS control survey, retracement of
existing townsite surveys,topographic surveys and mapping of the East
Professional Land Surveyor: Peach Street Corridor. Supervised the surveying and mapping, and assembly
Montana No. 14732LS; 2005 of survey deliverables.
North Dakota No. LS5988; 2008
Wyoming No. LS11751;2008 City of Bozeman, Montana, North 7th Lighting Design and Construction
Idaho No. 13395;2008 Administration, Bozeman, MT. Served as Professional Land Surveyor and
South Dakota No. RLS9818;2009 Task Manager for the GPS control survey, topographic surveys and mapping
Certified Federal Surveyor(CFedS) of the North 7th Street Corridor. Supervised the surveying and mapping,and
No. 1084:2007 assembly of survey deliverables.
City of Bozeman, Montana,Water Renovations Project, Bozeman, MT. Served
PROFESSIONAL as Professional Land Surveyor and Task Manager for the GPS control survey,
SUMMARY retracement of existing townsite surveys,topographic surveys and mapping of
E. Bryant St., N. Rouse Ave.,S. Black Ave., E.Aspen St., E. Mendenhall St.,
Mr. Boers'has over 95 years of N. Montana St., E. Story St.,and Dell Place. Supervised the surveying and
experience specializing in the mapping,and assembly of survey deliverables.
Public Land Survey System, FedEx Bozeman,ALTA/ACSM Land Title Survey, Bozeman, MT. Served as
cadastral surveys, route surveys, Professional Land Surveyor and Task Manager for the preparation of
GPS control surveys, aerial photo ALTA/ACSM Land Title Survey for feasibility, planning and acquisition. Tasks
control surveys, communication included research of public records, GPS control survey,cadastral survey and
sites, oil and gas, land anal sis,topographic ma in
subdivisions, and federal trust y PP 9,quality control and quality assurance project
deliverables.
lands. He is an expert in records
research and interpretation, Park High School, District#1, Park High School Renovations, Livingston, MT.
evidence analysis, and survey Served as Professional Land Surveyor, Certified Federal Surveyor, and
calculations. Mr. Boers is proficient Survey Task Manager responsible for the topographic survey of Park High
in project management, task School. Performed GPS surveys and conventional surveys as well as vertical
management, and client service. control to identify ground features and subsurface features for engineering
and architectural design. Prepared a boundary analysis and a FEMA
PROFESSIONAL ACTIVITIES elevation certificate for Park County and City of Livingston permitting. Served
Montana Association of Registered as Task Manager for the construction staking of engineering and architectural
Land Surveyors design improvements. Tasks included staking 1,200 lineal feet of curb and
North Dakota Society of Professional gutter, lighting,storm drain and a new water main.
Land Surveyors Big Horn County Commission, Fort Smith Canister Site Survey(CFedS), Fort
Professional Land Surveyors of Smith, MT. Served as Professional Land Surveyor, Certified Federal
Wyoming Surveyor, and Project Manager responsible for the boundary survey of federal
trust lands. Identified areas of encroachment at a canister site to clarify a
PROFESSIONAL HISTORY lease area. Performed boundary analysis, preparation of Certificate of Survey
2007-Present, Morrison-Maierle, Inc. and Certified Corner Records for retracement and dependent resurvey of the
Professional Land Surveyor Public Land Survey System surrounding and controlling the canister site.
2006-2007, Latvala, Boers and City of Bozeman, Montana, Lamme Street Rehabilitation Project, Bozeman, MT.
Associates, Inc., Project Manager, Served as Party Chief for topographic surveys and mapping of the Lamme
Professional Land Surveyor Street Corridor. Supervised the surveying and mapping,and assembly of
2000-2006, Latvala and Associates, survey deliverables.
Instrument Person, Party Chief,
Professional Land Surveyor
mmi(a�m-m.net PRI)VI llNI; RI S IR( l � IN PAR I NI RS111r \\']i iI CI n N l� 1O %c-nn NA iul IR ;()Al
Ad,
MORRISON City of Bozeman: 2014 Capital Improvements Field Survey
AA MMRLE,wc.
M(,pp-0,,.,,,,,C.„ .,. Professional Land Surveyor JON C. WILKINSON, P.L.S., CFed S
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION City of Bozeman, North 71h Lighting, Bozeman, MT. RNV Boundary Survey,
BS Construction Engineering Topographic Survey, and Easement Survey for lighting Improvements from 1-90
Technology; 1998 to Main street. Deed and ownership research along North 7 .
Montana State University City of Bozeman,Tamarack-Ida Rehab, Bozeman, MT. R/W Boundary Survey,
Topographic Survey of Tamarack and Ida for street Rehab. Deed and
SPECIALIZATION ownership research.
Boundary Surveys Montana Department of Transportation, City of Great Falls, Cascade County,
Alta Surveys MT. RNV Boundary Survey,Topographic Survey, Draft Certificate of Survey for
Topographic Surveys Street improvements/rebuild.
Construction Staking
Micro Station Drafting Montana Department of Transportation, Greeley Creek 1-90. CN 7749000, MT. I-
90, Frontage Rd.and Railroad RNV retracement,section search and breakdown,
REGISTRATION Topographic—Hyd.survey, deed and easement research, Certified Corner
Professional Land Surveyor Records,and draft Geopak/Micro Station Certificate of Survey.
Montana No. 16411 LS; 2008 Wyoming Department of Transportation, Powell North.#1506002,WY. WYO 295
Utah No. 7276002-2201;2009 RNV retracement(6 miles). Government Lot Resurvey retracement. Land
CFedS No. 1405;2010 Ownership, Record of Survey, deeds,and Corner Record research. Draft 20
sheet Geopak/Micro Station Record of Survey. Set 75 RNV monuments.
PROFESSIONAL Montana Department of Transportation, East Belgrade Interchange, CN
SUMMARY 5897.001,MT. 1-90, Frontage Rd. and Railroad RNV retracement, section
Mr. Wilkinson has field experience search and breakdown,Topographic survey,deed and easement research,
using conventional Topcon, Nikon, Certified Comer Records, and draft Geopak/Micro Station Certificate of Survey.
Sokkia, and Leica Total Stations. GPS U.S.A.C.E. Fork Peck Boundary, MT. Boundary posting survey of government
equipment includes Trimble and boundary at Fork Peck Dam for the United States Army Corps of Engineers.
Thales. Zeiss and Leica Digital levels. Dependent Resurvey and section breakdown of several sections in 2 Townships.
He has 15 years of office and field Draft 8 Sheet Certificate of Survey in Geopak/Micro Station.
experience including:
- Boundary Surveys, section City of Three Forks, MT. Boundary retracement of city blocks and lots,and an
breakdown, topographic, and ALTA/ACSM survey of the Sacajawea Hotel.
construction surveys CVS Pharmacy,Various Cities, MT. ALTA/ACSM and boundary retracements of
- Preparation of Certificates of Survey, City blocks in Great Falls, Mt., Billings, Mt.,Helena, Mt.,and Bozeman, Mt.
Certified Corner Records with Micro
Station/Geopak. Review C.O.S.'s U.S.A.C.E Lake Audubon, Garrison, ND. Boundary posting survey of government
- Courthouse research;Deed and boundary at Lake Audubon for the United States Army Corps of Engineers.
Certified Corner Record search, road Section breakdown of 21 sections in 3 Townships and standard parallel. Draft
petition and road dedication search, 12 Sheet Certificate of Survey in Geopak/Micro Station.
C.O.S. and easement research. Yellowstone Mountain Club, Big Sky, MT. Set property pins,topographic surveys,
PROFESSIONAL ACTIVITIES construction surveys, building layout.
Member of Montana Association of Spanish Peaks Resort, Big Sky, MT. Set property pins,topographic surveys,
Registered Land Surveyors. construction surveys, building layout.
Utah Council of Land Surveyors Montana Department of Transportation, MT. Five years of experience in Section
breakdown, section corner search, highway RNV retracements, Certified Corner
PROFESSIONAL HISTORY Records,courthouse research, Certificates of Survey, NGS high order digital
2007-Present, Morrison-Maierle, Inc. levels, NGS high order benchmark resets and control surveys.
Survey Party Chief Exxel Engineering Inc., Grand Rapids, MI. Subdivision plats,topographic surveys,
2002-2007, Mont. Dept. of Trans. construction staking surveys.
Helena, Mt. Survey Party Chief
2000-2002,Exxel Engineering Inc. Lee Metcalf Wilderness Boundary Survey-Lone Mountain, Big Sky, MT. Section
Grand Rapids, MI. Instrument man Breakdown, section comer search,scribe bearing trees,set wilderness
1997-2000,Gaston Engineering& boundary corners.
Surveying, Bozeman, Mt. Field
Eng.Tech and Surveyor
L
A' Cite of Bozeman: 2014 Capital Improvements Field Survey
Am MOMSON
MMME,INC. Survey Party Chief HANS J. STREUFERT, P.L.S.
M Employee-Owned Company
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Hysham Irrigation District, Hysham, MT. Topo survey of over 26 miles of irrigation
BS Civil Engineering; 1997 ditch. Set control using NGS Online Positioning Service. Coordinated with
Montana State University irrigation district on landowner access issues. Completed the field work
portion of the project in 5 days.
SPECIALIZATION Various Boundary and Topographic surveys—Powell County, MT. Retracement,
Boundary Surveys boundary realignment,and topo surveys for private landowners as well as
Construction Staking School District#15.
Topographic Surveys Easements through State lands—Deer Lodge County, MT. Topo survey and
REGISTRATION easement for access road through State lands. Worked with Department of
Natural Resources,SWLO.
Professional Land Surveyor: Bureau of Land Management, Geographic Coordinate Database(GCDB)
Montana No. 16971;2008 Enhancement,Southwest Montana. Served as party chief conducting
PROFESSIONAL research,comer search,and GPS observations of Public Land Survey
System corners. Utilized GPS static(OPUS)and RTK methods of survey for
SUMMARY land corner observations.
Mr. Streufert has field experience US Army Corps of Engineers, Garrison, ND. Parry chief and instrument person for
using conventional Trimble, Nikon, GPS control survey, retracement, and dependent resurvey of federally-owned
Sokkia, Leica and Topcon total lands located in various portions of 27 sections around Lake Audubon.
stations as well as Trimble Leica, Assisted in the recovery or reestablishment of Public Land Survey System
and Thales GPS equipment. His corners.
field work has primarily involved Utility Solutions/Four Corners, Bozeman,MT. Expanded project control network
construction staking, topographic via static and OPUS GPS methods.
surveys, and retracing boundaries.
He's done research at courthouses Well Location Surveys, Park, Gallatin,Sweet Grass,&Daniels Counties, MT.
for corner search and re- Party chief and instrument person for retracement and topographic surveys.
establishment, deed and easement Assisted in the recovery or reestablishment of Public Land Survey System
search and corner recordation. As corners,and calculating quantities for pad material. Generated well plats and
survey auditor, he reviewed calcs, other exhibits for submission to the Montana Board of Oil and Gas
field notes and performed Conservation.
independent field surveys.
North Star and Valley West Subdivisions, Bozeman,MT. Party Chief—Set
PROFESSIONAL ACTIVITIES property pins, construction and right-of-way staking of roads,water/sewer
Member of Montana Association of
lines,wetland surveys.
Registered Land Surveyors Theodore Roosevelt National Park, ND. Party chief;on-site survey management
and construction staking for 14-mile road reconstruction project.
PROFESSIONAL HISTORY Big Sky Aerial Photography, Big Sky, MT. Target placement and survey project
2003-Present, Morrison-Maierle, Inc. management for 140+square mile area.
Survey Party Chief Yellowstone Mountain Club, Big Sky, MT. Party Chief—Set property pins,
1997-2003, Kiewit Construction Co., construction and right-of-way staking for roads,water/sewer lines,buildings,
Denver, CO ski runs; topographic surveys of subdivision lots. Corner and deed search;
1996-1997, MT Dept of Transportation, generated easement exhibits;wetland surveys.
Bozeman, MT
Spanish Peaks Resort, Big Sky, MT. Party Chief—Set property pins,construction
and right-of-way staking for roads,water/sewer lines,buildings,ski runs;
topographic surveys of subdivision lots. Comer and deed search;generated
easement exhibits;wetland surveys.
1-25 Transportation Expansion Project,Denver, CO. Survey Auditor—Audited
field crews structure surveys, performed independent checks for calc
department,field note review, and independent GPS audit surveys. Party
Chief—right-of-way staking for roads;construction staking for roads,bridges,
and walls.
Various retracement,topographic,and construction surveys, MT. Bozeman, Big
Sky, Livingston, Havre, Cut Bank, Pony, and Deer Lodge.
w.,w.m-m.net mmi(h),m-m.net PROVIDINC; RI SMIRCI . IN PAR 1'M R,1111' WI I n <•111 NI'. 10 mull VI 'III] IR GOA11,
Ai City of Bozeman: 2014 Capital Improvements Field Survey
MORRISON
,�IA16' MAIERLE,INC. Survey Party Chief MATTHEW J. NELSON
An Empby--Owned Con%wny
CREDENTIALS RELEVANT- EXPERIENCE
EDUCATION GCDB Enhancement, Eastern MT. GCDB field survey in 10 townships in eastern
Associate in Land Surveying Montana. Served as party chief and instrument person;conducted research,
Nicolet College,2002 corner search,and GPS observations of Public Land Survey System comers.
Utilized GPS static(OPUS)and RTK methods of survey for land corner
SPECIALIZATION observations.
Boundary Surveys US Army Corps of Engineers, Garrison, ND. Party chief and instrument person for
Construction Staking GPS control survey, retracement, and dependent resurvey of federally-owned
Topographic Surveys lands located in various portions of 27 sections around Lake Audubon.Assisted
in the recovery or reestablishment of Public Land Survey System comers.
PROFESSIONAL Theodore Roosevelt National Park, ND. Party chief;on-site survey management
SUMMARY and construction staking for 14-mile road reconstruction project.
Mr. Nelson has field experience using Mt. Rainier National Park,WA. Party chief,on-site survey management and
conventional Nikon, Leica and Topcon construction staking for 7-mile road reconstruction project.
total stations as well as Thales and Gallatin County RID 395, Big Sky, MT. Topographic survey of 5.7 miles of road for
Trimble GPS equipment engineering design.
His field work has primarily involved Gallatin County RID 396,Three Forks, MT. Topographic and boundary surveys for
construction staking, topographic 13.5-mile road upgrade project.
surveys, and retracing boundaries. Yellowstone Mountain Club, Big Sky, MT. Party Chief—Set property pins,
He's also done research at construction and right-of-way staking for roads,water/sewer lines, buildings, ski
courthouses for corner search and re- runs;topographic surveys of subdivision lots. Comer and deed search;
establishment, deed and easement generated easement exhibits;wetland surveys.
search and corner recordation.
Spanish Peaks Resort, Big Sky, MT. Party Chief—Set property pins,
PROFESSIONAL ACTIVITIES construction and right-of-way staking for roads,water/sewer lines, buildings,ski
Associate Member of Montana runs;topographic surveys of subdivision lots. Comer and deed search;
Association of Registered Land
generated easement exhibits;wetland surveys.
Surveyors. North Star Subdivision, Four Corners, MT. Party Chief—Set property pins,
construction and right-of-way staking of roads, water/sewer lines,
PROFESSIONAL HISTORY wetland surveys.
2002-Present, Morrison-Maierle, Inc. Valley West Subdivision, Bozeman, MT. Party Chief—Set property pins,
Survey Party Chief. construction and right-of-way staking of roads, water/sewer lines, wetland
surveys.
Sourdough Water Treatment Plant, Bozeman, MT. Party Chief—Set
property pins, construction staking for new treatment plant building, water
lines, sewer lines and site grading.
Mitchell Development, Bozeman, MT. Party Chief—Set property pins,
topographic surveys, construction staking for water and sewer lines, site
grading and building lay outs for Kohis, City Brew and Verizon.
COB Water Renovations, Bozeman, MT. Party Chief—Topographic survey
of City of Bozeman streets for water renovations design.
i
f
W1%%1W.m-m.net I nimiCa.)m-m.net rll(YVIDING KI S(MR(-, . IN PAR I NI RSllll' WIM ('1 u N r? r() n, nn vi rin n+ ,;unt.
Al City of' Bozeman: 2014 Capital Improvements Field Surrey
.dA MOMSON
All MAIMLE,INC. Engineering/CAD Technician K. DEAN SQUIRES
M Bnppuyee-owned Company
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Water Treatment Plant Replacement, Bozeman, MT. Provided technical CAD
AOS, Drafting &Computer Design, services for the 22 MGD membrane filtration water plant.
1996, High-Tech Institute, Phoenix E.Tamarack St., Front St.. E.Aspen St.and N. Ida Ave. Street Rehabilitation
Civil Engineering Studies, 1994 Project, Bozeman, MT. Provided technical CAD Services for this street
Brigham Young University rehabilitation project located in an Urban Renewal District.
SPECIALIZATION North 7`h Lighting Design, Bozeman, MT. Provided technical CAD services for the
design of this entryway corridor lighting project, located within an Urban Renewal
CAD Layout of Civil,Airport,Site District. Performed CAD support for GPS control survey,topographic and
Grading,Subdivision, Road, Sewer, easement surveys and mapping of the North 7th Street Corridor.
Water and Storm Water Projects
Autodesk AutoCAD East Peach Street Rehabilitation Project, Bozeman,MT. Provided technical CAD
Autodesk Civil 3D support for this street rehabilitation project located in an Urban Renewal District.
MicroStation CAD support for GPS control survey, retracement of existing townsite surveys,
GEOPAK topographic surveys and mapping of the East Peach Street Corridor.
GIS-ArcMap Yellowstone Mountain Club, Big Sky, MT. Ongoing technical CAD support for
PROFESSIONAL topographic surveys,construction surveys,and building layout.
SUMMARY Spanish Peaks Resort, Big Sky, MT. Ongoing technical CAD support for
topographic surveys, construction surveys,and building layout.
Mr. Squires has 17 years of civil Middle Creek Parklands, Bozeman, MT. Provided CAD support for Preliminary Plat
engineering and surveying and Final Plat of Phase 2.
experience as a technician. The
work has included subdivision
layouts, boundary retracement,
section break downs, traffic
interchange design, urban and rural
roadway design, and sewer, water,
storm water and airport design. He
is adept at assembling
computerized topographical
mapping and boundary information
derived from field reconnaissance.
All projects have been produced
using Autocad, Civil 3D and Land
Desktop, Development or
MicroStation and GeoPak.
PROFESSIONAL ACTIVITIES
AutoDesk User Group International
PROFESSIONAL HISTORY
2013-Present, Morrison-Maierle, Inc.
Engineering/CAD Technician
2006-2013,Allied Engineering, Inc.
CAD Manager
1999-2004, Nolte Associates
Senior CAD Technician/Structural
CAD Captain
wrY•w.m—m.nCt • miniC?m—m.net PROVIUIN4; R1.SMIRC1 S IN PAR I N1 RSIIII' NN 1 t-!1 ('1 II N 1, !u ACII11 VI 1-Ill IR (;')All
AI' Cite of Bozeman: 2014 Capital Improvements Field Survey
.nil MORMSON
AA MAIERLE,INC. Survey Party Chief ROBERT G. BLANK.
M F"Pk*--Owned C nra y
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Lowe's of Helena. Construction staking, responsible for all construction staking of
General Education Diploma structures, utilities, and roads. Staking of Sanders Street and utilities.
Anaconda Senior High School Helena Costco. Construction staking on Costco building and Costco gas station.
SPECIALIZATION Washington Street Widening. Responsible for all construction staking of road
Construction Surveys widening from Cedar to Custer including storm drain and other utilities.
Helena Regency Condo's. Responsible for all construction staking of roads and
REGISTRATION utilities in this condominium development.
Certified Survey Technician III, NSPS Custer Landing subdivision. Responsible for all construction staking of all
buildings, roads and utilities in this commercial development.
PROFESSIONAL Stone Meadows subdivision. Responsible for all construction staking of all roads
SUMMARY and utilities in this residential development.
Robert has over 10 years' USFS Eva May. Instrument man for corner search and re-establishment of
experience in construction staking monuments and layout of boundary lines on various mineral claims.
and one year experience in Anaconda water line rehab. Responsible for topographic survey for design.
construction inspection. Responsible for construction staking of water line replacements.
PROFESSIONAL ACTIVITIES Helena Regional Airport. Responsible for topographic survey of existing taxiways
Montana Association of Registered and as-built survey of new surfaces and striping on taxiways.
Land Surveyors Cromwell Dixon Lane. Responsible for staking of new road and utilities.
PROFESSIONAL HISTORY Rocky Mountain Emergency services training center. Performed topographic
2006-Present, Morrison-Maierle, Inc. survey for design of new building and parking areas.
Survey Party Chief Merica Residence. Performed subsidence survey of existing structure and
2003-2006, Engineering Inc. surrounding improvements to monitor the area for movement.
Survey Party Chief Country Meadows Subdivision. Responsible for construction staking of new roads,
2002-2003, Engineering Inc. utilities and site grading.
Survey Instrument Man
2001-2002, Engineering Inc. HRAA Station One. Responsible for construction staking of building additions and all
Construction Inspector site work.
2000-2001 Engineering Inc.
Survey Rod Man Montana Law Enforcement Academy. Performed topographic survey of existing
conditions for design of new Education Center and waste water treatment
plant.
City of Helena Benton Avenue North Extension. Responsible for all construction
staking including roads and utilities.
Walgreens. Responsible for building and parking lot construction staking.
MDT Capitol Interchange. Responsible for set up of road alignments and all blue
topping of four new ramps.
Lewis and Clark Caverns Visitor Center. Responsible for Building, utility and all
other construction staking.
Various Cellular phone sites. Responsible for boundary surveys on new sites and
as built topographic surveys on existing sites.
Marriot Residence Inn. Responsible for building staking and currently on going utility
construction staking.
Staking Proposals.Work up bid proposals for various construction projects.
Montana Alberta Tie Line(MATL). Responsible for staking of boundaries, right of
way,cultural,wet lands, structures and guy wires along with as-builts of
existing structures. Landowner relations.
ww«•.m-m.net - mmi@im-m.net PkOVIDING RI .0111 '1 ] IN PART NI RSIlIP ) Iru CI 11 N IS I() nruu vi rnl na (;()AI
4, City of Bozeman: 2014 Capital Improvements Field Survey
A MORRISON
AA MAIMLE,INC. Professional Land Surveyor JEFFREY J. ROE, P.L.S.
M Empiny -Ov ed Colnpony
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Envirocon—Upper Little Blackfoot Remediation. Performed Pre and Post dig
AAS Land Surveying; 1986 volumetric surveys for mine remediation. Responsible for coordinating work,
Flathead Valley Community College field survey, computations,and deliverables.
Envirocon—Upper 10-Mile Yard Remediation. Performed topographic and
SPECIALIZATION volumetric surveys for mine remediation. Responsible for coordinating work,
Construction Staking field survey, computations,and deliverables.
Mining Reclamation Surveys Envirocon—Luttrell Repository. Performed topographic and volumetric surveys
Digital terrain modeling for mine remediation. Responsible for coordinating work,field survey,
REGISTRATION computations, and deliverables.
Professional Land Surveyor: TetraTech EMI—Limestone Hills. Performed GPS control and grid layout surveys
Montana No. 10157,2003 for unexploded ordnance.
Lowe's of Helena. Boundary and topographic,construction staking, and preparation
PROFESSIONAL of ALTA survey, preliminary and final plats, legal descriptions and all other
SUMMARY survey activities related to the development, including extensive retracement
of highway right-of-way along Custer Avenue. Also responsible for all
Mr. Roe currently serves as Senior construction staking of structures, utilities,and roads.
Land Surveyor in the Helena,MT Helena Costco. Boundary and topographic,construction staking,and preparation of
office. Mr. Roe has 29 years of ALTA survey, preliminary and final plats,legal descriptions and all other
surveying experience with a strong survey activities related to the development, including extensive retracement
background in the mining industry and of highway right-of-way along Custer Avenue. Also responsible for all
has performed many boundary, construction staking of structures, utilities, and roads.
topographic, volumetric, construction,
reclamation, and patented mining claim Montana Department of Transportation, Little Blackfoot Bridge. Performed
retracement surveys. Since joining topographic and cadastral survey for bridge replacement and highway
Morrison-Maierle in 2001, Mr. Roe has realignment. Responsible for fieldwork, research,extensive boundary analysis
completed numerous ALTA, boundary, and resolution, and compilation of deliverables.
design, and construction surveys in Montana Department of Transportation, Lewis and Clark County Safety
support of Morrison-Maierie's Airport, projects. Performed 108 and 120 surveys(control,topographic and
Municipal, Transportation, and Water cadastral)for three safety projects in Lewis and Clark County. Responsible for
Resources disciplines. Mr. Roe's fieldwork, research,computations, boundary analysis, monumentation, and
responsibilities include directing field compilation of deliverables.
crews, extracting and uploading layout
data from engineering plans, and Montana Department of Transportation, Dupuyer SE, MT. Control survey,
preparing legal exhibits, descriptions mapping verification,and right-of-way staking for design-build project with
and plats. Shumaker Construction.
PROFESSIONAL HISTORY Carroll College, Helena, MT. Extensive boundary survey to amend the plat for
infrastructure improvements and ownership changes on the Carroll College
2001-Present, Morrison-Maierle, Inc.- property. This three-year project required extensive boundary analysis,street
Senior Land Surveyor dedications and vacations, preparation of legal descriptions,and close
1993-2001, Montana Tunnels Mining coordination with the City of Helena, Carroll College and their attorneys.
Inc.-Senior Surveyor Emerald Ridge Subdivision,Helena, MT. Responsible for all survey related
1987-1993, Montana Tunnels Mining
Inc.-Mine Surveyor activities for 70-lot major subdivision in Lewis and Clark County, including
1986-1987,S&A Engineers boundary and topographic surveys,construction staking,and preparation of
Ponderosa Surveys preliminary and final plats.
Survey Crew Member US Forest Service IDIQ Contract. Prepared certificate of survey and corner records
for 12 miles of National Forest boundary retracement in the Custer National
Forest.
Big Horn REC, ROW Survey. Prepared easement exhibits and corner records for 8-
mile electrical transmission line near Frannie,Wyoming.
Montana Alberta Tie Line(MATL). Performed boundary surveys for easement
acquisition for proposed 130-mile, 230KV electrical transmission line from the
Canadian border to Great Falls, MT., and provided oversight and preparation
of 300 easement documents.
,%vww.m-m.net • mmi([l?m-m.net rRI>cIUIN.; RI SuuRCI , IN PARTNI RSIIII, WITH CI 11 N rx IO ACIM VI 1111 ua t,t>AI �—
City of Bozeman: 2014 Capital Improvements Field Surrey
� MOINSON
09 MMRLE,INC. Survey Technician/GIS MARK L. WALLER
M Employee-Owned C—Pary
CREDENTIALS RELEVANT EXPERIENCE
EDUCATION Milltown Superfund Site, Bonner, MT. Conduct and import topographic survey
BS/Geography/Cartography data into GIS system. Information used to calculate earthwork volumes.
University of Montana;2007 USFS Idaho Panhandle N.F. East Fork Lightning Creek, ID. Performed field
survey to be utilized in replacement bridge design. Survey performed
SPECIALIZATION consisted of control setup for conventional topographical mapping of
GPS and Conventional Surveying upper and lower reaches of river channel.
GIS Mapping and Analyses USFS Fish Passage Surveys, Montana. Performed field surveys on identified
CERTIFICATION culverts along Forest Highway System Roads in Lolo, Bitterroot and Flathead
MHSA 24—hour training 2007-present National Forests. Topographic mapping, cross-sections and stream profiles of
OSHA 1910.120 40-hour Hazardous sites for the United States Forest Service.
Waste Operations 2008-present Milltown Reservoir, Bridge Infrastructure Mitigation Project, Milltown, MT.
Level 2 Avalanche Certification-AN Surveying services including a Static GPS Control survey, Hydrographic
2008 surveys, River bank topographic survey, profile and map
ping survey of State
PROFESSIONAL Highway 200, profile and mapping survey of Interstate 90, Right of Way
mapping for State Highway 200 and Interstate 90,and settlement monitoring
S tI M M A R Y surveying of Interstate 90 have all been performed in support of this project.
Mr. Waller's job responsibilities include, Bitterroot Irrigation District Siphon 1-Phase 1 Replacement Project Ravalli
Surveying, and GIS analysis. He has County, Montana. Preliminary mapping of existing structures and
conducted topographic and boundary surrounding topography necessary for design. Establish horizontal and vertical
establishment/retracement surveys, control necessary for construction layout. Provide contractor with offsets to
construction staking, cadastral siphon and accompanying structures.
surveying and lot surveys. He has Daly Ditches Irrigation District Diversion Dam Replacement Ravalli County,
working knowledge of all conventional Montana. Preliminary mapping of existing structures, surrounding topography,
and GPS survey equipment and and Bitterroot River cross sections necessary for design. Establish horizontal
procedures. and vertical control necessary for construction layout. Provide contractor with
PROFESSIONAL ACTIVITIES offsets to new diversion dam alignment and hedge canal structure.
CH2M/Hill—Cross Sections of Blackfoot and Upper Clark Fork Rivers. Provided
Montana Association of Registered survey services on fifteen cross sections along the Blackfoot and Clark Fork
Land Surveyors rivers. Duties included using acquired safe practices from years of whitewater
West Central Montana Avalanche kayaking and knowledge of river dynamics to provide a safe and practical
Foundation-President of the Board method of obtaining difficult survey results in challenging locations. Cross
of Directors section surveys will be used by the Army Corps of Engineers to monitor geo-
morphological changes in the riverbed stemming from the removal of Milltown
PROFESSIONAL HISTORY Dam.
2007-Present, Morrison-Maierle, Inc. Bitterroot River Streambank Stabilization, Florence, MT. Perform a stream survey
Surveyor and GIS Specialist including in-stream cross sections above, below and through the proposed
2006, D.J. &A. PC bank stabilization and topographic mapping to document the existing
Survey Technician conditions of the stream bank. The survey will also include locating and
occupying Reference Monuments to correlate the project survey to the FEMA
vertical datum. Research and locate existing FEMA cross sections in relation
to the project. Creation of topographic mapping and cross sections to be used
for hydraulic analysis and stream bank stabilization for a private residence in
Florence, MT,
Twin Creek,TU Stream Channel Restoration, MT. Performed preliminary site
field survey to characterize site topography and existing stream
channel conditions in preparation of stream channel design to
reconnect Twin Creek to the main stem of Ninemile Creek and provide
fish passage to a tributary of the Clark Fork River that has been
functionally disconnected due to historic mining activities.
Kohrs and Manning Ditch Deerlodge, MT. Performed preliminary site field
survey to assist conceptual design of infrastructure improvements and
alternatives for the crossing of the K&M Ditch at Cottonwood Creek.
www.m-m.net mmi a,m-m.net PR(IVIDIN ; RI.c URCI a IN ionic i NI icaiir W1111 c'i u N rS 10 ne nn VI ,iui IR <;OAl �