Loading...
HomeMy WebLinkAbout2014 RFP Police and Courts-Langlas, Proposal Lan glas • ; ` GENERAL_ CONTRACTORS AW City of Bozeman Police 6 Courts FacilityRequest for Proposals 2270 Grant Road Billings, MT 59102 P 406.656.0629 F 406.656.1088 1019 East Main St.,Suite 101 Bozeman, MT 59715 P 406.585.3420 F 406.585.4110 LANGLAS.COM TABLE OF CONTENTS 1 Firm Information 12 The Project Team 17 Project Management and Approach 1. FIRM INFORMATION repeat customers and referrals.In the last 5 years, 1A. Firm Background:Describeyoufirm's our firm has now grown to an average annual history.Ident!fyyour senior management organization volume of $85,000,000. Our bonding capacity Include information identifying the frrm's annual also speaks to our reputation of successful projects volume of businessfinandallbouding capacity, with a single project limit of$60,000,000 and an and speak to the firm's stability in the marketplace. aggregate of$100,000,000. Information ident Eying the firm's strengths and weaknesses along with special capabilities that may be appropriate to this project will assist in the evaluation. Langlas has done more than stay stable over the last 5 years. Our average annual volume has increased by $30,000,000, and our professional L A N G L A S & ASSOCIATES IS A staff has increased also,adding 8 employees in the SECOND GENERATION FAMILY- superintendent and project manager positions. OWNED COMPANY ESTABLISHED Our diverse work portfolio also contributes to IN 1973. WE HAVE TWO FULLY growth. We build projects for the federal STAFFED OFFICES IN BILLINGS government, hospitals, school districts, Montana AND B O Z E M A N, AND HAVE State University and all types of private developers. PERFORMED A VARIETY Our stability and growth can be attributed OF WORK THROUGHOUT not only to project performance, but M O N TA N A, W YO M I N G, I DA H O, also our ability to cultivate and maintain positive working relationships with NORTH DAKOTA, IOWA, AND Owners, Design Professionals, and CALIFORNIA. Subcontractors. The importance of relationships has been a key ingredient Owners and family members actively involved in throughout our 40 years of success. the business include Steve R.Langlas-President, SteveT.Langlas-Vice President(Bozeman),Bill 2013 VOLUME S96,000,000 Langlas-General Superintendent and Catherine Bergman-Human Resources. Additional Senior Project Managers include:Brad Sinclair,John Flanagan,Loren Cantrell,Roger Davis,and Jason $20,160,000 Hubbard. Please refer to Appendix A for further Lump Sum information. Competitive Bid Honesty,integrity,pride in our work,and putting the needs of our project owners first are the core $75,840,000 values on which we have built our business.As a Negotiated Contracts,GC/CM result of these principles and our reputation of putting them into action, approximately 80% with Pre-Construction Services of our work is secured on a negotiated basis for l A \ 6 [ A N . ('O \l 1 1. FIRM INFORMATION El Langlas&Associates m® Present&Projected Workload Schedule Task Name DuratiStart Finish _ ___ _ _ 12015 2016 _ 2017 M A M J _ �J �A�S O_N DI1 F M A MIJ JIA S O NID J F M AIM 1 JIA S 0 N Di.] M Bozeman District Office 890 Mon Fri Bozeman District Office days 3/11/138/5/16 Whitefish High School 436 Mon Mon days 3/11113 11/10/14 Whitefish High School Super 8 Bismarck 190 Mon Fri days 11/4/13 7/25/14 Super B Bismarck Space Bank Phase III 110 Mon Fri 5/2/14 days 12/2/13 T1216eWest ank Phase III 1216 West Lincoln Fascade Improvement 85 Thu Wed days 112114 4/30/24 Lincoln Fascade Improvement Olive&Wallace Renovation Project 125 Mon Fri days 1/6/14 6/27/14 Olive&Wallace Renovation Project MSU Residence Hall Pre-Construction 150 Mon Fri days 1120114 8115114 MSU Residence Hall Pre-Construction Wingate Sidney 176 Mon Mon days 3/3/14 11/3/14 Wingate Sidney Police and Courts Pre-Construction 70 Mon Fri days 4/21/14 7/25/14 Police and Courts Pre-Construction Monforton School 198 Wed Fri days 4/30/14 1/30/15 Monforton School MSU Creative Arts Complex,Phase II 86 Fri Fri days 5/2/14 8/29/14 MSU Creative Arts Complex,Phase II Madison County Annex 220 Mon Fri 3/6/15 days 5/5/14 Madison County Annex Big Sky Medical Center 350 Mon Fri 9/4/15 days 5/5/14 Big Sky Medical Center MSU Residence Hall Construction 506 Mon Mon days 612/14 5/9/16 MSU Residence Hall Constructio Police and Courts Construction 270 Mon Fri days 4/6/1S 4/15/16 Police and Courts Construction 4 1. FIRM INFORMATION 1 C F I R M E X P E R I E N C E.Describe you firm's experience with projects of similar site,size,type,and complexity. Specfcally note the delivery method for each project,total construction cost,building gross square footage,date of bid, and date of completion. Describe your firm's experience working on similar publicly owned projects.What strategies did you employ to secure adequate labor and resources in order to fully complete the project on time and within budget? Provide information on LEED Silver,or higher,certified buildings that your firm has constructed. DEPARTMENT OF INTERIOR Billings,M•I' ContractAmount: $20,000,000 ® i® Contract Type: G C/CM Completion Date: May 2013 00510010 E`��t� Square Footage: 174,000 00 IN No so�� p t� Similarities:SIZE Dollar value,square fotage so ® C� TYPE: LEED Silver,government office building Nvith durable,high end finishes COMPLEXITY: Busy doNcntotiN•n em•irunmeut Keith SI 1ILAR: bordering thoroughfare and heave adjacent traffic SIZE /TYPE/COMPLEXITY/LEED constraints SILVER / PUBLICLY OWNED MSU RESIDENCE HALL Bozeman,MT ContractAmount: s30,000,000 Contract Type:GC/CM �j Completion Date: Fall 2016 Square Footage: 12 5,000 �i Similarities:SIZE,Dollar value,square lootagc r� TYPE.LEED Silver,institutional COMPLEXITY:Phased construction,Site constraints,Neorking on campus adjacent to SIMILAR: occupied buildings/ pedestrian traffic SIZE/TYPE/COMPLEXITY /LEED SILVER/ PUBLICLY OWNED Continued on neat page { i 1. FIRM INFORMATION PARK HIGH SCHOOL Lieingston, MT ContractAmount: $12,800,000 ContractType: GC/CM 1 Completion Date:Summer 2012 Square Footage: 110,000 r Similarities:SIZE: Dollar value,square footage TYPE:One level,durable finishes,publicly owned -- COMPLEXITY:Extensive remodel and new construction on existing campus without SIMILAR: interruption to normal school activitx.Sutmner SIZE /TYPE /COMPLEXITY/ phase included $4.6 million renovation PUBLICLY OWNED completed in just 10 weeks. --"' DEHLER PARK 13illintas, MT Contract Amount: $1 1,414,000 Contract Type: G C Completion Date: 2008 1 Square Footage: 2 city blocks Similarities: SIZE:Total site,dollar value TYPE:Publich owned COMPLEXITY.Self performed all coneretc•work for stadium seating and plaza areas. Compressed schedule. SIMILAR: STRATEGIES.lnvented/designed/built unique concrete SIZE/COMPLEXITY/ form systent for pouring concrete stadium risers that PUBLICLY OWNED reduced labor demands,increased productk ity and quality,and greatly reduced schedule. I VILLAGE DOWNTOWN LOFTS I ae nor' n�i i in IN t� Bozeman,MT ContractAmount: $29,000,000 Contract Type: GC/CM Completion Date: 2008 Square Footage: 174,000 Similarities:SIZE: Dollar value,square footage - - TYPE High end finishes COMPLEXITY: Coordination around existinlr SIMILAR: residents,phased construction with multipll SIZE/TYPE/COMPLEXITY Oc•c•upatu•y ttu•noycrs. STRATEGIES- Langlas sell performed all structural concrete work in underground parking garage. We also bussed employees from Butte on a daily basis w hen adequate local labor.vas unavailable. 8 1. FIRM INFORMATION 1C. Asidefrom specific strategies listedfor SUBCONTRACTOR RESOURCES individual projects above,Langlas also manages resources The success of a project is very much dependent asfollows for all of our projects. on the talent, capabilities and dedication of the subcontractors involved with the project. We LABOR RESOURCES ensure that we are able to secure subcontractor We understand the value of skilled tradesmen and resources by developing and maintaining positive, the need for adequate labor resources to ensure successful relationships with each contractor a successful project.IN ORDERTO FACILITATE involved in the project.WE WORK HARD TO THIS, WE MAINTAIN A STAFF OF 45 FULL ENSURE THAT THE PROJECT IS A SUCCESS TIME CARPENTERS AND LABORERS IN FOR THE SUBCONTRACTOR AS WELL AS BOZEMAN.The average length of time that our THE REST OF THE TEAM, GUARANTEEING tradesmen have spent with the company is 5 years, THAT THEY WANT TO BE PART OF THE with some of these individuals having been with -1 ANGLASTEW ON THE NEXT PROJECT. our company for over 10 years. In short, we hire talented, reliable employees and then invest in Our database of over 4,000 actively bidding those employees and treat them well. subcontractors and vendors ensures that 'we receive adequate bid coverage on bid day. Self-performing concrete and carpentry scopes Creative thinking and collaboration with of work may be required and will be evaluated those subcontractors is a strategy we utilize to for this project during the bid process.We have maintain schedule and budget. For example, completed self-performed concrete and Beaming we may prequalify mechanical and electrical on many local and regional projects. We also subcontractors in order to lock in manpower and have the resources to hire more carpenters as assist with pre-construction budgeting and system needed. In the past, we have employed over 80 design; or we may contract multiple flooring or carpenters and laborers as the demand increases. drywall contractors if required by the project Self-performing work will be a strategy reviewed scope and schedule. as needed. MATERIAL AND We have a prefabrication yard minutes away E O U I P M E N T RESOURCES in Bozeman and another yard 2 hours away LANGLAS OWNS OVER $2,000,000 OF in Billings. We often use these yards to NECESSARY EQUIPMENT. Securing equipment concurrently double or triple the production resources is rarely an issue as we own and maintain on-site during certain phases of construction. the majority of the construction equipment and tools required for a project of this size.Every piece of equipment that we own is checked on a bi-weekly basis by a professional maintenance service company to ensure its safe and effective operation. 9 1. FIRM INFORMATION 1 D R E F E R N C E S. Provide detailed contact information for the Owner and Architect for the last three(3)contracts completed by your firm,as well as two(2)projects underway. PROJECTS COMPLETED Northern Hotel Owner-Mike Nelson ................................................................................406.867.6767 Architect-Eric Simonson,A&E Architects.......................................................406.248.2633 Meadowlark Elementary School Owner- Kevin Barre,Owner's Representative..................................................406.522.6022 Architect-Jamie Lenon,Prugh&Lenon Architects............................................406.587.1255 Department of Interior Building Owner-David Ward,Boyer Company............................................................ 801.521.4781 Architect- GSBS Architects.........................................................................801.521.8600 PROJECTS CURRENTLY UNDERWAY MSU Creative Arts Owner- Bob Warfle ..................................................................................406.444.0771 Owner-Andy Allen...................................................................................406.994.5970 Engineer-Jami Lorenz...............................................................................406.556.8600 Whitefish High School Owner- Dr.Kate Orozco,Superintendent of Schools .........................................406.862.8640 Architect-Shane Jackola,Jackola Architects+Engineers.....................................406.755.3208 1E. At any time in the last l0 years has your firm been assessed and paid liquidated damages after completion of a project under a construction contract with a public owner? NO 10 2. THE PROJECT TEAM 13 2 B. For each team member: 2 BL Describe their responsibility on this Project LOREN CANTRELL, SENIOR PROJECT MANAGER, BOZEMAN,will provide input on cost impact for project design aspects,review constructability elements,and lead the pre-construction phase to control costs and schedule.Loren will also oversee Quality Management for the project and will be the primary point of contact for the Owner and Design Team.He will establish and maintain a clear and open channel of communication with the entire Team.He will contact key subcontractors to gain information on construction types, and new technology that could contribute to the project's success. Loren will also prepare bid advertisements, bid packages, bid documents, and contracts for the project. During construction,he will conduct meetings onsite as often as needed with the Team and construction staff to ensure that quality,budget,schedule and safety expectations are being met or exceeded. CHRIS BAREFIELD, PROJECT SUPERINTENDENT. BOZEMAN,will produce and maintain the schedule for all phases of the project. He will develop a phasing plan that incorporates the Owner's activities and requirements, Design Team requirements and construction requirements and compiles them all into one schedule.This schedule will help the Team understand impacts of design decisions and identify long lead elements that may affect the schedule. Chris will review constructability issues and traffic/safety concerns for the general public as well as the construction personnel. During construction, Chris will provide full-time on-site construction supervision where he will be directly responsible for quality control and quality assurance, safety, and project coordination. He will communicate with the Owner, Design Team, and building trades to coordinate all aspects of the project. `Alit rims a job w Well,or better,as anpw I've w17rked witV Chris Peters,Owner-Manhattan Plumbing&Hearing JASON FLEEGE. PROJECTENGINEER, BOZEMAN,will provide pre-construction assistance where needed.He will administer all the LEED certification process.He will prepare AutoCAD foundation and wall drawings to ensure that these elements are built according to plan and coordinated with other trades.He will assist Langlas and the subcontractors in understanding the design in a detailed way that will help alleviate change orders and problems at critical points in the construction schedule.Jason will provide any layout required for the project and will also prepare and track Requests For Information, perform submittal reviews,and assist in trade coordination and coordination with any Owner supplied equipment that may be incorporated in the project. 7a=is an emellent asset that allows us to complete our work mops ffidwdy.Pm glad he is on the joh, Brian Barlow,Owner-Paradigm Concrete ; '. L, 1 '\ , ( � ) \� 13 2 . THE PROJECT TEAM 2 B I i. Describe their experience and how it is relevant to this project. Demonstrate the proposed key personnel's specfc experience on projects o,f similar type,size and scope. LOREN CANTRELL - 23 Years of Experience Loren is an MSU graduate with a degree in Construction EngineeringTechnology and is currently registered as a LEED Accredited Professional. He has effectively performed pre construction and construction phase services on GC/CM and CMAR projects up to$60 million in size for public and private entities both within and outside of Montana. Loren is a strong team leader and understands the importance of positive relationships and attention to detail in the success of each of his projects. Demonstrated experience with equal or greater projects include: Big Sky,Medical Center S 17,500,000•Whitefish High School S 19,200,000 • Llniwersitw of CA Office of the President S 34,000,(M• IsMUD Customer Scrwice Center S42,000,(XX)• Secretarw oFState/CA State Archives S 56,000,(X)0 CHRIS BAREFIELD - 27 Years,f Experience As a superintendent for Langlas for the past 12 years,Chris has consistently proven his ability to successfully orchestrate complex projects with high quality and schedule demands. Most recently,Chris has received high praise from both our senior management and the project owner as he completes the $l 9.2 million Whitefish High School project. Complex elements for this project include: 77,000 Sl'new crnisuruction •46,300 SF remodel/renovation • Multiple phases• I•xtrnsi%e mechanical, electrical,and conuiuuiication systems•Enhanced insulation and building enN elope systems JASON FLEEGE - 9 Years of Experience Jason has proven to be a terrific asset to all of the projects with which he's involved. He has extensive experience with Auto Cad drafting and integration with Building Information Modeling(BIM)software to assist design teams in producing quality documents and avoid problems in the field. Jason also excels at coordinating mechanical,plumbing,and electrical trades to solve problems in advance of the work. He has experience on projects up to$280 million in size both within and outside of Montana. Demonstrated experience with equal or greater projects include: Whitefish High School S 19,200,000 • Meadowlark Heinentarw S 16,000,000•SC-1 Data Center S280,000,000 • CH-1 Data Center S160,000,000 M 14 2 . THE PROJECT TEAM 2 BIi I. Indicate the amount of time commitment available to this project during the pre-construction and construction phases.Will they be assigned full time?If not,what portion of their time will be utilized on the Project? What other projects are they assigned to and for what duration? LOREN CANTRELL Pre-Construction:Loren will be able to dedicate 40%of his full time work load to the pre- construction efforts of this project.We anticipate that the actual requirement will be less with the help of his support staff. ConsUmatton:Loren will he able to dedicate up to 70%of his full time efforts to the construction phase of this project.We anticipate that the actual requirement will be approximately 50%. Other Projects:Loren currently provides oversight to the Whitefish High School,requiring little of his time due to stage of project and a full support staff. He is also involved with a smaller Madison County/ Think One project that will be fully staffed with construction complete prior to construction of the Police and Courts Facility,and the Big Sky Medical Center that will be 70%complete by the time the Police and Courts project starts construction. CHRIS BAREFIELD Pre-Cooshvado :Chris will be available to commit up to 20%of his work load to pre-construction efforts.We anticipate the acttal requirement will be less than 10%. Construction:Chris will be assigned to this project full-time during construction. Other Projects:Chris is currently working on Whitefish High School which will be complete in November of this year. JASONFLEEGE Pre-Construction:Jason will be available for 10%of his full time work load.We anticipate that pre- construction efforts will require less than 5%of his time. Construction:Jason will be assigned to the project full time during the construction phase. Other Projects:Jason is currently working on the Whitefish High School. His portion of the work will be complete in October of this year. 2 B I V. Ident!&their length of employment with your firm and,if less than three years,prior frrm(s). LOREN CANTRELL- 16years JASON FLEEGE - 3years CHRIS BAREFIELD- 12years 2 . THE PROJECT TEAM 2 Bv. Provide references with contact information for each team member's last two projects in a similar role. LOREN CANTRELL Dr.Kate Orozco,Superintendent of Schools,Whitefish School District.....................406.862.8640 Cheryl Ridgley, Business Development Officer,Bozeman Deaconess.......... ..............406.414.5486 CHRIS BAREFIELD Dr.Kate Orozco,Whitefish Superintendent of Schools.........................................406.862.8640 Patty Kent,Western Montana Mental Health.....................................................406.532.8414 JASON FLEEGE Dow Powell,Owner's Representative ,Whitefish High School ...............................406.261.3698 Fran Albrecht,Watson's Children's Center........................................................406.235.4582 2C. A key personnel clause will be included in the GC/CM contract.This clause will require the project team identified in this proposal to be fully and completely engaged to the extent stipulated throughout the duration of this project,except for catastrophic events(e.g.termination of employment,illness,accident,death). We acknowledge this clause. . 16 3 . PROJECT MANAGEMENT AND APPROACH 3A. Describe your company's ability and approach to: pre-construction phase to ensure all cost items and potential construction issues have been addressed for i.Managing costs during design and construction the most accurate project budget possible. Langlas&Associates spends considerable time during WE ARE ONE OF THE FEW the pre-construction and bidding phases of the project CONSTRUCTION MANAGERS trying to identify all areas of concern so that there are THAT WORK TIRELESSLY TO no surprises during construction. This early effort PREPARE A BUDGET A N D WILL helps us to understand the project and create a plan that is realistic and achievable.We prepare complete CARRY THAT EFFORT THROUGH and thorough scopes of work that the bidders use to COMPLETION OF THE PROJECT. bid the project which takes into account the schedule, time of year for construction,local climate,local work To prepare a budget or estimate, we will spend force and local jurisdiction requirements. During considerable time with the Design Team and the construction,we are the Owner's advocate;ensuring Owner on constructability issues and reviewing that the subcontractors follow their scopes of work, the project programming to understand exactly construction plans and specifications in order to what the project intent is and to have a clear eliminate or minimize change orders or unforeseen understanding of project goals. costs.We are not a change order oriented company and seek to avoid them as much as possible through Budget estimates will be performed at schematic effective budgeting, detailed bid packages, and tight design, SO% design development, and 50% subcontracts. construction document stages (at a minimum) to ensure that once plans are complete, the project represents a scope of workThe City of Bozeman can 3ai1.DescriY°tw management P be cost many philosophies and afford to build. P oso techniques. We may ask key subcontractors to review the Our first obligation is to the Owner. In basic terms, plans with us to provide their input on budgets for our cost management philosophy is to manage the their work.WE WORK WITH A NUMBER OF City's money as if it were our own. Our many repeat SUBCONTRACTORS ACROSS THE STATE ON customers would attest to this fact. MANY PROJECTS DURING BUDGET PHASES, valuing their input and the expertise to help us with Techniques used to manage costs during the project achieving project cost goals.We perform our own include: takeoff of all materials and contact suppliers to give us the pricing to compare against a subcontractor that Formal Schedule of Values published to the City may have reviewed this scope of work and prepared providing breakdown of all Bid Package and other their own budget.This helps us to better understand costs used to establish the GMP. the overall budget, ask questions, and forecast the most realistic cost of the project.Langlas will repeat this exercise as many times as necessary through the "On past projects where there has been a lack of push from the owner or design team,Langlas has stepped up to provide the drive and pride needed for succes ful pre-construction.1 feel that SO%of the success of a project comes during pre- construction,before there is a shovel in the ground." Steve langlw,Owner-Langlas&Associates f A cI l A 1) _ ( r i \1 17 3 . PROJECT MANAGEMENT AND APPROACH El • Development and monitoring of a projected Construction-specific accounting software to Cash Flow Summary for the project based on track real-time project costs,subcontract and the Schedule of Values for the City's use in purchase agreement committed costs, and forecasting the probable amount of each draw labor expenditures. request. Project CPM Schedule as a measure of • Monthly review of the Schedule of Values monitoring actual progress against requested along with each pay application. draws for completed work. • Monthly review of any Change Order items. Change Orders, if any, will be tracked in summary on the Schedule of Values and 3ai2. hr at least the last 3 completed GC/CM projects, greater detail on a change order log with provide history of estimates at the programming state,each supporting documentation. design stage,final GMP,and final contract amount. 0 �0 GOB 07�Q L� ` NN G0� '31 ko + Elder Grove $4,293,948.00 $4,201,171.00 -2.2% $4,327,205 11 1BD Meadowlark $16,442,322.00 $15,483,771.00 -5.83% $15,483,771 IS 12 Northern Hotel $14,567,689.00 $13,712,441.00 -5.87% $14,490,614 13 13 Ennis School $9,S40,496.00 $8,997,818.00 -S.69% $8,639,854 22 20 GE Corp. $8,002,81S.00 $7,765,603.00 -2.96% $9,500,000 12 11 Financial Center Billings Clinic $11,730,400.00 $11,500,000.00 -1.96% $11,297,708 13 13 Surgery Center Hyalite Elementary $14,175,141.00 $12,519,197.00 -11.68% 512,750,970 15 14 School Dehler Park S11,459,000.00 $11,180,442.00 -2.43% S 11,521,33S 11 11 Lodges at S10,750,000.00 $10,580,000.00 -1.47% $10,580,000 14 13 Elkhorn Creek Village Loft A&B $30,193,000.00 $30,000,000.00 -0.64% s30,000,000 28 28 with Parking Garage Department of the s20,826,083.00 $18,0990439.00 -13.09% $ 18,05S,992 14 12 Interior(DOI) MSU-Creative $3,187,608.00 53,179,371.00 -0.26% $3,177,60S 6 6 Arts Complex Park High School $12,710,563.00 S12,023,079.00 -5.41% $12,921,752 14 14 f \ � �, I A - c' M 18 3 . PROJECT MANAGEMENT AND APPROACH 3aii. Integrate into the design team 3aiii. Assist the designers with: I. Quality of the project documents. ii. Constructability. INTEGRATION INTO THE DESIGN i i i. Alternative methods and products. TEAM WOULD BEGIN WITH A i V. Budgets and estimating SHORT SERIES OF MEETINGS The above four items are typically addressed each BETWEEN L A N G L A S, DESIGN time the Langlas staff reviews progress updates at Schematic Design (SD), Design Development (DD) TEAM MEMBERS, A N D T H E and 90%Construction Drawings(CD)in an effort to OWNER TO REVIEW CURRENT help the Team produce a quality set of bid documents SCHEMATIC DESIGN INFORMATION that,when finished,represents a product that the Team is happy with and the Owner can afford to build when AND LISTEN TO THE TEAM ABOUT all the bids are tallied on bid day. THE DESIGN GOALS, INTENDED preferably,Langlas would be given plan documents at MATERIALS, FINISHES, AND each design phase for review. Our staff will perform DESIRES FOR THE PROJECT. a comprehensive review of all drawings, review dimensions, section/detail references, comment oals is on areas that may need greater detail for clarity of Once a better understanding of these g intent,and offer suggestions for alternate construction achieved, we would begin an interactive dialogue about how we might help the Team achieve these details/methods/products that achieve equal or greater goals in terms of cost,quality,and schedule—which performance at a lower cost. then leads into spec design details and feedback Reviews would include both outline specifications and from either Langlas or key subcontractor consultants detailed specification manuals. The format to return on particular building systems or material types that comments to the DesignTeam may include a returned meet or exceed these goals.Our mindset has always set of "redlined" plans, or tabular list of comments been to roll up ourto work,doin what is necessary tosadvan a th leeves and�ecommon goals of referencing drawing sheets and details as previously the project, discussed and agreed with the balance of theTeam. We will also coordinate information between plan On 1ro past projects,our integration with the design drawings and written specifications to ensure consistent team has proven very successful. ThinkOne p p information and eliminate scope gaps. Architects may be able to provide relevant feedback to this statement based on a current projects we have together for Madison County. "LANGLAS HAS PUT FORTH THE MOST COMPREHENSIVE PRE- CONSTRUCTION EFFORT I HAVE EVER BEEN A PART OF." Bayard Dominick,Owner Rep for Cross Harbor Development 406.250.2920 19 3 . PROJECT MANAGEMENT AND APPROACH 3aiv. Safely build a quality building on time and At Langlas&Associates,safety is equal in weight to within budget. aspects of quality,schedule and budget. Quality is achieved through regular inspections by LA N G LA S HAS A PROVEN TRACK the Superintendent and Project Manager. Langlas RECORD OF EXCELLENT SAFETY uses a proprietary syetem of quality control PERFORMANCE. SAFETY IS A chea)<liete for each phase of construction from CONDITION OF EMPLOYMENT excavation through project closeout to ensure accuracy, avoid mistakes, and produce the highest FOR BOTH SALARIED STAFF AND quality construction. Checklists are completed by HOURLY CRAFTSPEOPLE. the Superintendent and reviewed/approved by the Project Manager. Our company's commitment to sc fetr can also be seen through: Langlas & Associates has a proven track record of strictly adhering to tight schedule and budget i. Site specific saki ty manuals, constraints. Our skills in these areas have been ii. Safety Officers empluved perfected through many years of working with local at each district office. developers and national account tenants who have narrow cost pro formas and publicized opening iii. Monthly on-site project myic.vs be a dates.This same performance has carried through Langlas Safety Officer and a representative > all of the construction types we've encountered, from our insurance carrier. including publicly owned facilities. iv. Weekly safety meetings conducted for Langlas crews and all subcontract trades. Safety meeting minutes and sign-in sheets posted to the main office for review through our%vebsite. V. Active safety incentive program for all Langlas craftspeople.. vi. A Workman s Compensation Experience Modification hating of 0.73,well behnv the national a%crage. vii.All Langlas statfhave 10 hour OSHA Certification and many have obtained their OSHA 30 hour Certifications. I \ N (, i \ 20 3 . PROJECT MANAGEMENT AND APPROACH Below are sorne examples-four schedule commitment.These projects icere all completed on or ahead of schedule. PROJECT CONTRACT SIZE SCHEDULE Billings Clinic Surgery Center $12,500,000 60,000 sf 13 months GE Capital Office Building(Design/Build) $10,4S0,000 S2,000 sf 10 months CarmikeTheater $10,000,000 50,000 sf 7 months Meadowlark $16,000,000 67,500sf 12months Ennis School(Multiphase) $8,997,818 43,000 sf 20 months GE Corp.Financial Center $10,149,000 52,000 sf 11 months Hyalite Elementary School $12,913,000 68,000 sf 14 months Lodges at Elkhorn Creek $10,750,000 26,000 sf 13 months Village LoftA&B with Parking Garage $30,000,000 174,000 sf 28 months Department of the Interior(DOI) $20,000,000 122,000 sf 12 months Cost commitments can be seen bF•our diligence in controlling project costs through realtime and monthh•cost reviews using construction specific accounting software. • Site utilization plan.. 3pv. Maintain good relations with the community Public right-of-�cays s,•ill be kept clean on a and adjacent property owners. regular basis during the course of construction. • Waste management plans and recycling plans POSITIVE RELATIONS WITH THE for all phases ofconstrucliontoAm% for proper"green"disposal and reuse of CO M M U N ITY, and adjacent property owners .r•aste materials,and as part of the l.ELD would be maintained through all methods of being process. a good neighbor such as: • Noise Neill be kept as minimal as possible. • Work hours ss ill be limited to those as • Cleanliness and am•areness of public access prey iously agreed%vith the t hs net•and/or by around the construction work zones. C'itt ordinance. • Portable Music players,tobacco List.outside • Langlas%sill coordinate•v ith oc•c•upanis and designated areas,and profane language"ill not neighbors to communicate planned actisit% and be tolerated. help address an% concerns�sith construction. I .- \ l, I 1 � t ( ) \I 21 3 . PROJECT MANAGEMENT AND APPROACH 3 b 1.Describe your approach to: on the current set of documents, but also reflects i.Cost estimating meeting discussions and our forecast of scope that a.What methodology do you use? eventually will be part of the project once the design is complete. Langlas uses a three-fold approach to cost estimating d.Do you have in-house estimating staf 1 that incorporates in-house material takeoffs and 1.fso what are their other labor estimates, subcontractor feedback for major responsibilities?How much of their time scopes of work (such as mechanical, electrical, is spent in cost estimating? plumbing), and our own historical database of project costs from other projects or similar All of our preliminary and final estimates are construction types we are currently working on or completed by the project manager who will have recently completed. be running your project to ensure consistency Ix How doyou organizeyour estimate? throughout all phases of design and construction, and guarantee no information is lost by transferring files between an estimator and project manager.The Detailed costs are categorized within proprietary end result is a project manager who is intimately estimate spreadsheets developed by our firm,then familiar with every aspect of your project, which organized by CSI division with line item detail also ensures better bid packages and the elimination for review by the Owner and Design Team. Pre- of scope gaps between building trades.The project construction estimates are tracked in the same manager will be supported by a team of in-house fashion throughout the stages of design (SD, DD, engineer resources to assist with material takeoffs, CD).Any variances from one stage to the next are pricing,and subcontractor calls,as necessary. hi-lited for evaluation and discussion. c.During design,how do you determine the final cost when not all work is shown or known? Langlas & Associates has extensive experience in performing preliminary estimates and forecasting project costs. Over 8011/o of our work is procured in the same or similar manner proposed for the Police and Courts Facility. Because we use a three-fold approach to estimating described above (Item 3bl.i.a — Methodology), we find that our preliminary estimates are usually within a S%- 10% range of the GMP. For preliminary estimates we use our experience and knowledge of past projects to develop an estimate that includes not only the items shown 22 3 . PROJECT MANAGEMENT AND APPROACH 3 b I i How do you ensure that this project will get appropriate response from the subcontracting community? l.onglas uses sri methods to ensure a strong response `2anglas and Assoc.has always treated us fairly and we from the subconrractor communtt. consider them as a`well ran'general contractingflrm.Our projects with them have been a mixture of design/build and i. "Totvn Hall"nicetings inciting local fully engineered projects.Langlas and Assoc,has helped us subcontractors to generate interest uul become successful in southwest Montana." answer questions about the project. Mark Kredit,Owner-Kredit Electric ii. Public achcrtisements in local and regional newspapers regarding open bidding for the "Langlas 8,lssociates has consistently proven to be a leader project. within the industry.Our company enjoys working with iii. ConductinL a pre-hid walkthrough niceting d'�professional mangers and superintendents.Itisreadily apparent that timely project completions and quality work with prospective hidclet•s. are important to the entire Langlas organization.We iv. Placing hid docununts in local and regional have always appreciated Langlas'abilityto make payments 11 builder's exchanges. in a timely manner,something we do not see as often with other general contractors•" v. Sending both fas and c-mail hirl requests Scott Hill Senior Project Manager-Hill Masonry using s�-ehhased bid management softsi arc, \rhereb\•the maintain a database of ovet•4,000 subcontractor and.supplier contacts tin-the "We believe that Langlas&e9ssoeiams'management skills Carious divisions of work. and team approach made these projects successful.These qualities have made their company standout above the vi. Making tirllrnv-up calls to im ited bidders to ensure thcc've receit cd the intro matirm, other general contractors that we have worked with." answer ducstinns,and generate Further DanielBurtell-BurtellFireProtection,Inc. interest in the project. i \I 23 3 . PROJECT MANAGEMENT AND APPROACH 3 b 112.How much do you use subcontractors,for cost 3 b I 0 Now do you address subcontract bids that are information during the Preconstruction phase? different than the cost estimate? The amount of subcontractor participation in If we've done our due diligence during pre- pricing exercises varies depending on the stage construction,this rarely happens.If it does, of design.At Schematic Design(SD),they are however,we would first interview the lowest used verylittlewhen we rely moreheavilyon our bids received for the category in question in-house database of historical costs for other to find out the driving factors for the cost projects or similar building types.Once greater overrun;obtain competitive alternates or detail is known during Design Development Value Engineering(VE)solutions from the (DD), we will begin to include Mechanical/ subcontractors;and seek comment and/or Electrical/Plumbing trades forbudget feedback approval on VE alternates from the Design based on preliminary drawings and an outline Team and Owner.If VE alternates meet specification.We might also include feedback budget expectations,then proceed with from masons and storefront glazing systems implementing solution.If VE alternates don't as an example.By the time SO%Construction meet budget expectations,but can reasonably Drawings(CD) are available,we typically run be implemented without undue risk through a"mock bid"soliciting one or two"bids"from the contingency,then we would make that each trade category, using subcontractors recommendation to the Owner.If all other whom we've worked with extensively in the attempts fail to bring the item(or project past.At both DD and CD stages, Langlas will total)in line with the cost estimate then provide our own material takeoffs comparing further discussions would need to occur with both real time and historical costs against the the DesignTeam and Owner to determine the subcontractor pricing we've received,in order most appropriate course of action. to fully evaluate the projected cost model. 3 bi i 3.When would you involve subcontractors in this project?Which ones? We anticipate involving subcontractors during the pre-construction phase for the Police and Courts Facility for the following trades: • Mechanical • Llectrical • I'lunibino • Steel • Site Work • Nlason ry Of required) 24 I , 3 . PROJECT MANAGEMENT AND APPROACH 3 bi I i.Value engineering,3bi V Budget reductions iii.How do you track progress against the schedule during construction? LANGLAS & ASSOCIATES" EXPERIENCE WITH VALUE Progress against the schedule is tracked on a weekly basis during on-site construction meetings,via use ENGINEERING IS EXTENSIVE. of a "3-Week" schedule which typically contains more detailed information than the CPM can Offering money-saving ideas to Owners and Provide.The CPM is then updated on a monthly Architects,without saeri$ee to f niction, basis and reviewed at each regularly scheduled quality or design,intent has been a fundamental Owner's meeting. In addition, the CPM may be principle on which we've built our business.We set up using a"baseline schedule"feature that will inherently begin the Value Engineering process show originally schedule activity timelines vs.actual with our first look at the project plans.We will progress for each activity. provide the Owner and DesignTeam with Value Engineering options and budget feedback through iv.Doyou use computer sof ware w develop the all phases of design so when the final documents schedule?If so,what kind? are printed and ready for subcontract bidding, what is shown represents a project that the Owner Yes.We use Microsoft Project. can afford to build. 3 b V.Planning and scheduling the construction v.Provide examples of the last schedule from two work recently completed projects. i.Do you use critical path scheduling methods? Please see appendix B. Yes. ii.How do you manage and schedule the procurement and the submittals process and its impact on field activities? We first generate the project CPM schedule to establish material installation dates.Lead times and delivery milestones for major material items will be shown on the CPM schedule. Separate from the CPM we also develop and maintain a Submittal and Delivery Schedule in spreadsheet form that is populated with dates relating back to the CPM Schedule and the project needs.Both the CPM and Submittal and Delivery Schedules are reviewed weekly in-house and at each regularly scheduled Owner's Meeting (typically once / month, minimum) to ensure submittals or their approvals will not impact field activities. 25 3 . PROJECT MANAGEMENT AND APPROACH El 3bviii. 3 bvi. Describe firm's approach to project Provide your construction change orders overhead and profit communication mark-ups WE PREFER COMMUNICATION Overhead and profit markups for construction THAT IS OPEN. HONEST, AND changes shall be as agreed during contract negotiations with the City of Bozeman. Such mark OFTEN BETWEEN ALL PARTIES. ups are typically equal to the construction manager's Phone calls, e-mails, photos, faxes, job site walks, percentage fee of the cost of work. drawing reviews,Request for Information,schedule discussions and meetings are all used on a regular basis Subcontractor markups are usually limited to 10% to help ensure that we are doing our part to actively overhead and 5%profit,or as mutually determined listen to the needs of the Owner and the DesignTeam with the City of Bozeman. and take appropriate action for the success of the project. 3 bvi i. Project safety—Has any state OSHA or federal OSHA cited and assessed penalties against your firm for any serious,"wil l"or repeat"violations of its safety or health regulations in the past five years? Yes.Langlas received two OSHA violations in 2009 and three in 2011.In an effort to improve safety performance,we hired a second safety manager,Bud Daigle,to better serve the company's needs across the five state area in which we work.Some of the items Bud has championed include:revamping our complete safety policy,implementing documented weekly safety inspections by all superintendents, purchasing thousands of dollars worth of new personal protective equipment and maintaining an accessible inventory,and performing regular safety inspections of our project sites.We have seen a noticeable improvement in our safety culture since, and expect more positive results in the future. Date of Inspection Project Infraction Cited Category Action Taken 11/14/11 Park High School Elect.Equip.Hazard Serious Replaced Equipment 09/20/11 Hardin High School RebarCaps Serious Installed Caps Fall Protection Repeat Put on Fall Protection 03/08/11 Alpine Orthopedics Fall Protection Repeat Put on Fall Protection 12/04/09 Homestead 6-plex Fall Protection Serious Put on Fall Protection 01/20/09 West Park Plaza Fall Protection Repeat Put on Fall Protection 26 2270 Grant Rd 1019 E Main St.# 101 Billings,MT 59102 LanglasBozeman,MT 59715 P:406.656.0629 & Associates P:406.58S.3420 F:406.656.1088 F:406.585.4110 GENERAL CONTRACTORS April 9,2014 f City of Bozeman Office of the City Clerk 121 North Rouse Ave Bozeman,MT S9771 ATTN:Chuck Winn,Assistant City Manager RE:Request for Proposals for City of Bozeman Police and Courts Facility Dear Chuck: Langlas & Associates is pleased to offer our response to your Request for Proposals for GC/CM Professional Services for the City of Bozeman Police and Courts Facility.We are honored to have your consideration and feel that our schedule driven background and years of experience on large complex projects makes us an excellent fit for this project. Langlas&Associates has provided GC/CM Services as a Montana-based business for the past 40 years.By putting the needs of our project owners first;operating with principles of honesty,integrity,commitment to costs,and pride in our work, we have become one of the leading GC/CM Firms in Montana. Over 80%of our work is performed using the negotiated Construction Manager at Risk,Design-Build,and/or General Contractor/Construction Manager delivery methods. Please let us know if you have any questions regarding the following information.We encourage you to contact any of our references and look forward to discussing the project in greater detail during the interview phase of the selection process. Sincerely, Steve T.Langlas Vice President E3M GENERAL CONTRACTORS Steve R. Lanalas l Owner/CEO I r Bill Lan las� Steve T. Langlas Dave Langlas Catherine B�1?,mn an 9 Brad Sinclair Owner/President Bozeman Oti.ner/Senior V.P. President Billings Office Production/Labor Owner!Office ager/ Office Coordinator HR Ben Duncan John Flanagan Jason Hubbard Loren Cantrell Roger Davis Labor Manager/Asset �� Senior Project Manager Senior Project Manager Senior Project Manager Senior Project Manager Manaaer/Risk&Safety I Manager Project Managers Eric Baker Alan Kuntz Assistant Project Managers Project Engineers Receptionists/ accounting Jason Arrowsmith Ben Walker Jason Flee e Angela Muller Sam Bergman Dave Reynolds 9 Office Assistants Joe Clark Nick Tibesar Daniel Arthun Matt Drake Josh Henigman Jolene Burrell Autumn Muller Bud Daigle(/Safety Officer) Ed George(/Safety Officer) Emily Mainwaring Dawn Musson Superintendents Foremen p Field Engineers Tim Atsatt Dan Dooley Jerry Galvin Fred Johnson David Loran Konnor Backer Ed Dann Chris Barefield Dennis Evanson Chuck Gilcrest Jon Kolb Randy Pendergraft Ira Couture Brent Erickson Jory Barefield Mike Falk J.D.Gray Steve Kynast Jon Talbot Rhett Kastelitz Adolfo Lopez Cory Craver Ben Flanagan Justin John Lane Huffman Ken Voe ele Armando Lopez 9 Graydon Sinclair Arnie Peterson 01/15/2014