Loading...
HomeMy WebLinkAbout12-17-07_Approve Final Plat of Cottage Partners Mino10432_16 REPORT TO: Honorable Mayor and City Commission FROM: Tim Cooper, Staff Attorney SUBJECT: Cottage Partners Minor Subdivision Final Plat MEETING DATE: December 17, 2007 RECOMMENDATION: Upon the Director of Public Service’s review and concurrence, the City Commission approves the Final Plat of Cottage Partners Minor Subdivision, and authorizes the Director of Public Service to execute the same on behalf of the City of Bozeman. BACKGROUND: This is a request for approval of a Subdivision Final Plat to subdivide ~ 11.5 acres into 3 lots for development. Cottage Partners Minor Subdivision is generally located on the south side of Haggerty Lane east of Ellis Street. At its November 20, 2006, public hearing, the Bozeman City Commission voted to conditionally approve the Cottage Partners Minor Subdivision Preliminary Plat. The applicant submitted a complete final plat on October 31, 2007, and staff has concluded all terms and conditions of preliminary plat approval have been met. State law provides that the governing body shall approve the plat only if: a) The plat conforms to the conditions of approval set forth on the preliminary plat and to the terms of the state subdivision law and regulations and the regulations adopted by the Bozeman City Commission; and b) The County Treasurer has certified that all real property taxes and special assessments assessed and levied on the land to subdivide have been paid. The County Treasurer has certified that the taxes and special assessments have been paid. Attached is a memorandum from Doug Riley, Associate Planner, delineating how the conditions of preliminary plat approval have been satisfied. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the property. ALTERNATIVES: As suggested by the City Commission CONTACT: Please email Tim Cooper at tcooper@bozeman.net if you have any questions prior to the public hearing. Commission Memorandum 154 planning • zoning • subdivision review • annexation • historic preservation • housing • grant administration • neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net MEMORANDUM To: Tim Cooper From: Doug Riley, Associate Planner driley@bozeman.net Date: December 7, 2007 Subject: Tract 4A of Minor Subdivision 162C – Final Plat #07039 Cottage Partners 1, Limited Partnership, has made application to the Planning Office for Final Plat review and approval for Tract 4A if Minor Subdivis on 162C, being a three lot subdivision located on the south side of Haggerty Lane approximately 1,000 feet east of Ellis Street. i On November 20, 2006, the City Commission granted preliminary plat approval to subdivide 11.535 acres into 3 lots. Staff’s summary review addresses the conditions of preliminary plat approval outlined in the Findings of Fact and Order. The developer has applied for final plat review and approval of the subdivision, electing to financially guarantee the required sidewalks along Farmhouse Lane and landscaping along Haggerty Lane. Based on the summary review provided below, both the City Engineering’s Office and Planning Department have reviewed the application against the conditions of preliminary plat approval; and as a result, find that final plat approval may be granted contingent on receiving the applicable financial guarantee for uncompleted improvements; payment of the cash in lieu of water rights and execution of the Improvements Agreement for this subdivision. Attached for your review: four (4) original mylars of the Final Plat, original Platting Certificate, Improvements Agreement, and Covenants. There will not be a “No Build” restriction necessary with the recording of this final plat. Please have the Director of Public Service sign the applicable certificates on the final plat, and return all of the documents to the Planning Office once the City Commission has acted on the final plat application. The Improvements Agreement will be recorded and filed with the final plat at the Clerk and Recorder’s Office. The Planning Staff respectfully requests that you prepare a City Attorney's Certificate using the attached original Platting Certificate; approve the Certificates of Director of Public Service, Release of Sanitary Restrictions and Certificate of Completion "as to form". If you find this submittal acceptable, please place the final plat application on the earliest scheduled Consent Agenda of the Bozeman City Commission and advise staff accordingly in order for the applicant to provide the appropriate financial guarantee; cash in lieu of water rights payment and the signed improvements agreement prior to the City Commission acting on the matter. Once the Commission has acted on the Final Plat application, please forward the original mylar plats and documents to the Director of Public Service and have the Director sign the appropriate certificates on 155 Page 2 the final plat. Please make sure the Director’s signature’s are notarized and return all of the documents to the Planning Office in the Inter-Department routing envelope for their protection. Based on the applicant having submitted a complete final plat application on October 31, 2007 and the application being deemed complete on November 6, 2007, the maximum 45 working day review period will expire on January 11, 2008. The final plat application complies with all of the code provisions identified in the Findings of Fact and Order. The conditions of preliminary plat approval and how they have been met, follow: 1. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. The subdivision complies with the standards identified and referenced in the Unified Development Ordinance and has been reviewed by the Planning and Engineering Departments. In regards to street lights, the Montana Department of Transportation has provided a letter dated September 27, 2007 that they “will not require illumination by the developer of the subject subdivision”…and that they “prefer to not to have spot lighting improvements on the corridor as each new development is approved.” The Planning Office is working with the developer on the provision of street lights at the intersecting streets with Haggerty Lane as part of a Site Plan currently under review and language regarding the waiver of right to protest future street lighting districts is a plat note and certificate and are included in the declaration of covenants, conditions and restrictions for this subdivision. 2. The subdivision shall be consistent with the approved Bozeman Deaconess Health Services Subarea plan. The subdivision is consistent with the approved Bozeman Deaconess Health Services Subarea Plan. 3. Upon further development of proposed Lots 4A-2 and 4A3, pedestrian and bicycle access should be provided through the subject property to provide connectivity from Haggerty Lane to the future farmstead and park facilities included in the adopted Bozeman Deaconess Health Services Subarea plan. Pedestrian and bicycle access is provided by the newly constructed Farmhouse Lane and Haggerty Lane improvements. 4. Unless the applicant can show that usable water rights or an appropriate fee in lieu thereof was provided when the subject property was annexed, water rights or an appropriate fee in lieu shall be provided with final plat approval, final site plan approval or the issuance of any building permits, whichever occurs first, for the remainder of the parcel except for Lot 4A-1. There are no water rights available for this property. The Engineering Department has calculated the required cash in lieu of water rights for the subdivision which will have to be paid prior to final plat approval. 5. The southwestern half of Haggerty Lane will need to be constructed to a 2-Lane minor arterial standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update along the entire frontage of the subdivision. This shall include tapers meeting AASHTO standards to transition back to the existing roadway. 156 Page 3 The improvement of Haggerty Lane has been completed and inspected by the Engineering Department. 6. The water main in Haggerty shall be 10” diameter in accordance with the City’s Water Facility Plan, and shall be extended along the entire frontage of the subdivision. This water main improvement has been constructed. 7. A sewer main (8”) will need to be extended along the entire frontage of the subdivision. This sewer main improvement has been constructed. 8. Utility occupancy permits shall be obtained from MDT for the water and sewer infrastructure within the state right of way. Occupancy permits for the water and sewer infrastructure have been obtained. 9. Approval shall be obtained from the Montana Department of Transportation of the traffic impact study and for all improvements along Haggerty Lane. Approval from MDT was obtained for the improvements to and along Haggerty Lane. 10. All improvements necessary to provide adequate level of service at the intersection of Haggerty and Main must be installed or financially guaranteed prior to filing of the plat unless a variance is granted by the City Commission. No building permits will be issued until all improvements are installed and accepted unless the variance is granted. Approval must be obtained from the Montana Department of Transportation for all improvements to Haggerty and Main. A variance was granted by the City Commission to this condition. 11. Culverts shall be sized in accordance with Section V.C.7 & 8 of the COB design standards. The preliminary calculations submitted did not account for the required overflow capacity. Revised culvert calculations were provided and reviewed and approved by the City Engineering Department. 12. Prior to final plat approval, the information required by Section 18.44.090.H of the UDO shall be provided for review of the deviations required to allow for the accesses onto Haggerty as shown on the Conceptual Connectivity Plan (2). A one foot no access strip shall be provided along the entire frontage of Haggerty except in locations where a deviation is granted to allow for an access. Accesses onto Haggerty Lane were reviewed and approved by the Engineering Department and a one foot no access strip is shown on the Final Plat along Haggerty Lane at the appropriate locations. 13. Public Street and utility easements shall be provided on the final plat for the streets shown on the Conceptual Connectivity Plan (2). A public street and utility easement has been provided on the final plat for the streets shown on the Conceptual Connectivity Plan. 14. The street from Haggerty Lane to the southern property line shall be fully constructed to the property line unless a variance is obtained to allow it to stop short. A temporary turnaround shall be installed at the end of the street within an easement on the adjoining property or, if an easement cannot be obtained, on the subject property in a configuration approved by city engineering. Haggerty Lane has been constructed to the southern property line and a temporary turnaround and easement has been provided. Attachments: Four (4) Mylar Final Plats Improvements Agreement with Estimate Original Platting Certificate 157 Page 4 Covenants Copy of the applicant’s submittal cc: Engineering Inc., 705 Osterman Drive, Suite F, Bozeman, MT 59715 Madison Engineering, 924 Stoneridge Drive, Suite 1, Bozeman, MT 59718 Cottage Partners I, Limited Partnership, 2555 West College Street, Suite B, Bozeman, MT 59718 158 159