Loading...
HomeMy WebLinkAbout11-13-07_Authorize City Manager to sign a South Towne Squar_9 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: South Towne Square MEETING DATE: 11/13/07 BACKGROUND: Attached is a copy of the partially executed Sidewalk Easement for the above referenced project. The easement is necessary to relocate the existing sidewalk onto private property in order to accommodate a bus turnout. Engineering staff has reviewed the easement and found it to be acceptable. RECOMMENDATION: Authorize City Manager to sign the easement. FISCAL EFFECTS: N/A ALTERNATIVES: None Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Easement Document Report compiled on 11/6/2007 36 37 38 39 40