Loading...
HomeMy WebLinkAbout11-05-07_Authorize the City Manager to sign the Durston Roa_9 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Sue Stodola, Project Engineer Chris Kukulski, City Manager SUBJECT: Durston Road SID 684 Project Professional Services Agreement Amendment No. 5 MEETING DATE: November 5, 2007, Consent Agenda RECOMMENDATION: The Commission make a motion to authorize the City Manager to sign the Durston Road SID 684 Professional Services Agreement Amendment No. 5. BACKGROUND: Three (3) original signature copies of the partially executed Amendment No. 5 to the Professional Services Agreement for the above referenced project have been provided to the City Clerk. The current Professional Services Agreement, which was signed on September 10, 2001, consists of pre-design design engineering services only. Amendment No. 1 to the Professional Services Agreement, which was signed on October 18, 2004, consists of preliminary design, final design, and bid phase engineering services. Amendment No. 2 to the Professional Services Agreement, which was signed on April 18, 2005, consists of an evaluation of the levels of service on the Durston Road corridor prior to completion of the proposed improvements. Amendment No. 3 to the Professional Services Agreement, which was signed on February 27, 2006, consists of construction phase services. Amendment No. 4 to the Professional Services Agreement, which was signed on November 6, 2006, consists of additional final design phase services. Amendment No. 5 provides for an increase to the construction engineering fees for items which occurred during the course of the construction phase, such as additional construction inspection due to increased construction time. The cost of these construction phase services increases the contract from $667,216.00 by $51,000.00 for a total of $718,216.00. The total amount of the amended Professional Services Agreement is $718,216.00. This amount is within the project budget. FISCAL EFFECTS: The project will be funded through an SID, Street Impact Fees, Water Impact Fees, and Sewer Impact Fees. 54 Commission Memorandum Durston Road SID 684 Project Professional Services Agreement Amendment No. 5 November 5, 2007, Consent Agenda Page 2 of 2 ALTERNATIVES: As may be suggested by the City Commission. Respectfully submitted, Approved by: _________________________________ ____________________________ Susan M. Stodola, Project Engineer Chris A. Kukulski, City Manager Attachments: Amendment No. 5 Report compiled on 10/30/07 cc: Stacy Ulmen w/orig. enclosures Project File 55 56 57 58 59