HomeMy WebLinkAbout10-01-07_Revised Aspen Park Major Subdivision Preliminary P_13 Report compiled on August 28, 2007 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Epple, Planning Director Chris Kukulski, City Manager SUBJECT: Aspen Park Subdivision Major Subdivision Preliminary Plat, #P-07027 MEETING DATE: Monday, October 1, 2007 RECOMMENDATION: Finding that the applicant has provided the Planning Office with a conceptual redesign of the subdivision that addresses the concerns identified by the Commission in its denial of the preliminary plat application, Staff recommends that the matter be discussed further with the applicant at the October 1, 2007 public meeting for consideration of conditional approval as recommended in Planning Board Resolution #P-07027. BACKGROUND: On Tuesday, September 10, 2007 Commissioner Jacobson voted to break a 2-2 tie voting against a motion to conditionally approve the preliminary plat application for Aspen Park Subdivision as recommended by the Planning Board. As a result, said motion to conditionally approve the preliminary plat failed on a vote of 2-3. After outlining the reasoning for denial of the preliminary plat application with the applicant’s representative, Tracy Poole, the City Commission elected to schedule the matter for October 1, 2007 to give the applicant the opportunity to further consider a redesign of the major subdivision as it relates to: 1) extension of east/west local streets to break up block lengths, 2) alleyway access serving residential lots along South 19th Avenue, and 3) presentation of residential dwellings onto the South 19th Avenue streetscape. UNRESOLVED ISSUES: As of this writing the applicant has provided staff with a conceptual redesign of the subdivision that responds to the issues identified by the Commission. The applicant has verbally committed to the alternative design as attached to this memo with regard to the presentation of residential lots onto South 19th Avenue, inclusive of alleyways. Therefore, the applicant wishes to continue their discussion with the Commission at its October 1, 2007 meeting in anticipation of a conditional approval of the revised subdivision design. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues, along with increased costs to deliver municipal services to the property, at such time the property is developed. ALTERNATIVES: As suggested by the City Commission. 315 CONTACT: Please feel free to email Dave Skelton at dskelton@bozemna.net if you have any questions prior to the public hearing. Respectfully submitted, _________________________________ _________________________________ Andrew Epple, Planning Director Chris Kukulski, City Manager Attachments: None Report compiled on September 25, 2007 316 317 C5fflNj9 BettllTY GIOU ISeptember 26 2007 Dear City ofBozeman planning staff and City Commission Staffs enclosed for your review are updated copies of the Aspen Park revised lot layout based on the comments ofthe City Commissioners given at the City Commission hearings dated 9 4 2007 and 9 10 2007 Please note the changes to the homes fronting 19th avenue This revised lot layout has a larger landscape buffer between 19th avenue and the frrst row of homes The changes to the plat do not significantly change the water sewer storm water or private utility services from what was originally submitted The revised lot layout has shorter block lengths with the addition of two connecting streets on the southern portion ofthe plat between 17th and 18th and between 15th and 16th With these revisions this plat continues to meet all the requirements as set forth in the UDO Thank you for you time and considemtioD Tracy Poole 318 Aspen Park Major Subdivision – Planning Resolution No. P-07027 1 Aspen Park Subdivision RESOLUTION #P-07027 RESOLUTION OF THE CITY OF BOZEMAN PLANNING BOARD ON A RECOMMENDATION OF A PRELIMINARY PLAT APPLICATION TO DIVIDE 79.98± ACRES INTO 227 RESIDENTIAL LOTS ON PROPERTY ZONED “R-1” (RESIDENTIAL, ONE-HOUSEHOLD LOW DENSITY DISTRICT) AND “R-2” (RESIDENTIAL TWO-HOUSEHOLD MEDIUM DENSITY DISTRICT) WHICH IS LOCATED EAST OF SOUTH 19TH AVENUE WITH THE INTERSECTION OF GRAF STREET, EAST OF MEADOW CREEK SUBDIVISION, AND WEST OF ALDER CREEK SUBDIVISION AND ALLISION SUBDIVISION, FUTURE PHASES, AND DESCRIBED AS A TRACT OF LAND LOCATED IN THE SOUTHWEST ONE-QUARTER OF THE NORTHWEST ONE-QUARTER AND SOUTHWEST ONE-QUARTER OF THE SOUTHWEST ONE-QUARTER OF SECTION 24, T2S, R5E, P.P.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA. ---------------------------------------------------------------------------------------------------------------------------- WHEREAS, the City of Bozeman has adopted a Master Plan pursuant to 76-1-604, M.C.A.; and WHEREAS, the City of Bozeman Planning Board has been created by Resolution of the Bozeman City Commission as provided for in Title 76-1-101, M.C.A., and a jurisdictional area created under 76-1- 504, M.C.A.; and WHEREAS, PM Investments, LLC, represented by Stahly Engineering & Associates, Inc., submitted a Major Subdivision Preliminary Plat Application to subdivide 79.98± acres of land into 227 residential lots on property described as a tract of land located in the southwest one-quarter of the northwest one-quarter and the southwest one-quarter of the southwest one-quarter of Section 24, T2S, R5E, City of Bozeman, Gallatin County; and WHEREAS, the proposed Major Subdivision Preliminary Plat Application has been properly submitted, reviewed, and advertised in accordance with the procedures of Section 18.06.040 of the Bozeman Unified Development Ordinance; and WHEREAS, the City of Bozeman Planning Board held a public hearing on Tuesday, August 21, 2007, to receive and review all written and oral testimony on the request for said Major Subdivision Preliminary Plat Application; and WHEREAS, five (5) letters of written testimony on the matter was received by the Planning Office discussing urban density, parkland, pedestrian and bicycle circulation, traffic generation, street lights, sanitary sewer capacity, integrity of Mandeville Creek, and downstream water user facilities; and WHEREAS, Don Seifert, 5700 Fowler Lane, discussed the limited ability to maintain Mandeville Creek as a water feature for the proposed subdivision based on lack of water features in the area; and WHEREAS, members of the City of Bozeman Planning Board discussed spacing of street intersections, potential neighborhood commercial nodes, transit system, workforce housing ordinance, irrigation ditches and permitting, ditch relocation, storm water discharge, improvements to South 19th 319 Aspen Park Major Subdivision – Planning Resolution No. P-07027 2 Avenue, street lights, parkland, ground water, basement restriction, subdivision design, and RSL lots; and WHEREAS, the City of Bozeman Planning Board, on a vote of 5 to 0, recommends conditional approval of Planning Application No. P-07027 for Aspen Park Subdivision with the conditions outlined in the staff report of the City of Bozeman Department of Planning and Community Development; and NOW, THEREFORE, BE IT RESOLVED, that the City of Bozeman Planning Board, on a vote of 5 to 0, recommends approval to the Bozeman City Commission to subdivide 79.98± acres of land into 227 residential lots on property described as a tract of land located in the southwest one-quarter of the northwest one-quarter and the southwest one-quarter of the southwest one-quarter of Section 24, T2S, R5E, City of Bozeman, Gallatin County, Montana be approved with the following conditions: City Engineer’s Office: 1. 1’ No Access Strip shall be shown on the plat along the entire lot frontage of 19th Avenue and Graf Street. 2. A temporary turnaround shall be installed at the end of any dead end street which is more than 1 lot long. This shall include dead ends created by project phasing. 3. The water main shall be 12” diameter in Graf Street and 24” diameter in 19th Avenue in accordance with the City’s Water Master Plan. 4. The sewer main shall be 24” on Stucky from its current terminus to 19th, and then 12” from Stucky to the southern property boundary on 19th in accordance with the City’s Wastewater Master Plan. 5. All street intersections not meeting the separation distance required by section 18.44.090.D of the UDO shall be right in right out only at their intersection with Graf unless the information required by section 18.44.090.H to grant a deviation by is provided to and approved by the City Engineer. 6. Radiuses to accommodate turning movements shall be installed in the “T” alleys. 7. All improvements necessary to provide adequate level of service at the intersections analyzed in the Traffic Impact Analysis (TIS) must be installed or financially guaranteed prior to filing of the plat for each phase. No building permits will be issued for a phase until all improvements required for the phase are installed and accepted. Approval of the TIS must be obtained from the Montana Department of Transportation and for all improvements along Kagy Boulevard and 19th Avenue. 8. Access Permits for the intersections, and Occupancy Permits for water and sewer mains and services within the State's right-of-way must be obtained from the Montana Department of Transportation. 9. The east half of South 19th Avenue shall be improved to the 120’ right of way, 5 Lane Principal Arterial standard as shown in the Transportation Plan along the entire frontage of the subdivision including tapers back to existing asphalt on the north and south end meeting AASHTO standards. All of the improvements to South 19th Avenue shall be complete with Phase I of the subdivision. 10. The sidewalks adjacent to South 19th shall be a minimum 6’wide, 6” thick, and shall be installed at the time the street improvements are done. 320 Aspen Park Major Subdivision – Planning Resolution No. P-07027 3 11. The full width of Graf Street along with the required utility extensions shall be improved to the 48’ BC to BC Collector standard as shown in the Transportation Plan from 19th Avenue to the eastern boundary of the subdivision. 12. 100-year flood elevations shall be computed for the watercourses that are within the subdivision boundary. All locations where flooding limits encroach onto proposed lots shall be noted on the final plat along with minimum floor elevation for the structures to be constructed on the effected lots. 13. Pursuant to section 18.42.070.3 of the UDO, sewer and water mains shall be stubbed out to the boundary of the subdivision to provide future service to adjoining undeveloped land. 14. Stormwater shall not be discharged to any irrigation ditch unless a variance is requested and approved by the City Commission. 15. The City cannot grant an exemption from the MDEQ review of plans and specifications. A master facilities exclusion form will be provided upon request following preliminary plat approval. 16. Road geometry should meet the criteria in the COB design standards unless a deviation can be justified. 17. Draft payback agreements for water, sewer and signalization improvements have been submitted by the developers of Meadow Creek Subdivision. If these paybacks are established, then they shall be paid with the final plat for each phase of the subdivision. 18. The medians shall have topsoil, irrigation, and seed unless a deviation can be justified from the COB Design Standards. 19. If an easement can be obtained from the adjoining property owner for South 15th Avenue, the entire street section exclusive of the sidewalk on the adjoining property shall be constructed. If the easement cannot be obtained, curb, gutter, standard boulevard, and sidewalk on the west side, along with a minimum pavement width of 24’ shall be installed. Planning Office: 20. The final plat shall comply with the standards identified and referenced in the Bozeman Municipal Code. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 21. Water rights, or cash-in-lieu thereof, as calculated by the City Engineer’s Office, is due with each final plat of the major subdivision. 22. A notation on the final plat and in the home owner’s association documents shall be provided noting that no direct access from individual lots onto South 19th Avenue and Graf Street is permitted. A one- foot “No Access” strip shall also be noted on the final plat for both streets. 23. A minimum twenty-five (25) foot front yard setback is required along South 19th Avenue and twenty (20) foot yard setback is required along Graf Street. Said notation shall be provided on the final plat and in the home owner’s association documents. 321 Aspen Park Major Subdivision – Planning Resolution No. P-07027 4 24. Trees may not be located within 10 feet of sewer and water services. Sewer and water services shall be shown on the landscaping plan of the park and open space plan, and approved by the Water/Sewer Superintendent. 25. Covenants shall address the requirements for street trees, a COB planting permit for street trees and obtaining utility locates before any excavation begins in the COB right of way. 26. The applicant shall proceed with implementation of a park maintenance district with assistance by City staff for the maintenance and up keep of all parkland improvements, and if possible landscape improvements located within public rights-of-way. A draft of the park maintenance district shall be submitted to the Planning Office for review at least sixty (60) days before submitting for final plat approval of the initial phase of the subdivision. 27. All private utilities shall be installed in rear yard utility easements where individual subdivision lots have access to public alleyways. 28. Sidewalks along park land should be constructed to a six foot width to accommodate snow removal equipment. 29. Fences located in the front, side or rear yard setback of properties adjacent to any park or open space shall not exceed a maximum height of 4 feet, and shall be of an open construction designed in a manner to be consistent along all park land and open space areas. This requirement with appropriate exhibits of fence types shall be addressed and illustrated in the home owner’s association documents. 30. 18.50.060 “Frontage” – Park land shall have frontage along 100 percent of its perimeters on public or private streets, unless otherwise noted. This further implies that all streets adjacent to parkland for a phase of the major subdivision must be improved with said phase (i.e., Vollmer Street). 31. All dedicated park lands shall be titled “Public Park”. The open space shall be titled “Open Space, Public Access”. Notes shall be included on the plat describing ownership and maintenance responsibility for both the park and open space, e.g.: public park, dedicated to the city and maintained by the homeowners association; and open space, public access, owned by the landowners, maintained by the homeowners association, etc. 32. Park dedication requirements shall be met prior to or in conjunction with each subdivision phase. Documentation of satisfaction of park dedication requirements in accordance with Section 18.50.020 of the BMC shall be provided 33. The Final Park Plan shall include: a. Current and Future site plan(s) for the entire property with the current plan showing developer installed improvements and the future plan showing any planned improvements not intended to be installed by the developer; b. The location of watercourse setbacks; c. Park landscaping plan, prepared by a qualified landscape professional in accordance with §18.78.100; d. Trail design and construction showing compliance with adopted City standards and trail classifications; e. The requirement for a preconstruction meeting prior to any site work, including trails; 322 Aspen Park Major Subdivision – Planning Resolution No. P-07027 5 f. Appropriate sections from the “Design Guidelines for City of Bozeman Parks”; g. Cost estimate and installation responsibility for all improvements; h. The park shall be described as a community park with a future community recreational facility and other related features as determined by the COB. 34. Subdivision lighting SILD information shall be submitted to the Clerk of Commission directly after Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete until the resolution to create the SILD has been approved by the City Commission. 35. Buildings proposed for construction with crawl spaces or basements shall include Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods to be submitted with each Building Permit. The Final Plat shall include a notation that due to high ground water conditions full or partial basements are not recommended. 36. The final plat for each phase shall identify the remainder (of each phase of the subdivision) (of the original tract of record) to be platted as an undevelopable lot in accordance with §18.74.080.B.6, BMC, with the following language placed on each undevelopable lot of the final plat “Lot development subject to further subdivision review.” No public improvements shall be required for the undevelopable lot until it is subdivided as a lot which is not subject to this restriction. 37. Applicant shall provide a soils report, along with building plans, to the Building Division, recommending types of foundations. If development shall occur in phases, the soils report may address those lots within the proposed phase. 38. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and code provisions listed in the staff report have been satisfactorily addressed. DATED THIS 21ST DAY OF AUGUST 2007, Planning Resolution #P-07027. ____________________________________ _________________________________ Andrew C. Epple, Planning Director JP Pomnichowski, President & Chair City of Bozeman, Department of City of Bozeman Planning Board Planning & Community Development 323