Loading...
HomeMy WebLinkAbout08-06-07_Approve and authorize Director of Public Service t_13 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Tim Cooper, Staff Attorney Chris Kukulski, City Manager SUBJECT: Loyal Gardens Subdivision, Phase 1B Final Plat MEETING DATE: August 6, 2007 RECOMMENDATION: Upon the Director of Public Service’s review and concurrence, the City Commission approves the Final Plat of Loyal Gardens Subdivision, Phase 1B, and authorizes the Director of Public Service to execute the same on behalf of the City of Bozeman. BACKGROUND: This is a request for approval of a Subdivision Final Plat to subdivide ~ 35 acres into 104 lots. The property is generally located on the southwest corner of Cottonwood Road and Huffine Lane. At its May 22, 2006, public hearing, the Bozeman City Commission voted to conditionally approve the Loyal Gardens Subdivision Preliminary Plat. The applicant applied for final plat approval, and staff has concluded all terms and conditions of preliminary plat approval have been met. State law provides that the governing body shall approve the plat only if: a) The plat conforms to the conditions of approval set forth on the preliminary plat and to the terms of the state subdivision law and regulations and the regulations adopted by the Bozeman City Commission; and b) The County Treasurer has certified that all real property taxes and special assessments assessed and levied on the land to subdivide have been paid. The County Treasurer has certified that the taxes and special assessments have been paid. Attached is a memorandum from Jami Morris, Contract Planner, delineating how the conditions of preliminary plat approval have been satisfied. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the property. ALTERNATIVES: As suggested by the City Commission Respectfully submitted, _________________________________ ____________________________ Tim Cooper, Staff Attorney Chris Kukulski, City Manager Attachments: Review Memo to Tim Cooper, dated July 19, 2007. 138 planning • zoning • subdivision review • annexation • historic preservation • housing • grant administration • neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net MEMORANDUM To: Tim Cooper From: Jami Morris, Contract Planner jamimorris@bresnan.net or 570-6209 Date: July 19, 2007 Subject: Loyal Garden MaSub Phase 1B Final Plat #P-07031 Covenant Investments Inc., has made application to the Planning Office for Final Plat review and approval for Loyal Garden Major Subdivision, Phase 1B, being a multi-phased, residential subdivision located on the southwest corner of Cottonwood Road and Huffine Lane. On May 22, 2006, the City Commission granted preliminary plat approval to subdivide 75 acres into 139 single and two-household residential lots, 15 mixed multiple household residential and office lots, and the remaining area as parks, open spaces, streets, and alleys with Phase 1B accounts for the remaining 35.19 acres and 106 lots. Staff’s summary review addresses the conditions of preliminary plat approval outlined in the Findings of Fact and Order. The developer has applied for final plat review and approval of Loyal Garden Phase 1B Major Subdivision, electing to financially guarantee the remaining infrastructure improvements. Based on the summary review provided below, both the City Engineering’s Office and Planning Department have reviewed the application against the conditions of preliminary plat approval; and as a result, find that final plat approval may be granted contingent on receiving the applicable financial guarantee. Attached for your review: four (4) original mylars of the Final Plat, original Platting Certificate, original lift station agreement, draft Improvements Agreement and draft Notice of Building Permit Restrictions. Please have the Director of Public Service sign the applicable certificates on the final plat, and return all of the documents to the Planning Office once the City Commission has acted on the final plat application. The Improvements Agreement will be signed, notarized, recorded and filed with the final plat at the Clerk and Recorder’s Office. The Planning Staff respectfully requests that you prepare a City Attorney's Certificate using the attached original Platting Certificate; approve the Certificates of Director of Public Service, Release of Sanitary Restrictions, and Certificate of Completion "as to form". If you find this submittal acceptable, please place the final plat application on the earliest scheduled Consent Agenda of the Bozeman City Commission. Once the Commission has acted on the Final Plat application, please forward the original mylar plats and documents to the Director of Public Service and have the Director sign the appropriate certificates on the final plat. Please make sure the Director’s signature’s are notarized and return all of the documents to the Planning Office in the Inter-Department routing envelope for their protection. 139 Page 2 The application was submitted on June 22, 2007. The final plat application was deemed complete on July 6, 2007. The maximum 45 working day review period will expire on September 10, 2007. On behalf of the Planning Office I would request that the plat be scheduled before the City Commission for approval on Monday, August 13, 2007. The final plat application complies with all of the code provisions identified in the Findings of Fact and Order. The conditions of preliminary plat approval, which are applicable to this phase, and how they have been met, follow: 1. Existing mature vegetation shall be saved and relocated within the subject property, to the maximum extent feasible. A majority of the mature vegetation was relocated to the open space and parkland areas. 2. The existing barn shall be maintained in its current location and incorporated into the new site design. If the barn is not able to be incorporated into the new site design, it shall be relocated to a within the project boundaries. If a structural report by a professional engineer indicates that the barn is not feasible to relocate, the developer will be required to complete a Montana Historic Property Record Form for review by the local and State Historic Preservation Offices prior to disassembly. The barn has not been moved. In the event the owner chooses to move the barn then the owner will be responsible for contacting the City Planning Office and the City Building Department for proper permitting. If the building is planned for demolition then the owner shall complete the Montana Historic Property Record Form and submit the form to the State Historic Preservation Office for review prior to disassembly. 3. Should any cultural materials be inadvertently discovered during construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman Historic Preservation Office must be contacted immediately. No cultural materials have been discovered to date. 4. The existing warehouse and residence shall either be connected to municipal water and sewer upon annexation of the property and availability of service, or removed from the property. The barn shall also be connected to municipal water and sewer if converted to a use which requires services. The warehouse and residence will be connected to City water and sewer upon availability. The barn is not planned for uses which would require connection. The extension of the water and sewer to the property has been included in the estimate for the financial guarantee. 5. The proposed lift station shall be relocated to be south of the large detention pond and orchard. If the lift station is proposed within an Entryway Overlay District, it shall be subject to the Bozeman Design Objectives Plan and must be reviewed and approved by Administrative Design Review Staff prior to construction. The lift station is located within the Entryway Overlay District. The applicant applied and was granted a Certificate of Appropriateness for the structure. 140 Page 3 6. A declaration of the most recent covenants, with the corrections outlined by Staff, must be included and recorded with the Final Plat. The covenants were rewritten as outlined by Planning Staff and were recorded with the final plat for Phase 1A 7. Water rights, or cash-in-lieu thereof, shall be provided and paid for prior to final plat approval. If the final plat of the subdivision is filed in phases, water rights will only be required for each phase as the final plat for that phase is filed. The amount of water rights required will be determined by the Director of Public Service based on the proposed final plat(s). Cash in lieu of water rights, in the amount of $14,835.57 was paid for Phase 1B on June 29, 2007. 8. The dedicated parkland shall be identified as “Public Park” on the final plat and the common open space access strips and pocket parks shall be overlaid with a public access easement. Provisions within the covenants shall provide for the care and maintenance of these areas, which will ensure usability for the homeowners and general public. The park has been appropriately labeled. Note #2 under General Notes outlines provisions for public access of the open space areas and the required maintenance by the homeowners association. Note #3 further requires the developer and then the homeowners association to maintain the park until such time a parks district is established. 9. Buildings proposed for construction with crawl spaces or basements shall include Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods to be submitted with each Building Permit. The final plat shall include a notation that due to high ground water conditions full or partial basements are not recommended. A high ground water notation is included on the plat. 10. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Phase 1A of Loyal Garden Subdivision included all of the documentation necessary to comply with the outlined code provisions which included: • Submittal of the final plat within 3 years of preliminary approval. • Subdivision lighting plan. • Adoption of a Final Park Master Plan • Memorandum of Understanding with the Weed Control District. • Stormwater master plan. • Plans and specifications for water and sewer main extensions and public streets. • Infrastructure improvements including water and sewer main extensions and services, street infrastructure including curb, gutter and asphalt. • Easements for water and sewer main extensions. • Submittal of an improvements agreement for improvements to be financially guaranteed. • Additional permitting • Construction route map 141 Page 4 11. The west half of Cottonwood Road including any required utility extensions shall be constructed along the frontage of the subdivision including tapers meeting AASHTO requirements to transition back to the existing road width. Any signalization, geometric or other offsite improvements identified in the TIA for the project shall be completed as well. All improvements to Cottonwood Road and Huffine Lane shall be completed in their entirety with Phase 1 of the development. The west half of Cottonwood Road has been designed to meet AASHTO standards. The improvements including the necessary off site improvements were included in the financial guarantee for Phase 1A. 12. A one-foot “No Access Strip” shall be shown on the plat along the entire lot frontage of Huffine Lane and Cottonwood Road. Phase 1A only has adjacency to Cottonwood Road. A one foot no access strip for Cottonwood Road has been depicted on the plat. 13. Sewer and water main stubs shall be provided across Cottonwood on both the north and south end of the subdivision for future extension to serve the properties to the south and east. The sewer main has been extended and water main stubs have been provided to facilitate the future extension of municipal services to adjacent properties. 14. The subdivision shall be fed from at least two separate offsite connections to the existing municipal water system. The subdivision has connected to the municipal water system from Cottonwood Road and Resort Drive. 15. The master planned 12-inch water main shall be installed along the entire north south frontage of the subdivision. Routing it through the subdivision as shown is acceptable. A 12 inch water main has been installed from the north to the south end of the property. 16. The water main in the Huffine right-of-way shall be extended to the western boundary of the subdivision. The water main has been extended to the western property line as required. 17. The sewer shall connect to the existing system on the extension of Yellowstone Avenue as shown in the master plan. The Huffine crossing shall be made with the master planned 12-inch gravity main, not the proposed force main. The design report was in compliance with the condition of approval. The sewer main extension across Huffine Lane from Yellowstone Avenue was installed with Phase 1A. 142 Page 5 18. The sewage lift station should be located as far as practical from building sites to minimize odor or noise complaints. The lift station shall be sized to collect the area that cannot gravity feed to the connection on Yellowstone. The final service area for the lift station shall be reviewed and approved by the City Engineer as part of the design report. The lift station was relocated as suggested and the City Engineers Office approved the Plans & Specifications on August 30, 2006. 19. The lift station shall include a SCADA system compatible with the City’s existing system. An autodialer will not be acceptable. The lift station shall also include backup power capable of running the entire station including both pumps. A wet well/dry well type station will not be acceptable. It shall be a wet well configuration with submersible pumps. The City Engineers Office accepted the redesign of the lift station on August 30, 2006. 20. The lift station shall be located outside of the Baxter Creek 100-year floodplain. The lift station was relocated outside of the Baxter Creek 100 year floodplain.. 21. Year round paved access must be provided to the lift station. The access, lift station, and force main must either be on separate lots dedicated to the city, or contained within easements. The paving was completed with Phase 1A. The lift station and force main were located within open space areas with a utility easement. 22. The property owners dependent on the sewage lift station shall be responsible for financing the costs of its operation and maintenance, which will be the responsibility of the City. The applicant shall agree in writing to a surcharge to cover the costs of operating and maintaining the lift station. The agreement shall be filed with the final plat and shall apply to all heirs, successors, and assigns. The agreement shall be subject to approval by the City Engineer and the City Attorney. A new lift station agreement has been submitted for Phase 1B and a signed original is included with the final plat submittal. 23. Any air relief valves on the sewer force main shall be accessible by the City’s flusher truck. This may require turnout(s) to be constructed at the location of the valves. No air relief valves were required with the sewer design. 24. An access permit shall be obtained from MDT for the street connecting to Huffine Lane. Utility occupancy permits shall be obtained from MDT for the water and sewer infrastructure within the state right of way. An access permit was issued for the approach onto Huffine Lane (Advance Drive) October 10, 2006 and utility occupancy permits were granted for the water and sewer infrastructure on September 18, 2006. 143 Page 6 25. The 100-year floodplain shall be delineated for Baxter Creek along the entire length of the subdivision. The floodplain shall be shown on the final plat. If the limits of the flooding encroach onto any proposed lots, minimum floor elevations for any structures on the lots shall be specified. The delineation must be based on post development conditions for the area within the drainage basin. The 100 year floodplain for Baxter Creek was identified on the final plat for Phase 1A. The only lot impacted by the floodplain delineation is Lot 1, Block 1 in Phase 1A. Minimum floor elevations were identified for the lot. 26. The variance requested to discharge subdivisions stormwater from the detention ponds to irrigation facilities is not supported by staff unless written permission is obtained from the ditch company. The stormwater system was redesigned to avoid discharge of stormwater into the irrigation facility. 27. All improvements necessary to provide adequate level of service at the analyzed intersections must be installed or financially guaranteed prior to filing of the plat for each phase. No building permits will be issued for a phase until all improvements required for the phase are installed and accepted. Approval must be obtained from the Montana Department of Transportation of the TIS and for all improvements along Huffine Lane. The improvements required from the Traffic Impact Study are partially completed and have been financially guaranteed. A Notice of Building Permit Restrictions will be filed with the final plat and no building permits will be issued until the improvements have been installed, inspected and accepted. 28. The drive access onto Cottonwood between Alpha Drive and Huffine Lane shall be eliminated unless the information required by section 18.44.090.H of the Unified Development Ordinance to grant a deviation is provided to and approved by the City Engineer. Alpha Drive is located in Phase 1A. The Engineers Office approved a access deviation for right in/right out access from Alpha Drive on March 7, 2007. 29. Reciprocal access and parking easements shall be provided for Lots 1, 2, and 3 of Block 1. This condition was required for Lots 1-3, Block 1 and was fulfilled with Phase 1A. 30. City standard sidewalks shall be installed along all street frontages. The trails and the sidewalks may be combined into one facility that is 10 feet wide and constructed of concrete. The combined walk may vary from the standard location (i.e. meander), but at the furthest, shall be no more than 15 feet from the right-of-way. A city standard sidewalk is being constructed along Cottonwood Road and a shared use path is proposed along Huffine Lane. The shared use path is located within a 35 foot wide public access easement that runs adjacent to the Huffine Lane right of way. Only a small portion of Block 11 has Cottonwood Road adjacency. The remaining improvements have not been installed but have been included in the estimate for the financial guarantee. 144 Page 7 31. Main extensions may be required into the larger multifamily lots rather than the multiple services that are preliminarily proposed. Final review and approval will be completed with the infrastructure design reports. The design report was reviewed and approved by the City Engineers Office on June 28, 2006. 32. The proposed alignment for the municipal utilities along Huffine shall be submitted for review and approval with the infrastructure design reports. The Engineers Office reviewed and approved the infrastructure design report on June 28, 2006. 33. Public street intersection sight triangles including the medians shall be free of plantings which at mature growth will obscure vision within the sight triangle. Maintenance of the medians shall be the responsibility of the homeowners association. The landscape plan submitted with the Master Park Plan appears to meet the street vision triangle requirements outlined in the UDO. There are street trees proposed along Huffine Lane and Cottonwood Road which fall within the vision triangle. This is acceptable as long as 8 feet of clearance is provided under the tree branches is provided. The HOA will be responsible for the maintenance of the medians. 34. All sanitary and storm manholes shall be located outside the limits of the proposed roundabouts and medians. No trees shall be planted within 10 feet of any of the proposed municipal utilities. The manholes have been located outside of the roundabouts and medians. No trees are planned within 10 feet of the municipal utilities 35. A schematic signage plan for the subdivision, noting any proposed traffic calming measures shall be included in the infrastructure design report. The schematic signage plan was included in the June 26, 2006 Revised Design Report. 36. The Alpha Drive pedestrian/bicycle crossing must be revised and is subject to review and approval by the Planning Department. The Alpha Drive crossing within Phase 1A was redesigned so that the sidewalk and the trail were combined at one crossing point. 37. Credit for excess parkland or affordable housing may only be applicable for a directly adjacent subdivision (not a subdivision across Huffine Lane or Cottonwood Road). The subdivider agrees and understands the requirement. 38. The Wetlands Review Board (WRB) shall review Preliminary Plat Application #P-06014. If the WRB recommends any substantive changes (as determined by the Planning Department) to the subdivision layout, the City Commission shall re-review the Preliminary Plat Application. The Wetlands Review Board did not require any changes to the subdivision layout. 145 Page 8 JM/jm Attachments: Four (4) Mylar Final Plats and One (1) Blackline Copy Improvements Agreement with Estimate Original Platting Certificate Draft Notice of Building Permit Restrictions Copy of the applicant’s submittal cc: Covenant Investments Inc., P.O. Box 11428, Bozeman, MT 59719 TD&H, 215 W Mendenhall St, Ste C-1, Bozeman, MT 59715 146 147