HomeMy WebLinkAbout2_Approve and authorize City Manager to sign the Not_2 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: WWTP Early Out Project MEETING DATE: 7/23/07 RECOMMENDATION: Approve and authorize City Manager to sign the Notice of Award. BACKGROUND: Attached is a copy, of the Notice of Award for the above referenced project. The WWTP Early Out project is the title that has been given to the conversion of the existing aeration basins to a “semi” BNR configuration which is necessary to keep the plant in compliance with the DEQ permit from now until the larger plant upgrade comes on line. This represents the first portion of the smaller interim project. It is on a very tight time line, so it was decided to procure the mixers separately since they have a long lead time, and that way we would not have to wait until a contractor is under contract and has approved submittals, ect. This is the bid for the mixers. Bids were opened on July 11th, with one bid being received from Wilo EMU in the amount of $44,395.00. Although there was only one bid received, it was under the Engineer’s Estimate of $55,000.00. Attached is a recommendation of award from the Engineer stating that having reviewed the bid documents they feel it is a responsible, responsive bid in accordance with what was specified. 5 FISCAL EFFECTS: To be paid from the Wastewater Fund ALTERNATIVES: Disapprove Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Notice of Award Award Recommendation Report compiled on 7/13/07 6 7 8 NOTICE OF AWARD July _, 2007 TO: Mr. Michael Prayoonvech c. WILO-EMU USA, LLC WILO-EMU USA 170 Big Star Drive P.O. Box 51302 Thomasville, GA 31757 Riverside, CA 92517 RE: City of Bozeman WRF Phase 1 Early Out Aeration Basin Mixer Prepurchase The BUYER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids dated June 24, 2007, and Instructions to Bidders. You are hereby notified that your BID has been accepted for items in the amount of $44,395 (Forty Four Thousand Three Hundred Ninety Five Dollars). You are required by the Information for Bidders to execute the Agreement and furnish the required Performance Bond, Labor and Materials Payment Bond, Certificates of Insurance, within ten (10) calendar days from the date of this Notice to you. In addition, you are required to submit Shop Drawings to Morrison Maierle Inc., 901 Technology Blvd., Attention James Nickelson, Bozeman, Montana, 59715 within ten (10) calendar days from the date of this Notice to you. If you fail to execute said Agreement and to furnish said Bonds and other required documents within ten (10) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the BUYER’s acceptance of your BID as abandoned and as a forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of the NOTICE OF AWARD to the BUYER. DATED this _ day of July, 2007. City of Bozeman, Montana 411 E. Main Street Bozeman, MT 59715 BUYER By:___________________________________ Chris A. Kukulski, City Manager ******************** ACCEPTANCE OF NOTICE Receipt of the above NOTICE OF AWARD is hereby acknowledged by the Seller, __________________________________________, this _____ day of ____________, 2007. By: ____________________________________________ Title ___________________________________________ 9