Loading...
HomeMy WebLinkAboutE- Packet 07-16-2007_Award of Base Bids for Construction of the Bozeman_11 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Finance Director James Goehrung, Superintendent of Facilities Chris Kukulski, City Manager SUBJECT: Award of Base Bids for Construction of the Bozeman Intermodal Facility. MEETING DATE: July 16, 2007 BACKGROUND: The City has advertised for and received bids on the Bozeman Intermodal Facility, in accordance with federal Disadvantaged Business Enterprise, Civil Rights and Davis Bacon Wage requirements. Martel Construction is the Construction Manager (general contractor) for the project. Bids were requested for the following elements: Base Bids: Basement, Main Floor, and two levels of parking. This totals approximately 335 parking spaces, and includes construction of the retail condominium shells on the main floor, street-side. Alternates 1&2: Additional level of parking, totaling approximately 105 spaces. Elevator and masonry work for future phases. Bid Tabulation Sheets are on file in the City Clerk’s office. The Bid Summary Sheet identifies the low bidder for each bid package. 71 As detailed at the bottom of the Bid Summary Sheet, we have secured funding for the Base Bid project. We are asking to award this Base Bid tonight, so that site staging and construction can begin as soon as possible. Money for construction of the Alternates is not in hand at this point, but would most likely come from the sale of the retail condominiums. The Parking Commission and the City plan to pursue the sale of the retail condominiums in the next weeks. Once a sales commitment is in place, we would return to this Commission to award the bids for the Alternates, hopefully in August 2007. RECOMMENDATION: Award the Base Bid for construction of the Bozeman Intermodal Facility to Martel Construction in the amounts listed on the June 11, 2007 Bid Day Summary Sheet. FISCAL EFFECTS: $9.2 million will be spent to construct the Base Bid Intermodal Parking Facility projects. Full funding of the project will come from the Federal Award, issuance of Grant Anticipation Notes for the FY08 & FY09 Federal Award, Tax Increment Financing (TIF) Bonds, Interest earnings during the construction period, and TIF Cash on Hand. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, Anna Rosenberry, Finance Director James Goehrung, Superintendent of Facilities Chris A. Kukulski, City Manager Attachment: Bid Day Summary Construction Cash Flow Projection 72 Bozeman Intermodal Facility June 11, 2007 Bid Day Summary Martel Construction, Inc. Bid Day Bid Day Bid Day Base Bid Alternate 1 Alternate 2 General Requirements 1A General Requirements, Bonds & G/L Insurance 456,872 94,000 0 Martel 456,872 Site Work 2A & 2B Site Clearing, Building Earthwork & Site Utilities 717,780 0 0 Walker 2C Site Concrete 116,688 0 0 JTL 2D Trees & Irrigation - ALLOWANCE 15,000 0 0 ALLOWANCE 2E Asphalt Paving 56,886 0 0 Gallatin Asphalt 2F Traffic Control Plan, Signage Etc. 198,366 0 0 Montana Lines Concrete Work 3A Concrete Work 3,080,000 673,000 0 Martel Masonry 4A Masonry 835,000 196,051 4,560 Anderson Metals 5A Supply Steel Package 472,175 44,000 0 Martel (Steel West) 5B Install Steel Package 234,000 35,000 0 Martel (Struct. Sys.) Carpentry 6A Supply & Install Finish Carpentry & Casework 6,000 0 0 Martel (Stahl) Thermal & Moisture 7A Metal Wall & Soffit Panels 94,215 0 0 Tri-Jack 7B & 7C EPDM Roofing / Sheet Metal Flashing & Trim 107,398 0 0 Missoula Sheet Mtl. 7D Joint Sealants 26,000 5,000 0 Martel (Rollinger) Doors, Frames & Hardware 8A Supply & Install Doors, Frames, Hardware 49,000 11,000 0 Martel (Kalmont) 8B Aluminum Storefronts & Glass & Glazing 191,200 30,965 0 Valley Glass Finishes 9A Metal Studs, Insulation, Carpentry, Drywall, Tape & Finish 244,630 28,480 0 Martel (w/ subs) 9B Acoustical Panel Ceilings 3,000 0 0 Martel (Empire) 9C Resilient Wall Base 600 0 0 Rich's 9D Painting 59,928 15,225 0 T & L Painting Specialties 10A Supply & Install Division 10 Specialties 1,500 0 0 Martel (w/ suppliers) Parking Control Equipment Supply & Install Parking Control Equipment by Owner by Owner Hoisting 14A Hydraulic Elevators 160,000 24,788 1,227 Gallatin Elevator 100,000 Mechanical Complete 15A Mechanical - Plumbing, HVAC & Fire Protection 461,000 12,000 0 Williams P & H 629,910 Electrical 16A Electrical, Fire Alarm & Communication Complete 573,000 47,393 0 Valley Electric 535,950 Trade ContractorBid Packages Page 1 of 273 Bozeman Intermodal Facility June 11, 2007 Bid Day Summary Martel Construction, Inc. Bid Day Bid Day Bid Day Base Bid Alternate 1 Alternate 2 Trade ContractorBid Packages Total Bid Packages 8,160,238 1,216,902 5,787 Construction Indirect Costs Construction Management Services (6% base, 4.5% Alt.)489,614 54,761 260 Paid Direct by The City of Bozeman Building Permits 40,453 Impact Fees 172,709 Commissioning - if Required 0 Material Testing 0 Builders Risk 9,584 Utility Line Relocation - Allowance 200,000 Parking Control Equipment - Allowance 135,328 Subtotal 558,074 Total Indirect Costs 1,047,688 54,761 260 Total Construction Costs & Indirect Costs 9,207,926 1,271,663 6,047 Construction Contingency - James to Administer 50,000 20,000 0 Total Project Cost 9,257,926 1,291,663 6,047 Source of Funds Federal Award - Direct 1,901,339 Federal Award - GANS (net of interest cost) 1,971,105 TIF BONDS 4,800,000 Interest Earnings During Construction 130,000 TIF CASH 460,000 Sale of Retail 1,291,663 6,047 TOTAL FUNDS AVAILABLE 9,262,444 1,291,663 6,047 Difference between Costs & Funds Available 4,518 0 (0) Page 2 of 274 Bozeman Intermodel FacilityCash Flow Projections7.13.07Martel Construction, Inc.Base BidAlternate No. 1 & 2 Combined Combined%9,257,926.00$ %1,297,710.00$ MonthlyAccumulatedMonthly Draw Accumulated Monthly Draw Accumulated1 May-07 0% -$ -$ 0% -$ -$ -$ -$ 2 Jun-07 5% 462,896.30$ 462,896.30$ 0% -$ -$ 462,896.30$ 462,896.30$ 3 Jul-07 8% 740,634.08$ 1,203,530.38$ 0% -$ -$ 740,634.08$ 1,203,530.38$ 4 Aug-07 10% 925,792.60$ 2,129,322.98$ 8% 103,816.80$ 103,816.80$ 1,029,609.40$ 2,233,139.78$ 5 Sep-07 10% 925,792.60$ 3,055,115.58$ 10% 129,771.00$ 233,587.80$ 1,055,563.60$ 3,288,703.38$ 6 Oct-07 10% 925,792.60$ 3,980,908.18$ 22% 285,496.20$ 519,084.00$ 1,211,288.80$ 4,499,992.18$ 7 Nov-07 12% 1,110,951.12$ 5,091,859.30$ 35% 454,198.50$ 973,282.50$ 1,565,149.62$ 6,065,141.80$ 8 Dec-07 10% 925,792.60$ 6,017,651.90$ 20% 259,542.00$ 1,232,824.50$ 1,185,334.60$ 7,250,476.40$ 9 Jan-08 8% 740,634.08$ 6,758,285.98$ 5% 64,885.50$ 1,297,710.00$ 805,519.58$ 8,055,995.98$ 10 Feb-08 7% 648,054.82$ 7,406,340.80$ 0% -$ 1,297,710.00$ 648,054.82$ 8,704,050.80$ 11 Mar-08 6% 555,475.56$ 7,961,816.36$ 0% -$ 1,297,710.00$ 555,475.56$ 9,259,526.36$ 12 Apr-08 5% 462,896.30$ 8,424,712.66$ 0% -$ 1,297,710.00$ 462,896.30$ 9,722,422.66$ 13 May-08 5% 462,896.30$ 8,887,608.96$ 0% -$ 1,297,710.00$ 462,896.30$ 10,185,318.96$ 14 Jun-08 4% 370,317.04$ 9,257,926.00$ 0% -$ 1,297,710.00$ 370,317.04$ 10,555,636.00$ 100% 9,257,926.00$ 100% 1,297,710.00$ 10,555,636.00$ 75