HomeMy WebLinkAboutE- Packet 07-16-2007_Authorize the City Manager to sign the contract fo_8
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: James Goehrung, Director of Facility Services
Chris Kukulski, City Manager
SUBJECT: Authorization to sign the Construction
Contract for the Downtown Bozeman Intermodal Facility
MEETING DATE: July 16, 2007
BACKGROUND: Final award authorization from the Federal Transit Administration for the
Downtown Intermodal Facility is due within days of this drafted memo. All components related
to construction of the project have been bid except for the landscaping work. There were no
bidders for this element of the project during the re-bid. A placeholder of $15,000 is in the
budget and this component will be bid as we get closer to the scheduled work next year.
Martel Construction Inc. was selected as the Construction Manger for this project and they will
act as the general contractor for the construction of the garage and the associated retail space.
The City will enter into one contract with Martel to oversee the project.
39
RECOMMENDATION: Staff recommends the award of the contract for Phase I
construction of the Downtown Bozeman Intermodal Facility to Martel Construction.
Commission action – Consent approval to authorize the City Manager to sign the contract
for construction of the base bid (Phase I) construction package to Martel Construction Inc.
for the Downtown Intermodal Facility in the amount of $8,699,852.00.
FISCAL EFFECTS: Sources of funds for this project and the dollar amounts are outlined
on the attached Estimated Costs and Funding Sources sheet. There are three main sources of
funding for Phase I Construction – the Federal award, Tax Increment Financing Bonds, and Tax
Increment Cash.
ALTERNATIVES: As suggested by the City Commission.
Respectfully submitted,
_________________________________ ____________________________
James Goehrung Chris A. Kukulski, City Manager
Director of Facility Services
Attachments: AIA A121 Construction Manager Contract
AIA Document Amendment #1
Construction Schedule
Report compiled on July 11, 2007
40
iAlA Document A121 CMc 2003 and AGe
Document 565
Standard Form of Agreement Between Owner and Construction Manager
where the Construction Manager is Also the Constructor
AGREEMENT
made as of the 19th day of June in the year of Two Thousand Seven
In words illdiCllte day month and year
Bozeman Inttnnodal Facility
Black Mtndenhall and Tracy
Bozeman MT 59715
ADDITIONS AND DELETIONS
The author of thisdocument has
added information needed for its
completion The author may also
have revised the text of the original
AlA standard form An Additions and
Deletions Repen that notes added
Information as well as revisionsto
the standard form text Is available
from the author and should be
reviewed A vertical line inthe left
margin of this document indicates
where the author has added
necessaryinformation and where
the author has addedto or deleted
from the original AlA text
This document has Important legal
consequences Consultation with an
attorney Is encouraged with respect
10 its completion ormodification
The 1997 Edition of AlA Document
A201 General Conditions of the
Contract forConstruction is referred
to herei n This Agreement requi res
modification if other general
conditions are utilized
BETWEEN the Owner
Name and address
City of Bozeman
POBox 1230
Bozeman MT 59715
and theConstruction Manager
Name llnd address
Martel Construction Inc
1203 South Church Avenue
Bozeman MT 59715
The Project is
Name I1ddress and brief description
The Architect is
Name and address
Prugh Lenon Architects P C
27 East Main Stc D
Bozeman MT 59715
The Owncr and Constmction Manager agree as set forth below
Inll AlA Document A121 TMCMc 2003 anel AGC Document 565 Copyright @ 1991 and 200 lby Tho Amedcan lI sli ute 01 Architocts en jThe Associated
General Contractors of America All rights rerved II ARNINC This document is pru nodby U Jw 1ltT1H nali tTr utlOs
Uni gdwrllurl ioprodul tfon or distrjbuthn of thb doclJunent or a y portion of ill mny fe lJa in SOVfH UtA erimimlllptmijlth tiH d will bD
po eG t d to m maximum hntpos ill de the law This document we prnduced by AiA softwaro aI15 19 50 on 07110 2007 under Order
No l000259422 1 which e piros on 9 18 2007 and is not for rasale
User Note Ii 4 135240 15
1
41
TABLE OF CONTENTS
ARTICLE 1 GENERAL PROVISIONS
11 Relationship of the Parties
1 2 General Conditions
ARTICLE 2 CONSTRUCTION MANAGER S RESPONSIBiliTIES
Paragraph deleted
2 2 Guaranteed Maximum Price Proposal and Contract Time
2 3 Construction Phase
2 4 Professional Services
2 5 Hazardous Materials
ARTICLE 3 OWNER S RESPONSIBILITIES
3 1 Information and Services
3 2 Owner s Designated Representutive
fi 3 3 Architect
3 4 Legal Requirements
Paragraphs delered
ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES
5 1 Compensation
5 2 Guaranteed Maximum Price
5 3 Changes in the Work
ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE
6 1 Costs to Be Reimbursed
6 2 Costs Not to Be Reimbursed
6 3 Discounts Rebates and Refunds
6 4 Accounting Records
ARTICLE 7 CONSTRUCTION PHASE
7 1 Progress Payments
7 2 Final Payment
ARTICLE 8 INSURANCE AND BONDS
8 1 Insurance Required of the Construction Manager
8 2 Insurance Required of the Owner
8 3 Performance Bond and Payment Bond
ARTICLE 9 MISCELLANEOUS PROVISIONS
9 1 Dispute Resolution
9 2 Other Provisions
ARTICLE 10 TERMINATION OR SUSPENSION
10 1 Termination Prior to Establishing Guaranteed Maximum Priee
10 2 Termination Subsequent to Estahlishing Guaranteed Maximum Price
10 3 Suspension
ARTICLE 11 OTHER CONDITIONS AND SERVICES
Inil AlA Document A121T CMc 2003 and AGC Document 565 Copyright @ 1991 and 2003 by The American Institute Of ArchitaclS and n Assooiated
General Conlraclors of America All rights reserved WARNING This 00 11 is protected by U Copyri 111 w 10 Irl nallonal r Mtl
U hodmd eproo tion or dieldbulionollhi 1 dotHfllH1t gf any porlion of ii may fOnd in savucvll jd ClIlnlnal p Ji Wd wW b
pW cultd tutho m IUIrl eXHnt pos lble under thelaw This docurnanl was producod by AlA sortwa e a115 1 9 50 on 07110 2007under Order
NO 1 000259422 1 which expires on 9 18 2007 and is not for resale
Usa Noles 14335240151
2
42
ARTICLE 1 GENERAL PROVISIONS
g 11 RELATIONSHIP OF PARTIES
The Construction Manager accepts the relationship of trust and confidence established with the Owner by thisAgreementandcovenantswiththeOwnertofurnishtheConstructionManagersrcasonableskillandjudgment andtocooperatewiththeArchitectinfurtheringtheintcrestoftheOwnerTheConstructionManagershallfurnish
construction administration and management services and use the Construction Manager s best efforts to perfurmtheProjectinanexpeditiousandeconomicalmanncrconsistentwiththeinterestsoftheOwnerTheOwnershall
endcavor to promote harmony and coopcration among the Owner Architect Construction Manager and other
persons or cntities employcd by the Owner for the Projecl
g 12 GENERAL CONDITIONS
During thc Construction Phasc of this P iect the Construction Managcr s responsihilities to the Owner shall be as
set forth in this Addcndum and in the 1997 Edition of the AlA Document A20 General Conditions of the Contract
for Construction The term Contractor as used in AlA Document A20 shall mean the Construction Manager
ARTICLE 2 CONSTRUCTION MANAGER S RESPONSIBILITIES
The Construction Manager shall perform the serviccs described in this Article
Paragraphs deleted
2 2 GUARANTEED MAXIMUM PRICE PROPOSAL AND CONTRACT TIME
2 2 1 At the end of the Bidding Phase the Construction Manager shall proposc in writing a guaranteed maximum
price GMP in the form of Amendment No 1 attached hereto The GMP shall be calculated by adding i the sum
of all of the awarded contracts for the Work ii the Construction Manager s Reimbursable Direct Job Costs iii
the Construction Managers Fee and iv the Construction Contingency The Construction Manager s fee shall becalculatedbyaddingthesumofalloftheawardedcontractsforthcWorkandmultiplyingthatsumbysixpercent
on the base bid and 4 5 percent on the alternates
The Construction Manager s Fee shall be established in accordance with Article 5 as amended
If thc proposed GMP is acceptable the Owner shall within ten 10 days approve Amendment No l and issue a
Notice to Proceed to the Construction Manager indicating its approval of the GMP and its decision to utilize the
Construction manager throughout the Construction Phase of that portion of the Project
Bids for construction work shall be formally awarded by the Construction Manager after the Construction ManagerreceivestheNoticetoProceedandshallbeawardedonbehalfoftbeOwnertothelowestresponsibleandresponsivebidderinaccordancewithMontanaLawAnybidforconstructionworkforwhichtheConstructionManageristhe
lowest responsible and responsive bidder shall be awarded by the Owner to the Constmction Manager and shall
constitute acontract between the Owner and construction Manager and the Construction Manager shall be the
guarantor of such contract under the provisions of this Agreemcnt relating to the GMP
Paragraphs deleted
g 2 2 3 The OM shall include the Construction Contingency The parties shall agrce to the amount that will he
designated as the Construction Contingency Tbe purpose of the Contingency Account is to provide a means of
compensating the Constrllction Manager during the Construction Phase for costs which arc properly rcimbursablc as
change orders approved by the Owner but which are not a basis for an increase in tbe OMP
To effectuatc a payment from the Contingency Account the parties shall execute a change order Any change order
to be paid from the Contingency Account shall be in tbe amount of the construction managers actual substantiated
increase in the cost of Workcaused by the change order plus the Construction MangoI s fee specified in Section
5 1 1
Inlt AlA Document AI2P CMc 2003 and AGC Document 565 Copyright @ 1991 and2003 by TheAmerican Inslilule of ArchiJect and The AssocialedGeneralContractorsofAmorlcaAllrightsreservedAnN1NGlhhJocurnllnt1prOluctedbyUSLwandIntefrlatlHtmTnahUnauthoriledreproducbcnorJl5lrlbuUon01thotiCwmnCYpOrItonofitHVmtiullin1mdclmipttciwillbirHGectQdtothamaximlUHBrntpOSisiblemdQfitmlwThisdOClJrnOt11wasproducedbyAlAsoftwarelit151950un01102007underOrderNo1000259422jwhichexpIreson911812007andsnotforresale
User Notes 1433524015
3
43
In the event the Owner fails or refuses to execute a change order for payment in whole or in part to the
Construction Manager form the Contingency Account and notwithstanding any provisions of the Contract
Documents to the contrary the Construction manager may pursue a claim for payment from the ContingencyAccountinaccordancewiththeprocedureprovidedAlAdocumentA2011997includingArticle4and7thcroof
Paragraphs deleted
g 2 2 5 The Construction Manager shall mcet with the OWncr and Architect to rcview the Guaranteed Maximum
Price proposal and the written statement of its basis In the event that the Owner or Architect discover anyinconsistenciesorinnccuraciesintheinformationpresentedtheyshallpromptlynotifytheConstructionManagerwhoshallmakeappropriateadjustmentstotheGuaranteedMaximumPriceproposalitsbasisorboth
2 2 6 Unless the Owner accepts the Guaranteed Maximum Price proposal in writing on or bldore the date specifiedintheproposalforsuchacceptanceandsonotifiestheConstructionManagertheGuaranteedMaximumPrice
proposal shall not be effcctive without written acceptauce by the Construction Manager
2 2 7 Prior to the Owner s acceptance of the Construction Manager s Guaranteed Maximulll Price proposal and
issuance of a Notice to Proceed the Construction Manager shall not incur any cost to bc reimbursed as part of the
Cost of thc Work except as the Owner may specifically authorize in writing
2 2 8 UpOll acceptance by the Owner of the Guaranteed Maximum Price proposal the Guaranteed Maximum Price
and its basis shall be set forth in Amendment No IThe Guaranteed Maximum Price shall be subject to additions
and deductions by a change in the Work as provided in the Contract Documents and the Date of Substantial
Completion shall be subject to adjustment as provided in the Contract Documents
2 2 9 The Owner shall authorize and cau e the Architect to revise the Drawings and Specificatiolls to the extent
necessary to reflect the agreed upon assumptiolls and clarifications contained in Amendment No I Such revised
Drawings and Specifications shall he furnished to the Construction Manager in accordance with schedules agreed to
by the Owner Architect and Constmetion Manager The Construction Manager shall promptly notify the Architect
and Owner if such revised Drawings and Specifications are inconsistent with the agreed upon assumptions and
clarifications
2 2 10 The Guaranteed Maximum Price shall include in the Cost of the Work only those taxes which are enacted at
the time the Guaranteed Maximum Price is established
2 2 11 If aftcr exccuting Amendment No 1 the parties agree to change the total sum of the GMboth particsshallsignanewsequentiallynumberedamendmentintheformofAmendmentNoIevidencingtheiragreement
to change the total sum of the GMP The GMP shall be amcnded only in the event of a Olllnge in the Scopc of
Work and any aTm ndmcnt to the GMP shall be limitcd to the actual substantiated increase or dccrcase in the ust
of Work caused thereby plus or minus the Construction Manager s fee specitied in Section 5 1 1
1 A Change in Scope means a change to the Project that is initiated requested or approved by the
Owner and 1I involves a change to a design schedule or procurement previously approved by the
Owner or b expands enlarges or diminishes the Scope ofthe Work and the nature quantity
scope orquality of the Constmction Manager s work and services or c is approved by the
OWncr in writing as a Change in Scope A Change in Scope may result in an increase ordecrease
to the GMP an increase ordecrease to the Project s Contract Time or a combination of the two
2 To effcetuate a Change in Scope either the Owner may initiate the Change or the Construction
Manager shall notify the Owner and Architect in Writing if it belicves it is entitled
a to un increase in the GMP or
b to an extension in the Contract Time or
cl to a combination of the two
3 The Construction Manager s failure to provide the Owner with written notice of aproposed
change in Scope within the 30 calendar days of the cvent giving rise to the Construction Managcr s claim shall mean
that thc Construction manager has waived any claim arising therefrom and the Construction Manager shall perform
Inll AlA Oocumal1l A121T CMc 2003and AGC Document 565 Copyright @ 1991 and 2003 TheAmerican Institute 01 Architects and The Associated
General Contractors01 America All rights reserved WAHNIMJ Thh docurnenll by u s CdPiright L1 llntoLo wl Tmdie
Un JutIt d nprod H U mcr di U ibut rt01 tl1l docum mtl orm pnrUon of it may result in severe civd and erilmnal pvnaltwl jjrtd w tin
pc e nj lhe m lonllE hiu d lhe Ill fhis document was produced by AlA soHwareat 15 19 50 on 07 10 2007 under OrderNo10002594221whichexpires19162001andisnollorresale
User NOles 1433524015
4
44
all work associated with the alleged Change in Scope at issue without an increase in thc OMP or the Contract time
and without use of the construction contingency Account
2 2 12 Within 30 calendar days of receiving the construction Manager s notice as provided in Section 2 2 11 or
after receiving the Construction Manager s comments recommendations or alternativcs as provided in Section
2 2 2 whichever is later the Owner shall exercise one of the follnwing options
a agree with the Construction Manager s request to incrcase the GMP or the Contract Time or both as
requested in the Construction Manager written noticc or
b acccpt only a portion of the Construction Manager s request to increase the OMP orthe Contract Time
or hoth or
c reject the Construction Manager s requcst for an increase to the GMP HId the Contract Time orhoth
lnd direct the Construction Manager tllprocecd with the Work
In the event the Owner refuses to agree with the Construction Manager s request to increase the OMP or the
Contract Time orboth in whole or in part and notwithstanding lIny provision of the Contract DOCllmcnts to the
contrary the Construction Manager may pursue a claimfor an increase in thc OMp or thc
Contract time or both in accordance with the procedure providcd AlA Document A20 1 1997
including Articles 4 and 7 thercof
g 2 3 CONSTRUCTION PHASE
2 3 1 GENERAL
2 3 11 The Construction PhllSC
Paragraphs deleted
with respect to any portion of the Project shall commence no Illter than the date of the issuancc of the Noticc to
Proceed
2 3 1 2 During the Construction Phase of any portion of the Project the Construction Manager s Obligations to the
Owner in addition to those set forth herein shall generally be as set forth in AlA Document A20l and shall
specifically include the performance of general and comprehensive oversight of the Project on behalf of the Owner
The Construction Manager shall on behalf of the Owner enter into contracts with Subcontractors that shall be
subject to ALA Document A20I as agreed upon by thc Owner Architcct and Construction Manager Such
documents shall become part of the Contract Documents governing the Work
g 2 3 12 1 The Construction Manager shall on behalf of the Owner enter into contracts in accordance with
Paragraph 2 2 1 above for the performance of the Work with all sllccessful responsive and responsible bidders in
thc competitive bidding process conducted by the Owncr In accordance with Section 2 2 1 the Owner will enter
into the contracts for specific work with thc COlistrudion Manager where the Constructi on Manager is the lowest
bidder All such direct contracts with the Construction Manager are guarantccd by the Construction Manager s
iMP and shall be treated in thc same fashion as other subcontracts for all purposes except as otherwise noted hcrein
orexpressly statcd in the contracts themsclves
2 3 1 2 2 Thc Construction Managcr shall be directly obligated to the Owner for the administration and
performancc of the Work under all of thc contracts referenced in Subparagraph 23 1 2 1
2 3 12 3 The Construction Managcr may undertake construction work with the Construction Manager s own forces
only under the following conditions 1 wch work is publicly bid according to the invitations to bid and
requircments of state law 2 the Construction Manager is the lowest responsive and responsible bidder for the work
as confirmed by the Architect and Owner
2 3 2 ADMINISTRATION
2 3 2 1 Those portions of the Work that the Construction Managcr docs not customarily perform with the
Construction Manager s own personnel shall be performed under subcontracts or by other appropriatc agreements
InII AlA Document A121T CMo 2003 and AGe Dooumenl565 Copyright @ 1991 and 2003 by Tho Ame ican Instiluteof Architects and TheAssociated
General Contracto of America All rigilts roserved WARNiNG This docurnMIis pmledad flY ItS CopYrlqH L mJ Im rr lilH1 TnHlJnaUlnGrvprodtwtinrlOfdidti1utionofthisdncntOfanypOHlnnofrlhWnsultinSeVfnWH1dmln31perHlLdOi w
pm OJ jltha xl Idml po Slbl H1 W llw This document was producod by AlA soltware aI15 19 50 On 0710 200111nder Orde
No 1000259422 1 wt IIpl so 9 18 2001 and is 01 lor res le
User Notes 1433524015
5
45
with the Construction Manager The Construdion Manager shall obtain bids from Subcontractors and from suppliersofmaterialsorequipmentfabricatedtoaspecialdesignfortheWorkfromthelistpreviouslyreviewedandafter
analyzing such bids shall deliver sllch bids to the Owner and Architect The Owner will determine with the advicc
of the Construction Manager which bids will be accepted provided however the Construction Manager at its sole
discretion may require that any bidder provide ftlll performance and payments bonds as a condition preccdent to
any work being awarded to such bidder The Owner may designate specific perwns or entities from whom the
Construction Manager shall obtain bids however if the Guaranteed Maximum Pricc has been established the
Owner may not prohibit the Construction MlInager from obtaining bids from other qualified bidders The
Construction Manager shall not be required to contract with anyone to whom the Construct ion Manager has
reasonable objection
2 3 2 2 If the Guaranteed Maximum Price has been established and a specific bidder among those whose bids arc
delivcred by the Construction Manager to the Owner and Architect I is recommended to the Owner by thc
Construction Manager 2 is qualificd to perform that portion of the Work and 3 has submitted a bid which
conforms to the requirements of the Contract Documents without reservations or exceptions but the Owner requiresthatanotherbidbeacceptedthentheConstructionManagermayrequirethatachangeintheWorkbeissuedto
adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of thc pcrson or
cntity recolTunended to the Owner by the Construction Manager and the amount of the subcontract or other
agreement actually signed with the person or cntity designated by the Owner
2 3 2 3 Subcontracts and agreements with suppliers furnishing material or equipment fabricated to a spccial designshallconformtothepaymentprovisionsofSubparagraphs718and719
2 3 24 The Construction Manager shall schedule and conduct meetings at which the Owner Architect
Construction Manager and appropriate Subcontractors can discuss the status of the Work The Construction
Manager shall prepare and promptly distribute meeting minutes
2 3 2 5 The Construction Manager shall prepare a schedule in accordance with Paragraph 3 10 of AlA Document
A20 I including the Owner s oceupllncy requirements
2 3 2 6 The Construction Manager shall record the progress of the Project and shall submit monthly written
progress reports to the Owner and Architect including information 011 each Subcontractor s Work as well as the
entire Project showing percentages of CJmpletion The Construction Manager shall keep a daily log containing 1
record of weather each Subcontractor s Work on site number of workers identification of equipmcnt Work
accomplished problems encountered and other similar data as the Owner may require The log shall be available to
the Owner and Architect
2 3 2 7 The Construction Manager shall develop a system of cost control for the Work including regularmonitoringofactualcostsforlIctivitiesinprogrcssandcstimutesforuncompletedtllsksandproposedchanges The
Construction Manager shall identify variances bctween actual and estimated costs and report the variances to the
Owner and Architect at regular intervals
92 3 2 8 The Construction Manager shall on behalf of the Owncr execute and enter into all contracts with
Subcontractors and shall ensure that the contracts contain all provisions required by law including but not limited
to compliance withprovisions addressing prcvailing W lgcs s 18 2 403 422 MCA Montana residential
preferences 18 2 403 MCA nondiscrimination 49 3 207 MCA and maintenance of records requirementssIH2406and422MCAasamendedSeegenerallyArticle211001above
The Construction Manager will conform to the provisions of S 15 50 206 MCA requiring the withholding of I of
all payments due the Subcontractors For each contract the Construction Manager will file the necessary forms
including the form PC I and related forms with the Montana Departmcnt of Revenue containing the information set
limh in ARM 42 31 2121 withing I 0 days of the award of the contract The Construction Manager will copy the
Owner with all filings and transmittals made with orto the Departmcnt of Rcvenue in fulfillment of its obligationsunderthispmvision
92 3 2 9 Utilizing the construction schedules provided by the various Subcontractors the Construction ManagershalIupdatetheProjectcollstmetionscheduleincorporatingtheactivitiesoftheSubcontractorsontheProject
In It AlA Document A121 CMc 20D3 and AGe Document 565 Copyright @ 1991 and 2003 by The American Institute of Architocts and TheASGociatod
Gen ral Contractors of America All rights reserved WAHNlW docunHmPWct 1l by U La ntllntermA PA iUrHlj lkorL d tptorlw tl rl or iaibutjonl A his dnUUfn1nttany pnnuo vf jlmay fH ituH 0stvcr md cnm n p iU nd will h
p ul rj I Iun O IHlt 9fsthH dor 111 1Uw ThiS dccument was produced by AlA software at 15 19 50 on 07 1012007 under OrderNo10002594221whichoxpireson9182007andISnotlorresale
User Notes 1433524015
6
46
including activity cquences and dumtions alloation of labor and materials and delivery of products requiringlongleadtimeandprocurementTheConstructionManagershallmaintainShopDrawingsProdutDataand
Samples and other submittal material from the Subcontractors in a separate tabular schedule The ProjectconstructionscheduleShllllincludetheOwnersoccupancyrequirementsshowingportionsoftheProjethaving
ocupancy priority The Construction Manager shall update and reissue the Project Construction schedule as
required to show CltITCnt conditions If an update indicates that the previously approved Project construction
schedule may not be met the Construction Manager shalllecommend cOllective action to the Owner and Architect
92 3 2 10 Consistcnt with the various bidding documents and utilizing information from the Subcontractors the
Construction Manager shull coordinate the selluence of construction and the assigning of space in areas where the
Subcontractors are performing Work
92 3 2 11 The Construction Manager shall determine in general that the Work of each Subcontructor is beingperformedinillcmdancewiththerequirementsofthcContractDocumentstoguardtheOwneragainstdefects and
deficiencics in the Work As appropriate the eonstmetion Manager shall have the authority upon written
luthori aIlion from the Owner to require additional inspcction or testing of the Work in accordance with the
provisions of the Contract Documents whether or notsuch Work is fabricated installed orcompleted The
Construction Manager in consultation with the Architect may reject Work that does not conform to thc
requircments of the Contract Documents
92 3 2 12 The ConstmClion Manager shall schedule and coordinate the sequence of construction in accordance with
the Contract Documents and the latest approved Project construction schedule as well as schedule and coordinate
any outside inspections required by law so as to avoid unnecess lry delays
2 3 2 13 The Construction Manager shall arrange for the delivery storage protcction and security of Owner
purchased materialsystems and equipment thm are part of the Project until sudl items are incorporated into the
Project if such materials systems and equipment are identified in the plans and specitications
2 3 2 14 Thc Construction Manager shall review requests for changes assist in negotiating the SubcontTactor s
proposals submit recommendations to the Architect and Owner and if incorpOfUtl the Arcbitect s modifications to
the Documents
92 3 2 15 In collaboration with the Architect the Constmetion Manager shall establish and implcment proledures
for expediting the processing and approval of Shop Dlllwings Product Data Samples and other Sllbmittuls The
Construction Manager sball review all shop Drawings Product Datu Samples and other submittals from the
Subcontractors The Construction Manager shull coordinate submittals with information contained in related
documents and simultaneously transmit to the Architect and Owner those that have been approved by the
Construction Manager The Construction Manager s actions shall be taken with such reasonable prolTlptness as to
calise no delay in the Work or in the activities of thc Owner or Subcontractors
92 3 2 16 The Construction Manager shall mainta in at the Project site for the Owner one record copy of all
Contracts Drawings Specil1eatiotls addenda Changc Orders and other Modification in good order and marked
currently to record changes und elections made during construction and in addition approved Shop DrawingsProductDataSamplesandsimilarrequiredubmittalsTheConstructionManagershallmaintainrecordsin
duplicate of principal building layout lines elevations of the bottom of the footing floor levels and key sire
elevations certified by a quulifi d surveyor or professional engineer The Construction Manager shall make all such
records and record Drawings available to the Architect and upon completion of the Project shall deliver them to the
Owner
92 3 2 17 With the Architect and the Owner s Muintenllnce personnel the Construction Manager shall conduct the
finaltcsting and start up utilities operating systems and eyuipment
92 3 2 18 Whcn the Construction Manager considcrs cach Subcontractor s Workor designated portion thereof
substantially complete the Construction Manager shall notify the Architect The Construction Manager shall assist
AlA Documenl A121 CMc 2003 and AGe Documenl565 Copyrlghl ilil1991 an j2003 tlY ThAmerican Institute of Architocts and ThoAssociated
G aral Centraclcrs 01 America All rights reserllad WAnNING TI dfi mem is protecllld by Irs VY uht Law nd In 1 f 111
UmHtthorib d rpnH hli 0 Qr dl tr blifion n thbJ HlUnHH t Oil any r Htlon of iC ItH y rm1h In 5HiHtt lvHan lMrirrHnw WiHlalUe L ntH wd tk
P o d eIb ir iu 0 poibtc und lhn law This decumenl was produced by AlA sottware l15 19 50 On 07 10 2007IJndQd
NO l000259422 1 Which Ei pires On 9 18 2007 and is not torresale
User Nole 1433524015
7Inl
47
the Architect in conducting inspections tu detcrmine whether thc Work ordcsignated portion thereof is substantially
cnrnplete
2 3 2 19 The Cunstruction Manager shall coordinate and administer any required corrcction and completion of the
Work or a dcsignated portion thereof the Cunstruction Manager shall evaluate the completion of the Work of the
Subcontractors and make recommendations to the Architect when work is ready for final inspection The
Construction Manager shall assist the Architect in making final inspections
2 3 2 20 The Construction Manager shall accompanied by the Architect and a representative of the Owner make
the following inspections per agreed dates on the Schedule Substantial Completion to determine that building
systems are operational but not necessarily balanced nooring is installed and walls paintcd that all furnishings and
other material will be able to be staged in classrooms and offices Balance to determine that all building systems
will be balanced all trim and cabinctry will be installed the spaces will be completed and rcady for staged materials
to be unpacked and the rooms put into use the gymnasium will he completed and all outside hard surfaces will be
fulIy completed Final to determine that all outside landscaping shall bc completed and all punch list items for
minor adjustments and repairs shall be completed Warranty such inspection shall be made approximately eleven
months after Substantial completion and acceptance of the work These inspections may be at different times for
different portions 01 the work The Construction Manager shall assist thc Architect in determining whether the
Work has been completed in accordance with the Contract Documents and shall assist the Architect in endeavoring
to see that any remedial work found to be necessary is performed in asatisfactory and workmanlike manncr by the
Subcontractor rcsponsible for the same
2 3 2 21 The Construction Manager shall secure and transmit to the Architect all warranties and similar submittals
required by the Contract Documents for delivery to the Owner and deliver all keys manuals record drawings and
maintcnance stocks to thc Owner Thc Consttuetion Manager shalI forward to the Architect a finallroject
Application for Payment upon compliance with the requirements of the contract dl uments
2 4 PROFESSIONAL SERVICES
Section 3 12 10 01 A201 1997 5h 11I apply to both the Preconstruction and Construction Phases
2 5 HAZARDOUS MATERIALS
Section 10 3 of A20 I HL 1997 shall apply to both the Preconstruction and Construction Phases Except as otherwise
prvided the Owner Construction Manager and Architect shall then proceed in the manner described in article 10
of AlA Document A20I The Owner shall be responsible for obtaining the services of a licensed lahoratory to
verify the presence orabsence of the material or substance reported by the Construction Manager and in the event
such material or substance is found to be present to verify that it has been rendered harmless The Construction
Manager shall assist the Owner in procuring the serviccs of persons or entities to perform tests verifying the
presence or absence of such material or substance orto perform the task of removal or safe containment of such
material or substance
ARTICLE 3 OWNER S RESPONSIBILITIES
3 1 INFORMATION AND SERVICES
3 1 1 The Owner shall provide full information in a timely manner regarding the requirements of thc Project
including a program which sets forth the Owner s objectives constraints and ctiteria including space requirements
and relationships t1exibility and expandability requirements special equipment and systems and site requirements
3 1 2 Thc Owner shall at the written request of the Construction Manager prior to commencement of the
Construction Phase and thereafter furnish to the Construction Manager reasonable cvidence that financial
arrangements have been made to fulfill the Owner s obligiltions under the Contruct Furnishing of such evidence
shall be a condition precedent to commencement or continuation of the Work After such cvidenee has been
furnishcd the Owner shall not lllilterially vary such tlnancial arrangements without prior notice to the Construction
Manager
3 1 3 The Owner shall establish and update an overall budget for the Project based on consultation with the
Construction Manager and Architcct which stwll incl lde contingencies for changes in the Work and other costs
which lre the responsibility of the Owner
Inlt AlA Document A121 YMCMc 2003 and AGC Document 565 Copyright @ 1991 and 2003 by The American instituto of ArchitoCIS andTtle Associulod
Gtlneral Contractors of Amorica All rlghts reserved WAnN1NL This doellment Is prolected by U S COPYright Ld it 1 llImnlli ir iI
Unfluthc wlfHl frpnHheUan Or distribution nf thhs Jqcument U any portion oJ UT may result in Sfn encivil VHi encn A 0 n hf LiH ij wiH hu
prose ljjm im tltn1 pogglb nileI lhe faw This document was producod by AlA software at 15 19 50 On 071t0 200 undor Order
No l000259422 1 which expires on 9 18 2007 and is nollorreaale
User Notea 1433524015
8
48
3 14 STRUCTURAL AND ENVIRONMENTAL TESTS SURVEYS AND REPORTS
In the Preconstruction Phase the Owner shall furnish the following with reasonable promptness and at the Owner s
expense Except to the extent that the Construction Manager knows of nny inaccuracy the Construction Managershallbeentitledtorelyupontheaccuracyofanysuchinformationreportssurveysdrawingsandtestsdescribed inSections3141through3144butshallexercisecustomaryprecautionsrelatingtotheperformanceofthcWork
3 1 4 1 Reports surveys drawings and tests concerning the conditions afthe site which are required by law
3 14 2 Surveys describing physic tl charactcristb legal limitations and utility locations for the site of the ProjectandawrittenlegaldescriptionofthesiteThesurveysandlegalinformationshallincludeasapplicablegradesandlinesofstreetsalleyspavementsandadjoiningpropertyandstructuresadjacentdrainagerightsofwayrestrictionseasementsencroachmentszoningdeedrestrictionsboundariesandcontoursofthesitclocations
dimensions and neccssary data pertaining to existing buildings other improvements and trees and information
concerning available utility services and lincs both public and private above and below grade including inverts and
depths All information on the survey shall be referenced to a project benchmark
3 1 4 3 The services of a geotechnical cngineer when such services are requested by the Construction ManagerSuchservicesmayincludebutarenotlimitcdtotestboringstestpitsdeterminationsofsoilbearingvalues
percolation tests evaluations of hazardOllS matcrials ground corrosion and resistivity tests including necesslryoperationsforanticipatingsubsoilconditionswithreportsandIppropriateprofessionalrecommendations
3 14 4 Structural mechanical chemical air and water pollution tests tests for hazardous materials and other
laboratory and envirollmental tcsts inspections and reports which arc required by law
3 14 5 The services of other consultunts when such services arc reasonably required by the scope of the Project ancl
arc requested by theConstruction Manager
3 2 OWNER S DESIGNATED REPRESENTATIVE
The Owner shall designate in writing a representative who shall have express authority to bind the Owner with
respect to all mutters requiring the Owner s approval orauthorization This representative shall have the authority to
make decisions on behalf of the Owner concerning estimates and schedules construction budgets and changes in
the Work and shall render such decisions promptly and furnish information expeditiously so as to avoid
unreasonable delay in the services or Work of the Construction Manager Except as otherwise providcd in Section
4 2 1 of A20 I TM 1997 the Architect does not have such authority
3 3 ARCHITECT
The OWLler shall retain an Architect to provide Basic Services including normal structural mechanical and
electrical enginecring services other than cost estimating services described in the edition of AIA@ oeument
B 151 TM 1997 Abbreviated Standard Form ofA greemelll Between Owner and Architect currcnt as of the datc of
this Agreement The Owner shall authorize and cause the Architect to provide those Additional Services described
in B 15 p L 1997 requested by the Constmction Managcr which mnst necessarily be provided by the Architcct for
the Preconstruction and Construction Phases of the Work Such servkcs shall be provided in accordance with time
schedules agreed to by the Owncr Architect and Constmctioll Manager Upon request of the Construction ManagertheOwnershallfurnishtotheConstructionManageracopyoftheOwnersAgreementwiththeArchitectfrom
which compensation provisions may be deleted
3 4 LEGAL REQUIREMENTS
The Owner sh 111 determine and advise the Architect and Construction Manager of any special legal requirementsrelatingspecitkallytotheProjectwhichdifferfromthosegenerallyapplicabletoconstructioninthcjurisdiction of
the Project The Owner shall furnish such legal services as are necessary to provide the information and services
required under Section 3 1
Inlt AlA Document A121 CMc 2003 and AGe Document 565 Copyright @ 1991 and 2003 by n Am rl n InstillHo of Architecls and The AssecialedGeneralContractorsofAmericaAllrightsraservedWAflNijNCfnnClInwotprAoehdbytJi0CLrllandHlhHnHHlihiiJmHjiJ
UnlIthndzcd reprcHhJHNontHdiClribut of thj d Cumw1t q iEli portion nt may re ull 10 MhNMtlV nd 1iinh A ndtm Tnd
r1 c fd to th sinum exhmi poS tlH 1 tl lilW This dOGum nl was producedby AlA software at 15 1950 en 07 10 2007 under Order
No 1000259422 1 which expires 00 9 18 2007 and is n01 for resale
User Notes 1433524015
9
49
Paragraphs deleted
ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES
The Owner shnlI compensate the Construction Manager for Constnlction Phase services as follows
5 1 COMPENSATION
f 5 1 1 For the Construction Manager s
Paragraphs deleted
services during the Construction Phase the Construction Manager s Fee shall be 6 0 percent on the base bid and 4 5
percent Oil the alternates of thc sum of all of the awarded contracts for the Work
The Owncr shall in no event be obligated to the Construction Manager for morc than the amount set filrth in this
Subparagmph 5 11 for Construction Phasc fees in connection with this Project Notwithstanding any other
provisions in the Contract Documents the basis for computing the Construction Manager s compensation under this
paragraph shilll specifically not include any inereascd contract sums necessitated by changes in the work increased
costs orcosts approved for any other reason except as provided by Sections 2 2 11 and 2 2 12
5 2 GUARANTEED MAXIMUM PRICE
f 5 2 1 The sum of the Cost of the Work as defined in Subparagraph 6 1 below together with the Construction
Manager s ree is guaranteed by the Construction Manager not to cxcecd the Guaranteed Maximum Price providedinamendmentNo1oranysequentiallynumberedAmendmentsubjectonlytoadditionsapprovedinaeeordame
with this Agreement and the Ocneral Conditions made a part hereof Such maximum sum as adjusted by approvedchangesintheworkisreferredtohereinastheadjustedGuaranteedMaximumPriceAnycostsorexpensesthai
cause the adjusted GUl1ranteed maximumPrice 10 be exceeded shall be the sole nsponsibility oland paid by the
Construction Manager without reimbursement by the ownerexcept as provided in Section 2 2 I I and 2 2 12
Paragraphs deleted
5 3 CHANGES IN THE WORK
5 3 1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the
execution of Amendment No 1 may be determined hy any of the methods listed in Section 7 3 3 of AZOI lM 1997
5 3 2 In calculating adjustments to Subcontrads the terms cost and fee as used in Subparagraph 7 33 3 of AlA
Document A20 I and the terms cost and areasonable allowance for overhead and profit as used in Subparagraph736pfAlADocumentA2GIshallhavethemeaningsassignedtotheminthatdocumcntandshallnotbeincreased
based on changes to the work except as specifically provided in Section 5 1 2 2 and 2 2 12 where the Owner
requests material changes which areuutside the scope of the Project
Paragraphs deleted
ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE
6 1 COSTS TO BE REIMBURSED
6 1 1 Thc term Cost of the Work shall mean the aggregate total of all Subcontracts competitively solicited and
awarded for construction work in connection with the Project including any contracts competitively solicited and
awarded to the Construction Manager l lCconstruction work in connection with the Project Construction
Contingency Account and Reimbursable Direct Job Costs defined in Amendment L In the event inconsistencybetweenanyContractDocumentandAmendmentIAmendment1shallgovern
ParaMraphs deleted
Init AlA Document A121 CMc 2003 end AGe Document 565 Copyright @ 1991 arid 2003 by The American ISHtuto 01 Architects andThe AssociatedGonoralCOfllractonortnlttiCiAllrightsreservedVAHijrklhdH1mefdhprChNJHHibyUSHldIrlhtnliuWlfnHtk
lkTndhlri tnd rcptodudhm rdi lrihutilfth lli dacdm ml tm 1nv podlnni rlH Y fHlj1 n lri0H 1nf Hminwl pf mailf Lmd
cn ted to Ihl u u xtenl 1 111 untier H Iw This document was produced by AlA software aI15 19 50 on 07 1012007 und Ord
NO 1000259422 1 which oxplros on 9 18 2007 an jis I10t for lasale
User Notes 1433524015
10
50
Tabie deleted
Parag mphl delded
6 2 COSTS NOT TO BE REIMBURSED
Paragraphs deleted
6 3 DISCOUNTS REBATES AND REFUNDS
6 3 1 Cash discounts ohwined on paymcnts made by the Construction Manager shall accrue to the OWncr if 1
before making the payment thc Construction Manager included them in an Application for Payment and reeeived
payment therefor from the Owner or 2 the Owner has deposited funds with the Construction Manager with which
to make payments otherwise cash discounts shall accrue to the Construction Manager Trude discounls rebates
refunds and amounts received from sales of surplus materials and equipment shall accrue to the Owner and the
Construction Manager shall make provisions so that they can be secured
6 3 2 Amounts which accrue to the Owner in accordance with the provisions of Section 0 3 shall be credited to
the Owner as a deduction from the Cost of the Work
6 4 ACCOUNTING RECORDS
6 4 1 The Construction Manager shall keep full and detailed aCCDunts and exercise sllch controls as may be
necessary for proper financial management under this Contract the at counting and control systems shall be
satisfactory to the Owuer The Construction Manager shall maintain records for all subcontracts change orders and
scope of Work changes resulting frol11 all Subtontractors The Owner and the Owner s aCtllllntants shall be
afforded access to the Construction Manager s records books correspondence instructions drawings receiptssubcontractspurchaseordersvouthersmemorandaundotherdatarelatingtothisProjectandtheConstruction
Manager shall preserve these for a period of three years after t1n ll payment or for such longer period as may be
required by luw
ARTICLE 7 CONSTRUCTION PHASE
7 1 PROGRESS PAYMENTS
g 7 1 1 Based upon Applications for Puyment submitted to the Architect by the Construction Manager llnd
Certificates for Payment issued by the Arthitect the Owner sh lllmake progress puyments to the Construction
Manager as provided below and elsewhere in the Contruct Documents
7 12 The period covered by each Application for Payment shall be one calcndar month cnding on the last day of
the month or as follows
7 13 Progress Payments are due and plyable pursuant to 28 2 210 I et self MCA which provides in part that a
contractor s request for paymcnt is considered approved by the Owner 21 days after receipt of the request by the
Owner or the person dcsignated in the contract by thc Owner to receive the payment request unless prior to that
time the Owner provides the contractor with a written statementcontaining specil1c items in the request for
payment that arcbeing disapproved by the Owner If the Owner pprovcs all or a portion of a contractor s request
for payment a providcd in the statute the Owner shall pay the contractor the approved amount within 7 days after
contractor s request for payment is approvcd
7 14 With each Application for Payment the Construction Manager shall submit payrolls petty cash accounts
receipted invoices or invoices with cheek vouchers attached and any other evidcnce required by the Owncr or
Architect to demonstrate that cash disbursements already made by the Construdion Manager on account of the Cost
of the Work equal or exceed I progress payments already received by the Construction Manager less 2 that
portion of those paymcnts attributable to the Construction Manager s Fee plus 3 payrolls for the period covered hy
the present Application for Paymcnt
7 15 Each ApplicatiDn for Payment shall be based upon the most recent schedule of values submitted by the
Construction Manager in accordance with the Contract Documents The schedule of values shull allocate the entire
Guaranlccd Maximum Price among the v arious portions of the Work except that the COIlstrudion Manager s Fee
shall be shown as a single separate item The schedulc of values shall be prepared in such form and supportcd by
Inll AlA Document A121 CMc 2003 and AGC Document 565 Copyright @ 1991 and 20 J by The ArTlelican Instiluteof ArchlloclS and The Associated
General Contractors of America All right rerved WAHNiN0 heumoIS pml d bV U S Copyrlpl11 La IWrnalll I1tJnlndh rb tJ lur dOi Of cthtntHJtk tflhi ol dCJ Hnf IiC I0ny Oftlon nf d rrH1Y re1 idl HI nVBn iv jrm old jelH lt1l
pro Guk IlaX Vi jit uno rth II This document w s producedby AlA soflware at 15 19 50 on 07110120011JI1uor Order
Ne 1000259422 1 wt k 11 explros on 9118 2007 and IS not for resale
User Notes 1433524015
11
51
sllch data to ub tantiate its accuracy as the Architect may require This schedule unless objected to by the
Architect shall be used as a basis for reviewing thc Construction Manager s Applicatjon for Payment
7 16 Applications filr Payment shall show the percentage completion of each portion of the Work as of the end of
the period covered by the Application for Payment The percentage completion shall be the lesser of I the
percentage of that portion of the Work which has actually been completed or 2 the percentage obtained by dividing
a the expense which has actually been incurred by the Construction Manager on account of that portion of the
Work for which the Construction Manager has made or intends to make actual payment prior to the next ApplicationfurPaymentbybtheshareoftheGuaranteedMaximumPriceallocatedtothatportionoftheWorkinthesdHdulc
of values
7 17 Subject to other provisions of theContract Documents the amount of each progress payment shall be
computcd as follows
1 Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as
determined by multiplying the percentage completion of each portion of the Work by the share of the
Guaranteed Maximum Price allocated to that portion of the Work in the schedule of Vlllues PendingfinaldeterminationofcosttotheOwnerofchungesintheWorkamountsnotindisputemaybe
included as provided in Section 7J 8 of A20 PM 1997 even though the Guaranteed Maximum Price
has not yet been adjusted by Change Order
2 Add that portion of the Guaranteed Maximum Price properly allocable to materials and equipmentdeliveredandsuitablystoredatthesiteforsubsequentincorporationintheWorkorifapprovedin
advance by the Owner suitably storcd offthe site at a location agreed upon in writing3AddtheConstructionManagersFcclessretainageofFivepercent500The Construction
Manager s Fcc shall be computed upon the Cost of the Work described in the two preceding Sections
at the rate stated inSection 5 1 1 or if the Construction Manager s Pee is stated as a fixed sum in that
Section shall be an amount which bears the same ratio to that fixed sum Fee as the Cost of the Work
in the two prcceding Sections bear to a reasonable estimate of the probahle Cost of the Work uponitscompletion
4 Subtract the aggregate of previous payments made by the OWner
5 Subtract the shortfall if any in licated by the Construction Manager in the documentation required bySection714tosubstantilltepriorApplicationsforPaymentorresultingfromerrorssuhsequentlydiscoveredbytheOwnersaccountantsinsuchdocumentation
6 Subtract amounts if any for which the Architect has withheld or nullified a Certificate for Payment
as provided in Section 9 5 of A20ITMI997
7 18 After the words retainagc of in the first entence of Subparagraph 7 1 7 3 insert the words five percent5AllrctainageamountsunderthisprovisionshallbeplacedinaninterestbearingaccountbytheOwnerin the
name of both parties in accordance with Montana law The interest from that account shall be payable to the
Construction Manager as it is accrued The payment of the escrow account shall be made to the Construction
Manager simultaneously with the final payment less only such amount as may reasonable be necessary to corrcct
any identified deficiency in the Work in accordance with Sections 28 2 2101 et scq ofthc Montana Code
Annotated
Except with the Owner s prior approval payments to Subcontractors shall he subject to retention of not less than
five percent 5
7 1 9 Except with the Owner s prior approval the Construction Manager shall not makc advance payments to
suppliers for materials orequipment which have not been delivered and stored at the site
7 110 In taking action on the Construction Manager s Applications for Payment the Architect shall be entitled to
rely on the accuracy und completeness of the information furnished by the Construction Munager and hall not be
deemed to represent that the n hitect has made adetailed examination audit or arithmetic verification of the
documentation submitted in accordance with Section 7 14 or other supporting data that the rchitcct has made
exhaustive or continuous on site inspections or that the Architect has made examinations to ascertain how or f lr
what purposes the Construction Manager has used amounts previously paid on account of the Contract Such
examinations audits and verifications ifrequired by thc Owner will be performed by the Owner s accountants
acting in the sole interest of the Owner
AlA Document A121 rCMo 2003 and AGC Document 565 Copyright rtJ 1991 and 2003 by The American Instituto of Architects and TheAssociatedGoneralContractorsofAmerGaAllrightsreservedWARNiNGljgdlCUll1FjwprolloindhyUSClpyNlhlawlOcilfllornallonaliJ
ith lrilfd rprndUdjbn or distntn m onhls dOC Hn f1L 1 uny portion vt it rrmyi suH in uvuru iltH ChuiFtll pcnalticsj wJ will h
rw itUh d tu 1110 iMUm 1 P it Ilnderlh Igw This document was prOlJlJced by AlA software at 15 1950 on 0111012007 undor Ordor
No 1000259422 1 whlcl1 expires on 9 18 2001 and is not forresale
User Noles 1433524015
12Inlt
52
7 111 The Construction Manager shall develop Ilnd implement procedures for the timely review and processing of
application for payment by Subcontractors for progress and final payments
7 1 12 Bascd on the Constmction Manager s observations and eval uations of each Subcontractor s application for
payment the Construction Manager shall review and certify the amounts due the respective Subcontractors and shall
incorporate such certified amounts due the rc peetive Subcontractors and shall incorporate such certined amounts
into the Applicatioll for Payment developed under Subparagraph 7 1 5 above
7 113 The Construction M n lger s certification fOr payment shall constitute a representation to thc Owner bilsed
on the Construction Manager s determinations at the site and on the data comprising the Subcolltmctor s
applications for payment that to the best of the Construction Managers knowledge information and belief the
Work has progressed to the point indicatcd and the quality of Work is ill accordance with the Contract Documents
The foregoing representations arc subject to an evaluation of the Work for conformance with thlContract
Documcnts upon Substantial Completion to results of subsequent tests and inspections to minor deviations from
the Contract Documcnts correctable prior to completion and to specific qualifications expressed by the Construction
Munager in writing The issuance of uCertificate for Payment shall further constitute a rcprcscntation that the
various Subcontractors arc entitled to payment in the amount eeltified
7 2 FINAL PAYMENT
7 2 1 Except as may otherwise be provided herein final payment shall be made by the Owner to the Construction
Manager when this Agreement has been fully performed by the Construction Manager and all Work completed
by the Subcontractors except for their respective responsibilities to a correct nonconforming Work as providcd in
AlA Document A20I and b satisfy other requirements if any which necessarily survive final payment 2
2 a final Application for Payment and a final accounting for the Cost of the Work have been submitted by the
Construction Manager and reviewed by the Owner and or its accountants and 3 a final Certificate for Payment has
then been issued by the
Paragraphs deleted
Architect Such final payment shall bc made pursuant to 28 2 2101 et seqMCA
7 2 2 The amount of lhe final payment shall be calculated as follows
1 Take the sum of the Cost of the Work substantiated by the Construction Manager s final accountingandtheConstructionManagersFccbutnotmorethantheGuaranteedMaximumPricc
2 Subtract amounts if any for which the Architect withholds in whole or in part aflnu Certificatc for
Payment as provided in Section 9 5 1 of A201nl 1997 or other provisions ofthe Contmct
Documents
3 Subtract the aggregate of previous payments made by the Owner
If the aggregate of previous payments made by the Owner cxceeds the amount due the COllstructiol Manager the
Construction Manager shnll reimhurse the difference to the Owner
7 2 3 The Owner s accountants will review and report in writing m the Construction Manager s final accountingwithin30daysafterdeliveryofthennalaccountingtotheArchitectbytheConstructionManagerBaseduponsllch
Cost of the Work as the Owner s accountants report to be substantiated by the Construction Manager s final
accounting and provided the other conditions of Section 7 2 1 have been met the Architect will within seven days
after reccipt of the writtell report of thc Owncr s accountants either issue to the Owner a final Certificate for
Payment with acopy to the Construction Manager or notify the Construction Manager and Owner in writing of the
Architect s rcasons for withholding a certificate as provided in Section l S I of A201 1997 The time periods
stated in this Section 7 2 supersede those stated in Section 94 1 ofA201lM 1997
7 2 4 If the Owner s accountants report the Cost of the Work and AlA Document A201 Expenses as substantiated
by the Construction Manager s final accounting to be less than claimed by the Constmction Manager the
Construction Manager shall be entitled to proceed to resolve such dispute under Article 9 or us otherwise providedhereinwithoutafurtherdecisionoftheArchitectPendingafinalresolutionofthcdisputedamounttheOwner
shaH pay the Construction Manager the amount certified in the Architect s final Certilkate for P lyment
Inlt AlA Document A12FMCMc 2003 and AGC Document 565 Copyright @ 1991 nd 2003 by TheAmerican Institule 01 Archilcct and Tho Asoclaled
General Contmclors of America All rights reserved WARNiNG fhi docunwnl isrrN led by U S Copyrlgh11ndto r IrI
Ut JI ttF fed rp oducinn or kAributiol1 or thi dOt UrrH nt or any pflftlon of it m v rl Hdi in 36lVere ciVil lnd crim slr mlitws and will tH
V jbd to tM ma im it pO ibl d4 tm law This documenl was producedby AlA software aI15 19 50 on 07 10 2007 under Ordor
No 1000259422 1 wiliet expires o 9 18 2007 a d is not tor resale
User Notes 14335240151
13
53
Paragraphs deleted
ARTICLE 8 INSURANCE AND BONDS
8 1 INSURANCE REQUIRED OF THE CONSTRUCTION MANAGER
During both phases of the Project the Construction Manager shall purchase and maintain insurance as set forth in
Section 111 of A20I I997 Such insurance shall be writtcn for not less than the f6llowing limits or greatcr ifrequiredbybw
fi 8 1 1 Without limiting any of the other obligations or liabilities of the Construction Manager the Construction
Manager shall secure and maintain stich insurance from an admitted insurance company orcompanies authorized
to write insurance ill the State of Montana with a minimum A M Best Rating of A as will protect himself his
subcontractors thc Owner and the ArchitectEnginccr and their respective agents and employces from claims for
bodily injury deHth or property damage which may arise from operations Hnd completcd operations under this
Agrccmcnt Such coverage shall be written for claims arising outof all prcmises operations and all liabilityassumedbythcConstructionManagerunderanycontractoragreementConstnlCtionManagershallnotcommence
work under this Agreement until such insurance has been obtained and certificates of insurance with binders or
ccrtified copies of the insurance policy shall have been filed with the Owner and the ArchitectlEngineer
All insurancc coverages shall remain in effect throughout the life of the Agreement except that the construction
Manager shall maintain the Commercial Gencral Liability coverage for a period of at least one year following the
substantial completion date for property damage resulting from occurrences during the agreement period
Each insurance poli cy shall contain a clause providing that it will not be cancelled by the insurancc company with
45 days written notice to the Owner and Architl ctlEngincer of intention to cancel
Owner and ArchitectEngineer ure to be added lIS additional insured under the Gcnera Liability CoveragesHoweverTheOwnerandtheConstructionManagerunderstandthattheinsurancecoverageprocuredbythe
constrnction Manager shall not provide coverage for design related liubilities it being the responsibility of the
Architect to provide for the same Certificates of Insurance shall be provided identifying such interests
The minimum alTlount of such primary insurancc coverages shall be as follows
1 Commercial General Liability Occurrence Form
Bodily Injury and Property Dam lgc
1 000 000 00 per oecurrcnce
2 000000 00 General Aggregate
2 OOOOOo no Products and Completed
Coverage to include
Premiscs Operations
Products Completed Operations
Contractual Liability
OperatiOlls of Independent Contractors
Personal Injury
Broad Form Property Damage
Deductiblc Not more thall 5000 00 per occurrence on property damage
2 Automobile Liability Combined Single Limit
Combined Single Limits 1 000 000 00 each accident
Uninsured I Undcrinsured Motorist Limits 1 000 000 00
Bodily Injury and Property Damage Coverage to include
All owned autos
All Hircd Autos
AlA Oocumenl A121 CMe 2003 and AGC Doeumenl565 Copyright @ 1991 and2003 by Tha American Institute of NeMacts and Tha Associated
Genera Contractors of America All rights reserved WARNING this dclJme t is probduU by LIS Cq Vrqhl Law nl1d Inl mHlet1 iO Iit s
Urtw thorizod reprnducHon nr aubUtJQll of ttlhdUGHmnnt Or allVpon tif a may re lJa eVt fcivil rld crifl1inal v rh it51 anrl will bJ
1 5eculmJ 10 the m I11 W sibk der thr 10 This documenl was producad by AlA software at 15 19 50011 07110 2007 under OrdsrNo1000259422Jwhichexpireson911B12007andisnotforrasala
User Notes 1433524015
14Inil
54
All non owned autos
3 Umbrella orExcess Insurance
Per Occurrence Limit 5 000 000 00
Annual Aggregate Limit 5 000 000 00
This coverage to apply to the eonunercial general liability and the automobile liability Totul
limit of liability coverage requested is 5 000 000 00 and can be made up of a combination of the
primury und the umbrella orcxcess insurance coverage
4 Workers Cornpensutioll
Occupational injury ullcl Disease Statutory Employer s Liability
These requirements may be written with General Liability Policy by endorscment if unavailable
from Workers Compensation carrier
Paraflraphs deleted
8 2 INSURANCE REQUIRED OF THE OWNER
During both phases of the Project the Owner shall purchase und maintain liability and property insurance includingwaiversofsubrogationassetforthinSections112and114ofA20JTM1997Suchinsunll1ceshallbewrittenIllI
not less than the following limits or greater if required by law
8 2 1 Propcrty Insurance
Deductible Per Occurrence
Aggregate Deductible
g 8 2 2 The Owner shall purchase and maintain liability ancl property insurance as follows
Buildcrs Risk
General Liability
Boiler und Machinery Insurance
10 600 000 00
1 000 000 00 per occurrence
10 600 000 00
The Construction Manager shall be added as an additional insurcd under the Owncr s liability and propertyinsurance
8 3 PERFORMANCE BOND AND PAYMENT BOND
8 3 1 The Construction Manager shull lumish bonds covering the faithful performance of this contract and all
contracts competitively solicited and awarded for construction work in connection withthe Project and payment of
all obligations arising thereunder including labor and materials Bonds may be obtained through the Construction
Manager s usual source and the cost thcrcof shall be included in the Cost of the Work The amount of each bond
shall be equal to 1000of the Contract Sum of this contract and any and all contracts competitively solicited and
awarded for construction work in connection with the Project Both the Construction Managcr and the Owncr shall
be listed as obligees on the payment and performance bonds
8 3 2 The Construction Manager shall deliver the required bonds to the Owner at least three days before the
commencemcnt of any Work at the Project site
AlA Dooument A121 eMo 2003 ond AGC Oocument 565 Copyrlghl @ 1991 and 2003 by TheAmerican Instituto 01 Architects and ThoAssocinted
General Contractors of AmlHica All rlghlS reserved WAHNING This don i5 p otl cled by UL C ppqhl Law nd 1 1 11 g
UWil Jlhodn8 un or diddLuhm jthIS d KiHw nt rmy porl1un n 1 m v msult in Hf ere eiVil lrd enm 1r0naHJr wd
plo e td l0 nnJimlJ fx pH t1ih d w d rti bw This documBnt was producod by AlA software at 15 19 50 Hill7 1 0 2007 llndo Onjor
No 1000259422 which expires on 918 2001 and is not 10 asate
Use NOles 1433524015
15
Init
55
ARTICLE 9 MISCELLANEOUS PROVISIONS
9 1 DISPUTE RESOLUTION
9 1 1 During both the Preeonstruction and Constluction Phases Claims disputes or other matters ill IUestionbetweenthepartiestothisAgreementshallbercsolvedasprovidedinSections43through46inAlADoeumcnt
A20 I TM 1997 except that during the Preeonstruetioll Phase no decision by the Architect shall be a condition
precedent to mediation
9 2 OTHER PROVISIONS
fi 9 2 1 Unless otherwise noted or unless otherwise inconsistent with their intcnded meaning in this Agreement the
terms used in this Agreement shall have the same meaning as those in A20 ITM 1997 General Conditions ftheCuntractfinConstruction
fi 9 2 2 EXTENT OF CONTRACT
This Contract which includes this Agreement its Addendum its Amendments and the other documents
incorporated herein by refcrence represents the entire and integrated agreement between the Owner and the
Construction Manager and supersedes all prior negotiations representations or agreements either written ororal
This Agreement and its Addendum may be amended only by written instrument signed by both the Owner und
Construction Manager If any document incorporated into this Agreement or its Addendum is inconsistent with
either this Agreement this Agreement and its Addendum shall govern
9 2 3 OWNERSHIP AND USE OF DOCUMENTS
Article 1 6 of A20I nl 1997 shall apply to both the Preconstruct ion and Construction Phases
9 2 4 GOVERNING LAW
The Contract shall be govemed by the law of the place where the Project is located
9 2 5 ASSIGNMENT
The Owner and Construction Manager respectively bind themselves their partners successors assigns and legalrepresentativestothetherpartyheretoandtopartncrssuccessorsassignsandlegalrepresentativesofsuchother
party in respect to covenants agreements and obligations contained in the Contract Documents Except as providedinSection1322ofA20ITM1997neitherpartytotheContractshallassigntheContractasawholewithoutwritten
COrlsent of the other If either party attempts to make such an assignment without such consent that party shall
nevertheless remain legally responsible for all obligations under the Contract
ARTICLE 10 TERMINATION OR SUSPENSION
10 1 TERMINATION PRIOR TO ESTABLISHING GUARANTEED MAXIMUM PRICE
10 11 During the preconstruction Phase the Owner may terminate this Agreement at any time without cause and
the Construction Manager may terminate this Agreement for any of the reasons descrihcd in Section 14 1 1 of
A201HL1997
10 12 If the Owner or Construction Manager terminatcs this Agreement pursuant to this Section 10 1 1 above primtocommencementoftheConstructionPhasetheConstructionManagershallheequitablycompensatedfor
Prcconslmction Phase Services performed prior to receipt of notice of tcrmination provided however thnt the
compensation for stich services shall not exceed the eompen ation set forth in Section 4 1 1
10 1 3 After commencement of the Construction Phase the Construction Manager
Paragraphdeleted
may terminate this Agreement for any of the reasons set forth in and pursuant to Subparagraph 14 of AlA
Document A20I The Owner may terminate this Agreement for any of the reasons set forth and pursuant to
Subparagraphs 4 2 or 144 of AlA Document A20l The Owner may terminate this Agreement for any of the
reasons set forth and pursuant to Subparagraphs 14 2 or 144 of AlA Document A201
10 14 If the Owner or Construction Manager terminates this Agreement Pursuant to Paragraph 10 1 3 the
COllstnlCtion Manager shall be entitled to compensation for services rendered prior to termination in an amount that
bears the same ratio to the Construction Manager s total Fee as the alnount of Work completed during the
Construction Manager s total Fee as the amount of Work completed during the Construction Manager s period of
Construction Phase services bears to the tntal Cost of the Work The aggregate of previous payments made by the
Inlt ALA Document A121TMCMc 2003 lInd AGC Document 565 Copyright @ 1991 and 2003 by TheAmerican Institute 01 Architects and Tho AssociatedGenoralContractors0AmencaAllrIghtsreservedIAHNINGThidOClOtmprotectedbyeopYI11tO1IMmiJhM1Im1UrmAhwio0fryproductlQndHHribtdion01thiSthcJtmmtooriWHlaIIlQ1itrrwyrffultinttqVenlcivilltifrimdHpnn1tHh1niNdbe
V ulud to lh a imum hnl p ilb unJe U IliIo This document was produced by AlA soltwaraat 15 19 50 on 0711 0 2001 umier OrderNol0002594221whichepireson91812001aridIsflotlorresale
User Not s 1433524015
16
56
Owner with respect to the Construction Manager s Fcc shall be deducted from the figure arrived at through the
above referenced ratio No amounts beyond amounts that are tied to actual work performed shilll be paid to the
Construction Manager
10 2 TERMINATION SUBSEQUENT TO ESTABLISHING GUARANTEED MAXIMUM PRICE
Subsequent to execution by both parties of Amendment No I the Contract may be terminated as provided in Article
14 of A201JM 1997
Parafraphs deleted
10 3 SUSPENSION
The Work may be suspended by the Owner as provided in Article 14 of A20 PcI997 Add Article 11 and the
following Subparagraphs of Article II
ARTICLE 11 OTHER CONDITIONS AND SERVICES
111 The Construction Manager shall itself comply with Ilnd shall ensure the compliance of the various
Subcontn clorS with 18 2403 MCA in terms of giving preference to the employment of bona fide Montanil
residents in the work it performs under this Agreement and in paying the standard prevailing wage rate of wagesincludingtravelallowanceandfringebenefitsineffectandapplicabletotheoperationsthatarcconductedin
performing the Work 011 this Project The Construction Manager will properly classify its employees and ensure
that the various Suhcontraetors properly classify their respective employees in accordance with the most rccent
Montana prevailing wage ratcs as established by the Montana Department of Labor prior to commencing operationsunderthisAgreementAcopyoftheapplicableprevailingwageratesarecontninedintheProjectManualandarc
expressly incorporated herein by reference
112 No waiver of uny breach of anyone of the agreements terms conditions or covenants of this Agreement bytbeOwnerorConstructionManagershallbedeemedtoimplyorconstituteawaiverofanyotherugreementterm
condition or covenant of this Agreement The failure of either party to insist Oil strict performance of any
agreemcnt term condition or covenant herein set forth shall not constitute or be construed as a waiver of the rightsofeitherortheotherthereaftertoenforceanyotherdefaultofsuchagreementtermconditionorcovenantneither
shall such failure to insist upon strict performance be deemed sufficient grounds to enable either party to forcgo or
subvert or otherwise disregard any other agreement term condition or covenant of this Agreement
11 3 If in any instance any provision hereof shall be determinc d to be invalid or unenforceable under anyapplicablelawsllchprovisionshallnotapplyinsuchinstancesbuttheremainingprovisionsshallbegiven effect in
accordance with the terms
114 Any notices required or permitted under this Agreement or which any party elects to give shall be in writinganddeliveredeitherpersonallytotheotherpartysauthorizedagentsetforthbeloworaschangedbywritten
notice Of by depositing such notice with the United States Postal Service postage fully prepaid to the person at the
address set forth below by certified mail return receipt requested orto such other address as either party may later
designate in writing ny notice given hy mail as herein provided shall be deemed given when deposited in the
United States mail
Owner Owner s Construction Representative
City of Bozeman
Altn James Goehrung
POBox 1230
Bozeman MT 59715
Inlt AlA Document A121 CMc 2003 and AGC Documenl56S Copyrlghl @ 1991 and 2003 by Tll0 American Institute 01 Architects and The AssociatedGoneralContraclorsofArnericaAllrightsreservedANGThithClBCHH1IRproteAedl1wl1ndnnHiu1lIHMfhrildBpndUdmflHhikiblollofHuthJLn11oflYindian01dmayrUtHclflflrdVlndtllandwil
lWtecut d tit na lnlUm hml p s ble d the Illw This document was produclQ by AlA soltwaroaI15 1950 on 0711012007 undor O jONO10002594221whichexpireson9182007andisnOItorresale
User Notes 14335240j 5
17
57
Construction Manager Martel Cunstruction IneAnnMarkBrown
1203 Somh Church
Bozeman MT 59715
11 5 This Agre ement may be executed in several counterparts and each such counterpart shall be deemed anoriginal
116 Time is of the essence and the Construction Manager agrees to proceed with the provision of services underthisAgreementwithduediligenceandwithoutdelayinordertomeettheOwnersscheduleofconstructionand
occupancy It is expressly grecd and understood between the parties that the Project must reach SuhstantialCompletionnulatcrthanAugust
117 The Construction Manager shall reject the use of any hazardous material in the construction of the projectincludinghutnotlimitedtoasbestosasbestosproductspolychlorinatedbiphenylPCBorothertoxicsubstancesFurtherifanysuchmaterialsarediscoveredinthecourseoftheconstructiontheConstructionManagershallnotifytheOwnerimmediately
11 S In the event either party tiles suit to enforce their rights under this agreement the prevailing party shall beentitledtorecovertheircostsandattorneysteesfromtheotherpartyinadditiontoanyotherdamagesawardedbythecourtItisunderstoodandagreedthatanysuitfiledtointerpretorenforceanyoflheprovisionsofthis
agreement shall be filed in the Eighteenth Judicial District court of the State of Montana
This Agreement cntered into as of the day and year first written above
OWNER CONSTRUCTION MANAGER
Signature
Anthony W Martel Vice
PresidentlSecretary
Printed lllme and ritle
SignnlureI
Printed name and title
Date Date
ATTEST ATTEST
Init ALA Document A121CMc 2003 and AGC Document 565 Copyright @ 1991 and 2003 by The American Il1Stilwt 01 Architects and rhe A socialerlGeneralContractorsojArmoricaAllrightsreservedWARNINGThisJocnliPWWcllObyUSoCrign1ilWMdlntllabjTmUn3lJtmdldreprodoctlonOfdhkibHionorthidOCUiTiQntroranyportimltlitmayrmdtinSfVn0civilandrhqApoliHLridwObprosecutedllheUIposbbHieItlawrhisdocumentwaSproducedtyAlAsoftwareat151950On07102007underOrderNo10002594221whichexpireon9182007nndisnotforresale
User Noles 1433524015
18
58
AIA Document A121 CMc 2003
Amendment No 1
AMENDMENT NO 1
TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER
Pursuant to Section 2 2 of the Agreement datcd June 19 2007 between City of
Bozcman A Municipal Corporation Owner and Martel Construction Inc SUbchapterSCorporationtheConstructionManagerforBozemanIntermodalFacilitythe
Project the Owner and Construction Manager establish a Guaranteed Maximum Price
and Contract Time for the Work as set forth below
ARTICLE I GUARANTEED MAXIMUM PRICE
The Construction Manager s Guaranteed Maximum Price for the Work including the
estimated Cost of the Work as defined in Article 6 and the Construction Manager s Fee as
defined in Article 5 is Eight Million Six Hundred Ninety Nine Thousand EightHundredFiftyTwoDollars869985200ThisPriceisfortheperformance of
the Work in accordance with the Contract Documents listed and attachcd to this
Amendment and marked Exhibits A through F as follows
Exhibit A Drawings Specifications addenda and General
Supplementary and other Conditions of thc Contract em which the Guaranteed
Maximum Price is based I one volume of 24x36 Drawings dated April 2007
and Volume I and II of the Project Manuals dated April 200
Exhibit B Attached Amendment No 1 Spreadsheet dated June 11 2007
Exhibit C Assumptions and Clarifications made in preparing the
Guaranteed Maximum Price pages through dated
Exhibit D
11 2007
Completion Schedule pages I through dated July
Exhibit E Alternate Prices pages through dated
Exhibit Ii Unit Prices pages through dated
ADDIllONS AND DELETIONS
The author of this document has
added information needed for Its
completion The author may also
have revised the text of the original
AlA standard form An Additions and
Deletions Report that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed A verticalline in the left
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AlA text
This document has important legal
consequences Consultation with an
attorney Is encouraged with respect
to its completion or modification
fnlt
1
AlA DocumntA121 CMc 20D3 Amendment NO 1 Copyright @ 1991 1998 and 2003 by The American In titute of Architects and The AssociatodGeneralContractors01AmericaAllrightsreservedWAHNINGThisdocumentIsproteclOdbyUSCopyrightLawanoInlemaljonalrliuUnaull1QI1CCproduclionordhllibulionoflliinJclmmtoranyportionofIIIMyUlIlnseverllciviln1cmpCl1alllcwdwhbe
pro ecourj10 the maximum xli possible unkr ll1e law This documentwas prOduced by AlA software at 10 2119 on 07111 2007ul1derOrderNal0002594221whichexpireon9182007andisnotforresalaUserNotes722476724
59
ARTICLE II CONTRACT TIME
The date of Substantial Completion established by this Amendment is August 2008
OWNER CONSTRUCTION MANAGER
Signature Signature
Anthony W Murtel
Printed name and titlePrintednameandtitle
Date Date
ATTEST ATTEST
In It 11 111 Dooument A121CMc 2003 Amendment No 1 Copyright @ 1991 1998 and 2003 by The American Institute of Architects and TI1e AssociatedGeneralContraotors01AmericaAllrightsreservedWARNINGThilldocumentIsprotootdbyUSCopyrightL3WandIntemaHmml1moUesUnmllhNitedNproducliOnordlsldmllonofthisdocumentOranypllr1lm0111mayrsultinseverecivilwdcriminalpenallhwillLalmCIltlldtothwnMJllmOmextm1tpossibleundrlhe13WThisdocumentwasproducedbyAlAsoftwaroat102119on071112007undorOrdorNo10002594221whichexpireson9182007andisnotforresale
User Notes 722478724
2
60
ptJiKiikf COiist1ilidiOi mCoQfl1f OtJIIIIllIta ConEplolo
hfvftn Jor Bid
g
C
cl ona
CrtAll AoP fGMP tor CiIy C oa
C tuetion
Slmc l lDJ Sl ilcIi iiJrinij utMyltllloc ttlflf ions SOG
Slrudwat V3too cast In ploKltcilc1a
Wi Mly Adjustmo
w C W
ConIpIow iISf5tilfm SMdewiiJik 1IC
ll1 f1C an oIJ1dNelIplI of GMgo U
R lilk ti1 NU
C NtUihertj rou
SIllIfC lC
OwnofO oey
0 1
Rtcflo Sboltu farr IQnf hMnt
JiilNn JId4 HddioodkveJ to P kitIO Gw
arligSU Jiio da
0
s4yI
lt6dJi
1
1
11
iO rn
1rilitbly
21
22clij 5
5dJIJ
IS
J5lby ib4no1
4ffil1
WElod 4111o1
1
Tuo 41241oD7
T rMonG111toi
MofI 7iJWt11
Mic7JJO i07
Moo 13OJ01
MooHt Jl7
Mo Jl
4IilIIl
Man3f10i03
l7JC
6Ima
2i a
WGd1n9i
OI a
lli1
1
luo 11iQ
TwM7ml
kyilriuFroSaw
I Y7i9 iOl V1
u1rN1 jtiUItI 7 jE
ffl 413111 ai U
1CM 7NDt
ThJ WJQl je
WoIId6lU01 Ilmm
JO07
friHIHilO1
Fd WJDi
1
TlJSllnlOl
friSI30IGI
fr 6NlOl
TilJQ 1lf1a
Tucit1fOi
Tuo 7l8rol
Worl
W161O
Wold 1J9W1
ewa
1H
T1b ln 7lll MIT
llI Yr vT
TT
A 1
61