Loading...
HomeMy WebLinkAboutE- Packet 07-16-2007_Approve Resolution No_ 4040, Change Order No_ 1 fo_5 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: WWTP Roofing Project MEETING DATE: 7/16/2007 RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign the change order. BACKGROUND: Attached is a copy, of change order number 1 for the above referenced project. When the project was originally bid, there were 7 total roofs included in the project. After the bid opening, Tom Adams and I discussed the award of the project, and decided that one of the roofs should be removed since the building will be eliminated during the upcoming plant upgrade. He and I were not on the same page as to which building to remove, so as a result the wrong one was removed in the award of the contract. The maintenance build was removed in the award, and instead it should have been the recycle sludge building. This change order is to add back in the maintenance building and remove the recycle sludge building. The change order increases the contract price by $10,670.00. This includes adding back in the maintenance building at $20,010.00, and deleting the recycle sludge building at $9,340.00. There is no change in the contract time with this change order. FISCAL EFFECTS: None ALTERNATIVES: Disapprove Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Change Order 1 & Resolution 4040 Report compiled on 7/5/07 27 28 COMMISSION RESOLUTION NO. 4040 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH METALWORKS OF MONTANA, INC., MISSOULA, MONTANA. WHEREAS, the City Commission did, on the 26th day of March 2007, authorize award of the bid for the Wastewater Treatment Facility Re-Roof project, to Metalworks of Montana, Inc., Missoula, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Metalworks of Montana, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the _____ day of _______ 20______. __________________________________________ JEFFREY K. KRAUSS, Mayor ATTEST: ________________________________________ BRIT FONTENOT City Clerk APPROVED AS TO FORM: _____________________________________ PAUL J. LUWE City Attorney 29