HomeMy WebLinkAboutAppendix D - Stormwater Design Report - Flanders Mill
DESIGN REPORT
STORMWATER MANAGEMENT
FLANDERS MILL SUBDIVISION
Prepared for:
Flanders Mill, LLC
235 Greenhills Ranch Road, Bozeman, MT 59718
Prepared by:
C&H Engineering and Surveying, Inc.
1091 Stoneridge Drive, Bozeman, MT 59718
(406) 587-1115
Project Number: 13067
April 2014
Design Report - Page 2 of 8
INTRODUCTION
The proposed Flanders Mill Subdivision is a major subdivision located on a 136.75-acre parcel
legally described as Tract 1 of Certificate of Survey No. 2834 located in the East Half of the West
Half of Section 3, Township 2 South, Range 5 East of P.M.M., City of Bozeman, Gallatin County,
Montana. It is bordered by Baxter Lane to the north, Ferguson Avenue to the east, and Flanders
Mill Road to the west. The proposed subdivision includes 292 single family lots on 55.33 acres
(zoned R-3) and two multi-family lots on 5.42 acres (zoned R-4).
STORMWATER MANAGEMENT
Stormwater runoff from the subdivision will be conveyed to numerous retention and detention
facilities on site via surface flow in catch curb and gutter to various storm sewer curb inlets. The
site is split up into 31 drainage areas, which are identified on the Stormwater Facilities Plan found
in Appendix B. Drainage Areas 1-11 contribute to the part of the site located south of Oak St.
Drainage Areas 12-31 contribute to the part of the site located north of Oak Street. There is a large
groundwater lake proposed to be built just south of Oak St. This lake will provide detention
volume for nearly the entire southern part of the site. The remainder (Drainage Area #6) of runoff
from the south part of the site will be detained in an existing pond that has an outlet structure. The
outlet structure will be routed to discharge into the new creek. There are four proposed detention
ponds and two proposed retention ponds to control stormwater runoff in the north part of the site.
Existing Detention Pond – South of Oak St.
A 16,931 ft3 detention pond was constructed in 2006 near the southwest intersection of Ferguson
Ave. and Oak St. during the construction of Phases II and III of Diamond Estates Subdivision No.
2. Phase III of the subdivision, which included over 100 residential lots within the proposed
Flanders Mill Subdivision (south of Oak and west of Ferguson), was never constructed after the
economic recession.
The original design of the detention pond included a contributing area within the proposed
Flanders Mill Subdivision of 15.35 acres with a composite runoff coefficient of 0.33 (Water,
Design Report - Page 3 of 8
Sewer, Storm Drainage, & Street Improvements Design Report; 2006, Gaston Engineering). The
new proposal reduces the contributing area from the development to 3.87 acres with a runoff
coefficient of 0.61 (Drainage Area #6). The existing detention pond will not require modifications
as the proposed runoff volume into the pond has been reduced from the original design. The
Diamond Estates Storm Drainage Area exhibit for the existing detention pond is provided in
Appendix C (2006, Gaston Engineering).
Detention Pond – Man-Made Lake Detention Facility – South of Oak St.
A groundwater lake (Man-Made Lake) is proposed within Park #1. The Man-Made Lake has been
designed to have adequate capacity above groundwater table elevations to manage stormwater
flows from the south part of the development. Collected runoff will discharge to the Lake at two
locations: from Tanzanite Drive (contributing Drainage Areas 1, 2, 3, 4, 5, 7 and 8), and from Oak
Street (contributing Drainage Areas 9, 10 and 11). The pre-development runoff rate for this
50.65-acre area was calculated to be 6.21 cfs for the 10-year storm. The required detention storage
volume for the Lake was calculated as 26,676 ft3, which limits the discharge of post-development
stormwater runoff to the pre-development rate of 6.21 cfs.
The footprint of the proposed lake is 112,762 ft2. The stormwater additions will cause the Lake
water level to rise 0.24 ft conservatively assuming that the embankment slopes rise straight up. The
Lake will have a minimum of 0.5 ft of freeboard to account for the stormwater additions and
wind/wave action. Supporting stormwater calculations can be found in Appendix A.
Detention Pond #1 – North of Oak St.
Detention Pond #1 is located to the southeast of Park #2 (the center oval park), as shown on the
Stormwater Facilities Plan in Appendix B. It receives runoff from Drainage Areas 12 and 13,
totaling 16.99 acres. The pre-development runoff rate for this 16.99-acre area was calculated to be
2.15 cfs for the 10-year storm. The required storage volume for Detention Pond #1 was calculated
as 11,277 ft3, which limits the discharge of post-development stormwater runoff to the
pre-development rate of 2.15 cfs. Due to the preliminary nature of this report, Detention Pond #1 is
shown as 21,233 ft3 on the Stormwater Facilities Plan. This oversizing is to account for potential
changes in the stormwater management plan. Supporting stormwater calculations can be found in
Design Report - Page 4 of 8
Appendix A.
Detention Pond #2 – North of Oak St.
Detention Pond #2 is located in the northwest corner of the site, immediately east of Flanders Mill
Rd., as shown on the Stormwater Facilities Plan in Appendix B. It receives runoff from Drainage
Areas 14, 15, 16, 17, 29, 30 and 31, totaling 19.47 acres. The pre-development runoff rate for this
19.47-acre area was calculated to be 2.19 cfs for the 10-year storm. The required storage volume
for Detention Pond #2 was calculated as 13,096 ft3, which limits the discharge of
post-development stormwater runoff to the pre-development rate of 2.19 cfs. Due to the
preliminary nature of this report, Detention Pond #2 is shown as 15,591 ft3 on the Stormwater
Facilities Plan. This oversizing is to account for potential changes in the stormwater management
plan. Supporting stormwater calculations can be found in Appendix A.
Detention Pond #3 – North of Oak St.
Detention Pond #3 is located in the northwest corner of the site, immediately to the south of Baxter
Lane, as shown on the Stormwater Facilities Plan in Appendix B. It receives runoff from Drainage
Areas 18, 26, 27, and 28, totaling 11.63 acres. The pre-development runoff rate for this 11.63-acre
area was calculated to be 1.46 cfs for the 10-year storm. The required storage volume for Detention
Pond #3 was calculated as 7,147 ft3, which limits the discharge of post-development stormwater
runoff to the pre-development rate of 1.46 cfs. Due to the preliminary nature of this report,
Detention Pond #3 is shown as 11,709 ft3 on the Stormwater Facilities Plan. This oversizing is to
account for potential changes in the stormwater management plan. Supporting stormwater
calculations can be found in Appendix A.
Detention Pond #4 – North of Oak St.
Detention Pond #4 is located in the northeast corner of the site, immediately south of Baxter Lane,
as shown on the Stormwater Facilities Plan in Appendix B. It receives runoff from Drainage Areas
20, 21, 22, and 25, totaling 10.25 acres. The pre-development runoff rate for this 10.25-acre area
was calculated to be 1.34 cfs for the 10-year storm. The required storage volume for Detention
Pond #4 was calculated as 6,613 ft3, which limits the discharge of post-development stormwater
runoff to the pre-development rate of 1.34 cfs. Due to the preliminary nature of this report,
Design Report - Page 5 of 8
Detention Pond #4 is shown as 7,509 ft3 on the Stormwater Facilities Plan. This oversizing is to
account for potential changes in the stormwater management plan. Supporting stormwater
calculations can be found in Appendix A.
Retention Pond #1 – North of Oak St.
Retention Pond #1 is located in the northeast corner of the site, immediately to the west of
Ferguson Avenue, as shown on the Stormwater Facilities Plan in Appendix B. It receives runoff
from Drainage Area 23, totaling 1.99 acres. The runoff volume for the 10-year, 2-hour storm was
calculated to be 2,726 ft3. Due to the preliminary nature of this report, Retention Pond #1 is shown
as 16,347 ft3 on the Stormwater Facilities Plan. This oversizing is to account for potential changes
in the stormwater management plan. Supporting stormwater calculations can be found in
Appendix A.
Retention Pond #2 – North of Oak St.
Retention Pond #2 is located within Park #2 (the center oval park), as shown on the Stormwater
Facilities Plan in Appendix B. It receives runoff from Drainage Area 19, totaling 2.53 acres. The
runoff volume for the 10-year, 2-hour storm was calculated to be 2,624 ft3. The pond is sized to
hold 2,663 ft3 of stormwater. Supporting stormwater calculations can be found in Appendix A.
Design Report - Page 6 of 8
APPENDIX A
SUPPORTING CALCULATIONS
EXISTING DETENTION POND - SOUTH OF OAK
Stormwater Design Calculations
Calculate required volume
Q = CiA
V=7200Q
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 6 Area (acre)C FACTOR
Low-Den Residential 0.80 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.20 0.20
ROW 2.87 0.71
Total 3.87
Weighted C6=0.61
Retention Pond Summary
Total Area = 3.87 acres
Weighted C = 0.61
Rainfall intensity = 0.41 in./hr. (C.O.B Design Standards 10-yr, 2-hr storm)
Runoff, Q = 1.0 cfs
Volume, V = 6983 ft2
MAN-MADE LAKE DETENTION FACILITY
Stormwater Design Calculations
Calculate T c - Pre Development condition
Overland Flow
Tc = 1.87 (1.1-CCf)D1/2/S1/3
S = Slope of Basin (%) 1.20 Storm Return
C = Rational Method Runoff Coefficient 0.2 2 to 10
Cf = Frequency Adjustment Factor 1 11 to 25
D = Length of Basin (ft) 1639.5 26 to 50
51 to 100
Tc = Time of concentration (minutes)64.10
Calculate Rainfall intensity (in./hr.) - Pre Development condition
i = 0.64x-0.65 (See Figure I-3, Bozeman Design Standards and Specs - 10 yr storm)
x = storm duration (a.k.a. Tc)1.07 hrs
i = rainfall intensity (in./hr.) 0.613
Calculate Runoff (cfs) - Pre Development condition
Q = CiA
C = Rational Method Runoff Coefficient 0.2
i = rainfall intensity (in./hr.) 0.613
A = Area (acres) 50.65
Q = Runoff (cfs) 6.21
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 1 Area (acre)C FACTOR
Low-Den Residential 12.49 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.76 0.20
ROW 4.77 0.71
Total 18.01
Weighted C1=0.44
Drainage Area 2 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
MAN-MADE LAKE DETENTION FACILITY
Stormwater Design Calculations
ROW 0.55 0.71
Total 0.55
Weighted C2=0.71
Drainage Area 3 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.39 0.71
Total 0.39
Weighted C3=0.71
Drainage Area 4 Area (acre)C FACTOR
Low-Den Residential 7.74 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.56 0.20
ROW 2.65 0.71
Total 10.96
Weighted C4=0.43
Drainage Area 5 Area (acre)C FACTOR
Low-Den Residential 2.45 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 1.00 0.71
Total 3.45
Weighted C5=0.46
Drainage Area 7 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.43 0.71
Total 0.43
Weighted C7=0.71
Drainage Area 8 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.32 0.71
Total 0.32
MAN-MADE LAKE DETENTION FACILITY
Stormwater Design Calculations
Weighted C8=0.71
Drainage Area 9 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 10.31 0.20
ROW 0.00 0.71
Total 10.31
Weighted C9=0.20
Drainage Area 10 Area (acre)C FACTOR
Low-Den Residential 2.01 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.74 0.20
ROW 2.03 0.71
Total 4.78
Weighted C10=0.48
Drainage Area 11 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 1.43 0.71
Total 1.43
Weighted C11=0.71
Lake Detention (from south) Summary
Total Area = 50.65 acres
Weighted C = 0.41
Release = 6.21 cfs
Determine required storage volume (ft 3 ) in detention pond
Duration(min) Duration(hrs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage (ft3)
35 0.58 0.91 18.89 39676 13041 26635
36 0.60 0.89 18.55 40070 13414 26656
37 0.62 0.88 18.22 40456 13786 26669
38 0.63 0.86 17.91 40835 14159 26676
39 0.65 0.85 17.61 41208 14532 26676
40 0.67 0.83 17.32 41575 14904 26671
41 0.68 0.82 17.05 41936 15277 26659
42 0.70 0.81 16.78 42291 15649 26641
43 0.72 0.79 16.53 42641 16022 26618
44 0.73 0.78 16.28 42985 16395 26590
MAN-MADE LAKE DETENTION FACILITY
Stormwater Design Calculations
Determine Lake water level rise
Lake Footprint= 112762 ft2
Embankment Slopes= 1V:0H conservative assumption
Lake Water Level Rise= 0.24 ft
DETENTION POND #1
Stormwater Design Calculations
Calculate T c - Pre Development condition
Overland Flow
Tc = 1.87 (1.1-CCf)D1/2/S1/3
S = Slope of Basin (%) 1.26 Storm Return Cf
C = Rational Method Runoff Coefficient 0.2 2 to 10 1
Cf = Frequency Adjustment Factor 1 11 to 25 1.1
D = Length of Basin (ft) 1537 26 to 50 1.2
51 to 100 1.25
Tc = Time of concentration (minutes)61.16
Calculate Rainfall intensity (in./hr.) - Pre Development condition
i = 0.64x-0.65 (See Figure I-3, Bozeman Design Standards and Specs - 10 yr storm)
x = storm duration (a.k.a. Tc)1.02 hrs
i = rainfall intensity (in./hr.) 0.632
Calculate Runoff (cfs) - Pre Development condition
Q = CiA
C = Rational Method Runoff Coefficient 0.2
i = rainfall intensity (in./hr.) 0.632
A = Area (acres) 16.99
Q = Runoff (cfs) 2.15
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 12 Area (acre)C FACTOR
Low-Den Residential 9.33 0.35
High-Den Residential 0.00 0.50
Open Space/Park 1.03 0.20
ROW 5.20 0.71
Total 15.55
Weighted C12=0.46
Drainage Area 13 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
DETENTION POND #1
Stormwater Design Calculations
ROW 1.43 0.71
Total 1.43
Weighted C13=0.71
Detention Pond #1 Summary
Total Area = 16.99 acres
Weighted C = 0.48
Release = 2.15 cfs
Determine required storage volume (ft 3 ) in detention pond
Duration(min) Duration(hrs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage (ft3)
44 0.73 0.78 6.42 16937 5669 11268
45 0.75 0.77 6.32 17071 5798 11273
46 0.77 0.76 6.23 17202 5927 11276
47 0.78 0.75 6.15 17332 6055 11277
48 0.80 0.74 6.06 17461 6184 11276
49 0.82 0.73 5.98 17587 6313 11274
50 0.83 0.72 5.90 17712 6442 11270
51 0.85 0.71 5.83 17835 6571 11264
52 0.87 0.70 5.76 17957 6700 11257
53 0.88 0.69 5.68 18077 6829 11248
DETENTION POND #2
Stormwater Design Calculations
Calculate T c - Pre Development condition
Overland Flow
Tc = 1.87 (1.1-CCf)D1/2/S1/3
S = Slope of Basin (%) 1.09 Storm Return Cf
C = Rational Method Runoff Coefficient 0.2 2 to 10 1
Cf = Frequency Adjustment Factor 1 11 to 25 1.1
D = Length of Basin (ft) 2010 26 to 50 1.2
51 to 100 1.25
Tc = Time of concentration (minutes)73.22
Calculate Rainfall intensity (in./hr.) - Pre Development condition
i = 0.64x-0.65 (See Figure I-3, Bozeman Design Standards and Specs - 10 yr storm)
x = storm duration (a.k.a. Tc)1.22 hrs
i = rainfall intensity (in./hr.) 0.562
Calculate Runoff (cfs) - Pre Development condition
Q = CiA
C = Rational Method Runoff Coefficient 0.2
i = rainfall intensity (in./hr.) 0.562
A = Area (acres)19.47
Q = Runoff (cfs)2.19
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 14 Area (acre)C FACTOR
Low-Den Residential 0.83 0.35
High-Den Residential 5.50 0.50
Open Space/Park 0.00 0.20
ROW 1.68 0.71
Total 8.01
Weighted C14=0.53
Drainage Area 15 Area (acre)C FACTOR
Low-Den Residential 1.98 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
DETENTION POND #2
Stormwater Design Calculations
ROW 0.78 0.71
Total 2.76
Weighted C15=0.45
Drainage Area 16 Area (acre)C FACTOR
Low-Den Residential 0.73 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.30 0.20
ROW 1.15 0.71
Total 2.18
Weighted C16=0.52
Drainage Area 17 Area (acre)C FACTOR
Low-Den Residential 0.93 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.54 0.71
Total 1.47
Weighted C17=0.48
Drainage Area 29 Area (acre)C FACTOR
Low-Den Residential 1.73 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.99 0.20
ROW 0.00 0.71
Total 2.71
Weighted C29=0.30
Drainage Area 30 Area (acre)C FACTOR
Low-Den Residential 0.20 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.10 0.71
Total 0.30
Weighted C30=0.47
Drainage Area 31 Area (acre)C FACTOR
Low-Den Residential 1.73 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.30 0.71
Total 2.02
DETENTION POND #2
Stormwater Design Calculations
Weighted C31=0.40
Detention Pond #2 Summary
Total Area = 19.47 acres
Weighted C = 0.47
Release = 2.19 cfs
Determine required storage volume (ft 3 ) in detention pond
Duration(min) Duration(hrs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage (ft3)
50 0.83 0.72 6.55 19653 6568 13085
51 0.85 0.71 6.47 19790 6699 13090
52 0.87 0.70 6.39 19925 6831 13094
53 0.88 0.69 6.31 20058 6962 13096
54 0.90 0.69 6.23 20190 7094 13096
55 0.92 0.68 6.16 20320 7225 13095
56 0.93 0.67 6.09 20448 7356 13092
57 0.95 0.66 6.02 20575 7488 13088
58 0.97 0.65 5.95 20701 7619 13082
59 0.98 0.65 5.88 20825 7750 13075
DETENTION POND #3
Stormwater Design Calculations
Calculate T c - Pre Development condition
Overland Flow
Tc = 1.87 (1.1-CCf)D1/2/S1/3
S = Slope of Basin (%) 1.09 Storm Return Cf
C = Rational Method Runoff Coefficient 0.2 2 to 10 1
Cf = Frequency Adjustment Factor 1 11 to 25 1.1
D = Length of Basin (ft) 1426 26 to 50 1.2
51 to 100 1.25
Tc = Time of concentration (minutes)61.68
Calculate Rainfall intensity (in./hr.) - Pre Development condition
i = 0.64x-0.65 (See Figure I-3, Bozeman Design Standards and Specs - 10 yr storm)
x = storm duration (a.k.a. Tc)1.03 hrs
i = rainfall intensity (in./hr.) 0.629
Calculate Runoff (cfs) - Pre Development condition
Q = CiA
C = Rational Method Runoff Coefficient 0.2
i = rainfall intensity (in./hr.) 0.629
A = Area (acres) 11.63
Q = Runoff (cfs) 1.46
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 18 Area (acre)C FACTOR
Low-Den Residential 4.60 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.37 0.20
ROW 2.42 0.71
Total 7.39
Weighted C18=0.46
Drainage Area 26 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
DETENTION POND #3
Stormwater Design Calculations
ROW 0.73 0.71
Total 0.73
Weighted C26=0.71
Drainage Area 27 Area (acre)C FACTOR
Low-Den Residential 0.91 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.47 0.20
ROW 0.00 0.71
Total 1.38
Weighted C27=0.30
Drainage Area 28 Area (acre)C FACTOR
Low-Den Residential 0.71 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.54 0.20
ROW 0.88 0.71
Total 2.13
Weighted C28=0.46
Detention Pond #3 Summary
Total Area = 11.63 acres
Weighted C = 0.46
Release = 1.46 cfs
Determine required storage volume (ft 3 ) in detention pond
Duration(min) Duration(hrs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage (ft3)
40 0.67 0.83 4.44 10646 3509 7137
41 0.68 0.82 4.37 10738 3597 7141
42 0.70 0.81 4.30 10829 3684 7144
43 0.72 0.79 4.23 10918 3772 7146
44 0.73 0.78 4.17 11007 3860 7147
45 0.75 0.77 4.11 11094 3948 7146
46 0.77 0.76 4.05 11179 4035 7144
47 0.78 0.75 3.99 11264 4123 7141
48 0.80 0.74 3.94 11347 4211 7136
49 0.82 0.73 3.89 11429 4299 7131
DETENTION POND #4
Stormwater Design Calculations
Calculate T c - Pre Development condition
Overland Flow
Tc = 1.87 (1.1-CCf)D1/2/S1/3
S = Slope of Basin (%) 1.21 Storm Return Cf
C = Rational Method Runoff Coefficient 0.2 2 to 10 1
Cf = Frequency Adjustment Factor 1 11 to 25 1.1
D = Length of Basin (ft) 1365 26 to 50 1.2
51 to 100 1.25
Tc = Time of concentration (minutes)58.37
Calculate Rainfall intensity (in./hr.) - Pre Development condition
i = 0.64x-0.65 (See Figure I-3, Bozeman Design Standards and Specs - 10 yr storm)
x = storm duration (a.k.a. Tc)0.97 hrs
i = rainfall intensity (in./hr.) 0.652
Calculate Runoff (cfs) - Pre Development condition
Q = CiA
C = Rational Method Runoff Coefficient 0.2
i = rainfall intensity (in./hr.) 0.652
A = Area (acres) 10.25
Q = Runoff (cfs) 1.34
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 21 Area (acre)C FACTOR
Low-Den Residential 2.45 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.08 0.20
ROW 0.78 0.71
Total 3.31
Weighted C21=0.43
Drainage Area 22 Area (acre)C FACTOR
Low-Den Residential 2.69 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.08 0.20
DETENTION POND #4
Stormwater Design Calculations
ROW 2.94 0.71
Total 5.70
Weighted C22=0.53
Drainage Area 25 Area (acre)C FACTOR
Low-Den Residential 0.71 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.39 0.20
ROW 0.00 0.71
Total 1.10
Weighted C25=0.30
Drainage Area 20 Area (acre)C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.00 0.20
ROW 0.14 0.71
Total 0.14
Weighted C20=0.71
Detention Pond #4 Summary
Total Area = 10.25 acres
Weighted C = 0.48
Release = 1.34 cfs
Determine required storage volume (ft 3 ) in detention pond
Duration(min) Duration(hrs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage (ft3)
40 0.67 0.83 4.09 9806 3206 6601
41 0.68 0.82 4.02 9892 3286 6606
42 0.70 0.81 3.96 9975 3366 6609
43 0.72 0.79 3.90 10058 3446 6612
44 0.73 0.78 3.84 10139 3526 6613
45 0.75 0.77 3.78 10219 3607 6613
46 0.77 0.76 3.73 10298 3687 6611
47 0.78 0.75 3.68 10376 3767 6609
48 0.80 0.74 3.63 10453 3847 6606
49 0.82 0.73 3.58 10528 3927 6601
RETENTION POND #1
Stormwater Design Calculations
Calculate required volume
Q = CiA
V=7200Q
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 23 Area (acre) C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 0.96 0.20
ROW 1.03 0.71
Total 1.99
Weighted C23=0.47
Retention Pond #1 Summary
Total Area = 1.99 acres
Weighted C = 0.47
Rainfall intensity = 0.41 in./hr. (C.O.B Design Standards 10-yr, 2-hr storm)
Runoff, Q = 0.4 cfs
Volume, V = 2726 ft3
RETENTION POND #2
Stormwater Design Calculations
Calculate required volume
Q = CiA
V=7200Q
Calculate Weighted C - Post Development condition
ROW Component Width (ft)C FACTOR
Road/C&G/Sidewalk 41 0.95
Landscaping 19 0.2
Total 60
ROW Weighted C=0.71
Drainage Area 19 Area (acre) C FACTOR
Low-Den Residential 0.00 0.35
High-Den Residential 0.00 0.50
Open Space/Park 1.78 0.20
ROW 0.75 0.71
Total 2.53
Weighted C19=0.35
Retention Pond #2 Summary
Total Area = 2.53 acres
Weighted C = 0.35
Rainfall intensity = 0.41 in./hr. (C.O.B Design Standards 10-yr, 2-hr storm)
Runoff, Q = 0.4 cfs
Volume, V = 2624
ft3
Design Report - Page 7 of 8
APPENDIX B
STORMWATER FACILITIES PLAN
Design Report - Page 8 of 8
APPENDIX C
STORM DRAINAGE AREA EXHIBIT –AREA 7
DIAMOND ESTATES SUBDIVISION PHASES
II & III
2006 GASTON ENGINEERING