HomeMy WebLinkAboutAppendix C - Water and Sewer Design Report - Flanders Mill DESIGN REPORT WATER AND SEWER FLANDERS MILL SUBDIVISION Prepared for: Flanders Mill, LLC 235 Greenhills Ranch Road, Bozeman, MT 59718 Prepared by: C&H Engineering and Surveying, Inc. 1091 Stoneridge Drive, Bozeman, MT 59718 (406) 587-1115 Project Number: 13067 April 2014 Design Report - Page 2 of 10 INTRODUCTION The proposed Flanders Mill Subdivision is a major residential subdivision located on a 136.75-acre parcel legally described as Tract 1 of Certificate of Survey No. 2834 located in the East Half of the West Half of Section 3, Township 2 South, Range 5 East of P.M.M., City of Bozeman, Gallatin County, Montana. It is bordered by Baxter Lane to the north, Ferguson Avenue to the east, and Flanders Mill Road to the west. The subdivision will connect to existing City of Bozeman water and sewer mains. The proposed subdivision includes 292 single family lots on 55.33 acres (zoned R-3) and two multi-family lots on 5.42 acres (zoned R-4). This report assumes that the multi-family lots will contain 57 dwelling units assuming 10.4 dwelling units per acre for R-4 zoning (Table V-1, City of Bozeman Design Standards and Specifications Policy). WATER DISTRIBUTION SYSTEM Current water mains and stubs in the area utilized for this project include: the 12-inch ductile iron pipe (DIP) located in Baxter Lane at the north subdivision boundary, the 10-inch DIP in Oak Street at the east central portion of the subdivision, and 8-inch DIP stubs on the west side of Ferguson at the intersections of Moonstone Drive, Sunstone Street, Annie Street, Renova Lane, and Tanzanite Drive. A WaterCAD analysis is enclosed (Appendix A of this report) analyzing all mains installed with this project. The connections to the existing system are modeled as two pumps representing the connections near the south (Ferguson) and north (Baxter) ends of the subdivision with characteristics matching pressure/flow data measured by the City of Bozeman Water Department. Water Distribution System Demands The design parameters used herein are according to the City of Bozeman Design Standards and Specifications Policy (DSSP) dated March 2004. Design Report - Page 3 of 10 Average Daily Residential Usage = 170 gallons per capita per day Average Population Density = 2.11 persons/dwelling unit Minimum Fire Hydrant Flow = 1,500 gpm Residual Pressure Required = 20 psi for Fire Flow Average Day Demand (Peaking Factor = 1.0) Maximum Day Demand (Peaking Factor = 2.3) Peak Hour Demand (Peaking Factor = 3.0) Water Demands (349 dwelling units) Average Day Demand = 349 d.u. x 2.11 persons/d.u. x 170 gpcpd = 125,186 gpd = 86.94 gpm Maximum Day Demand = 7.47 gpm x 2.3 = 199.95 gpm Peak Hour Demand = 7.47 gpm x 3.0 = 260.81 gpm Water Distribution System Hydraulic Analysis A water distribution model was created using WaterCAD Version 6.5 for demand forecasting and describing domestic and fire protection requirements. In order to model the system, each junction node of the water distribution system was assessed a demand based on its service area. The table shown below quantifies the demands placed at the junction nodes and calculates the demands for Average Day, Maximum Day and Peak Hour within the subdivision. The peaking factor for each case is 1.0, 2.3 and 3.0 respectively. Design Report - Page 4 of 10 Static, residual and pitot pressures were measured by the City of Bozeman Water Department for the 8-inch water main in Andalusian Avenue north of Equestrian at Hydrant #2485 and the 8-inch water main stub near the intersection of Ferguson Avenue and Sunstone Street. The measurements at the Ferguson/Sunstone hydrant were taken on the low pressure side of the existing pressure reducing valve (PRV) in Ferguson. The Hydrant Pressure/Flow Result Forms are attached in Appendix A of this report. The results are shown below: JUNCTION NODE # OF UNITS AVG. DAY (GPM) MAX. DAY (GPM) PEAK HOUR (GPM) Design Report - Page 5 of 10 Location Hydrant # Static Pressure Pitot Pressure Residual Pressure Andalusian near Kimberwicke 2485 107# 94# Andalusian 2484 80# (1500 gpm) Ferguson/Sunstone 2278 81# 75# Ferguson/Moonstone 2279 65# (1350 gpm) This flow/pressure information was used to develop relationships between static head and flow at the tie in points. This relationship was simulated in the WaterCAD model using pumps at the connection points. The pumps are connected to reservoirs which act as a source of water. The elevations of the reservoirs are fixed at the elevation of the pumps, which is also equivalent to the elevation of the tie in point. The reservoir does not create any head on the system; the head is generated entirely by the pumps. The input data and the pump curves are included in Appendix A of this report. Water Distribution System Design Summary The model shows that the existing water distribution system provides adequate flow and pressure for the proposed subdivision. The modeled connection point (pump) at Baxter Lane supplied sufficient pressure to the system which forced the modeled connection pump at Ferguson to shut off. The lowest pressure observed in the model was 80.97 psi at Junction #264 near the southwest boundary of the subdivision. The proposed 8-inch and 10-inch DIP water mains provide adequate capacity to serve the development. The flows and pressures within the system for the Peak Hour Demands were generated using WaterCAD and can be found in Appendix A of this report. The capacity of the system to meet fire flow requirements was tested by running a steady state fire flow analysis for all junctions at fire hydrant locations. The model shows that all hydrant junctions satisfy fire flow constraints (residual pressure > 20 psi, flow rate > 1500 gpm), while providing service to lots at peak hour. The results of the analysis at peak hourly flow are given in Appendix A of this report. Design Report - Page 6 of 10 SANITARY SEWER SYSTEM Sewer main lines will be installed in nearly all streets in the subdivision and will connect to two trunk/interceptor mains: the Valley West Trunk Main/Baxter Interceptor and the Ferguson Trunk Main/27th Avenue Cattail Creek Interceptor. Sanitary Sewer Design Load The flow rates used herein are according to the City of Bozeman Design Standards and Specifications Policy, March 2004 (COB DSSP). The peaking factor for the design area is determined by calculating the equivalent population and inserting the population into the Harmon Formula. An 8-inch main is the minimum diameter allowed within the City of Bozeman. The proposed mains within the subdivision will be 8-inch. All new sewer lines shall be sized to flow at no more than 75% of capacity for peak hour conditions. The city average of 2.11 persons per household is used to calculate the equivalent population for the service area. Valley West Trunk Main/Baxter Interceptor Connection: The 18-inch Valley West Trunk Main flows west to east through the portion of the proposed subdivision that lies south of future Oak Street before jogging 360-ft to the north and transitioning to a 21-inch line near the Ferguson/Renova intersection. A majority of the proposed lots south of Oak Street will connect to the Trunk Main with two new manholes, three main connections to existing manholes, and several direct service connections. The equivalent population and assumed infiltration rate for the contributing area is calculated as follows: Equivalent Population: (2.11 persons/d.u.)(92 d.u.) = 194 persons Assumed infiltration rate: (150 gal/acre/day) (30.74 acres) = 4,611 gal/day Total Design Load: The peak flow rate is calculated by multiplying the City's design generation rate of 89 gallons per capita per day by the population, multiplying by the peaking factor, and adding the infiltration rate: Design Report - Page 7 of 10 Harmon Formula: Peaking Factor = (18 + P0.5)/(4 + P0.5) where: P = Population in thousands Peaking Factor = (18 + 0.1940.5)/(4 + 0.1940.5) Peaking Factor = 4.15 Peak Flow Rate: (89 gal/person/day)(194 persons)(4.15) + 4,611 gal/day = 76,356 gal/day = 53.03 gpm (0.1181 cfs) Sanitary Sewer Hydraulic Analysis: The capacity of an 8-inch main is checked using Manning’s Equation: Q = (1.486/n)AR2/3S1/2 For an 8-inch PVC sewer main: Manning's n = 0.013 for PVC Minimum Slope = 0.004 ft/ft A = area = (3.14/4)d 2 = (3.14/4)(8/12)2 = 0.34907 ft2 P = perimeter = 2(3.14)r = 2(3.14)(4/12) = 2.0944 ft R = hydraulic radius = A/P = 0.34907/2.0944 = 0.16667 ft R2/3 = 0.30105 ft S = 0.004 ft/ft S1/2 = 0.0632 ft/ft Qfull = (1.486/0.013)(0.34907)(0.30105)(0.0632) = 0.7592 cfs Q0.75 = (0.75)(0.7592) = 0.5694 cfs > Qpeak = 0.1181 cfs adequate Based on these calculations, an 8-inch sewer main is more than adequate to carry the design flows for the subdivision. According to the 2007 Bozeman Wastewater Facilities Plan, the Baxter Interceptor is flowing at less than 50% capacity for the peak day model. This indicates that the Interceptor has adequate capacity to manage the additional flows from the proposed development. Design Report - Page 8 of 10 Ferguson Trunk Main/27th Avenue Cattail Creek Interceptor Connection: The north part of the proposed subdivision lying north of future Oak Street (including a small portion of the south part) will connect to the existing Ferguson Trunk Main at the intersection of Ferguson Avenue and Tanzanite Drive, and at the Ferguson/Baxter roundabout. The contributing area includes 200 single family lots and 2 multi-family lots (5.5025 acres, zoned R-4). The multi-family lots are assumed to have a total of 57 dwelling units assuming 10.4 dwelling units per acre for R-4 zoning (Table V-1, COB DSSP). Therefore, the total number of contributing dwelling units is 257 (200 + 57). The equivalent population and assumed infiltration rate for the contributing area is calculated as follows: Equivalent Population: (2.11 persons/d.u.)(257 d.u.) = 543 persons Assumed infiltration rate: (150 gal/acre/day) (106.01 acres) = 15,901 gal/day Total Design Load: The peak flow rate is calculated by multiplying the City's design generation rate of 89 gallons per capita per day by the population, multiplying by the peaking factor, and adding the infiltration rate: Harmon Formula: Peaking Factor = (18 + P0.5)/(4 + P0.5) where: P = Population in thousands Peaking Factor = (18 + 0.5430.5)/(4 + 0.5430.5) Peaking Factor = 3.96 Peak Flow Rate: (89 gal/person/day)(543 persons)(3.96) + 15,901 gal/day = 206,976 gal/day = 143.73 gpm (0.3203 cfs) Sanitary Sewer Hydraulic Analysis: The capacity of an 8-inch main is checked using Manning’s Equation: Q = (1.486/n)AR2/3S1/2 Design Report - Page 9 of 10 For an 8-inch PVC sewer main: Manning's n = 0.013 for PVC Minimum Slope = 0.004 ft/ft A = area = (3.14/4)d 2 = (3.14/4)(8/12)2 = 0.34907 ft2 P = perimeter = 2(3.14)r = 2(3.14)(4/12) = 2.0944 ft R = hydraulic radius = A/P = 0.34907/2.0944 = 0.16667 ft R2/3 = 0.30105 ft S = 0.004 ft/ft S1/2 = 0.0632 ft/ft Qfull = (1.486/0.013)(0.34907)(0.30105)(0.0632) = 0.7592 cfs Q0.75 = (0.75)(0.7592) = 0.5694 cfs > Qpeak = 0.3203 cfs adequate Based on these calculations, an 8-inch sewer main is more than adequate to carry the design flows for the subdivision. Downstream from the proposed connection, the Ferguson Trunk Main transitions to an 18-inch line before entering the Baxter Meadows Lift Station. According to the 2007 Bozeman Wastewater Facilities Plan, the Ferguson Trunk Main and the 27th Avenue/Cattail Creek Interceptor are flowing at less than 50% capacity for the peak day model, thus indicating that the lines have adequate capacity downstream from the proposed subdivision. Design Report - Page 10 of 10 APPENDIX A WATERCAD MODEL & COB HYDRANT DATA