Loading...
HomeMy WebLinkAboutFlanders Mill Master Park Plan Final 14_0415 rv1FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.0OVERALLPARK ANDTRAILS PLANSCALE 1:160160'0320'NORTHFLANDERS MILL ENTRANCE CONCEPT4/9/14APRIL 2014OVERALL PARK AND TRAILS PLAN1L1.0 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.1CENTRAL PARK ANDCOMMUNITY CENTERCONCEPT30060'DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLYSCALE 1:304/9/14APRIL 2014 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.2WETLANDPARK50'0100'SCALE 1:50DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY4/9/14APRIL 2014 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.3TRAILS PLANSCALE 1:160160'0320'NORTH4/9/14APRIL 2014N.T.S.TYPICAL OPEN SPACE / STREAM CORRIDOR2L1.3TRAIL PLAN1L1.3SCALE 1:160 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.4PLANTINGPLANSCALE 1:100100'0200'LOCATION KEY4/9/14APRIL 2014 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.5PLANTINGPLAN100'0200'LOCATION KEYSCALE 1:1004/9/14APRIL 2014 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.6PLANTINGPLAN100'0200'LOCATION KEYSCALE 1:1004/9/14APRIL 2014 FLANDERS MILL BOZEMAN, MT FLANDERS MILL PARK PLAN TMS 4/9/14 FLANDERS FLANDERS c://design5/clients CHECKED BY: FILE: DATE: PROJECT: DIR:L1.7IRRIGTIONPLANAPRIL 2014SCALE 1:1010'020'NORTH VALVEEVENLY SPACEDSPRAY NOZZLES W/HEAD-TO-HEADCOVERAGEIRRIGATION MAIN LINE TOSUPPLY WELLIRRIGATION CONCEPT (FOR DESIGN INTENT ONLY; FINAL DESIGN AND AS-BUILTS BY CONTRACTOR)1L1.7