Loading...
HomeMy WebLinkAboutE- Packet 06-11-2007_Approve Final Plat of Valley West Phase 3D_8 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Tim Cooper, Assistant City Attorney Chris Kukulski, City Manager SUBJECT: Valley West Phase 3D Subdivision Final Plat MEETING DATE: Ju 17, 2006 BACKGROUND: This is a request for approval of a Subdivision Final Plat to subdivide approximately 32 acres into 105 mixed density residential lots on property located within Valley West Planned Unit Development. At the June 6, 2005 public hearing, the City Commission voted to approve the Valley West Phase 3 Subdivision Preliminary Plat with thirty-two conditions. The applicant has applied for final plat approval and staff has concluded all terms and conditions of preliminary plat approval have been met. State law provides that the governing body shall approve the plat only if: a) The plat conforms to the conditions of approval set forth on the preliminary plat and to the terms of the state subdivision law and regulations and the regulations adopted by the Bozeman City Commission; and b) The County Treasurer has certified that all real property taxes and special assessments assessed and levied on the land to subdivide have been paid. The County Treasurer has certified that the taxes and special assessments have been paid. Attached is a memorandum from Brian Krueger, Associate Planner, delineating how the conditions of preliminary plat approval have been satisfied. RECOMMENDATION: Upon the Director of Public Service’s review and concurrence, the City Commission approves the Final Plat of Valley West Phase 3D Subdivision, and authorizes the Director of Public Service to execute the same on behalf of the City of Bozeman. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the property. ALTERNATIVES: As suggested by the City Commission Respectfully submitted, _________________________________ ____________________________ Tim Cooper, Assistant City Attorney Chris Kukulski, City Manager Attachments: Review Memo to Tim Cooper, dated May 18, 2007. 43 planning • zoning • subdivision review • annexation • historic preservation • housing • grant administration • neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net Memorandum ____________________________________________________________________________________ To: Tim Cooper, Staff Attorney From: Brian Krueger, Associate Planner Date: May 18, 2007 Re: Valley West Phase 3D Final Plat, #P-06036 ____________________________________________________________________________________ Attached, please find a paper copy of the above referenced subdivision, the Original Platting Certificate, four (4) signed mylars, and the full 3-ring binder with additional required Final Plat submittal information. On June 6, 2005, the City Commission granted preliminary plat approval for Phase 3 of the Valley West Planned Unit Development Subdivision, as submitted by Bozeman Lakes, LLC and Aspen Enterprises, LLC, represented by Morrison-Maierle, Inc, subject to 32 conditions and five code provisions. The Findings of Fact and Order were signed on July 18, 2005. Based on the following review of the conditions of preliminary plat approval, Planning Staff finds that all conditions of approval have been met. Conditions of Approval: 1. The following plat note shall be included on the Final Plat: “Lots 214A – 219D are approved to allow attached townhouses or detached single household residences. These lots are smaller than the standards set forth by the Unified Development Ordinance for single household residences and were approved with relaxations as part of the Planned Unit Development. Please refer to the Second Amended and Restated Declaration of Protective Covenants and Restrictions for Valley West to determine setback requirements.” The lots referenced in this condition are not part of Phase 3D. 2. The Final Plat shall be revised to clarify that Accessory Dwelling Units/Auxiliary Apartments are not allowed on Restricted Size Lots (RSLs). See plat note #6 on sheet 1. 3. A declaration of the most recent covenants, with the corrections outlined by Staff, for Valley West Planned Unit Development must be included and recorded with the Final Plat for Phase 3. The City of Bozeman shall be party to any changes or modifications made to the restrictive covenants and Architectural Guidelines as they relate to any zoning and/or planning bylaws. The covenants were recorded with the Phase 3A and the supplementary setback chart will be recorded with Phase 3D. 4. The Final Plat shall indicate acreages for all remainder tracts and shall include the following plat note: “Applicant shall provide evidence that all original tracts of record of this property are or through this subdivision will become remainder tracts of less than 160 acres were not created for the purpose of transfer, and that any subsequent transfer of said tracts may not occur prior to filing of a subdivision plat or certificate of survey reviewed and approved by the City of Bozeman.” An 44 Page 2 affidavit, subject to review and approval by City legal staff, must also be submitted with the Final Plat. No remainder tracts are included in Phase 3D. 5. Water rights, or cash-in-lieu thereof, shall be provided and paid for prior to final plat approval. If the final plat of the subdivision is filed in phases, water rights will only be required for each phase as the final plat for that phase is filed. The amount of water rights required will be determined by the Director of Public Service based on the proposed final plat(s). Water rights in the amount of $29,117.53 have been paid for Phase 3D. 6. The dedicated parkland shall be identified as “Public Park” on the final plat and the common open space access strips and pocket parks shall be overlaid with a public access easement. Provisions within the covenants shall provide for the care and maintenance of these areas, which will ensure usability for the homeowners and general public. Parkland has been designated as “Public Park” See sheet 2 of 3. The open space areas have a public access easement, but will be maintained by the Homeowner’s Association as stated in plat note #9 on sheet 1. 7. Buildings proposed for construction with crawl spaces or basements shall include Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods to be submitted with each Building Permit. The final plat shall include a notation that due to high ground water conditions full or partial basements are not recommended. See plat note #8 on sheet 1. 8. The trail north of Meyers Lake shall extend north to connect to Durston Road. The section of park referenced in this condition is included in Phase 3D and is planned to be improved with a trail as shown in the landscaping plans. The improvements agreement includes a line item for trail construction. 9. The Superintendent of Public Facilities and Lands shall review and approve of the language in the Declaration of Protective Covenants and Restrictions for Valley West, particularly Article I “Definitions” and Article X “Open Space and Common Areas.” Further, the Declaration shall include language approve by the Superintendent to assure completion of parkland facilities and trails in the Valley West Park Master Plan and allowing the City of Bozeman, if necessary, to become a party to assessments for such completion and maintenance. The master parks plan has been approved. 10. Storm Water Master Plan: A Stormwater Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease, and other pollutants from the runoff from the private and public streets and all lots has been provided to the City Engineer. The applicant is advised that although the general storm drainage and grading concept has been reviewed, the submitted data will be subject to further review as part of the infrastructure plan and specification review process. The Engineering Division has approved the Stormwater Master Plan. 11. Stormwater generated by the proposed subdivision shall not be discharged into an irrigation ditch. The applicants were granted approval with the initial PUD and have obtained written permission from the Maynard-Border Pipeline Group. See Section 11 of the Final Plat submittal materials. 12. The final plat must account for the ditch and the utility/drainage ditch easement along Ferguson 45 Page 3 Avenue. A drainage easement is provided along Ferguson Avenue. See Sheet 3 of 3. 13. The Developer's engineer has provided a comprehensive Design Report evaluating existing capacity of water and sewer utilities for the entire Valley West PUD. Detailed review and approval of the Design Report will be required as part of the infrastructure plan and specification review and approval process. The Engineering Division has reviewed and approved the comprehensive design report. 14. The location of and distinction between existing and proposed sewer and water mains and all easements shall be clearly and accurately depicted on the plans and specs, as well as all nearby fire hydrants and proposed fire hydrants. Existing and proposed water and sewer main, hyrdrants, and corresponding easements are so noted on the plat and the plans and specifications. 15. Any easements needed for the water and sewer main extensions shall be a minimum of 30 feet in width. While the final location of the water and sewer mains will be determined once the final street widths are approved, in no case shall the utility be less than 10 feet from the edge of the easement. All necessary easements shall be provided prior to final plat approval and shall be shown on the plat. Wherever water and/or sewer mains are not located under or accessed from improved streets, a 12 foot wide all weather access drive shall be constructed above the utilities to provide necessary access. All water and sewer main easements are a minimum of 30 feet in width. The plans and specifications have been approved. 16. Plans and Specifications for water and sewer main extensions, prepared and signed by a Professional Engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by the Montana Department of Environmental Quality. The applicant shall also provide Professional Engineering services for Construction Inspection, Post-Construction Certification, and preparation of mylar Record Drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. No building permits shall be issued prior to City acceptance of the required infrastructure improvements. The plans and specifications have been approved. 17. Any public street rights of way which are within the boundaries of this subdivision and for which easements were provided with the Valley West Annexation Agreement shall be dedicated to the City on the Final Plat for this subdivision. The applicant shall also dedicate any public streets within the development. This condition is not applicable to this phase. 18. Street names must be approved by the City Engineer and county road office prior to final plat approval. The proposed street names are acceptable with the following exceptions: a. “East” is to be deleted from East Perry Street b. Foster Street should not be used as there is a Foster Lane in the county. East has been deleted from East Perry Street. Foster Street has been changed to Bembrick Street, see Sheet 2. Street names have been approved by the City Engineer and accepted by the County Road Office. 19. The final plat shall contain a note prohibiting direct access from single family or duplex lots to Cottonwood Road, Durston Road, and Ferguson Avenue. 46 Page 4 The final plat includes a 1 foot vehicular no access easement for single family and duplex lots fronting Cottonwood Road, Durston Road, and Ferguson Avenue. See plat note #4 on Sheet 1 of the Final Plat. 20. City standard curb, gutter and sidewalk shall be provided along all streets in the subdivision. Per Chapter 18.44.080 of the Unified Development Ordinance, sidewalks will be installed prior to occupancy of any individual lots. The improvements agreement and financial guarantee ensure that sidewalks will be completed within the required time frames. 21. The applicant is advised that the installation of any traffic calming devices such as curb bulbs and traffic circles will be considered in detail and approved if appropriate during the infrastructure plan and specification review process. The traffic calming devices have been reviewed and approved by the Engineering Division as part of the plan and specification review process. 22. All typical street sections, including sidewalk location within the right-of-way and provisions for bicyclists shall be in conformance with the street standards recommended in the Greater Bozeman Area Transportation Plan, 2001 Update, unless otherwise approved by the City Commission, or by the City Engineer through the plan and specification review and approval process. The Engineering Division has approved the street sections. 23. Plans and Specifications for streets and storm drainage facilities, prepared and signed by a Professional Engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. The applicant shall also provide Professional Engineering services for Construction Inspection, Post-Construction Certification, and preparation of mylar Record Drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. No building permits shall be issued prior to City acceptance of the required infrastructure improvements. The Engineering Division has approved the plans and specifications. 24. Sidewalk shall be installed along Ferguson Avenue as part of the Phase 3 subdivision improvements. The installation of sidewalk along Ferguson Avenue shall be guaranteed per the Improvements agreements. 25. The Engineering Division recommends that the east half of Cottonwood Road, from Durston Road to Huffine Lane, be improved to a full principal arterial standard as a part of this development. The Valley West lots are already encumbered with Special Improvement Districts (SID). The Cottonwood Road improvements are to be complete prior to filing the final plat of any phase west of Cottonwood Road. Non-applicable – this phase is east of Cottonwood Road. 26. The applicant is advised that Durston Road, from Cottonwood Road to Ferguson Road, shall be improved, as part of this development, to one half of a minor arterial standard and shall match the section built by Laurel Glen. City standard sidewalk, curb and gutter will be required in the standard location on the development’s side of the street. Detailed review of the street and intersection design, and approval by the City Engineer will be required as part of the infrastructure plan and specification review process. The Durston Road improvements are to be complete prior to filing the final plat of any phase adjacent to Durston Road. 47 Page 5 Durston Road, between Cottonwoood Road and Ferguson Avenue, has been approved by the Engineering Division as part of Phase #3 plans and specifications. Construction of Durston Road is substantially complete. 27. The applicant is advised that building permits may not be issued, in accordance with the following conditions that have been made to recent subdivisions in the vicinity of Durston Road: a. Building Permits may be issued for no more than 35 54% (Sub-phases a, b, e, and f) of the subdivision, not to exceed 15.8 24.8 net acres, as soon as September 15, 2005 provided Babcock Street or Durston Road improvements are substantially completed (“the road is being used”) and all other requirements for the issuance of a building permit have been met (i.e., completion and acceptance of necessary infrastructure improvements and the final plat). b. No building permits will be issued for the remaining 65 46% of the subdivision until the construction contract for improvements to Durston Road from N. 19th Avenue to approximately Fowler Avenue has been awarded. West Babcock Street was opened on November 10, 2005. The construction contract for improvements to Durston Road has been awarded and construction is substantially complete. 28. An update of the detailed Traffic Impact Analysis prepared by a qualified Traffic Engineer registered in the State of Montana has been provided to the City Engineer. The update shall address level of service evaluations for the following intersections: Cottonwood Road/Huffine Lane and Ferguson Road/Huffine Lane. The Report shall include recommendations for any necessary off-site roadway improvements. Detailed review and approval of the Traffic Impact Analysis will be required as part of the infrastructure plan and specification review and approval process. The Traffic Impact Analysis has been reviewed and approved by the Engineering Division. 29. If an easement can be obtained for Eneboe Ave and Foster Street, adjacent to the undeveloped property, the entire street section exclusive of the sidewalk on the adjoining property shall be constructed. If the easement cannot be obtained, curb, gutter, standard boulevard, and sidewalk on the Valley West side, along with a minimum pavement width of 24-feet shall be installed. Copies of the recorded easements have been provided. 30. The location of mailboxes shall be coordinated with the City Engineering Department prior to their installation. Mailbox location information is included with the Final Plat and has been coordinated with the Engineering Division and the USPS. 31. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to plan and specification approval. All 404 and 310 permits are in place for the PUD. 32. If construction activities related to the project result in the disturbance of more than 1 acre of natural ground, an erosion/sediment control plan may be required. The Montana Department of Environmental Quality may need to be contacted by the Applicant to determine if a Stormwater Discharge Permit is necessary. If a permit is required by the State, the Developer shall demonstrate to the City full permit compliance. A Stormwater Discharge Permit from the Montana Department of Environmental Quality was obtained for this project and is included in Section 32 of the Final Plat submittal materials. 48 Page 6 Code Provisions: (a) The Final Plat must be in compliance with all requirements of the UDO including Section 18.06.060 “Final Plat Application,” including, but not limited to the following item: per Section, 18.06.040.D.6, the Final Plat must be submitted within three (3) years for multi-phased major subdivisions. The Final Plat applications were submitted within the required time period. (b) The Final Plat must be in compliance with all requirements of the UDO including Chapter 18.42 “Development Standards” including, but not limited to the following items: i Section 18.42.060.B requires all utility easements to be noted on the Final Plat. ii Section 18.42.150.C.6 requires bollard style lights to be installed at all pathway intersections with streets. A cut sheet for the light shall be submitted to the Planning Office for approval prior to installation. All utility easements are noted on the Final Plat and an SILD has been submitted to the City. (c) The Final Plat must be in compliance with all requirements of the UDO including Chapter 18.48 “Landscaping” including, but not limited to the following item: Section 18.48.070 requires that the developer install vegetative ground cover, boulevard trees and an irrigation system in the public right-of-way boulevard strips along all external perimeter development streets and adjacent to public parks or other open space areas. The master parks plan has been approved and improvements related to landscaping are included in the Improvements Agreement and the financial guarantee. (d) The Final Plat must be in compliance with all requirements of the UDO including Chapter 18.50 “Park & Recreation Requirements” including, but not limited to the following item: i Based on Section 18.50.080 the subdivider must decide on the improvements to be completed by the subdivider prior Final Park Plan approval. ii Section 18.50.110 requires pathways to be maintained by the developer in conformance with the approved maintenance plan until 50% of the lots are sold. Thereafter the Homeowners Association is responsible for pathway maintenance. Plans and Specifications for the trail will need to be reviewed by the Parks Department prior to construction. The master parks plan has been approved. (e) The Final Plat must be in compliance with all requirements of the UDO including Section 18.78.070 “Final Plat,” including, but not limited to the following item: i. Per Section 18.78.070.D, Final Park Plan, the Park Plan must be approved by the City Commission prior to Final Plat approval. ii. Section 18.78.070.C states that a Memorandum of Understanding shall be entered into by the Weed Control District and the subdivider for the control of county declared noxious weeds and a copy provided to the Planning Department prior to Final Plat approval. iii. The final plat submittal shall include all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The final plat application shall include four (4) signed reproducible copies on a stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high density 3½-inch floppy disk or compact disk; and five (5) paper prints. Again, the master parks plan has been approved. A copy of the MOU is included in Section (e) of the Final Plat submittal materials. 49 Page 7 Please prepare a City Attorney’s Certificate using the attached original copy of the Platting Certificate and approve the certificates as to form. If you find this submittal acceptable, please place it as a consent item on the next available City Commission Agenda. The complete plat was submitted on April 20, 2007; therefore, the 45-working day review period ends on June 22, 2007. If you need additional information or have questions regarding any of the documentation, please feel free to contact me. Attachments: Four (4) signed Mylars of Final Plat Original Platting Certificate Full Final Plat Submittal (3-ring binder) – Please return binder for our files. One paper copy of Final Plat (in binder) CC: Debbie Arkell, Director of Public Service (with paper copy of plat) (note: A. Kerr has checked for closure) Deanna Shannon, SID Accounting Clerk Brit Fontenot, Clerk of Commission (with paper copy of plat) Donald Meyers, Bozeman Lakes, LLC & Aspen Enterprises, LLC, 2415 East Camelback, Suite 900, Phoenix AZ 85016 Greg Stratton, Valley West, 25A Clifden Drive, Bozeman MT 59718 Morrison – Maierle, Inc., c/o Kevin Jacobsen, P.O. Box 1113, Bozeman, MT 59718 Intrinsik Architecture, 428 East Mendenhall, Bozeman, MT 59715 50 51 52 53