HomeMy WebLinkAboutE- Packet 06-04-2007_Authorize the City Manager to sign Amendment No_ 2_9 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: Wastewater Facility Plan Update MEETING DATE: 6/4/07 BACKGROUND: Attached is a copy of the partially executed Amendment No. 2 with Morrison Maierle, Inc. for Professional Engineering Services for the above referenced project. The document is in the City’s standard format. During the course of the project, a few items were added that were not included in the original scope. We are attempting to close out the contract and we need to take care of these items in order to do so. Reviewing the type of disinfection system that will be used in the new plant was not originally included because it was being covered by a separate contract. That contract was canceled, so the effort had to be transferred here. Also, the original contract only anticipated two public meetings, and in the end it required three to get the plan adopted. This amendment reflects the effort associated with those two items. The proposed fee of $5,000.00 appears to be commensurate with the items complexity and level of effort expended. RECOMMENDATION: Authorize City Manager to sign. FISCAL EFFECTS: This project will be paid for from the Wastewater Fund. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Amendment No. 2 Report compiled on 5/30/2007 128 129 130