Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Chris Kukulski, City Manager
SUBJECT: Wastewater Facility Plan Update
MEETING DATE: 6/4/07
BACKGROUND: Attached is a copy of the partially executed Amendment No. 2 with Morrison
Maierle, Inc. for Professional Engineering Services for the above referenced project.
The document is in the City’s standard format. During the course of the project, a few items were added
that were not included in the original scope. We are attempting to close out the contract and we need to
take care of these items in order to do so. Reviewing the type of disinfection system that will be used in
the new plant was not originally included because it was being covered by a separate contract. That
contract was canceled, so the effort had to be transferred here. Also, the original contract only anticipated
two public meetings, and in the end it required three to get the plan adopted. This amendment reflects the
effort associated with those two items. The proposed fee of $5,000.00 appears to be commensurate with
the items complexity and level of effort expended.
RECOMMENDATION: Authorize City Manager to sign.
FISCAL EFFECTS: This project will be paid for from the Wastewater Fund.
ALTERNATIVES: As suggested by the City Commission.
Respectfully submitted,
_________________________________ ____________________________
Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager
Attachments: Amendment No. 2
Report compiled on 5/30/2007