HomeMy WebLinkAboutE- Packet 06-04-2007_Approve the Award of CTEP Project STPE 1299(11), H_11 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Sara Folger Chris Kukulski, City Manager SUBJECT: CTEP Project Construction Contract Award MEETING DATE: June 4, 2007 BACKGROUND: On May 9, 2007 sealed bids were opened for the CTEP project STPE 1299(11), Historic School Rehab – Bozeman, referred to as the East Willson School Re-Roof project. This was the second advertised bid for the project, as no bids were received during the first bid period in April. Two bids were received for the project, one from a Belgrade roofing contractor and one from a Missoula contractor. The Missoula firm is the apparent low bidder. I request permission to award the contract for this project to Mark Buck Construction, Inc. for the bid amount of $216,840.00. The CTEP program allows for funding this type of project because of the building’s location on a state highway and its historic status. The E. Willson project has been “on the books” since 2000. Three design iterations and rising cost issues have created long delays in project implementation. In December 2006 the Bozeman School District agreed to make a significant contribution toward completion of the project, and the design consultant, ThinkOne Architects, has donated the bulk of its services for design and construction adminsitration. The roof of the building, constructed around 1905, is leaking and the interior is suffering significant water damage. The objective of this CTEP project is to halt the water damage so that potential re-use of the building becomes more feasible. RECOMMENDATION: Authorize the City Manager to award the construction contract for the East Willson Roof Rehab CTEP project to the apparent low bidder, Mark Buck Construction, Inc. of Missoula, Montana. FISCAL EFFECTS: The original CTEP budget of $136,000.00 for the project has not been modified by the School District’s contribution. Thus the City’s 13.42% match amount applies to the original CTEP budget, or $18,251.00. The School District has pledged additional funds 136 up to $90,000.00 to complete the project, which will prevent the City from having to use “unallocated” CTEP funds to complete construction. ALTERNATIVES: As suggested by the Commission. Respectfully submitted, _________________________________ ____________________________ Sara Folger, Grants Administrator / Chris A. Kukulski, City Manager CTEP Coordinator Report compiled on May 29, 2007 137 NOTICE OF AWARD Dated: June 4, 2007 To: Mark Buck Construction, Inc. 4900 Mallard Way Missoula, MT 59808 CONTRACT: Historic School Rehab – Bozeman STPE 1299(11) CN 4524 PROJECT: Community Transportation Enhancement Program project named: Historic School Rehab – East Willson School Roof Repair- Bozeman. OWNER”S Contract No. CTEP Project No. STPE 1299(11) CN 4524 You are notified that your Bid dated May 7th, 2007 for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a contract for the Historic School Rehab – Bozeman. The contract Price of your contract is Two Hundred Sixteen Thousand, Eight-Hundred Forty Dollars exactly. You must comply with the following conditions precedent within fifteen days of the date of this Notice of Award, that is by June 20, 2007: 1. Deliver with the executed Contract documents the Contractor’s Performance Bond, Payment Bond, and certificates of insurance as specified in the Instructions to Bidders (Article 18 and Article 19). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award, and to declare your Bid security forfeited. You are required to return an acknowledged copy of this Notice of Award to the Owner. Dated this ___4th_________ day of ____June________, 2007. City of Bozeman Owner By___________________________________ Title City Manager ACCEPTANCE OF NOTICE Receipt of the above NOTICE OF AWARD is hereby acknowledged By________________________________________________ This _________ day of ______________, 2007. By ________________________________________________ Title _______________________________________________ 138