BACKGROUND: Representative Allied Engineering submitted a Site Plan application, to allow
the construction of four 5,000 square foot buildings and one 4,000 square foot building for retail
and office uses with related site improvements at 2000 South 3rd Avenue, zoned "B-1"
(Neighborhood Business District). Vehicular access to the site would be provided by two accesses
one along South 3rd Avenue and one along Kagy Boulevard.
Both the Development Review Committee (DRC) and staff recommend overall conditional
approval of this application with the conditions and code provisions outlined in the staff report.
The code provisions are on pages 3-6 and the conditions are on pages 12 and 13 of the staff report.
UNRESOLVED ISSUES: The Department of Planning is not aware of any unresolved issues for
the proposed development at this time.
FISCAL EFFECTS: The Department of Planning is not aware of any fiscal effects for the
proposed development at this time.
ALTERNATIVES: As suggested by the City Commission.
CONTACT: Please email Brian Krueger at bkrueger@bozeman.net if you have any questions prior
to the public hearing.
APPROVED BY: Andrew Epple, Planning Director
Chris Kukulski, City Manager
73
CITY COMMISSION STAFF REPORT
SOUTH TOWNE SQUARE SITE PLAN FILE NO. #Z-07051
#Z-07051 South Towne Square Site Plan Staff Report 1
Item: Zoning Application #Z-07051, a Site Plan Application to allow the
construction of four 5,000 square foot buildings and one 4,000 square
foot building for retail and office uses with related site improvements
at 2000 South 3rd Avenue, zoned "B-1" (Neighborhood Business
District).
Owner/Applicant: Kailo Design and Development, LLC.
9350 Walker Road
Belgrade, MT 59714
Representative: Allied Engineering Services, Inc.
32 Discovery Drive
Bozeman, MT 59718
Date: Before the Bozeman City Commission on Monday, May 14, 2007 at 6
pm in the Community Room, Gallatin County Courthouse, 311 West
Main Street, Bozeman Montana,
Report By: Brian Krueger, Associate Planner
Recommendation: Conditional Approval
____________________________________________________________________________________
PROJECT LOCATION
The subject property is generally located at 2000 S. 3rd Avenue and is legally described as Lot 3, Block 4 of
Thompson’s Addition #3 Subdivision, SW ¼ Sec. 18 Township 2S, Range 6E, PMM, City of Bozeman,
Gallatin County, Montana.
The property is zoned B-1 (Neighborhood Business District).
Please refer to the vicinity map provided on Page 2.
74
PROPOSAL
The property owner Kailo Design and Development, LLC, represented by Allied Engineering Services, Inc.,
have made application for a Site Plan to allow the construction of five commercial buildings for mixed uses
with related site improvements on approximately 4.97 acres at 2000 South 3rd Avenue.
The main ingress and egress to the property is from accesses from Kagy Boulevard and South 3rd Avenue.
On March 28, 2007 the Development Review Committee (DRC) recommended conditional approval of this
application. Their recommended conditions and comments are included in this report.
ZONING DESIGNATION & LAND USES
The subject property is zoned B-1 (Neighborhood Business District). The intent of the B-1 district is to
provide for smaller scale retail and service activities frequently required by neighborhood residents on a day
to day basis, as well as residential development as a secondary purpose, while still maintaining compatibility
with adjacent residential uses. Development scale and pedestrian orientation are important elements of this
district. The following land uses and zoning are adjacent to the subject property:
North: Kagy Corner and other neighborhood business uses, zoned B-1 (Neighborhood Business
District). Single Household residential, zoned R-1 (Residential Single Household, Low
Density District).
South: Single Household residential, zoned R-1 (Residential Single Household, Low Density
District).
East: Single Household residential, zoned R-1 (Residential Single Household, Low Density
District).
#Z-07051 South Towne Square Site Plan Staff Report 2 75
West: Museum of the Rockies, annexed and zoned PLI (Public Lands and Institutions District) and
open space, not annexed and under County jurisdiction.
ADOPTED GROWTH POLICY DESIGNATION
The subject property is designated as Neighborhood Commercial in the Bozeman 2020 Community Plan.
This category is the smallest scale of the commercial land use designations and is oriented at serving the
needs of the neighborhood. This category is typified by smaller scale shops and services and a high level of
pedestrian, bicycle, and transit opportunities. Neighborhood Commercial centers are intended to support
and help give identity to individual neighborhoods by providing a visible and distinctive focal point.
North: Existing single household residential and neighborhood commercial, designated
Neighborhood Commercial and Residential.
South: Existing single household residential, designated Residential.
East: Existing single household residential, designated Residential.
West: Museum of the Rockies and open space, designated Public Institutions.
REVIEW CRITERIA & STAFF FINDINGS
Section 18.34 “Site Plan and Master Site Plan Review Criteria”
In considering applications for site plan approval under this title, the Planning Director, City Commission,
DRC, and when appropriate, the ADR Staff, the DRB or WRB shall consider the following:
1. Conformance to and consistency with the City’s adopted growth policy
The development proposal is in conformance with the Bozeman 2020 Community Plan including the
“Neighborhood Commercial” classification. This category is typified by smaller scale shops and services
and a high level of pedestrian, bicycle, and transit opportunities. Neighborhood Commercial centers are
intended to support and help give identity to individual neighborhoods by providing a visible and
distinctive focal point. The proposal is in conformance and consistent with this designation.
2. Conformance to this title, including the cessation of any current violations
The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful
requirements of the Bozeman Municipal Code or state law. The following code provisions must be
addressed prior to Final Site Plan approval:
a. Section 18.34.130 requires the applicant to submit seven (7) copies a Final Site Plan within 6 months
of preliminary approval containing all of the conditions, corrections and modifications to be
reviewed and approved by the Planning Office.
• If occupancy of any structure is to occur prior to the installation of all required on-site
improvements, the Improvements Agreement must be secured by a method of security equal to
one and one-half times the amount of the estimated cost of the scheduled improvements not yet
installed. Said method of security shall be valid for a period of not less than twelve (12) months;
#Z-07051 South Towne Square Site Plan Staff Report 3 76
however, the applicant shall complete all on-site improvements within nine (9) months of
occupancy to avoid default on the method of security.
b. Section 18.34.140 states that a Building Permit must be obtained prior to the work, and must be
obtained within one year of Final Site Plan approval. Building Permits will not be issued until the
Final Site Plan is approved.
c. Section 18.38.050.F requires all mechanical equipment to be screened. Rooftop equipment should
be incorporated into the roof form and ground mounted equipment shall be screened with walls,
fencing or plant materials.
d. Section 18.42.130 requires all fences to be maintained with the finished side out. All fence details
shall be noted in the final site plan.
e. Section 18.42.170 requires the size of the trash receptacle to be appropriately sized for the use and
approved by the City Sanitation Department. Accommodations for recyclables must also be
considered. All receptacles shall be located inside of an approved trash enclosure. A copy of the
site plan, indicating the location of the trash enclosure, dimensions of the receptacle and enclosure
and details of the materials used, shall be sent to and approved in writing by the City Sanitation
Division (phone: 586-3258) prior to final site plan approval.
f. Sections 18.42.150 requires a lighting plan for all on-site lighting including wall-mounted lights on
the building must be included in the final site plan submittal. Lighting cut-sheets shall be provided
with the final site plan. Light standards may not exceed a height of twenty (20) feet from finish
grade.
g. Section 18.42.150.D.7.e requires that all outdoor lighting shall be designed and located such that the
maximum illumination measured in footcandles at the property line shall not exceed 0.3 onto
adjacent residential properties.
h. Section 18.42.150.D.7.c requires that except for residential lights, street lighting, pathway
intersection lighting and security lighting, all lighting shall be turned off between 11:00p.m. and
6:00a.m. Exceptions shall be granted to those businesses which operate during these hours; such
lighting may remain illuminated only while the establishment is actually open for business.
i. Section 18.48.050.C, 18.48.050.E, 18.48.060 and 18.78.100.C state that the final landscape plan must
meet all of the minimum landscape standards, fulfill the necessary points and be signed and certified
by a landscape professional.
j. Section 18.46.040.D states that disabled accessible spaces shall be located as near as practical to a
primary entrance. Parking spaces and access aisles shall be level with slopes not exceeding 1:50 in all
directions. Raised signs shall be located at a distance no greater than five feet from the front of each
accessible space and shall state “Permit Required $100 Fine”. One of the disabled accessible spaces
shall also be signed “Van Accessible”. The “Van Accessible” space shall be 8 feet wide with an 8
foot wide striped unloading aisle/ramp.
k. Section 18.52.060 outlines the amount of permitted signage for the property. A Sign Permit shall be
reviewed and approved by the Planning Office prior to the construction and installation of any on-
site signage.
#Z-07051 South Towne Square Site Plan Staff Report 4 77
l. Section 18.52.070 requires that a comprehensive signage plan be submitted for all commercial,
office, industrial, and civic uses consisting of two or more tenant or occupant spaces on a lot.
m. A final copy of the covenants, restrictions, and articles of incorporation, with language that indicates
that the lot is included in the property owner’s association, shall be submitted with the final site plan
application for review and approval by the Planning Department and shall contain, but not be
limited to, provisions for assessment, maintenance, repair and upkeep of common open space areas,
public parkland/open space corridors, stormwater facilities, public trails, snow removal, and other
areas common to the association pursuant to Chapter 18.72 of the Bozeman Unified Development
Ordinance.
n. The FSP shall be adequately dimensioned.
o. A Storm Water Drainage/Treatment Grading Plan and Maintenance Plan for a system designed to
remove solids, silt, oils, grease, and other pollutants must be provided to and approved by the City
Engineer. The plan must demonstrate adequate site drainage (including sufficient spot elevations),
storm water detention/retention basin details (including basin sizing and discharge calculations, and
discharge structure details), storm water discharge destination, and a storm water maintenance plan.
p. A storm water easement must be established on the adjacent property and filed with the County
Clerk and Recorder's Office for the retention pond and discharge course if located off the subject
property.
q. Plans and specifications for any water, sewer and/or storm sewer main extensions, and Public or
Private Streets (including curb, gutter & sidewalks) prepared by a Professional Engineer (PE) shall
be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by
the Montana Department of Environmental Quality. The applicant shall also provide Professional
Engineering services for construction inspection, post-construction certification, and preparation of
mylar record drawings. Specific comments regarding the existing and proposed infrastructure shall
be provided at that time. Construction shall not be initiated on the public infrastructure
improvements until the plans and specifications have been approved and a pre-construction
conference has been conducted.
No building permits will be issued prior to City acceptance of the infrastructure
improvements, unless all of the requirements for 18.74.030.C.1.b are met to allow for
concurrent construction.
r. Plans and Specifications for any fire service line must be prepared in accordance with the City's Fire
Service Line Policy by a Professional Engineer (PE), and be provided to and approved by the City
Engineer prior to initiation of construction of the fire service or fire protection system. The
applicant shall also provide Professional Engineering services for construction inspection, post-
construction certification, and preparation of mylar record drawings.
s. Easements for the water and sewer main extensions shall be a minimum of 30 feet in width, with the
utility located in the center of the easement. In no case shall the utility be less than 10 feet from
edge of easement.
t. Sewer and water services shall be shown on the FSP and approved by the Water/Sewer
Superintendent. City of Bozeman applications for service shall be completed by the applicant.
u. The location of existing water and sewer mains shall be properly depicted, as well as nearby fire
#Z-07051 South Towne Square Site Plan Staff Report 5 78
hydrants. Proposed main extensions shall be labeled "proposed".
v. The drive approach shall be constructed in accordance with the City's standard approach (i.e.,
concrete apron, sidewalk section and drop-curb) and shown as such on the FSP. A City Curb Cut
and Sidewalk Permit shall be obtained prior to FSP approval.
w. City standard sidewalk shall be installed and properly depicted at the standard location (i.e., 1 foot
off property line) along the street(s) frontage. Any deviation to the standard alignment or location
must be approved by the City Engineer.
x. Typical curb details (i.e., raised and/or drop curbs) and typical asphalt paving section detail shall be
provided to and approved by the City Engineer. Concrete curbing shall be provided around the
entire new parking lot perimeter and adequately identified on the FSP.
y. Flood plain:
a) A Flood Plain Development Permit must be obtained from the City Engineer prior to any
construction taking place within the delineated 100 year floodplain.
b) The 100 year flood plain boundary and flood elevations must be depicted on the FSP.
z. The Montana Fish, Wildlife & Parks, SCS, Montana Department of Environmental Quality and
Army Corps of Engineer's shall be contacted regarding the proposed project and any required
permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to FSP approval.
aa. All existing utility and other easements must be shown on the FSP.
bb. Adequate snow storage area must be designated outside the sight triangles, but on the subject
property (unless a snow storage easement is obtained for a location off the property and filed with
the County Clerk and Recorder's office).
cc. Drive approach and public street intersection sight triangles shall be free of plantings which at
mature growth will obscure vision within the sight triangle.
dd. If construction activities related to the project result in the disturbance of more that 1 acre of natural
ground, an erosion/sediment control plan may be required. The Montana Department of
Environmental Quality, Water Quality Bureau, shall be contacted by the Applicant to determine if a
Storm Water Discharge Permit is necessary. If required by the WQB, an erosion/sediment control
plan shall be prepared for disturbed areas of 1 acre or less if the point of discharge is less than 100'
from State Waters.
ee. The applicant shall submit a construction route map dictating how materials and heavy equipment
will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified
Development Ordinance. This shall be submitted as part of the final site plan for site developments,
or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to
ensure that the construction traffic follows the approved routes.
ff. All construction activities shall comply with section 18.74.020.A.2. of the Unified Development
Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent
streets. The City may require a guarantee as allowed for under this section at any time during the
#Z-07051 South Towne Square Site Plan Staff Report 6 79
construction to ensure any damages or cleaning that are required are complete. The developer shall
be responsible to reimburse the City for all costs associated with the work if it becomes necessary
for the City to correct any problems that are identified.
3. Conformance with all other applicable laws, ordinances, and regulations
The Final Site Plan will be reviewed to ensure compliance with this section. The proposal conforms
to all other applicable laws, ordinances, and regulations. The plans will be further evaluated against
the requirements of the International Building Code at the time application is made for a Building
Permit and a Floodplain Permit will be required for all improvements within the floodplain
boundary (i.e., trail, landscaping and grading).
4. Relationship of site plan elements to conditions both on and off the property
Existing- The subject property was developed in the 1970’s with a church which was constructed
primarily of brick with a unique octagonal roof form. The primary entrance to the property is
currently from South 3rd Avenue only. The church building has been demolished. The riparian area
has undergone change over the years. Most recently a large amount of fill was placed along the
north side of the riparian corridor.
Proposed- The proposal for the redevelopment of the property is for more contemporary building
designs constructed with multiple types of traditional and neo-traditional materials. The buildings
have been modulated and designed into units that provide relief from the mass and scale of the
buildings. The buildings have been designed on all four sides and present an urban front facade
orientation to both the side walk and interior parking lot. Most buildings include entrances on both
sides of the buildings. There are a total of 5 buildings proposed. Four buildings are proposed at
5,000 square feet in footprint and one proposed at approximately 4,000 square feet with an open
greenspace/square in between the buildings within the parking lot. The existing riparian area will be
preserved. Additional landscaping will also be installed along South 3rd Avenue, Kagy Boulevard and
within the parking lot to integrate the hardscape with the existing softscape adjacent to the creek.
West- The Museum of the Rockies to the west is a large flat roofed brick and stucco contemporary
structure. The museum is by far the largest building in the ½ mile radius. The building is well
integrated and visually relates to the corridor because of the vertical and horizontal modulation of
the building. There is minimal landscaping within the parking lot but some large trees existing
vegetation on the north, south and west sides of the building.
Residences to the North, South & East- The residences to the north, south and east were generally
constructed in the 1960’s and 1970’s, with a couple of exceptions. The homes are one and two story
structures mostly constructed of wood siding. The homes within the subdivision to the south are
oriented inward towards the center of the subdivision with no outward orientation to Kagy
Boulevard or South 3rd Avenue. In contrast the homes along Willson Avenue, to the north of the
subject property, are all oriented to address the street.
Commercial Development to the North- The Rosa’s and the Kagy Corner development (day care, gas
station with convenience store, professional offices, medical offices, dental offices, dry cleaner and
coffeehouse) building designs are typical for commercial development in this area during the late
1980’s. The buildings are somewhat residential in design with peaked roof forms and wood siding.
All of the buildings are oriented towards Kagy Boulevard but with parking between the structures
#Z-07051 South Towne Square Site Plan Staff Report 7 80
and the streetscape. There are one and two story structures within the development and moderate
amounts of landscaping within the parking lot. The Kagy Corner development consists of 8
buildings all of which are detached. The buildings range in size from 2,800 square feet to 12,500
square feet. Most of the buildings have multiple tenants some of which are designed as attached
“side by side” units sharing a common wall. Planning Staff estimates the floor to area ratio for the
South Towne Square Development at 18.5% and 22.72% for the Kagy Corner development.
5. The impact of the proposal on the existing and anticipated traffic and parking
conditions
The traffic study was updated in January 2007 for the Kagy Boulevard (principal arterial street) and
South 3rd Avenue (collector street) intersection. The study suggests that the total uses on site will
generate as many as 2,132 average daily trips. The estimated traffic counts are derived the Institute
of Traffic Engineers manuals and is generally based on gross square footage and specific uses. The
interception of Kagy and South 3rd currently operates at a LOS D.
The Kagy Boulevard access will have full turning movements: right in, right out, left in and left out.
The South 3rd Avenue access will have a median or other Engineering approved device to allow
three out of four turning movements: left out, right in and right out. The left turn in has been
prohibited by the Engineering Office because the ultimate design for the intersection includes a left
turn lane for north bound 3rd onto Kagy that would interfere with the left turn into the site from
South. 3rd.
The minimum parking requirements for the uses on site are as follows: 1 per 300 sf retail and 1 per
250 sf office. The total required for this establishment would be 122 standard parking stalls and 5
disabled accessible spaces. Since the property is implementing a Neighborhood Commercial growth
policy designation the parking is permitted a 20% reduction in parking for retail, 10% for the office.
By definition the parking could be reduced to a minimum of 103 standard parking stalls required.
The applicant has requested two additional allowed reductions. First, a reduction for a transit stop
within 400 feet of the site and landscaping in lieu. The transit stop allows an additional 5%
reduction and a five space reduction is proposed for landscaping in lieu. The site plan depicts 92
standard parking stalls.
6. Pedestrian and vehicular ingress and egress
The primary entrance to the development is from Kagy Boulevard and the second access is on
South 3rd Avenue. The access onto South 3rd Avenue is 360 feet from the projected curb line and
the Kagy Boulevard access is located 480 feet from the projected curb line. The minimum access
separation for the South 3rd Avenue access is 330 feet for full access and the access on Kagy
Boulevard would generally be required to maintain a 660 foot separation.
The applicant has requested a deviation from the access separation distance for the Kagy Boulevard
access. As previously described, the property is not located within an Entryway Overlay District.
The site plan application does not request any relaxations or variances from the City Commission.
However, a request was forwarded to the City Engineer regarding access placement on Kagy
Boulevard. Per Section 18.44.090.H of the U.D.O. access deviations may be approved at the
discretion of the City Engineer. This allowance was originally adopted into the text to provide
flexibility for lots platted prior to adopting wider access separation standards. The City Engineer has
subsequently reviewed the traffic impact study prior to approving the proposed access separation
#Z-07051 South Towne Square Site Plan Staff Report 8 81
distance. The ordinance indicates a 660 foot spacing requirement with a minimum access separation
of 315 feet. The Kagy Boulevard access is located approximately 430 feet from the intersection of
an arterial street and a collector street. The property line is 680 feet from the intersection. The
proposed access has been aligned with the existing break in the median and located as far from the
intersection without conflicting with the watercourse and watercourse setback. In addition, the
Engineering Office has required some median modifications on Kagy Boulevard in order to provide
a dedicated turn lane for westbound traffic turning into the site. The geometry of the median shall
meet AASHTO standards and be approved by the Montana Department of Transportation.
The sidewalk on South 3rd Avenue is currently constructed as a curb walk so there is no boulevard.
A boulevard with grass and street trees would be required with the redevelopment of the site. The
existing sidewalk on Kagy Boulevard is already constructed with a grass boulevard. Street trees
would be required with the redevelopment of the site. The applicant has also depicted a third means
of pedestrian and bicycle access by way of a multi-use trail adjacent to the watercourse. The trail
would provide an ideal connection between the bike lane on South 3rd Avenue and Kagy Boulevard.
Not only will this amenity provide an alternative means of accessing the property it will also create
an environment for social interaction and physical fitness. Comments regarding the trail from the
Gallatin Valley Land Trust have been attached to the staff report. At a minimum the trail will need
to be constructed to a Class II A standard 6-foot in width and within a 25-foot wide public access
easement.
7. Landscaping, including the enhancement of buildings, the appearance of vehicular use,
open space, and pedestrian areas, and the preservation or replacement of natural
vegetation
The wetlands and the riparian vegetation adjacent to the watercourse including the large willow tree
will be preserved under this development proposal. The landscape design is required to meet the
standard of 23 points. The landscape plan currently designates that 27 points are met on site. A
large square has been included within the parking area for this development that will provide
functional outdoor areas on site for patrons and employees of the development. The final landscape
plan will be reviewed during final site plan review for conformance with the requirements of
Chapter 18.48 BMC.
8. Open space
The existing open space adjacent to the watercourse including the watercourse setback, the wetlands
and the floodplain will continue to provide a small pocket of wildlife habitat and open space for the
public, employees, and patrons. In addition to the landscaped yard space and hardscaping on site a
large square has been included within the parking area for this development that will provide
functional outdoor areas. The site plan suggests that the landscaped areas accounts for
approximately 14% of the lot coverage and open space areas account for 37% of the lot coverage.
To guarantee protection of the existing riparian corridor the Planning Staff has suggested two
additional conditions of approval. One, a temporary perimeter fence/barricade should be installed
around the adjacent to the watercourse during construction to protect the creek and adjacent
properties from drifting construction debris. Two, any existing mature vegetation planned for
removal shall be flagged for review and approval by the City Forester and Planning Office prior to
final site plan approval. No mature vegetation shall be removed without prior City approval.
9. Building location and height
#Z-07051 South Towne Square Site Plan Staff Report 9 82
The buildings range in height from 29’ to 43’ in height. The building that is proposed to be 43 feet
in height utilizes a monument clock tower element that is specifically listed as an exception from the
height limits per section 18.38.060.D.2.a of the Bozeman Municipal Code. The exception allows up
to four feet above the height limit. The proposal is currently one foot above the allowed maximum
limit and will need to be reduced in height for the final site plan submittal or the applicant would
need to seek a Conditional Use permit specifically requesting the additional height.
The buildings are located mostly along the street frontage providing enclosure to the street edge.
The exception is the banking facility drive through which interrupts the street wall in this area and
provides a smaller element near the intersection. This parcel is not within the Entryway Corridor
Overlay and is not subject to the provisions of the Design Objectives Plan, although staff looks to
the plan for guidance during site plan reviews for the community’s preferences in site and building
design.
One building is setback from the street and adjacent to the Figgins Creek watercourse. Staff is
recommending a condition to allow a pedestrian/bicycle trail behind the building.
10. Setbacks
The yard setbacks in the B-1 district are 7 feet for the front, 10 feet in the rear and 5 feet on the
sides for buildings. Since the property also fronts on an arterial street there is a 25 foot setback
adjacent to Kagy Boulevard. The parking setbacks in B-1 district are 25 feet for a front yard, ten
feet for a rear yard and 8 feet for side yards.
In addition to the standard yard setbacks this property also has a 50 foot watercourse setback. The
watercourse setback is measured from the high water mark or extended to the floodplain boundary,
whichever is greater. All improvements have been noted outside of the watercourse setback.
Since the property also included nonjurisdictional isolated wetlands the Wetlands Review Board
reviewed the functional assessment for the isolated wetlands within the riparian area. Based on their
analysis the WRB recommended that a 25 foot wide setback should be provided between the
isolated wetland and the back of curb or that a 4 foot high fence should be constructed along the
entire length of the development to prevent garbage, individuals, and dogs from entering the
wetlands. The WRB further suggested that the applicant provide multiple waste stations for dogs.
Staff concurs with the recommendation for waste stations and has included that condition in the
recommended conditions of approval. Staff does not concur with the recommendation to provide a
4’ high fence along the entire north side of Figgins Creek. Staff finds that this fence would be in
conflict with a proposed trail along the watercourse, provide a backside appearance to the
neighborhood, and that the disturbance of installing the fence in this area may outweigh any benefit
the fence may provide. Staff does recommend that adequate area be provided to accommodate a
trail along Figgins Creek. The trail depicted on the plans need to continue past the building rather
than moving into the site where it may conflict with retail pedestrian and vehicular traffic.
11. Lighting
The light fixture details appear to meet the lighting standards. All lighting fixtures must be noted on
the final site plan including wall-mounted lighting and any proposed security lighting. All light
fixtures shall conform to the requirements outlined in the City of Bozeman Unified Development
#Z-07051 South Towne Square Site Plan Staff Report 1083
Ordinance. Additionally, the pole style light must identify the maximum pole height and a final
photometric lighting plan must be submitted for the entire site. Staff has noted a code provision
that all site lighting other than security lighting must be turned off between the hours of 11:00 p.m.
and 6:00 a.m. The maximum allowed light in footcandles allowed at the property line is .03
footcandles.
12. Provisions for utilities, including efficient public services and facilities
The private utilities, water and sewer are located within Kagy Boulevard. Water and sewer are
provided throughout the development with individual building taps in the shared driveways. The
applicant will need to coordinate with Northwest, Qwest, or other private providers for other
services. The utilities and easements need to be coordinated with the landscape plan to ensure no
overlap. No trees are permitted within ten feet of mains and services as noted in the conditions.
13. Site surface drainage
Retention ponds are depicted in three areas within the site. One in the square area within the
parking lot, one at the corner of Kagy and South 3rd Avenue and one at the easternmost access along
Kagy Boulevard. None of the pond areas depicted exceed 1/3 the area of the front yards.
Stormwater runoff calculations will be required as part of the Final Site Plan and any needed grading
for stormwater must be provided.
14. Loading and unloading areas
This project does not meet the threshold to provide an off street loading berth. The applicant has
proposed a loading area. The area reserved for unloading is approximately 80 feet long by 9 feet
wide. Trucks will access the site from Kagy Boulevard, a designated truck route in the Bozeman
Area Transportation Plan.
15. Grading
A grading and drainage plan is required for review and approval by the City Engineering
Department prior to final site plan approval.
16. Signage
All new signage shall require a sign permit and shall be included with the Final Site Plan submittal. A
comprehensive signage plan is required for all commercial multi-tenant complexes.
17. Screening
All rooftop and ground mounted mechanical equipment will have to be screened. Screen details shall
be provided with the final site plan.
18. Overlay district provisions
Not applicable.
19. Other related matters, including relevant comment from affected parties
#Z-07051 South Towne Square Site Plan Staff Report 1184
Public and Agency comment is attached to the staff report. The public comment has centered
around height, viewshed, and Commission jurisdiction issues. One public comment letter directly
proposed conditions for the project. Most of the conditions are related to height requirements.
20. If the development includes multiple lots that are interdependent for circulation or other
means of addressing requirement of this title, whether the lots are either:
a. Configured so that the sale of individual lots will not alter the approved configuration or
use of the property or cause the development to become nonconforming;
b. The subject of reciprocal and perpetual easements or other agreements to which the City
is a party so that the sale of individual lots will not cause one or more elements of the
development to become nonconforming.
Not applicable. The parcel is one lot.
RECOMMENDED CONDITIONS OF APPROVAL
Based on the previous analysis, the DRC, and ADR staff find that the application, with conditions, is in
general compliance with the adopted Growth Policy and the City of Bozeman Unified Development
Ordinance. The following conditions of approval are recommended. Please note that these conditions are
in addition to the required code provisions beginning on Pages 3,4,5, and 6 of this report.
1. A trail shall be provided in the watercourse setback along the entire length of Figgins Creek as it
crosses from South 3rd Avenue to Kagy Boulevard.
2. The trail shall be constructed to a Class IIA standard 6-foot in width, a natural gravel fines
topcourse, and within a 25-foot wide public access easement. The specifications for the trail shall be
identified on the final site plan for review and approval by the Parks Department. A
preconstruction meeting shall be held on site with the Planning and Parks Department prior to
commencing grading and construction of the trial.
3. The applicant shall provide adequate bike parking for the number of expected employees and
customers. The applicant shall consider providing covered bicycle parking to extend the commuting
season.
4. The applicant in consultation with MDT, the City of Bozeman, and Streamline Transit shall locate,
design, and construct a transit stop with seating, lighting, a bike rack, and a shelter on the south side
of Kagy Boulevard frontage east of the intersection with South Third Avenue per section 18.44.120
of the Bozeman Municipal Code.
5. The applicant shall provide a minimum of two waste stations for dog owners adjacent to the
pedestrian trail along Figgins Creek.
6. The trash enclosure located adjacent to the truck loading area shall be relocated to another location
on site away from the isolated wetland. The final location of all locations require the written
approval of the City Sanitation Department.
7. A temporary perimeter fence/barricade shall be installed along the watercourse setback area during
construction to protect the creek and adjacent properties from construction debris.
#Z-07051 South Towne Square Site Plan Staff Report 1285
8. All existing mature vegetation planned for removal shall be flagged for review and approval by the
City Forester and Planning Office prior to final site plan approval. No mature vegetation shall be
removed without prior City approval.
9. Prior to construction a tree protection zone (TPZ) shall be established around the large willow tree
to be preserved. The TPZ shall be as specified and approved by the City Forester. The willow shall
be trimmed by a qualified arborist of dead wood over the construction area, and trimmed so that
branches will not be overhanging the building for 5 years of anticipated growth. Any roots that are
encountered during the construction shall be cut cleanly with a sharp tool. In the spring additional
water shall be given to the tree to accommodate for the root loss.
10. An additional fire hydrant shall be provided along the Kagy Boulevard frontage somewhere between
Building 3 and the Kagy access.
11. An Occupancy Permit must be obtained from the Montana Department of Transportation for
location of water and sewer mains and services within the State's right-of-way, and an Access permit
must be obtained for the drive approach onto Kagy, unless MDT determines they are not required.
12. The median on Kagy shall be reconstructed to provide a dedicated turn lane for westbound traffic
turning into the site. The geometry of the median shall meet AASHTO standards and be approved
by the Montana Department of Transportation.
13. The northbound left turn bay for the ultimate design for the 3rd and Kagy intersection will extend
beyond the proposed access. A median or other traffic control device approved by the City
Engineering Department shall be installed on the South 3rd access to prohibit southbound traffic
from entering the site. All other movements will be allowed from this access.
14. All improvements necessary to provide adequate level of service at the intersections analyzed in the
Traffic Accessibility Study (TAS) must be installed as part of this development unless a variance is
applied for and approved by the City Commission. Approval of the TAS must also be obtained
from the Montana Department of Transportation and for all improvements along Kagy Boulevard.
15. That the applicant upon submitting the Final Site Plan for approval by the Planning Director and
prior to issuance of a building permit, will also submit a written narrative outlining how each of the
conditions of approval and code provisions have been satisfied.
CONCLUSION/RECOMMENDATION
The DRC and Staff have reviewed the Site Plan Application. Staff recommends to the City Commission
approval of said application with the conditions and code provisions outlined in this Staff Report. Staff has
identified various code provisions that are currently not met by this application. Some or all of these items
are listed in the findings of this Staff Report. The applicant must comply with all provisions of the
Bozeman Unified Development Ordinance, which are applicable to this project, prior to receiving Final Site
Plan approval. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the
lawful requirements of the Bozeman Municipal Code or state law.
#Z-07051 South Towne Square Site Plan Staff Report 1386
Attachments: Applicant’s Submittal Materials
Public Comment
Agency Comment
Aerial exhibit
Report Sent to:: Kailo Design and Development, LLC.
9350 Walker Road
Belgrade, MT 59714
Allied Engineering Services, Inc.
32 Discovery Drive
Bozeman, MT 59718
#Z-07051 South Towne Square Site Plan Staff Report 1487
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305